Pmi - Sam1 (Star Tcc)

download Pmi - Sam1 (Star Tcc)

of 1

Transcript of Pmi - Sam1 (Star Tcc)

  • 8/17/2019 Pmi - Sam1 (Star Tcc)

    1/1

    R-BACKUS - LG

    7.21kA @ 10kV

    (Asym)

    R-BACKUS - G

    Trip 4

    R-BACKUS - GTrip 3

    R-BACKUS - G

    Trip 2

    R-BACKUS - G

    Trip 1

    10K.5 1 10 100 1K5 50 500 5K

     Amps X 10 PMI (Nom. kV=10, Plot Ref. kV=10)

    10K.5 1 10 100 1K5 50 500 5K

     Amps X 10 PMI (Nom. kV=10, Plot Ref. kV=10)

    1K

    .01

    .1

    1

    10

    100

    .05

    .5

    5

    50

    500

           S     e     c     o     n       d     s

    1K

    .01

    .1

    1

    10

    100

    .05

    .5

    5

    50

    500

     S  e c  on d   s 

    ETAP Star 12.6.0H

    PMI - SAM1

    Project: Coordinacion Playas del Sur 

    Location: Cañete

    Contract: Luis Alata Contreras

    Engineer: Ing. César Chilet

    Fault: Ground

    SAM 1

    10 kV

    PMI

    10 kV

    MT210 kV

    TRAMO 2

    O-->I R-BACKUS

    TRAMO 3

    F-SAM1

    R-BACKUS