Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9,...

23
Port Everglades Master / Vision Plan Update Presentation to Port Everglades Association July 9, 2010

Transcript of Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9,...

Page 1: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Port EvergladesMaster / Vision Plan Update

Presentation to Port Everglades Association

July 9, 2010

Page 2: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Market Forecast Drives the Plan

Page 2

Containers(TEUs)

Dry/Neo-Bulk(Tons)

Petroleum(Tons)

Cruise(Passengers)

2026 2,734,704 8,028,035 22,489,376 6,986,7112029 2,401,230 7,625,627 16,699,008 5,161,118

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

July 9, 2010

(12%)

(5%)

(25%)

(26%)

Page 3: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Status of 2006 Master Plan Projects

Project StatusMidport Roadway (Eller Drive)Improvements

Completed and in operation

Mobile Harbor Crane at Midport Completed

Cruise Terminal 18 Expansion Completed and in operation

Intermodal Bridge over FPL Canal Opened June 10

Southport Container Yard Improvements Construction to be completed in October 2010

Eller Drive Overpass FDOT Construction procurement begins in 2011

McIntosh Road Improvements Construction procurement begins in 2011

By-Pass Road Design in progressPhase 1 construction procurement begins in Jan 2011Phase 2 construction procurement begins in Sept 2012

Cruise Terminal Improvements at CT 2, CT19, CT 21 and CT 26

In planning

Page 3July 9, 2010

Page 4: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Turning Notch Project

May 4th, 2010 Page 4

Page 5: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Turning Notch Project

May 4th, 2010 Page 5

Phase 11450’ long

Page 6: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Turning Notch Project

May 4th, 2010 Page 6

Phase 22450’ long

Page 7: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

• May 4, 2010 BCC supports the expansionproject

• June 15, 2010 BCC approves agreementwith FDEP on release of ConservationEasement

• Project 1 included in Port’s 5-year CapitalImprovement Program

• Projected Broward County EconomicImpact– 3,843 Local Jobs– $9.4 Million per year in Local Taxes– $173.6 Million per year in Economic Activity

July 9, 2010 Page 7

Turning Notch Project 1 (at Existing Water Depth)

Page 8: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

• No need for Locally Preferred Plan (LPP)

• May 4, 2010 BCC supports continuingwith fully funded ACOE study

• ACOE schedule calls for– May 2011 – Draft Feasibility Study Released

for Public Comment– Nov 2012 - Design Start– Jan 2015 - Construction Start

• Projected Broward County EconomicImpact– 1,037 Local Jobs– $2.6 Million per year in Local Taxes– $43.3 Million per year in Economic Activity

July 9, 2010 Page 8

Turning Notch Project 2

Page 9: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Conservation Easement – Upland Enhancement

• 8.68 acres is replacedwith approximately 16.5acres

Page 9July 9, 2010

8.68acres

Page 10: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Conservation Easement – Upland Enhancement

• 8.68 acres is replacedwith approximately 16.5acres

Page 10July 9, 2010

16.5acres

8.68acres

Page 11: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Conservation Easement – Upland Enhancement

• 8.68 acres is replacedwith approximately 16.5acres

Page 11July 9, 2010

• Conservation Easementbecomes approximately60 acres of Fee SimpleArea

16.5acresFee Simple Transfer Area

60 Acres

8.68acres

Page 12: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

5-year Master Plan

Page 12July 9, 2010

Page 13: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Page 13July 9, 2010

Page 14: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Page 14July 9, 2010

Page 15: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Page 15July 9, 2010

Page 16: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

5-year Bulkhead Projects

Page 16July 9, 2010

Page 17: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

10-year Vision Plan

July 9, 2010 Page 17

Page 18: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

10-year Bulkhead Projects

Page 18July 9, 2010

Page 19: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

20-year Vision Plan

July 9, 2010 Page 19

Page 20: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

20-year Bulkhead Projects

Page 20July 9, 2010

Page 21: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Cost Comparison of 2009 vs. 2006 Master Plans

July 9, 2010 Page 21

2009 Cost ($M)

2006 Cost($M)

5-Year Master Plan 464$ 395$10-Year Vision Plan 585$ 737$20-Year Vision Plan 552$ 810$

Total 1,601$ 1,942$

Page 22: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

Upcoming Master Plan Presentations

• Stakeholders Briefing at Port Everglades on July 29,9:00 a.m, Terminal 29

• Public Meeting on August 31, 5:30 – 7:30 p.m.,Public Library Downtown

Page 22July 9, 2010

Page 23: Port Everglades Master / Vision Plan Update · Presentation to Port Everglades Association July 9, 2010. Market Forecast Drives the Plan Page 2 Containers (TEUs) ... 2010 Page 3.

All Great Projects Begin in a Master Plan!

Page 23July 9, 2010