PLAN LAYOUT 8TH FLOOR€¦ · 08.04.2015  · G R n e w h e a v y d u t y c a r p e t L E G A L A S...

4
GSPublisherVersion 0.8.100.100 MINISTRYOF TANSPORT, INFRASTRUCTURE, HOUSING & URBAN DEVELOPMENT. STATE DEPARTMENT OF PUBLIC WORKS APPROVED SA Name PROJECT: Signed Date Checked Client Drawing No. 1 Scale : 1:100 P.S.A Mar 2018 CHIEF ARCHITECT Arch. S. K. Muli OGW Drawing title Drawn ......................................................... General This drawing is to be read in conjuction with engineers' drawings. All dimensions are in mm unless otherwise specified. Drawings are not to be scaled. Only figured dimensions to to be used. The contractor must check & verify all the dimensions before commencement of the work. Mar 2018 THE GOVERNMENT OF THE REPUBLIC OF KENYA NOTES REVISIONS NOTES s.no date details initials sign PROPOSED RENOVATIONS TO KENYA TOURISM BOARD (KTB) OFFICES AT KENYA RE TOWERS (7TH & 8TH FLOOR) RAGATI ROAD, UPPER HILL - NAIROBI ARCH N. KORIR ARCH MURIGU J. M. KENYA TOURISM BOARD (KTB) A B C C D D E E F F G H 1 2 3 4 5 5 6 6 100 4,000 100 5,150 2,800 900 100 3,000 100 200 4,000 100 8,650 200 3,135 100 2,700 100 2,400 100 2,400 100 2,400 100 3,885 200 3,000 5,250 2,200 2,500 1,650 1,700 4,050 2,900 435 2,450 400 2,100 400 2,100 400 2,100 400 1,039 950 900 3,000 50 250 900 4,850 2,500 900 641 2,841 2,691 1,350 5,950 3,550 9,267 900 105 900 2,479 1,550 1,999 2,000 900 1,050 900 1,200 1,100 2,700 100 3,401 1,950 4,100 15,037 100 1,850 4,100 300 1,000 2,750 300 1,000 2,750 4,450 100 4,150 100 2,800 100 3,000 100 4,445 100 100 2,400 4,350 100 3,450 100 1,250 100 4,500 100 1,850 100 4,450 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 1,600 100 2,450 1,000 600 1,351 4,100 8,350 3,193 900 1,600 1,804 700 900 850 4,100 11,825 1,350 1,950 1,652 14,634 1,852 4,243 4,243 2,350 600 900 4,700 2,350 1,809 8,627 17,747 12,000 10,409 10,395 3,967 850 919 12,169 4,100 4,569 17,890 8,627 7,654 7,707 11,984 1,900 426 3,543 900 100 4,200 100 6,100 4,450 100 8,635 200 4,150 2,500 5,800 NEW RECEPTION COUNTER TO DETAIL NEW ACOUSTIC PADDING ACCESS CONTROL NEW HIGH LEVEL CABINETS DEMOLISH DOOR DEMOLISH W/TOP DEMOLISH DOOR NEW HW DOOR DEMOLISH HW DOOR NEW HW DOOR NEW HW & GLASS PARTIRTION NEW ACOUSTIC PADDING NEW ACOUSTIC PADDING NEW 2.4 M HIGH AL. PARTITION NEW HW & GLASS PARTIRTION BOARDROOM new heavy duty carpet AIR CONDITIONING SECRETARY/PA TO CEO new heavy duty carpet KITCHEN WAITING AREA new porcelain tiles CHIEF EXECUTIVE OFFICER new heavy duty carpet AIR CONDITIONING RECEPTION AREA new porcelain tiles WAITING AREA new heavy duty carpet PROCUREMENT STORE new porcelain tiles MANAGER HR & ADMIN new heavy duty carpet COMPANY SEC. new heavy duty carpet CHAIRMAN new heavy duty carpet PASSAGE new porcelain tiles EXHIBITION MANAGER new heavy duty carpet MANAGER SUPPLY CHAIN MNGT new heavy duty carpet PR MANAGER new heavy duty carpet DIR .MARKET DEVELOPMENT new porcelain tiles STRATEGY & COMPLIANCE MNGR new porcelain tiles AMM(E&E) AMM(PRM) RESEARCH MANAGER new porcelain tiles AIR CONDITIONING PRO COMM OFFICER ASST MNGR SUPPLY CM SUPPLY CHAIN ASST SUPPLY CHAIN ASST SUPPLY CHAIN OFFICER FIRE EXIT LIFT LIFT LIFT LIFT SH WC WHB PRINTING DIRECTOR MRTG SUPPORT new porcelain tiles DIR & RESEARCH STRATEGY new porcelain tiles LEGAL SERV. MNGR new heavy duty carpet LEGAL ASST. new heavy duty carpet 0. Ground Floor (3) 1:100 8TH FLOOR PLAN LAYOUT

