3.6.5.1 SHEET NO. SHEET CONTENTS JB JM CK DW KT DATE CONSTRUCTION DOCUMENTS PROJECT NO. 11.18.2015 DATE OF ISSUE REVISION NO. PROJECT PHASE 2014_311 PROJECT TEAM DRAWN BY Ancillary Building 5th Floor Remodel Rooms 5019 & 5010 CLIENT CONTACT Balasubramanian Dignity Health St. Joseph's Hospital ADA Remediation 350 West Thomas Road, Phoenix, Arizona 85013 © 2015 this (hard copy or electronic) drawing is an instrument of service and the property of the Orcutt|Winslow Partnership and shall remain their property. The design professional shall not be responsible for any alterations, modifications or additions made to this drawing by any party other than the design professional. Use of this drawing shall be limited to the original site for which it was prepared and publication thereof is expressly limited to such use, re-use or reproduction. Unless otherwise agreed in writing, design professional reserves all copyright or other proprietary interest in this drawing, and it may not be re-used for any other purpose without the design professional’s written consent. Publication by any method in whole or part is prohibited without the written permission of the design professional. Any information obtained or conclusions derived from this drawing shall be at the user’s sole risk. Teresa Walsh 3033 North 3rd Avenue Phoenix, Arizona 85013 602.407.3891 t - f [email protected] 3003 n central ave sixteenth floor phoenix az 85012 [email protected] 602.257.1764 t 602.257.9029 f www.owp.com . A . . . T E NO F I C E R T C I A I R I T R S T ER E D A C H E G C T E d e n g i S D e t a A R U I A Z O N S , JON BENTON 14333 expires 03/31/17 1 0 /3 0 / 1 5 Orcutt|Winslow Project 2014_311 St. Joseph's Hospital ADA Remediation, Ancillary Building 5th Floor Remodel Sheet 3.6.5.1 Rooms 5019 & 5010 was plotted by Jon Benton on Wednesday, September 14, 2016 at 11:25 AM; file found at BIM Server: bimserver.owp.com - BIM Server 19/Education Studio/14_311 St Josephs ADA Remediation Part 1 FLOOR PLAN & ELEVATION GENERAL NOTES: A. Contractor to recess floor slab at accessible showers in compliance w/ ICC/ANSI A117.1 for the disabled where indicated on architectural plans. B. Provide concealed in-wall blocking behind shower seats, grab bars, etc. per manufacturer's recommendations. C. Refer to Accessible Details for plumbing fixtures and accessories installation. REMODEL FLOOR PLAN & ELEVATION KEYNOTES: 1. SURFACE MOUNT DOUBLE ROLL TOILET TISSUE DISPENSER 2" MINIMUM CLEAR BELOW BOTTOM OF SIDE WALL GRAB BAR. 2. SURFACE MOUNT TOILET SEAT COVER DISPENSER 2" MINIMUM CLEAR BELOW BOTTOM OF SIDE WALL GRAB BAR. 3. MOUNT 42" LONG SIDE WALL GRAB BAR 36" TO TOP OF BAR FROM EXISTING FFL WITH CONCEALED METAL BACKING. 4. MOUNT 36" LONG REAR WALL GRAB BAR 36" TO TOP OF BAR FROM EXISTING FFL WITH CONCEALED METAL BACKING. 