PLANNING PROCESS
FOR
INTEGRATED NATURAL RESOURCE MANAGEMENT
O/o. Commissioner, Rural Development,Andhra Pradesh, Hyderabad.
RD Programmes focusing on NRM
• Watershed Development Programmes.
• Comprehensive Land Development
Programnme (INDIRA PRABHA).
• National Rural Employment Guarantee Scheme
– Andhra Pradesh.
Objectives of INRM Planning
• Village Saturation-cover entire area
• Avoid repetition of planning process for each
scheme.
• Avoid overlapping/duplication of works.
• Make different programmes complimentary to
each other- fill gaps
Purpose of INRM Planning
• To prepare exhaustive list of NRM works for
saturating the village lands.
•To get a perspective plan for EGS.
•To identify works / treatment to be taken up
under watershed development projects.
•To identify all works to develop assigned lands
and SC/ST patta lands.
•To restore and strengthen all water bodies.
Planning Strategy Planning Strategy
• Entire Village/GP saturation approach• Cluster based approach with TA as
facilitator• Strictly following PNP in case of
assigned lands and lands of SC/ST and Survey number wise works identification in other cases
Planning Strategy Planning Strategy
• Gram Sabha on the last day in every GP
• Compilation and estimation input data sheets
• Compilation at generation of estimates at MCC using RAGA software
• Take approval of GP
Information / Documents to be collected before taking up INRM Planning
• Village Information.
• Total Area, Wastelands, Area under Cultivation,
Assigned lands, Common Property Resources, Water
bodies, Wells, Types of Soils.
• Population details, Livestock.
• Community Based Organisations,
• Crops, yield particulars. Contd….
Information / Documents to be collected before taking up INRM Planning (Contd…..)
• Cadastral Map / Survey of India Topo Sheet.
• Treatment maps of completed / ongoing programme.
• Action Plans of Watershed / CLDP.
• EGS Shelf of works.
• List of works completed earlier under other programmes.
Preparatory Works
• Advance intimation to village with schedule.
• Orientation meeting (Grama Sabha) involving
GP / CBOs, Farmers, all villagers etc.
• Small Group meetings.
Time Plan for INRM Planning
• Hold meeting with GP Sarpanch, Ward members,
Farmers, Assigned land holders, land less poor, wage
seekers (Labour groups), VO members, watershed
committees, VSS members, WUA members, Rythu Mithra
Groups etc and explain the purpose and methodology of
preparing village comprehensive NRM.
• PRA Exercise for preparing Resource Map etc.
Day-1
Contd…
Time Plan for INRM Planning
• Conduct field visit to the different parts of village along with
villagers to identify and list out works under various
categories and collect measurements & fill up the input
data sheets for such works.
Day - 2, 3 & 4
Day - 5
• Consolidation and finalization of plan / prioritization of
works and taking the approval of Grama Sabha.
Categories of works under INRM
• Assigned Land Development.
• Ridge Area Treatment.
• Rainfed Agriculture Land Development.
• CPR Development.
• Drainage Line treatment.
Contd……
Categories of works under INRM (Contd..)
• Restoration of existing water bodies (IB&PR tanks
canals).
• Maintenance of watershed works.
• Raising of Tree plantations in Institution &
households.
• Raising of Nurseries.
• Waterlogged areas / flood affected areas.