Transcript of PLAN LAYOUT 8TH FLOOR€¦ · 08.04.2015  · G R n e w h e a v y d u t y c a r p e t L E G A L A S...

  • GSPublisherVersion 0.8.100.100

    MINISTRYOF TANSPORT,INFRASTRUCTURE,HOUSING & URBAN DEVELOPMENT.

    STATE DEPARTMENT OF PUBLIC WORKS

    APPROVED

    SA

    Name

    PROJECT:

    Signed Date

    Checked

    Client

    Drawing No. 1Scale : 1:100

    P.S.A

    Mar 2018

    CHIEF ARCHITECTArch. S. K. Muli OGW

    Drawing title

    Drawn

    .........................................................

    GeneralThis drawing is to be read in conjuction withengineers' drawings.All dimensions are in mm unless otherwisespecified.Drawings are not to be scaled. Only figureddimensions to to be used. The contractor mustcheck & verify all the dimensions beforecommencement of the work.

    Mar 2018

    THE GOVERNMENT OF THE REPUBLIC OF KENYA

    NOTES

    REVISIONS

    NOTES

    s.no date details initials sign

    PROPOSED RENOVATIONS TOKENYA TOURISM BOARD (KTB)OFFICES AT KENYA RE TOWERS(7TH & 8TH FLOOR) RAGATIROAD, UPPER HILL - NAIROBI

    ARCH N. KORIR

    ARCHMURIGUJ. M.

    KENYA TOURISM BOARD (KTB)