5. SURFACE MOUNT SOAP DISPENSER WITH HIGHEST OPERABLE PART NOT HIGHER THAN 42" ABOVE FFL. 6. SURFACE MOUNT PAPER TOWEL DISPENSER WITH HIGHEST OPERABLE PART NOT HIGHER THAN 48" ABOVE FFL. 7. SURFACE MOUNT COAT HOOK WITH TOP OF HOOK AT +46" AFF. 8. SURFACE MOUNT FRAMED GLASS MIRROR WITH BOTTOM OF REFLECTIVE SURFACE AT 40" MAXIMUM AFF. MATCH BEIP MIRRORS AT ANCILLARY MAIN MEN'S & WOMEN'S RESTROOMS NEAR ELEVATORS. 9. SURFACE MOUNT 18" X 48" STAINLESS STEEL FRAMED TEMPERED GLASS MIRROR. 10. SURFACE MOUNT WATER CLOSET PARAPHERNALIA SHELF PER ACCESSIBLE DETAIL, OR OTHER LOCATIONS AS DIMENSIONED ON PLAN. 11. WALL MOUNT LAVATORY PER ARCHITECTURAL PLUMBING PLANS AND ACCESSIBLE DETAILS. 12. INSTALL ACCESSIBLE INSULATION OVER EXPOSED LAVATORY HOT WATER AND DRAIN PIPING PER PLUMBING AND ACCESSIBLE DETAILS. 13. INSTALL WATER CLOSET AS SHOWN PER ACCESSIBLE DETAILS AND PLUMBING PLAN. 14. INSTALL URINAL PER PLUMBING PLAN AND ACCESSIBLE DETAILS. 15. INSTALL PAPER TOWEL DISPENSER PER ACCESSIBLE DETAILS. 16. CONSTRUCT NEW INSULATED METAL FRAME WALL, OR OPENING INFILL CREATED BY DEMOLITION, WITH MOISTURE RESISTANT GYPSUM BOARD AND CERAMIC TILE TO MATCH ADJACENT WALL SURFACE. 17. PROVIDE AND INSTALL NEW TOILET PARTITIONS AND DOOR(S) AS NEEDED TO MATCH EXISTING PARTITION AS SHOWN. 18. PROVIDE AND INSTALL AUTOMATIC DOOR OPENER FOR EXISTING DOOR PER SPECIFICATIONS AND ELECTRICAL DRAWINGS. 19. RE-INSTALL DOOR AND FRAME REMOVED BY DEMOLITION. 20. NEW DOOR AND FRAME TO MATCH DOOR REMOVED BY DEMOLITION. 21. PROVIDE AND INSTALL SHOWER GRAB BARS PER ACCESSIBLE DETAILS. 22. BABY CHANGE STATION REMOVED IN DEMOLITION. PATCH AND REFINISH WALL WHERE STATION WAS REMOVED TO MATCH EXISTING. 23. NEW DOOR AND HOLLOW METAL FRAME TO MATCH EXISTING. 24. REMOVE AND RELOCATE ACCESS PANEL TO ALLOW FOR GRAB BAR. 25. PROVIDE AND INSTALL NEW 23 1/2" DEEP URINAL SCREEN. 26. NEW METAL FRAMED PAINTED GYPSUM BOARD SOFFIT. 27. NEW LAVATORIES IN COUNTERTOP. SEE PLUMBING PLAN. 28. INSTALL RELOCATED LIGHT FIXTURE PER ELECTRICAL DRAWINGS. 29. NEW LIGHT FIXTURE PER ELECTRICAL SPECIFICATIONS. 30. NEW 36" X 36" ACCESSIBLE TRANSFER SHOWER WITH WALL MOUNTED CONTROLS AND SEAT PER ACCESSIBLE DETAILS AND MPE PLANS. 31. NEW CASEWORK WITH SINK REMOVED IN DEMOLITION. 32. NEW ACCESSIBLE SHOWER CONTROL PER PLUMBING PLANS. 33. NEW ACCESSIBLE ROLL-IN SHOWER AND SHOWER CONTROL FITTINGS PER DETAILS AND PLUMBING PLAN. 34. INSTALL FACE OF PANEL 1 1/2" FROM WATER CLOSET CENTERLINE. 35. MODIFY COUNTER PANEL AS NEEDED FOR CLEAR DIMENSION SHOWN. 36. CUSTOM REAR WALL GRAB BAR WITH RETURN. 37. MOUNT 18" LONG SIDE WALL VERTICAL GRAB BAR 39" TO BOTTOM OF BAR FROM EXISTING FFL WITH CONCEALED METAL BLOCKING. TP M1 S1 SS M2 M3 5" x 18" PARAPHERNALIA SHELF (U.N.O.) HORIZONTAL GRAB BAR MOUNT TOP SURFACE AT 33" MIN -36" MAX AFF COAT HOOK MOUNT WITH TOP OF HOOK AT 46" AFF LAVATORY MIRROR MOUNT 40" MAX AFF TO BOTTOM OF REFLECTIVE SURFACE TYPE M1 PER KEYNOTE 8 (M3 SPECIAL PER FINISH PLAN) ENLARGED PLAN LEGEND SHOWER SEAT FOR TRANSFER TYPE ACCESSIBLE SHOWER SOAP DISPENSER (SURFACE MOUNT) WITH