Plaster Works
Transcript of Plaster Works
-
8/12/2019 Plaster Works
1/79
1
Plasterworks
There is always something tocover up.
-
8/12/2019 Plaster Works
2/79
2
Plaster provides
A smooth surface
Sound insulation
Moisture insulation
-
8/12/2019 Plaster Works
3/79
3
Mixture 1:1:6
-
8/12/2019 Plaster Works
4/79
4
Lime
Lime gives the smooth white surfacedesired for walls.
Lime bonds with concrete and bricks
Without lime the plaster would be rough.
-
8/12/2019 Plaster Works
5/79
5
Lime Preparation
Lime needs to be dissolved in water a dayahead, otherwise it will not mix
smoothly with sand. Build a tub or usea number of barrels to mix lime withwater for the next day.
-
8/12/2019 Plaster Works
6/79
6
Lime Tub
-
8/12/2019 Plaster Works
7/79
7
Plastering a Wall
Makes Life smoother
-
8/12/2019 Plaster Works
8/79
8
You need
2m
7..10cm
A Straight Edge made ofplaned wood or aluminum
-
8/12/2019 Plaster Works
9/79
9
A Gauging Trowel
-
8/12/2019 Plaster Works
10/79
10
Finishing Trowel
-
8/12/2019 Plaster Works
11/79
11
Sponge Rubber Float
-
8/12/2019 Plaster Works
12/79
12
Make yourself a Float
This wooden plank with the handle is ideallysuited for floating, plastering and leveling
(60X15X2cm plank)
The thickness of the handle should be 4cm
-
8/12/2019 Plaster Works
13/79
13
External Angle Trowel
-
8/12/2019 Plaster Works
14/79
14
Internal Angle Trowel
-
8/12/2019 Plaster Works
15/79
15
Lath Hammer
-
8/12/2019 Plaster Works
16/79
16
Water and Brush
-
8/12/2019 Plaster Works
17/79
17
Mortar Mixing Tray
Be a professional. Work withproper tools.
-
8/12/2019 Plaster Works
18/79
18
Make yourself a tray
80
100
32
140
-
8/12/2019 Plaster Works
19/79
19
You need two boards
Thickness 20 mm
-
8/12/2019 Plaster Works
20/79
-
8/12/2019 Plaster Works
21/79
21
And a Bottom Board
76
36
Thickness 20 mm
-
8/12/2019 Plaster Works
22/79
22
And prepare your mortar
-
8/12/2019 Plaster Works
23/79
23
Portable Scaffolding
Be a professional
-
8/12/2019 Plaster Works
24/79
24
Make yourself a Donkey
130
150
50
12
30
75o
24mm
Planks
-
8/12/2019 Plaster Works
25/79
25
Draw the Shape on the Floor
130
150
50
12
30
75o
-
8/12/2019 Plaster Works
26/79
-
8/12/2019 Plaster Works
27/79
27
Mark the lengths and angles
C h l k d i i
-
8/12/2019 Plaster Works
28/79
28
Cut the planks and positionthem again
-
8/12/2019 Plaster Works
29/79
-
8/12/2019 Plaster Works
30/79
30
Nail all gussets on the frame
M k th F b t
-
8/12/2019 Plaster Works
31/79
31
Make another Frame butdifferent
130
150
50
18
75o
12
-
8/12/2019 Plaster Works
32/79
-
8/12/2019 Plaster Works
33/79
-
8/12/2019 Plaster Works
34/79
-
8/12/2019 Plaster Works
35/79
35
Add the other leg
-
8/12/2019 Plaster Works
36/79
36
Nail the gussets
S it ith th
-
8/12/2019 Plaster Works
37/79
37
Secure it with another crossbrace
See ho the t o f me e
-
8/12/2019 Plaster Works
38/79
38
See how the two frames areinterlocked
1
2
-
8/12/2019 Plaster Works
39/79
39
As next we need the braces
150
90
30
34cm
58cm
80cm
-
8/12/2019 Plaster Works
40/79
40
Cut the braces 45o
34cm58cm
80cmLength
You need 4 Nos. of each length
-
8/12/2019 Plaster Works
41/79
41
Nail the Braces into Position
-
8/12/2019 Plaster Works
42/79
42
50X50
Braces and Legs
The innercrossbraces arenot shown
-
8/12/2019 Plaster Works
43/79
43
With 2 Donkeys and a Plank
40mm Plank
It will be safe to climb
-
8/12/2019 Plaster Works
44/79
44
Start
How to get it straight
The Plaster Thickness should
-
8/12/2019 Plaster Works
45/79
45
The Plaster Thickness shouldAverage 20mm
-
8/12/2019 Plaster Works
46/79
46
Fix Pegs on to the Wall
Small pieces oftiles, glass etc
-
8/12/2019 Plaster Works
47/79
47
Level the pegs vertically
-
8/12/2019 Plaster Works
48/79
48
and with the straight edge
horizontally
-
8/12/2019 Plaster Works
49/79
49
Throw a 10mm Layer on anarea of 1sqm with a trowel
-
8/12/2019 Plaster Works
50/79
50
This is to create a bonding layer on thewall
If the ground is concrete increase thelime and cement ratio; It will stickbetter to a smooth surface
Do not work on a larger area than 1sqm. You will not be able to control thesetting time and level the plaster
-
8/12/2019 Plaster Works
51/79
51
Velocity
The velocity created by throwing makesthe mortar stick to the surface.