    A

    B

    C

    C

    D

    D

    E

    E

    F

    F

    G

    H1

    2

    3

    4

    5

    5

    6

    6

    100

    4,000

    100

    5,150

    2,800

    900

    100

    3,000

    100

    200

    4,000

    100

    8,65

    020

    03,135 100 2,700 100 2,400 100 2,400 100 2,400 100 3,885 200

    3,00

    0

    5,250

    2,200

    2,500

    1,6501,700

    4,050

    2,90

    0

    435 2,450 400 2,100 400 2,100 400 2,100 400 1,03995

    0

    900

    3,00

    0

    50

    250

    900

    4,850

    2,500

    900

    641

    2,841

    2,691

    1,350

    5,950

    3,550

    9,267 900105

    9002,4

    79

    1,550

    1,999

    2,000

    900

    1,050

    900

    1,200

    1,100

    2,700

    100

    3,401

    1,950

    4,100

    15,03

    7

    100

    1,850

    4,100

    300

    1,000

    2,750

    300

    1,000

    2,750

    4,450 100 4,150 100 2,800 100 3,000 100

    4,44

    510

    0

    100 2,400

    4,350

    100

    3,450

    100

    1,250100

    4,500

    100

    1,850

    100

    4,450

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    1,600

    1002,450

    1,000

    600

    1,351

    4,100

    8,350

    3,19

    390

    0

    1,600

    1,804

    700

    900

    850

    4,100

    11,825

    1,350

    1,950

    1,652

    14,634

    1,8524,243

    4,24

    3

    2,350

    600

    900

    4,700

    2,350

    1,809

    8,62

    7

    17,747

    12,00

    0

    10,409

    10,3

    95

    3,967

    850

    919

    12,16

    9

    4,100

    4,569

    17,890

    8,62

    7

    7,654

    7,707

    11,98

    4 1,900

    426

    3,54

    390

    010

    0

    4,200

    100

    6,100

    4,450 100

    8,63

    520

    0

    4,150

    2,500

    5,800

    NEW RECEPTION

    COUNTER TO DETAIL

    NEW ACOUSTIC

    PADDING

    ACCE

    SS C

    ONTR

    OL

    NEW HIGH LEVEL CABINETS

    DEMOLISH DOOR

    DEMOLISH W/TOP

    DEMOLISH DOOR

    NEW HW DOOR

    DEMOLISH HW DOOR

    NEW HW DOOR

    NEW HW

    & GLASS PARTIRTION

    NEW

    ACOU

    STIC

    PADD

    ING

    NEW ACOUSTIC

    PADDING

    NEW

    2.4 M

    HIG

    H

    AL. P

    ARTIT

    ION

    NEW HW & GLASS PARTIRTION

    BOARDROOMnew heavy duty carpet

    AIR CONDITIONING

    SECRETARY/PA TO CEO

    new heavy duty carpet

    KITCHEN

    WAITING AREAnew porcelain tiles

    CHIEF

    EXEC

    UTIVE

    OFFIC

    ER

    new he

    avy du

    ty carp

    et

    AIR CO

    NDITI

    ONING

    RECEPTION AREA

    new porcelain tiles

    WAITI

    NG AR

    EA

    new he

    avy du

    ty carp

    et

    PROCUREMENT STORE

    new porcelain tiles

    MANAGER HR & ADMINnew heavy duty carpet

    COMP

    ANY S

    EC.

    new he

    avy du

    ty carp

    et

    CHAIRMANnew heavy duty carpet

    PASS

    AGE

    new po

    rcelain

    tiles

    EXHIBITIONMANAGER

    new heavy duty carpet

    MANAGERSUPPLY CHAIN MNGT

    new heavy duty carpet

    PRMANAGER

    new heavy duty carpetDIR .MARKETDEVELOPMENTnew porcelain tiles

    STRATEGY &COMPLIANCE MNGR

    new porcelain tiles

    AMM(

    E&E)

    AMM(

    PRM)

    RESEARCH MANAGERnew porcelain tiles

    AIR CONDITIONING

    PRO

    COMM

    OFFIC

    ER

    ASST

    MNGR

    SUPP

    LY CM

    SUPP

    LY CH

    AIN

    ASST

    SUPP

    LY CH

    AIN

    ASST

    SUPP

    LY CH

    AIN

    OFFIC

    ER

    FIRE EXIT

    LIFT

    LIFT

    LIFT

    LIFT

    SH

    WC

    WHB

    PRINTING

    DIRECTOR MRTGSUPPORT

    new porcelain tiles

    DIR & RESEARCHSTRATEGY

    new porcelain tiles

    LEGA

    L SER

    V. MN

    GR

    new he

    avy du

    ty carp

    et

    LEGA

    L ASS

    T.

    new he

    avy du

    ty carp

    et

    0. Ground Floor (3) 1:100

    8TH FLOORPLAN LAYOUT

  • GSPublisherVersion 0.8.100.100

    MINISTRYOF TANSPORT,INFRASTRUCTURE,HOUSING & URBAN DEVELOPMENT.

    STATE DEPARTMENT OF PUBLIC WORKS

    APPROVED

    SA

    Name

    PROJECT:

    Signed Date

    Checked

    Client

    Drawing No. 1Scale : 1:100

    P.S.A

    Mar 2018

    CHIEF ARCHITECTArch. S. K. Muli OGW

    Drawing title

    Drawn

    .........................................................