OPERATING LEVER @ 48" AFF MAX PAPER TOWEL DISPENSER (SURFACE MOUNT) WITH TOP OF OPENING AT 48" AFF MAX TOILET TISSUE DISPENSER DOUBLE ROLL (SURFACE MOUNT) 2" CLEAR BELOW GRAB BAR SEAT COVER DISPENSER (SURFACE MOUNT) 2" BELOW BOTTOM OF GRAB BAR LEVEL BABY CHANGING STATION (SURFACE MOUNT) 48" MAX AFF TO LATCHING PART AND 34" MAX TO TOP OF OPENED SURFACE 16" HIGH VERTICAL GRAB BAR MOUNT BOTTOM AT 40" AFF 18"W x 48"H WALL MIRROR MOUNT BOTTOM AT 30" AFF TO BOTTOM OF REFLECTIVE SURFACE SD 6 8 REFLECTED CEILING PLAN GENERAL NOTES: A. Ceilings and other suspended items shall be attached to structure by fully embedded or "shear" connection; pull out connections are not acceptable. B. All gypsum board ceilings shall be 5/8" type 'X' gypsum board on light gauge framing or suspension system. C. Verify all ceiling heights. All existing ceiling heights drawn are assumed 9'-0" AFF, and may not be accurate. Where ceiling supports are to extend, match existing height, direction, manufacturer, style, color, and type of grid. D. Center all devices, sprinkler heads, etc. in ceiling tiles and ceiling areas. E. All soffits over casework to extend 1” beyond the face of casework. F. Provide continuous sound batt insulation above all toilet room ceilings. G. Fire sprinkler contractor shall reference all drawings and specifications for determining proper coverage and sprinkler head layout/design. H. Reveal molding to be used at all intersections of different materials. All soffit reveals shall be a continuation of vertical wall reveals. I. Refer to electrical drawings for location of reused, relocated, existing or new light locations. Patch all GWB ceilings with new gypsum wall board where damaged or removed for new work. Match existing depth, finish and color of ceiling to be patched. REFLECTED CEILING PLAN KEYNOTES: 1. REMOVE, REPLACE AND REFINISH SUSPENDED CEILING, FRAMING, GYPSUM BOARD AND TEXTURE TO MATCH EXISTING ADJACENT CEILING, AND PAINT ENTIRE CEILING. 2. NEW OR RELOCATED LIGHT FIXTURE PER ELECTRICAL PLANS. 3. NEW OR RELOCATED HVAC DIFFUSER PER MECHANICAL PLANS. 4. NEW LAY-IN CEILING SYSTEM WITH VINYL-FACED FINISH. 5. REMOVE LIGHT FIXTURE PATCH AND REPAIR AS REQUIRED. DEMOLITION PLAN GENERAL NOTES: A. Sawcut and remove existing concrete floor slab to accommodate new utility work. Compact trench backfill and patch floor slab to match existing. B. Coordinate demolition with new construction. All demolition and repair necessary to accomplish new construction shall be included. Contractor shall remove all existing improvements whether or not specifically indicated on the drawings to facilitate the completion of all required work. Contractors shall visit the site and verify all quantities and items required to be removed. C. Contractor shall carefully remove wall and floor mounted toilet fixtures, partitions and bracing, accessories, grab bars, light fixtures, doors and frames, portions of frame