Do not smoothen the surface
The next layer will stick better to arough surface
-
8/12/2019 Plaster Works
52/79
-
8/12/2019 Plaster Works
53/79
53
Apply another layer withthe float
Plaster by adding layer by layer,building the plaster up to itsrequired thickness and evenness.
-
8/12/2019 Plaster Works
54/79
54
Apply another layer with
the float
This time, use the float to add onlayers.
Put the mortar on the float and pressit on the wall by moving
horizontally and then slowlyupwards.
-
8/12/2019 Plaster Works
55/79
-
8/12/2019 Plaster Works
56/79
56
Wait againuntil the mortar sets in
-
8/12/2019 Plaster Works
57/79
-
8/12/2019 Plaster Works
58/79
58
Level the Plaster Surface
Scrape the surface with the straight edge
horizontally and vertically and remove bumps.
Start always from the guide points moving in alldirections to level the plaster.
-
8/12/2019 Plaster Works
59/79
59
Water the area with a brush
If an area becomes toohard and cannot bescraped with the straight
edge apply some waterwith the brush
The water will soften the
lime and cement andallow bumps be cut off
-
8/12/2019 Plaster Works
60/79
60
Fill up the lower areas
-
8/12/2019 Plaster Works
61/79
-
8/12/2019 Plaster Works
62/79
62
Float the area
Now its time to use the float.
Floating means moving the float over thearea in wide circles to level the surfaceentirely.
Wet first the plaster with the brush.
-
8/12/2019 Plaster Works
63/79
-
8/12/2019 Plaster Works
64/79
64
Water the area with a brush
If the mortar becomes hard water theplaster with a brush to soften theplaster
Control the softness of the plaster intime before it hardens entirely.
-
8/12/2019 Plaster Works
65/79
65
Equalise Joints
Level with adjoining areas.
The joints must be equalised nowotherwise it will be too late.
Scrape off the bumps or add some
mortar. Wet the joints and smoothenthem fully with the float.
-
8/12/2019 Plaster Works
66/79
66
Rubber Sponge Floating
If the plaster is even the next step is
floating of cement waterApply cement water on the surface andfloat it with the rubber sponge float to
smoothen the surface
-
8/12/2019 Plaster Works
67/79
67
Apply Lime
Prepare with lime and water a paste
Apply this paste onto the surface with afinishing trowel
-
8/12/2019 Plaster Works
68/79
68
Outside or Inside?
Outside walls are kept rough.They arenot rubber floated.
-
8/12/2019 Plaster Works
69/79
69
Floor rendering
-
8/12/2019 Plaster Works
70/79
-
8/12/2019 Plaster Works
71/79
71
Cement Pegs on the Ground
at Finish Level
-
8/12/2019 Plaster Works
72/79
72
Pour the Mixture 1:4
-
8/12/2019 Plaster Works
73/79
73
Distribute the Mixture evenly
with the Straight Edge
Distribute the Mixture evenly
-
8/12/2019 Plaster Works
74/79
74
st bute t e tu e e e ywith the Straight Edge
-
8/12/2019 Plaster Works
75/79
75
Level the Surface
-
8/12/2019 Plaster Works
76/79
76
Let the Cement Set In
-
8/12/2019 Plaster Works
77/79
77
Float the Surface
-
8/12/2019 Plaster Works
78/79
78
Smoothen the surface with
the finishing trowel
-
8/12/2019 Plaster Works
79/79
Application
This rendering is good for
Carpets
Tiling etc