    GeneralThis drawing is to be read in conjuction withengineers' drawings.All dimensions are in mm unless otherwisespecified.Drawings are not to be scaled. Only figureddimensions to to be used. The contractor mustcheck & verify all the dimensions beforecommencement of the work.

    Mar 2018

    THE GOVERNMENT OF THE REPUBLIC OF KENYA

    NOTES

    REVISIONS

    NOTES

    s.no date details initials sign

    PROPOSED RENOVATIONS TOKENYA TOURISM BOARD (KTB)OFFICES AT KENYA RE TOWERS(7TH & 8TH FLOOR) RAGATIROAD, UPPER HILL - NAIROBI

    ARCH N. KORIR

    ARCHMURIGUJ. M.

    KENYA TOURISM BOARD (KTB)

    B

    C

    C

    D

    D

    E

    E

    F

    F

    G

    H

    I

    2

    3

    4

    5

    5

    6

    6

    7

    BOARDROOMnew heavy duty carpet

    SECRETARY/PA TO CEO

    new heavy duty carpet

    KITCHEN

    RECEPTION AREAnew porcelain tiles

    CHIEF

    EXEC

    UTIVE

    OFFIC

    ER

    new he

    avy du

    ty carp

    et

    DIRECTOR MRTGSUPPORT

    new porcelain tiles

    RECEPTION AREA

    new porcelain tiles

    WAITI

    NG AR

    EA

    new he

    avy du

    ty carp

    et

    PROCUREMENT STORE

    new porcelain tiles

    CHAIRMANnew heavy duty carpet

    PASS

    AGE

    new po

    rcelain

    tiles

    EXHIBITIONMANAGER

    new heavy duty carpetMANAGER

    SUPPLY CHAIN MNGTnew heavy duty carpet

    PRMANAGER

    new heavy duty carpet

    DIR. MARKETDEVELOPMENTnew porcelain tiles

    DIR & RESEARCHSTRATEGY

    new porcelain tiles

    STRATEGY &COMPLIANCE MNGR

    new porcelain tiles

    AMM(

    E&E)

    AMM(

    PRM)

    RESEARCH MANAGER

    new porcelain tiles

    PRO

    COMM

    OFFIC

    ER

    ASST

    MNGR

    SUPP

    LY CMSU

    PPLY

    CHAI

    N

    ASST

    SUPP

    LY CH

    AIN

    ASST

    SUPP

    LY CH

    AIN

    OFFIC

    ER

    FIRE EXIT

    LIFT

    LIFT

    LIFT

    LIFT

    SHWC

    WHB

    COMP

    ANY S

    EC.

    new he

    avy du

    ty carp

    et

    LEGA

    L SER

    V. MN

    GR

    new he

    avy du

    ty carp

    et

    LEGA

    L ASS

    T.

    new he

    avy du

    ty carp

    et

    PRINTING

    SUPPORT STAFF

    MANAGER HR & ADMINnew heavy duty carpet

    0. Ground Floor (1) 1:100

    8TH FLOORFURNITURE LAYOUT

  • GSPublisherVersion 0.8.100.100

    MINISTRYOF TANSPORT,INFRASTRUCTURE,HOUSING & URBAN DEVELOPMENT.

    STATE DEPARTMENT OF PUBLIC WORKS

    APPROVED

    SA

    Name

    PROJECT:

    Signed Date

    Checked

    Client

    Drawing No. 1Scale : 1:100

    P.S.A

    Mar 2018

    CHIEF ARCHITECTArch. S. K. Muli OGW

    Drawing title

    Drawn

    .........................................................

    GeneralThis drawing is to be read in conjuction withengineers' drawings.All dimensions are in mm unless otherwisespecified.Drawings are not to be scaled. Only figureddimensions to to be used. The contractor mustcheck & verify all the dimensions beforecommencement of the work.

