Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec. 2010 Draft Amendments to the Polk 2035 Mobility Vision Plan (MVP) Steering Committee - January 28, 2010 Polk Transportation Planning Organization 2035 Mobility Vision Plan

description

Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec The Citizens’ and Technical Advisory Committees approved these draft amendments during their last respective meetings. TPO staff recommends approval of the draft amendments as presented to open the 45-day public comment period. LLLLL

Transcript of Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec. 2010 Draft Amendments...

Page 1: Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec. 2010 Draft Amendments to the Polk 2035 Mobility Vision Plan (MVP) Steering.

Polk Transportation Planning Organization2035 Mobility Vision Plan

Nov./Dec. 2010

Draft Amendments to thePolk 2035 Mobility Vision Plan (MVP)

Steering Committee - January 28, 2010

Polk Transportation Planning Organization2035 Mobility Vision Plan

Page 2: Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec. 2010 Draft Amendments to the Polk 2035 Mobility Vision Plan (MVP) Steering.

MVP Proj #

Project Location Phase Adopted 2035 MVP

FDOT Draft Tentative Work

Program

Amount($1,000)

Proposed 2035 MVP Amendment

300B & 300C

Central Polk Parkway

New 6-Lane Highway from US 17/92 to I-4 including a new interchange @ I-4.

Design 2016-2020 2013/14 $3,512 Design needs to be changed from 2016-2020 to FY 2013/14.

300A & 299

Central Polk Parkway

New 6-Lane Highway from SR 570 to SR 60 and from SR 60 to 17/92

Design Unfunded 2012/13 &2013/14

$34,372 Design is not funded in the MVP. Change plan to include Design in FY 2012/13 & 2013/14.

201 State Road 542(Phase I)

2 to 3-Lane widening between First Street & Buckeye Loop Rd.

ROW Committed 2016/17 $15,839 The MVP shows right-of-way as a committed phase. Project needs to be shown in FY 2016/17.

96 US 17/92 2 to 4-Lane widening between 10th & 17th St.

PD&E 2021-2025 2016/17 $700 PD&E was shown in 2021-2025. Project is now funded in 2016/17.

4 US 98 4 to 6-Lane Widening between Edgewood Drive & Main Street.

PD&E/Design

2021-2025 2011/12 $5,100 PD&E & Design is shown in 2021-2025. Project is now funded in FY 2011/12.

108 US 27 4 to 6-Lane Widening between Ritchie Rd and Barry Rd.

CST 2014/15 2011/12 $16,225 CST was shown in 2015. FDOT has funded the project in FY 2011/12.

Total $75,748  

MVP Proj #

Project Location Phase Adopted 2035 MVP

FDOT Draft Tentative Work

Program

Amount($1,000)

Proposed 2035 MVP Amendment

HSR Florida High Speed Rail

Downtown Tampa to Orlando International Airport

CST Committed($2.65B)

Not Funded $0 In order to be consistent with FDOT’s adopted Work Program and the TPO’s adopted TIP, this project needs to be reflected as an unfunded need in the 2035 MVP as it is no longer a funded project.

Total $0  

Highway Projects

Transit Projects

Polk 2035 Mobility Vision Plan (MVP) Proposed Amendments

Page 3: Polk Transportation Planning Organization 2035 Mobility Vision Plan Nov./Dec. 2010 Draft Amendments to the Polk 2035 Mobility Vision Plan (MVP) Steering.

Polk Transportation Planning Organization2035 Mobility Vision Plan

Nov./Dec. 2010

The Citizens’ and Technical Advisory Committees approved these draft

amendments during their last respective meetings.

TPO staff recommends approval of the draft amendments as presented to open the

45-day public comment period.