Pooling Cost Determination Change of Operator Eric R. King Week Four September 15, 2011

description

Pooling Cost Determination Change of Operator. Week Four September 15, 2011. Eric R. King. The Forced Pooling Statute. In order to avoid the drilling of unnecessary wells To protect correlative rights Prevent economic waste - PowerPoint PPT Presentation

Transcript of Pooling Cost Determination Change of Operator

Page 1: Pooling Cost Determination Change of Operator

PoolingCost DeterminationChange of Operator

Eric R. King

Week FourSeptember 15, 2011

Page 2: Pooling Cost Determination Change of Operator

The Forced Pooling Statute

• In order to avoid the drilling of unnecessary wells

• To protect correlative rights

• Prevent economic waste

May require owners to pool and develop the lands in the spacing unit as a unit

Page 3: Pooling Cost Determination Change of Operator

OAC 165:5-7-7: Pooling

Page 4: Pooling Cost Determination Change of Operator

OAC 165:5-15-3:Pooling Orders

Page 5: Pooling Cost Determination Change of Operator

May your negotiations as a Landman on values be as sharp

as this couple’s math.

Page 6: Pooling Cost Determination Change of Operator

(g) Notice of hearing for a redetermination of well costs shall be as provided in the initial application. Such request shall be in the form of a motion filed under the original CD number of the pooling.

Cost Determination “Motion”

OAC 165:5-7-7(g)

Page 7: Pooling Cost Determination Change of Operator

Pooling Cases

• Pooling cases summarized– Be sure and review case number 52 and

53 involving Harding and Shelton.

Page 8: Pooling Cost Determination Change of Operator

• Since 1960 the Commission has ruled that participants may share in force-pooled acreage

• The Right to Share is an equitable right• Randy Specht the Commission Appellate

Referee has suggested the time is ripe to make this issue the subject of a rulemaking. See alsoMichael L. Decker’s article, In Search of a Visage of Truth – Rulemaking or Adjudication at the Corporation Commission, 60 OBAJ 2655 (1989)

Participant’s Right to Share in Force Pooled Acreage

Page 9: Pooling Cost Determination Change of Operator

Strategy in Enforcing Such Right

Page 10: Pooling Cost Determination Change of Operator

Unusual Overburdened Transactions

1. 1/4 royalty

2. Bonus of $500 per acre to be paid within 2 years of execution of lease

3. 100% back-in after payout

4. Request for statutory bond allegedly available under 52 O.S. Sec 87.1 (allegedly allows for deduction of completed well costs from production – but makes no provision for payment in the event of a dry hole)

Page 11: Pooling Cost Determination Change of Operator

Unusual Overburdened Transactions

1. 40% burdened leases delivering a 60% NRI

Page 12: Pooling Cost Determination Change of Operator

We are fortunate to have captured the reaction of a news anchor regarding the acceptance of the

unusual overburdened transactions

Page 13: Pooling Cost Determination Change of Operator

Overburdened Transactions

Page 14: Pooling Cost Determination Change of Operator

The Treatment of Excessively Burdened

Working Interests Under a Pooling Application

Page 15: Pooling Cost Determination Change of Operator

See “A Primer on Forced Pooling of

Oil and Gas interests in Oklahoma”

by Charles Nesbitt, 50 O.B.J. 648 (1978)

Page 16: Pooling Cost Determination Change of Operator

A clip that explains the hierarchy at the Corporation Commission

Page 17: Pooling Cost Determination Change of Operator

Commissioners Mineral Owners and Oil Companies

The Lawyers

Page 18: Pooling Cost Determination Change of Operator

Change of Operator 165: 5-7-11

Page 19: Pooling Cost Determination Change of Operator

Sample Forms

Page 20: Pooling Cost Determination Change of Operator

Eric R. KingOne Leadership Square, 15th Floor

211 N. Robinson Ave.

Oklahoma City, OK 73102

(405) 235-5518