walls, recessed accessories, etc. to minimize damage to wall, floor and ceiling surfaces. Provide straight line scoring and/or cutting joints to separate and protect existing walls and finishes from portions of walls to be removed. D. Where grab bars are to be removed, replaced or provided new in remodel work, Contractor shall carefully remove finishes as needed to expose existing backing, or to prepare for the installation of backing for new grab bars. E. Where gypsum board is to remain, patch, tape and float portion of wall as needed to match adjacent new finish. F. Contractor to coordinate demolition so all wiring, conduit, equipment, etc. to remain is not damaged. Certain items may be temporarily removed and replaced later during course of restoration. General Contractor will be required to incorporate this work into their schedule. The systems may include, but are not limited to the following: EMS/controls, electrical power and lighting, data, audiovisual, security, intercom, CATV, etc. Contractor to tag and loop wire to remain back to control panels, typical. G. Any plumbing to be demolished shall have piping terminated above finished ceiling, below finished floor, and behind finished walls. All drain/waste/vent piping to be capped and sealed at all openings per requirements of AHJ. H. Remove existing ceiling grid, suspension wires, lighting fixtures, conduits, exit signs, speakers, smoke detectors, curtain tracks, HVAC diffusers and return grilles, and any other ceiling mounted apparatus in all areas of demolition, UNO. I. Remove floor and wall covering throughout areas of demolition only as needed to facilitate new construction. Parge, float and/or prepare floor and wall surfaces to receive new finishes. J. Contractor to maintain or repair fire and smoke ratings of existing floor, roof and wall assemblies throughout, and remove and replace any fireproofing or fire- stopping damaged during demolition or new construction to conform to proper fire rating. K. Contractor shall provide full height temporary partitions with UL rating as needed to separate the construction activity, noise, and dirt from adjacent areas. L. Contractor shall coordinate any shutdown required during demolition with Owner. DEMOLITION PLAN KEYNOTES: 1. REMOVE THE EXISTING SURFACE MOUNT DOUBLE ROLL TOILET TISSUE DISPENSER FOR RELOCATION. 2. REMOVE EXISTING SURFACE MOUNT TOILET SEAT COVER DISPENSER FOR RELOCATION. 3. REMOVE THE EXISTING SIDE WALL GRAB BAR AT THE WATER CLOSET. 4. REMOVE THE EXISTING REAR WALL GRAB BAR AT THE WATER CLOSET. 5. REMOVE THE EXISTING SURFACE MOUNT SOAP DISPENSER FOR RELOCATION. 6. REMOVE THE EXISTING SURFACE MOUNT PAPER TOWEL DISPENSER FOR RELOCATION. 7. REMOVE THE EXISTING SURFACE MOUNT COAT HOOK FOR RELOCATION. 8. REMOVE THE EXISTING SURFACE MOUNT LAVATORY MIRROR FOR RELOCATION. 9. REMOVE EXISTING (OR PORTION OF) TOILET PARTITIONS AS SHOWN. 