PLEIADES RACURS International Conference October 2009.

22
PLEIADES RACURS International Conference October 2009

Transcript of PLEIADES RACURS International Conference October 2009.

Page 1: PLEIADES RACURS International Conference October 2009.

PLEIADES

RACURS International Conference

October 2009

Page 2: PLEIADES RACURS International Conference October 2009.

© Spot Image 20082

PLEIADES data, Very High Resolution imagery (VHR)

0.5m color

0.5m pan2m color

Page 3: PLEIADES RACURS International Conference October 2009.

© Spot Image 20083

PLEIADES, largest swath on the market place

PLEIADES

20 x 20 Km

60 x 60 KmSPOT

WorldView

17 x 17 Km

GeoEye

15 x 15 Km

For the same 0.5m GSD

Page 4: PLEIADES RACURS International Conference October 2009.

© Spot Image 20084

PLEIADES Terminal: Standard image products

50 cm B&W 8 or 16 bits

2 m colour 4 bands : B, R, G, NIR 8 or 16 bits

Pan Sharpened 50 cm colour 4 bands : B, R, G, NIR 3 bands in True or False colours 8 or 16 bits

Bundle : 50 cm B&W + 2 m colour bands 8 ou 16 bits

Product level SENSOR 1A level

radiometric corrections Perfect P and XS registration Localization accurracy: spec.7m (CE90)

ORTHO Geo-Location accurracy: spec.7m (CE90)

Page 5: PLEIADES RACURS International Conference October 2009.

© Spot Image 20085

PLEIADES 1-A

180°

PLEIADES 1-B

Twin satellite constellation

1-A: March 2010

1-B: +12 to 18 months

Page 6: PLEIADES RACURS International Conference October 2009.

© Spot Image 20086

PLEIADES constellation: key performances

Daily Revisit @<1m

1,000,000 km² per day

Top-level agility

200 km in 11 sec.

800 km in 25 sec.

Slew Time

Page 7: PLEIADES RACURS International Conference October 2009.

© Spot Image 20087

PLEIADES constellation: acquisition modes

typically 15 targets over 1,000 km

Multiple Point Targets

High-level agility

20 km

20 km

Same - pass Large Collection

Stereo, Tri-stereo

Up to 21,600 km²Or

1 deg²

In a single pass

Page 8: PLEIADES RACURS International Conference October 2009.

© Spot Image 20088

PLEIADES image processing: AOI sub-scene production

Multiple Point Targets

20 km

20 km

Page 9: PLEIADES RACURS International Conference October 2009.

© Spot Image 20089

PLEIADES image processing: Seamless same-day ortho-mosaic product

Same- pass Large Collection

Page 10: PLEIADES RACURS International Conference October 2009.

© Spot Image 200810

Illustration over Japan

Multiple Target imaging time~20%

Same-pass large collection

imaging time~40 to 80%

Page 11: PLEIADES RACURS International Conference October 2009.

© Spot Image 200811

PLEIADES: a dual access to data

10% High Priority Data (HPD) for Defense partners: France, Italy, Spain

90% for WW users through Spot Image

350 images/ day

~35 images HPD/ day

Access rights

Spot Image get access to up to 5 HPD

images / day for Pleiades-1A

Page 12: PLEIADES RACURS International Conference October 2009.

© Spot Image 200812

Routine: Centralized programming loop

Dialogue with Spot Image, as for SPOT Feasibility study

Standard Priority level Can be upgraded to Priority or Dedicated Priority (so-called DUAL High

priority data)

60 days Routine:

72 hours

Collection window

Routine Programming mode

Dead-Line for request

Page 13: PLEIADES RACURS International Conference October 2009.

© Spot Image 200813

DRS or Customer

Order RequestOrder Confirmation

Telemetry downlink

2Ghz networl

Collection plan upload

Collection

direct reception & processing

Collection plan

Routine: nominal centralized programming loop

Routine

Page 14: PLEIADES RACURS International Conference October 2009.

© Spot Image 200814

Routine

Priority level Upgrade

StandardDedicated

PriorityPriority

Routine programming priority level upgrade

Upgrade in case of conflict

To Priority: when conflicting with other routine request To dedicated priority: when conflicting with other priority request...

Or when depositing the request for time-critical or important data

Page 15: PLEIADES RACURS International Conference October 2009.

© Spot Image 200815

Urgent: 24/7 automatic procedure for deposit

No dialogue with Spot Image, except if requested during working days/hours

Up to 4 hours before collection

Limited AOI

Priority level

Dead-Line for Request Collection window

7 daysUrgent:

4 hours

Urgent Programming mode

Page 16: PLEIADES RACURS International Conference October 2009.

© Spot Image 200816

Urgent: 24/7 automatic procedure

6:00 UT13:40 UT 23:20 UT

Ability to take in account Urgent programming up to 4 hours before collection

24/7 access through automatic process with no intervention from Spot Image

collection plan update and upload 3 times a day, every 8 hours

Page 17: PLEIADES RACURS International Conference October 2009.

© Spot Image 200817

PLEIADES vs. competitors

Non-US VHR solution

90% of the resource available for Spot Image customers

Field-Proven Services Experience of station customer& station network management Full range of programming services up to direct tasking

Competitive pricing

Twin Constellation performance Top agility P and XS simultaneous collection Largest swath for same [email protected]

Page 18: PLEIADES RACURS International Conference October 2009.

© Spot Image 200818

PLEIADES vs. competitors: technical assets

Mission A constellation of 2 identical Pleiades satellites ensuring daily revisit of any

point of the globe Continuity of service : beyond 2018 Dual mission but…95% of satellite data for worldwide end-users

50% for GE-1, 15-30% for WV1…

Imaging capacity Large imaging capacity: 500,000km2 /day /satellite (roll<30°) Scene size 20 x 20 km with GSD 0.7m vs. 15x15 km with 0.5m for GE or 17 x17

for WV Permanent Pan + XS imaging mode, no « slowdown » Agility: very large mono-pass capacity

Pleiades more agile than GE-1(x2), same as WV Tri-stereo

Services High level of reliability and operationality ( SPOT legacy) Mosaic , pan-sharpened and 3D products as output of standard PHR archiving

& processing system

0

50

100

1er trim.

Data availibility for market

W V-1

GE-1

PHR

15

15

20

Page 19: PLEIADES RACURS International Conference October 2009.

© Spot Image 200819

18 sec

200 km

IKONOS

9 sec

200 km

WorldView-2

Pleiades and WorldView benefit from Control Moment Gyros (CMGs) that provide an acceleration >10X better than competition

20 sec

200 km

GeoEye-1

PLEIADES vs. competitors: Agility Comparison

11 sec

200 km

Pleiades

No CMG With CMG

Page 20: PLEIADES RACURS International Conference October 2009.

© Spot Image 200620

Pleaides + Spot 6: a bright EO constellation in orbit…very soon

Spot 6 (left) and 2 Pleiades (right) ready to span their wings, phased on the same orbit …with unique advantages:

-coherent data collection planning by Spot Image as unique commercial satellite operator

-2+1 optical LEO systems having same imaging bands and fully compatible ground image reception and processing

-60km swath

-2m ground resolution

-800km corridor view -20km swath

-0.5m ground resolution

-800km corridor view

Page 21: PLEIADES RACURS International Conference October 2009.

© Spot Image 200621

PLEIADES 1-A

SPOT 6

PLEIADES 1-B

97°

103° SPOT 7

PLEIADES + Spot 6/7 constellation in 2012

Page 22: PLEIADES RACURS International Conference October 2009.

© Spot Image 200622

Contact :[email protected]

Thank you !