R-BACKUS - LG
7.21kA @ 10kV
(Asym)
R-BACKUS - G
Trip 4
R-BACKUS - GTrip 3
R-BACKUS - G
Trip 2
R-BACKUS - G
Trip 1
10K.5 1 10 100 1K5 50 500 5K
Amps X 10 PMI (Nom. kV=10, Plot Ref. kV=10)
10K.5 1 10 100 1K5 50 500 5K
Amps X 10 PMI (Nom. kV=10, Plot Ref. kV=10)
1K
.01
.1
1
10
100
.05
.5
5
50
500
S e c o n d s
1K
.01
.1
1
10
100
.05
.5
5
50
500
S e c on d s
ETAP Star 12.6.0H
PMI - SAM1
Project: Coordinacion Playas del Sur
Location: Cañete
Contract: Luis Alata Contreras
Engineer: Ing. César Chilet
Fault: Ground
SAM 1
10 kV
PMI
10 kV
MT210 kV
TRAMO 2
O-->I R-BACKUS
TRAMO 3
F-SAM1
R-BACKUS