Planning Guide English r2

download Planning Guide English r2

of 23

Transcript of Planning Guide English r2

  • 7/28/2019 Planning Guide English r2

    1/23

    Planning Guide

    PlanningG

    uide

    SIGMA constantly endeavors to improve products so that information in this catalog is subject to change without notice.

    2010. 06 Printed in Korea / Revision No. 2

  • 7/28/2019 Planning Guide English r2

    2/23

    Established in 1995 Accumulated Sales (as of 2007)

    - over 160,000 units

    The Design Center in Korea provides

    perfect customer satisfaction by meeting

    any customer needs

    SIGMA has been serving you in more

    than 70 countries around the world for

    over 35 years

    The Design Center SIGMA in the world

    Your partner for Elevator

    The Changwon Factory in Korea which is

    referred as the single largest elevator

    plant provides one-stop manufacturing

    of high quality

    Annual production Capacity (as of 2007)

    - Elevator : 15,000 units

    The Changwon Factory

  • 7/28/2019 Planning Guide English r2

    3/23

    Distributed Inverter(Di) control drastically improves reliability and

    performance of elevators. By adopting Di control, the control

    panel size has been reduced by 46% not to mention wiring and

    installation time. The formation of high efficiency and

    compactness allows the traction machine to save energy by 50%

    and provide installation space.

    SIGMAs sophisticated, state-of-the-art fuzzy logic reduces

    waiting time and enhances performance efficiency at a particular

    moment, depending on its location, direction, load and the overall

    passenger calls currently on the system. SIGMAs modernmicroprocessor technology can be used to optimize group

    performance to satisfy high customer standards.

    SIGMA provides best-in-class ride quality on every lift we install.

    High switching speed of power device in the drive(IGBT) reduces

    motor noise. Moreover, door operator with VVVF control ensures

    silent door movement. The result of modern technology allowsSIGMA to reduce vibration and noise to a minimum level.

    Customers define luxury as a swift, smooth and silent ride. Our

    seamless interface between tenant requirements and elevator

    performance meets the exact standards and higher expectation

    of customers.

    Ride Comfort

    Energy &

    Space Saving

    SIGMA Elevator companys number one priority is safety. Our basic spirit to ensure safety

    is through control technology such as back-up solution, safety drive operation and morethan 10 other safety devices.

    We execut e more than 30 kinds of reliab ility tests . These intense quality assurance

    programs make fool-proof products from design stage.

    Through SIGMA Net which monitors elevator, escalator and movingwalks by internet-

    based software, our elevator not only provides a comprehensive and easy-to-use interface

    but also brings perfect quality to reality.

    Safety & Reliability

    EMI Test(Electro Magnetic Interference)

    Vibration andDropping Test

    ESD Test(Electro Static Discharge)

    Burst Test

  • 7/28/2019 Planning Guide English r2

    4/23

  • 7/28/2019 Planning Guide English r2

    5/23

  • 7/28/2019 Planning Guide English r2

    6/23

  • 7/28/2019 Planning Guide English r2

    7/23

  • 7/28/2019 Planning Guide English r2

    8/23

    Entrance Details Entrance Details

    14 _ Planning Guide Planning Guide _ 15

    SectionB-B

    Front View of Entrance

    SectionA-A

    Building Structure Plan (Normal Button)

    Narrow Jamb without Transom Panel

    SectionB-B

    Front View of Entrance

    SectionA-A

    Building Structure Plan (Normal Button)

    S-Type Wide Jamb with Transom Panel

    Building Structure Plan (Slim Type Button) Building Structure Plan (Slim Type Button)

    MIDRISE

    MIDRISE

    Note 1. Hdimension in building structure plan depends upon the type of hall indicator selected.

    2. Unit : mm

    Note 1. Hdimension in building structure plan depends upon the type of hall indicator selected.

    2. Unit : mm

  • 7/28/2019 Planning Guide English r2

    9/23

    Entrance Details Entrance Details

    16 _ Planning Guide Planning Guide _ 17

    SectionB-B

    Front View of Entrance

    SectionA-A

    Building Structure Plan

    T-Type Jamb with Transom Panel T-Type Jamb with Transom Panel (MUSE Top Floor)

    SectionB-B

    Front View of Entrance

    SectionA-A

    Building Structure Plan (Normal Button)Building Structure Plan (Slim Type Button) Building Structure Plan (Slim Type Button)

    MIDRISE

    MIDRISE

    Note 1. Hdimension in building structure plan depends upon the type of hall indicator selected.