    Mar 2018

    THE GOVERNMENT OF THE REPUBLIC OF KENYA

    NOTES

    REVISIONS

    NOTES

    s.no date details initials sign

    PROPOSED RENOVATIONS TOKENYA TOURISM BOARD (KTB)OFFICES AT KENYA RE TOWERS(7TH & 8TH FLOOR) RAGATIROAD, UPPER HILL - NAIROBI

    ARCH N. KORIR

    ARCHMURIGUJ. M.

    KENYA TOURISM BOARD (KTB)

    9.400 m2

    16.430 m2

    7.987 m2

    5.962 m2

    B

    C

    D

    D

    E

    E

    F

    F

    G

    G

    H

    I

    2

    3

    4

    4

    5

    5

    6

    73,

    000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    1,350

    4,569

    11,98

    4

    7.558 m2

    7.366 m2

    5.211 m2

    13.503 m2

    0.019 m2

    8.383 m2

    35.343 m2

    18.407 m2

    13.418 m2

    24.051 m2

    16.800 m2

    16.800 m2

    6.283 m212.905 m2

    12.905 m2 11.488 m2

    5.299 m2

    9.651 m2

    4.271 m2

    9.000 m2

    9.000 m2

    13.942 m2

    12.757 m2

    LIFT

    LIFT

    LIFT

    LIFT

    GYPSUMCEILING

    ACOUSTICCEILING

    0. Ground Floor (2) 1:100

    8TH FLOOR CEILING PLAN

  • GSPublisherVersion 0.8.100.100

    MINISTRYOF TANSPORT,INFRASTRUCTURE,HOUSING & URBAN DEVELOPMENT.

    STATE DEPARTMENT OF PUBLIC WORKS

    APPROVED

    SA

    Name

    PROJECT:

    Signed Date

    Checked

    Client

    Drawing No. 1Scale : 1:100

    P.S.A

    Mar 2018

    CHIEF ARCHITECTArch. S. K. Muli OGW

    Drawing title

    Drawn

    .........................................................

    GeneralThis drawing is to be read in conjuction withengineers' drawings.All dimensions are in mm unless otherwisespecified.Drawings are not to be scaled. Only figureddimensions to to be used. The contractor mustcheck & verify all the dimensions beforecommencement of the work.

    Mar 2018

    THE GOVERNMENT OF THE REPUBLIC OF KENYA

    NOTES

    REVISIONS

    NOTES

    s.no date details initials sign

    PROPOSED RENOVATIONS TOKENYA TOURISM BOARD (KTB)OFFICES AT KENYA RE TOWERS(7TH & 8TH FLOOR) RAGATIROAD, UPPER HILL - NAIROBI

    ARCH N. KORIR

    ARCHMURIGUJ. M.

    KENYA TOURISM BOARD (KTB)

    B

    C

    D

    E

    E

    F

    F

    G

    G

    H

    H

    I

    2

    3

    3

    4

    4

    5

    6

    7

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    6,000

    0.881 m2

    0.329 m2

    7.558 m27.366 m2

    5.211 m2

    13.503 m2

    0.019 m2

    14.667 m2

    18.407 m2

    13.418 m2

    24.051 m2

    12.757 m2

    13.942 m212.905 m2

    12.905 m2

    9.651 m2

    4.271 m2

    16.800 m2

    16.800 m2

    6.975 m2

    13.942 m2

    38.133 m2

    18.199 m2

    4.437 m228.106 m2

    8.200 m2

    65.804 m2

    21.116 m2

    40.824 m2

    11.488 m2

    LIFT

    LIFT

    LIFT

    LIFT

    CARPET

    600X600MM GRANITO TILE(MATT FINISH)BORDER TILE

    600X600MM GRANITOTILE (MATT FINISH)

    0.447 m2

    0.447 m2

    0.447 m20.881 m2

    0. Ground Floor (4) 1:100

    8TH FLOORTILING LAYOUT

    8th Floor LayoutsA.05 LayoutA.06 LayoutA.07 LayoutA.08 Layout