Planning Guide English r2
-
Upload
james-chan -
Category
Documents
-
view
220 -
download
0
Transcript of Planning Guide English r2
-
7/28/2019 Planning Guide English r2
1/23
Planning Guide
PlanningG
uide
SIGMA constantly endeavors to improve products so that information in this catalog is subject to change without notice.
2010. 06 Printed in Korea / Revision No. 2
-
7/28/2019 Planning Guide English r2
2/23
Established in 1995 Accumulated Sales (as of 2007)
- over 160,000 units
The Design Center in Korea provides
perfect customer satisfaction by meeting
any customer needs
SIGMA has been serving you in more
than 70 countries around the world for
over 35 years
The Design Center SIGMA in the world
Your partner for Elevator
The Changwon Factory in Korea which is
referred as the single largest elevator
plant provides one-stop manufacturing
of high quality
Annual production Capacity (as of 2007)
- Elevator : 15,000 units
The Changwon Factory
-
7/28/2019 Planning Guide English r2
3/23
Distributed Inverter(Di) control drastically improves reliability and
performance of elevators. By adopting Di control, the control
panel size has been reduced by 46% not to mention wiring and
installation time. The formation of high efficiency and
compactness allows the traction machine to save energy by 50%
and provide installation space.
SIGMAs sophisticated, state-of-the-art fuzzy logic reduces
waiting time and enhances performance efficiency at a particular
moment, depending on its location, direction, load and the overall
passenger calls currently on the system. SIGMAs modernmicroprocessor technology can be used to optimize group
performance to satisfy high customer standards.
SIGMA provides best-in-class ride quality on every lift we install.
High switching speed of power device in the drive(IGBT) reduces
motor noise. Moreover, door operator with VVVF control ensures
silent door movement. The result of modern technology allowsSIGMA to reduce vibration and noise to a minimum level.
Customers define luxury as a swift, smooth and silent ride. Our
seamless interface between tenant requirements and elevator
performance meets the exact standards and higher expectation
of customers.
Ride Comfort
Energy &
Space Saving
SIGMA Elevator companys number one priority is safety. Our basic spirit to ensure safety
is through control technology such as back-up solution, safety drive operation and morethan 10 other safety devices.
We execut e more than 30 kinds of reliab ility tests . These intense quality assurance
programs make fool-proof products from design stage.
Through SIGMA Net which monitors elevator, escalator and movingwalks by internet-
based software, our elevator not only provides a comprehensive and easy-to-use interface
but also brings perfect quality to reality.
Safety & Reliability
EMI Test(Electro Magnetic Interference)
Vibration andDropping Test
ESD Test(Electro Static Discharge)
Burst Test
-
7/28/2019 Planning Guide English r2
4/23
-
7/28/2019 Planning Guide English r2
5/23
-
7/28/2019 Planning Guide English r2
6/23
-
7/28/2019 Planning Guide English r2
7/23
-
7/28/2019 Planning Guide English r2
8/23
Entrance Details Entrance Details
14 _ Planning Guide Planning Guide _ 15
SectionB-B
Front View of Entrance
SectionA-A
Building Structure Plan (Normal Button)
Narrow Jamb without Transom Panel
SectionB-B
Front View of Entrance
SectionA-A
Building Structure Plan (Normal Button)
S-Type Wide Jamb with Transom Panel
Building Structure Plan (Slim Type Button) Building Structure Plan (Slim Type Button)
MIDRISE
MIDRISE
Note 1. Hdimension in building structure plan depends upon the type of hall indicator selected.
2. Unit : mm
Note 1. Hdimension in building structure plan depends upon the type of hall indicator selected.
2. Unit : mm
-
7/28/2019 Planning Guide English r2
9/23
Entrance Details Entrance Details
16 _ Planning Guide Planning Guide _ 17
SectionB-B
Front View of Entrance
SectionA-A
Building Structure Plan
T-Type Jamb with Transom Panel T-Type Jamb with Transom Panel (MUSE Top Floor)
SectionB-B
Front View of Entrance
SectionA-A
Building Structure Plan (Normal Button)Building Structure Plan (Slim Type Button) Building Structure Plan (Slim Type Button)
MIDRISE
MIDRISE
Note 1. Hdimension in building structure plan depends upon the type of hall indicator selected.
2. Unit : mm
Note 1. Hdimension in building structure plan depends upon the type of hall indicator selected.