    2. Unit : mm

    Note 1. Hdimension in building structure plan depends upon the type of hall indicator selected.

    2. Unit : mm

  • 7/28/2019 Planning Guide English r2

    10/23

    Overhead, Pit Depth & Machine Room HeightElevator Layouts

    18 _ Planning Guide Planning Guide _ 19

    Passenger Elevator Passenger Elevator

    Overhead, Pit Depth & Machine Room Height

    1.0

    1.5

    1.75

    1.0

    1.5

    1.75

    1.0, 1.5, 1.75

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    L 1020

    4550

    4600

    4750

    4800

    4950

    5000

    1500

    1600

    1800

    1800

    2100

    2100

    2200

    2400

    4200

    4250

    4400

    4450

    4600

    4650

    1450

    1550

    1600

    1700

    1700

    1850

    2200

    2400

    4200

    4250

    4400

    4450

    4600

    4650

    1450

    1600

    1550

    1700

    1800

    1950

    2500

    2850

    4400

    4400

    4450

    4600

    4600

    4750

    1450

    1550

    1500

    1600

    1700

    1950

    2200

    2400

    Overhead

    Pit Depth

    Machine Room Height

    Speed (m/s) Load (kg)Standard

    Code / Country

    EN Code Malaysia Singapore

    2.0

    2.5

    2.0

    2.5

    2.0

    2.5

    5500

    5700

    2100

    2400

    2400

    2400

    5200

    5400

    2100

    2500

    2400

    2400

    5200

    5400

    2100

    2500

    2850

    2850

    5200

    5400

    2000

    2400

    2400

    2400

    Overhead

    Pit Depth

    Machine Room Height

    Speed (m/s)Standard

    Code / Country

    EN Code Malaysia Singapore

    (Unit : mm)

    (Unit : mm)

    Hoistway & Machine Room Plan (Simplex) Hoistway Section

    Hoistway & Machine Room Plan (Duplex)

    Note

    1.(Separating Beams) : By Others

    2. Unit : mm

    MID RISE MID RISE

    MIDRISE

    MIDRISE

  • 7/28/2019 Planning Guide English r2

    11/23

  • 7/28/2019 Planning Guide English r2

    12/23

  • 7/28/2019 Planning Guide English r2

    13/23

    Elevator Layout

    24 _ Planning Guide Planning Guide _ 25

    Passenger Elevator Passenger Elevator

    Hoistway & Machine Room Plan (Simplex)

    Hoistway & Machine Room Plan (Duplex)

    Hoistway Section

    Hoistway & Machine Room Plan (Group control)

    Note

    1.(Separating Beams) : By Others

    2. Unit : mm

    HIGH RISE HIGH RISE

    HIGHRISE

    HIGHRISE

    2.0 5500 5200 5300 5200 5200

    2.5 5700 5400 5500 5400 5400

    3.0 6000 5700 5700 5700 5700

    3.5 6400 6300 6300 6300 6300

    4.0 7100 6800 6900 6900 6800

    5.0 7700 7500 7600 7600 7500

    6.0 7700 7500 7600 7600 7500

    7.0 8000 7800 7900 7900 7800

    2.0 2100 2100 1950 2000 2100

    2.5 2400 2500 2400 2400 2500

    3.0 2700 3000 2900 2900 2900

    3.5 3200 3500 3400 3400 3450

    4.0 3800 4000 3900 3900 3950

    5.0 4000 4400 4300 4300 4400

    6.0 4000 4400 4300 4300 4400

    7.0 6000 6200 6100 6100 6200

    2.0 2400 2400 2400 2400 2850

    2.5 2400 2400 2400 2400 2850

    3.0 3000 3000 3000 3000 3500

    3.5 3000 3000 3000 3000 3500

    4.0 3000 3000 3000 3000 3500

    5.0 3500 3500 3500 3500 3900

    6.0 3500 3500 3500 3500 3900

    7.0 3500 3500 3500 3500 3900

    Overhead, Pit Depth & Machine Room Height

    Overhead

    Pit Depth

    Machine Room Height

    Speed(m/s)