10. REMOVE PORTION OF WALL TILE AS NEED TO EXPOSE EXISTING GRAB BAR BACKING. 11. REMOVE PORTION OF FLOOR TILE AS NEEDED FOR RELATED FIXTURE REMOVAL AND RELOCATION PER THE REMODEL PLANS. 12. REMOVE EXISTING (OR PORTION OF) EXISTING METAL FRAME AND GYPSUM BOARD WALL AS SHOWN AND/OR DIMENSIONED. 13. REMOVE EXISTING LAVATORY AND RELATED PIPING AND PRESERVE AND PROTECT THE FIXTURE FOR RELOCATION PER THE ARCHITECTURAL AND PLUMBING REMODEL PLANS. 14. REMOVE EXISTING LIGHT FIXTURE(S) FOR RELOCATION PER THE ARCHITECTURAL AND ELECTRICAL REMODEL PLANS. 15. REMOVE THE EXISTING WATER CLOSET AND RELATED PIPING AND PRESERVE AND PROTECT THE FIXTURE FOR RELOCATION PER THE ARCHITECTURAL AND PLUMBING REMODEL PLANS. 16. REMOVE THE EXISTING URINAL AND RELATED PIPING AND PRESERVE AND PROTECT THE FIXTURE FOR RELOCATION PER THE ARCHITECTURAL AND PLUMBING REMODEL PLANS. 17. REMOVE EXISTING MILLWORK SURFACE. 18. REMOVE EXISTING DOOR AND FRAME FOR RELOCATION. 19. REMOVE EXISTING RECESSED TOILET ROOM DISPENSER. 20. REMOVE EXISTING SHOWER GRAB BAR. 21. REMOVE EXISTING TOILET PARTITIONS, PATCH AND REPAIR WALL AND FLOOR FINISHES TO MATCH EXISTING. 22. REMOVE EXISTING URINAL SCREEN. 23. REMOVE EXISTING CASEWORK. 24. REMOVE EXISTING BABY CHANGE TABLE FOR RELOCATION. 25. REMOVE COMPLETELY EXISTING SHOWER FINISHES, SEAT AND FITTINGS. 26. REMOVE EXISTING FLOORING AND DRAIN PER PLUMBING DEMOLITION PLAN. 27. REMOVE EXISTING WALL MOUNTED SHELF. 28. REMOVE EXISTING LAVATORY OR SINK, COUNTERTOP AND/OR CASEWORK. 29. REMOVE AND DISPOSE OF EXISTING DOOR AND FRAME. 30. REMOVE EXISTING NON-ACCESSIBLE SHOWER CONTROLS. DN 5' 5'-6" 5'-4" 01 02 03 04 5010 3.6.5.1 01 02 03 04 5019 3.6.5.1 ADD AUTO- MATIC OPENER 14 27 13 4 3 3 17 13 1 17 2 1 18 8 27 8 6 5 2 6 5 1 16 5 5 ADD AUTO- MATIC OPENER 18 6 6 4 13 MENS TLT T5010 WOMENS TLT T5019 ENVIR. SERV T5009 DN 5' 5'-10" 5 5 9 1 12 12 15 22 12 15 2 2 14 28&8 14 28&8 3 14 14 9 1 16 3 6 6 18 MENS TLT T5010 WOMENS TLT T5019 ENVIR. SERV T5009 2'-10" 3'-2" 12 8 5 6 5 6 27 3'-10" 2'-10" 8" 2" min 12 17 3 & 4 Provide 18" Vert Grab Bar per Standard Detail on Sheet G2 6 5 27 1 2 13 8 C L First Roll Highest Operable Part 1 2 3 & 4 13 13 16 17 1 13 1 17 1'-5" 3 & 4 13 1 8" 2" min 3 & 4 13 1 2 Provide 18" Vert Grab Bar per Standard Detail on Sheet G2 C L First Roll 5 6 5 6 27 12 3 2 17 8 3'-10" 2'-10" 2' 12 27 5 6 8 14 16 Highest Operable Part DN 1 2 2 3 3 MENS TLT T5010 WOMENS TLT T5019 ENVIR. SERV T5009 6 SCALE: 1/4" = 1'-0" 1B 5019 & 5010 Remodel Plans SCALE: 1/4" = 1'-0" 1A 5019 & 5010 Demolition Plans SCALE: 1/4" = 1'-0" 1C 5019 Elev 01 SCALE: 1/4" = 1'-0" 1D 5019 Elev 02 SCALE: 1/4" = 1'-0" 1E 5019 Elev 03 SCALE: 1/4" = 1'-0" 1F 5019 Elev 04 SCALE: 1/4" = 1'-0" 2C 5010 Elev 01 SCALE: 1/4" = 1'-0" 2D 5010 Elev 02 SCALE: 1/4" = 1'-0" 2E 5010 Elev 03 SCALE: 1/4" = 1'-0" 2F 5010 Elev 04 SCALE: 1/4" = 1'-0" 3 5019 & 5010 Reflected Ceiling Plan SEE SHEET 3.7.1 FOR INTERIOR PLAN AND ELEVATION FINISHES ASI 9 Ancillary 5th RRs 8.24.16 6