2. Unit : mm
-
7/28/2019 Planning Guide English r2
10/23
Overhead, Pit Depth & Machine Room HeightElevator Layouts
18 _ Planning Guide Planning Guide _ 19
Passenger Elevator Passenger Elevator
Overhead, Pit Depth & Machine Room Height
1.0
1.5
1.75
1.0
1.5
1.75
1.0, 1.5, 1.75
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
L 1020
4550
4600
4750
4800
4950
5000
1500
1600
1800
1800
2100
2100
2200
2400
4200
4250
4400
4450
4600
4650
1450
1550
1600
1700
1700
1850
2200
2400
4200
4250
4400
4450
4600
4650
1450
1600
1550
1700
1800
1950
2500
2850
4400
4400
4450
4600
4600
4750
1450
1550
1500
1600
1700
1950
2200
2400
Overhead
Pit Depth
Machine Room Height
Speed (m/s) Load (kg)Standard
Code / Country
EN Code Malaysia Singapore
2.0
2.5
2.0
2.5
2.0
2.5
5500
5700
2100
2400
2400
2400
5200
5400
2100
2500
2400
2400
5200
5400
2100
2500
2850
2850
5200
5400
2000
2400
2400
2400
Overhead
Pit Depth
Machine Room Height
Speed (m/s)Standard
Code / Country
EN Code Malaysia Singapore
(Unit : mm)
(Unit : mm)
Hoistway & Machine Room Plan (Simplex) Hoistway Section
Hoistway & Machine Room Plan (Duplex)
Note
1.(Separating Beams) : By Others
2. Unit : mm
MID RISE MID RISE
MIDRISE
MIDRISE
-
7/28/2019 Planning Guide English r2
11/23
-
7/28/2019 Planning Guide English r2
12/23
-
7/28/2019 Planning Guide English r2
13/23
Elevator Layout
24 _ Planning Guide Planning Guide _ 25
Passenger Elevator Passenger Elevator
Hoistway & Machine Room Plan (Simplex)
Hoistway & Machine Room Plan (Duplex)
Hoistway Section
Hoistway & Machine Room Plan (Group control)
Note
1.(Separating Beams) : By Others
2. Unit : mm
HIGH RISE HIGH RISE
HIGHRISE
HIGHRISE
2.0 5500 5200 5300 5200 5200
2.5 5700 5400 5500 5400 5400
3.0 6000 5700 5700 5700 5700
3.5 6400 6300 6300 6300 6300
4.0 7100 6800 6900 6900 6800
5.0 7700 7500 7600 7600 7500
6.0 7700 7500 7600 7600 7500
7.0 8000 7800 7900 7900 7800
2.0 2100 2100 1950 2000 2100
2.5 2400 2500 2400 2400 2500
3.0 2700 3000 2900 2900 2900
3.5 3200 3500 3400 3400 3450
4.0 3800 4000 3900 3900 3950
5.0 4000 4400 4300 4300 4400
6.0 4000 4400 4300 4300 4400
7.0 6000 6200 6100 6100 6200
2.0 2400 2400 2400 2400 2850
2.5 2400 2400 2400 2400 2850
3.0 3000 3000 3000 3000 3500
3.5 3000 3000 3000 3000 3500
4.0 3000 3000 3000 3000 3500
5.0 3500 3500 3500 3500 3900
6.0 3500 3500 3500 3500 3900
7.0 3500 3500 3500 3500 3900
Overhead, Pit Depth & Machine Room Height
Overhead
Pit Depth
Machine Room Height
Speed(m/s)
Standard EN Code
Code / Country
ANSI Singapore Malaysia
(Unit : mm)
-
7/28/2019 Planning Guide English r2
14/23
-
7/28/2019 Planning Guide English r2
15/23
-
7/28/2019 Planning Guide English r2
16/23
-
7/28/2019 Planning Guide English r2
17/23
32 _ Planning Guide Planning Guide _ 33
Hospital Elevator Hospital Elevator
Hoistway & Machine Room Plan (Simplex)
Hoistway & Machine Room Plan (Duplex)
Hoistway Section
Elevator Layouts Layout Dimensions
Power Supply Plan
EntranceOpening(mm)
Car SizeHoistway Size
AHBNAN BH AH BH AL AR R2R1
Reaction(kg)
R4R3
Dimensions inHoistwaySimplex Duplex
BR AM
Machine Room Size
Simplex Machine Room PitDuplex
(Unit : mm)
(200~220 / 346~440V)
(220V / 400V)
S BMAMBM
11
15
750
1000
37
37
28.2
32.8
43
20
37.6
43.8
850
1150
1700
2000
1150
1500
2250
2650
5.5
5.5
5.5
5.5
8 / 5.5
8 / 5.5
14 / 5.5
14 / 5.5
38 / 14
38 / 14
38 / 14
38 / 14
60 / 38
60 / 38
38 / 14
60 / 20
30 / 14
14 / 5.5
14 / 5.5
14 / 5.5
34 / 14
22 / 5.5
22 / 5.5
22 / 5.5
17
17
17.8
20.8
19
19
23.8
27.6
10
10
8.9
10.4
11
11
11.9
13.8
100 / 75
100 / 75
150 / 100
150 / 100
125 / 100
125 / 100
150 / 100
150 / 100
75 / 50
75 / 50
75 / 50
75 / 50
75 / 50
75 / 50
75 / 50
100 / 50
8
11
9.5
11
8
11
13
15
11
15
1100
1100
1300
1500
2300
2300
2150
2350
2900
2900
4450
4850
2900
2900
225
225
575
575
150
150
230
230
2600
2800
4200
4200
4950
5350
4200
4200
5850
5900
5250
5250
6650
6800
6150
6150
0.75
1.0
1.5
1.75
0.75
1.0
1.5
1.75
3500
3750
3700
3700
3900
4100
4600
4600
4950
5650
8350
10150
6050
7000
9900
11950
3750
4150
6150
7500
4450
5050
7050
8650
750
1000
0.75
1
1.5
1.75
0.75
1
1.5
1.75
0.75 ~ 1.75
4400
4600
4800
5000
1200
1500
1800
2100
2300
Overhead, Pit Depth & Machine Room Height
Overhead
Pit Depth
Machine Room Height
Speed (m/s) Dimension (mm)
(Unit : mm)
Speed(m/s)
Capacity
Load(kg)Person
Hospital
Hospital
0.75
1.0
1.5
1.75
0.75
1.0
1.5
1.75
MCCB Capacity ofBuilding(A)
MotorCapacity
(kW)
Heat Output(kcal/H)
Earth WireSize()
Starting Power(kVA/set)
Power SupplyCapacity(kVA)
Simplex DuplexSimplex Duplex
Lead-in Wire Size()
Simplex Duplex
Speed(m/s)
Capacity
Load(kg)Person
-
7/28/2019 Planning Guide English r2
18/23
-
7/28/2019 Planning Guide English r2
19/23
-
7/28/2019 Planning Guide English r2
20/23
-
7/28/2019 Planning Guide English r2
21/23
-
7/28/2019 Planning Guide English r2
22/23
-
7/28/2019 Planning Guide English r2
23/23