    Standard EN Code

    Code / Country

    ANSI Singapore Malaysia

    (Unit : mm)

  • 7/28/2019 Planning Guide English r2

    14/23

  • 7/28/2019 Planning Guide English r2

    15/23

  • 7/28/2019 Planning Guide English r2

    16/23

  • 7/28/2019 Planning Guide English r2

    17/23

    32 _ Planning Guide Planning Guide _ 33

    Hospital Elevator Hospital Elevator

    Hoistway & Machine Room Plan (Simplex)

    Hoistway & Machine Room Plan (Duplex)

    Hoistway Section

    Elevator Layouts Layout Dimensions

    Power Supply Plan

    EntranceOpening(mm)

    Car SizeHoistway Size

    AHBNAN BH AH BH AL AR R2R1

    Reaction(kg)

    R4R3

    Dimensions inHoistwaySimplex Duplex

    BR AM

    Machine Room Size

    Simplex Machine Room PitDuplex

    (Unit : mm)

    (200~220 / 346~440V)

    (220V / 400V)

    S BMAMBM

    11

    15

    750

    1000

    37

    37

    28.2

    32.8

    43

    20

    37.6

    43.8

    850

    1150

    1700

    2000

    1150

    1500

    2250

    2650

    5.5

    5.5

    5.5

    5.5

    8 / 5.5

    8 / 5.5

    14 / 5.5

    14 / 5.5

    38 / 14

    38 / 14

    38 / 14

    38 / 14

    60 / 38

    60 / 38

    38 / 14

    60 / 20

    30 / 14

    14 / 5.5

    14 / 5.5

    14 / 5.5

    34 / 14

    22 / 5.5

    22 / 5.5

    22 / 5.5

    17

    17

    17.8

    20.8

    19

    19

    23.8

    27.6

    10

    10

    8.9

    10.4

    11

    11

    11.9

    13.8

    100 / 75

    100 / 75

    150 / 100

    150 / 100

    125 / 100

    125 / 100

    150 / 100

    150 / 100

    75 / 50

    75 / 50

    75 / 50

    75 / 50

    75 / 50

    75 / 50

    75 / 50

    100 / 50

    8

    11

    9.5

    11

    8

    11

    13

    15

    11

    15

    1100

    1100

    1300

    1500

    2300

    2300

    2150

    2350

    2900

    2900

    4450

    4850

    2900

    2900

    225

    225

    575

    575

    150

    150

    230

    230

    2600

    2800

    4200

    4200

    4950

    5350

    4200

    4200

    5850

    5900

    5250

    5250

    6650

    6800

    6150

    6150

    0.75

    1.0

    1.5

    1.75

    0.75

    1.0

    1.5

    1.75

    3500

    3750

    3700

    3700

    3900

    4100

    4600

    4600

    4950

    5650

    8350

    10150

    6050

    7000

    9900

    11950

    3750

    4150

    6150

    7500

    4450

    5050

    7050

    8650

    750

    1000

    0.75

    1

    1.5

    1.75

    0.75

    1

    1.5

    1.75

    0.75 ~ 1.75

    4400

    4600

    4800

    5000

    1200

    1500

    1800

    2100

    2300

    Overhead, Pit Depth & Machine Room Height

    Overhead

    Pit Depth

    Machine Room Height

    Speed (m/s) Dimension (mm)

    (Unit : mm)

    Speed(m/s)

    Capacity

    Load(kg)Person

    Hospital

    Hospital

    0.75

    1.0

    1.5

    1.75

    0.75

    1.0

    1.5

    1.75

    MCCB Capacity ofBuilding(A)

    MotorCapacity

    (kW)

    Heat Output(kcal/H)

    Earth WireSize()

    Starting Power(kVA/set)

    Power SupplyCapacity(kVA)

    Simplex DuplexSimplex Duplex

    Lead-in Wire Size()

    Simplex Duplex

    Speed(m/s)

    Capacity

    Load(kg)Person

  • 7/28/2019 Planning Guide English r2

    18/23

  • 7/28/2019 Planning Guide English r2

    19/23

  • 7/28/2019 Planning Guide English r2

    20/23

  • 7/28/2019 Planning Guide English r2

    21/23

  • 7/28/2019 Planning Guide English r2

    22/23

  • 7/28/2019 Planning Guide English r2

    23/23