Transcript of FLOOR PLAN & ELEVATION GENERAL NOTES: REMODEL FLOOR … - ADA... · R T I C A I R T R S T E R E D A...

Page 1: FLOOR PLAN & ELEVATION GENERAL NOTES: REMODEL FLOOR … - ADA... · R T I C A I R T R S T E R E D A C H E G C T n ed i g S D e t a A R U I A Z O N S, JON BENTON 14333 expires 03/31/17

3.6.5.1SHEET NO.

SHEET CONTENTS

JB JM CK DW KT

DATE

CONSTRUCTION DOCUMENTS

PROJECT NO.

11.18.2015

DATE OF ISSUE

REVISION NO.

PROJECT PHASE

2014_311

PROJECT TEAM DRAWN BY

Ancillary Building 5th Floor RemodelRooms 5019 & 5010

CLIENT CONTACT

Balasubramanian

Dig

nity

He

alth

St.

Jo

sep

h's

Ho

spita

lA

DA

Re

me

dia

tio

n3

50

We

st T

ho

ma

s R

oa

d,

Pho

enix

, A

rizo

na

8

50

13

© 2015 this (hard copy or electronic) drawing is an instrument of service and the property ofthe Orcutt|Winslow Partnership and shall remain their property. The design professional shallnot be responsible for any alterations, modifications or additions made to this drawing by anyparty other than the design professional. Use of this drawing shall be limited to the original sitefor which it was prepared and publication thereof is expressly limited to such use, re-use orreproduction. Unless otherwise agreed in writing, design professional reserves all copyright orother proprietary interest in this drawing, and it may not be re-used for any other purposewithout the design professional’s written consent. Publication by any method in whole or partis prohibited without the written permission of the design professional. Any informationobtained or conclusions derived from this drawing shall be at the user’s sole risk.

Teresa Walsh3033 North 3rd AvenuePhoenix, Arizona 85013

602.407.3891 t- [email protected]

3003 n central avesixteenth floorphoenix az [email protected]

602.257.1764 t602.257.9029 f

www.owp.com

.A.

.

.

T EN O

FI

CE

R TCI A

IR

I T

RSTERED A CH

EG C

TE

dengiS

Det

aA R

UI

AZ O N S

,

JONBENTON

14333

expires 03/31/17

1 0 / 30 / 15

Orc

utt|

Win

slo

w P

roje

ct 2

014

_3

11 S

t. J

ose

ph'

s H

ospi

tal

AD

A R

emed

iati

on

, A

ncill

ary

Bui

ldin

g 5

th F

loor

Rem

ode

l S

heet

3.6

.5.1

Ro

om

s 5

019

& 5

010

was

plo

tted

by

Jo

n B

ento

n o

n W

edne

sday

, S

epte

mb

er 1

4,

20

16 a

t 11

:25

AM

; fi

le f

oun

d a

t B

IM S

erve

r: b

imse

rver

.ow

p.c

om

- B

IM S

erve

r 19

/Edu

cati

on

Stu

dio

/14

_3

11 S

t Jo

sep

hs A

DA

Rem

edia

tio

n P

art

1FLOOR PLAN & ELEVATION GENERAL NOTES:

A. Contractor to recess floor slab at accessible showers in compliance w/ICC/ANSI A117.1 for the disabled where indicated on architectural plans.

B. Provide concealed in-wall blocking behind shower seats, grab bars, etc.per manufacturer's recommendations.

C. Refer to Accessible Details for plumbing fixtures and accessoriesinstallation.

REMODEL FLOOR PLAN & ELEVATION KEYNOTES:

1. SURFACE MOUNT DOUBLE ROLL TOILET TISSUE DISPENSER 2" MINIMUMCLEAR BELOW BOTTOM OF SIDE WALL GRAB BAR.

2. SURFACE MOUNT TOILET SEAT COVER DISPENSER 2" MINIMUM CLEARBELOW BOTTOM OF SIDE WALL GRAB BAR.

3. MOUNT 42" LONG SIDE WALL GRAB BAR 36" TO TOP OF BAR FROMEXISTING FFL WITH CONCEALED METAL BACKING.

4. MOUNT 36" LONG REAR WALL GRAB BAR 36" TO TOP OF BAR FROMEXISTING FFL WITH CONCEALED METAL BACKING.

5. SURFACE MOUNT SOAP DISPENSER WITH HIGHEST OPERABLE PART NOTHIGHER THAN 42" ABOVE FFL.

6. SURFACE MOUNT PAPER TOWEL DISPENSER WITH HIGHEST OPERABLEPART NOT HIGHER THAN 48" ABOVE FFL.

7. SURFACE MOUNT COAT HOOK WITH TOP OF HOOK AT +46" AFF.

8. SURFACE MOUNT FRAMED GLASS MIRROR WITH BOTTOM OFREFLECTIVE SURFACE AT 40" MAXIMUM AFF. MATCH BEIP MIRRORS ATANCILLARY MAIN MEN'S & WOMEN'S RESTROOMS NEAR ELEVATORS.

9. SURFACE MOUNT 18" X 48" STAINLESS STEEL FRAMED TEMPEREDGLASS MIRROR.

10. SURFACE MOUNT WATER CLOSET PARAPHERNALIA SHELF PERACCESSIBLE DETAIL, OR OTHER LOCATIONS AS DIMENSIONED ON PLAN.

11. WALL MOUNT LAVATORY PER ARCHITECTURAL PLUMBING PLANS ANDACCESSIBLE DETAILS.

12. INSTALL ACCESSIBLE INSULATION OVER EXPOSED LAVATORY HOTWATER AND DRAIN PIPING PER PLUMBING AND ACCESSIBLE DETAILS.

13. INSTALL WATER CLOSET AS SHOWN PER ACCESSIBLE DETAILS ANDPLUMBING PLAN.

14. INSTALL URINAL PER PLUMBING PLAN AND ACCESSIBLE DETAILS.

15. INSTALL PAPER TOWEL DISPENSER PER ACCESSIBLE DETAILS.

16. CONSTRUCT NEW INSULATED METAL FRAME WALL, OR OPENING INFILLCREATED BY DEMOLITION, WITH MOISTURE RESISTANT GYPSUM BOARDAND CERAMIC TILE TO MATCH ADJACENT WALL SURFACE.

17. PROVIDE AND INSTALL NEW TOILET PARTITIONS AND DOOR(S) ASNEEDED TO MATCH EXISTING PARTITION AS SHOWN.

18. PROVIDE AND INSTALL AUTOMATIC DOOR OPENER FOR EXISTING DOORPER SPECIFICATIONS AND ELECTRICAL DRAWINGS.

19. RE-INSTALL DOOR AND FRAME REMOVED BY DEMOLITION.

20. NEW DOOR AND FRAME TO MATCH DOOR REMOVED BY DEMOLITION.

21. PROVIDE AND INSTALL SHOWER GRAB BARS PER ACCESSIBLE DETAILS.

22. BABY CHANGE STATION REMOVED IN DEMOLITION. PATCH ANDREFINISH WALL WHERE STATION WAS REMOVED TO MATCH EXISTING.

23. NEW DOOR AND HOLLOW METAL FRAME TO MATCH EXISTING.

24. REMOVE AND RELOCATE ACCESS PANEL TO ALLOW FOR GRAB BAR.

25. PROVIDE AND INSTALL NEW 23 1/2" DEEP URINAL SCREEN.

26. NEW METAL FRAMED PAINTED GYPSUM BOARD SOFFIT.

27. NEW LAVATORIES IN COUNTERTOP. SEE PLUMBING PLAN.

28. INSTALL RELOCATED LIGHT FIXTURE PER ELECTRICAL DRAWINGS.

29. NEW LIGHT FIXTURE PER ELECTRICAL SPECIFICATIONS.

30. NEW 36" X 36" ACCESSIBLE TRANSFER SHOWER WITH WALL MOUNTEDCONTROLS AND SEAT PER ACCESSIBLE DETAILS AND MPE PLANS.

31. NEW CASEWORK WITH SINK REMOVED IN DEMOLITION.

32. NEW ACCESSIBLE SHOWER CONTROL PER PLUMBING PLANS.

33. NEW ACCESSIBLE ROLL-IN SHOWER AND SHOWER CONTROL FITTINGSPER DETAILS AND PLUMBING PLAN.

34. INSTALL FACE OF PANEL 1 1/2" FROM WATER CLOSET CENTERLINE.

35. MODIFY COUNTER PANEL AS NEEDED FOR CLEAR DIMENSION SHOWN.

36. CUSTOM REAR WALL GRAB BAR WITH RETURN.

37. MOUNT 18" LONG SIDE WALL VERTICAL GRAB BAR 39" TO BOTTOM OFBAR FROM EXISTING FFL WITH CONCEALED METAL BLOCKING.

SD

TP

M1

S1

SS

M2

M3

5" x 18" PARAPHERNALIA SHELF (U.N.O.)

HORIZONTAL GRAB BARMOUNT TOP SURFACE AT 33" MIN -36" MAX AFF

COAT HOOKMOUNT WITH TOP OF HOOK AT 46" AFF

LAVATORY MIRROR MOUNT 40" MAX AFF TOBOTTOM OF REFLECTIVE SURFACE TYPE M1 PERKEYNOTE 8 (M3 SPECIAL PER FINISH PLAN)

ENLARGED PLAN LEGEND

SHOWER SEAT FOR TRANSFER TYPEACCESSIBLE SHOWER

SOAP DISPENSER (SURFACEMOUNT) WITH OPERATING LEVER@ 48" AFF MAX

PAPER TOWEL DISPENSER (SURFACEMOUNT) WITH TOP OF OPENING AT48" AFF MAX

TOILET TISSUE DISPENSERDOUBLE ROLL (SURFACE MOUNT)2" CLEAR BELOW GRAB BAR

SEAT COVER DISPENSER(SURFACE MOUNT) 2" BELOWBOTTOM OF GRAB BAR LEVEL

BABY CHANGING STATION (SURFACEMOUNT) 48" MAX AFF TO LATCHING PARTAND 34" MAX TO TOP OF OPENED SURFACE

16" HIGH VERTICAL GRAB BARMOUNT BOTTOM AT 40" AFF

18"W x 48"H WALL MIRROR MOUNT BOTTOM AT30" AFF TO BOTTOM OF REFLECTIVE SURFACE

SD

6

8

REFLECTED CEILING PLAN GENERAL NOTES:

A. Ceilings and other suspended items shall be attached to structure by fullyembedded or "shear" connection; pull out connections are not acceptable.

B. All gypsum board ceilings shall be 5/8" type 'X' gypsum board on lightgauge framing or suspension system.

C. Verify all ceiling heights. All existing ceiling heights drawn are assumed9'-0" AFF, and may not be accurate. Where ceiling supports are to extend,match existing height, direction, manufacturer, style, color, and type of grid.

D. Center all devices, sprinkler heads, etc. in ceiling tiles and ceiling areas.

E. All soffits over casework to extend 1” beyond the face of casework.

F. Provide continuous sound batt insulation above all toilet room ceilings.

G. Fire sprinkler contractor shall reference all drawings and specifications fordetermining proper coverage and sprinkler head layout/design.

H. Reveal molding to be used at all intersections of different materials. All soffitreveals shall be a continuation of vertical wall reveals.

I. Refer to electrical drawings for location of reused, relocated, existing or newlight locations. Patch all GWB ceilings with new gypsum wall board wheredamaged or removed for new work. Match existing depth, finish and colorof ceiling to be patched.

REFLECTED CEILING PLAN KEYNOTES:

1. REMOVE, REPLACE AND REFINISH SUSPENDED CEILING, FRAMING,GYPSUM BOARD AND TEXTURE TO MATCH EXISTING ADJACENT CEILING,AND PAINT ENTIRE CEILING.

2. NEW OR RELOCATED LIGHT FIXTURE PER ELECTRICAL PLANS.

3. NEW OR RELOCATED HVAC DIFFUSER PER MECHANICAL PLANS.

4. NEW LAY-IN CEILING SYSTEM WITH VINYL-FACED FINISH.

5. REMOVE LIGHT FIXTURE PATCH AND REPAIR AS REQUIRED.

DEMOLITION PLAN GENERAL NOTES:

A. Sawcut and remove existing concrete floor slab to accommodate new utilitywork. Compact trench backfill and patch floor slab to match existing.

B. Coordinate demolition with new construction. All demolition and repairnecessary to accomplish new construction shall be included. Contractor shallremove all existing improvements whether or not specifically indicated on thedrawings to facilitate the completion of all required work. Contractors shall visitthe site and verify all quantities and items required to be removed.

C. Contractor shall carefully remove wall and floor mounted toilet fixtures,partitions and bracing, accessories, grab bars, light fixtures, doors and frames,portions of frame walls, recessed accessories, etc. to minimize damage to wall,floor and ceiling surfaces. Provide straight line scoring and/or cutting joints toseparate and protect existing walls and finishes from portions of walls to beremoved.

D. Where grab bars are to be removed, replaced or provided new in remodel work,Contractor shall carefully remove finishes as needed to expose existing backing,or to prepare for the installation of backing for new grab bars.

E. Where gypsum board is to remain, patch, tape and float portion of wall asneeded to match adjacent new finish.

F. Contractor to coordinate demolition so all wiring, conduit, equipment, etc. toremain is not damaged. Certain items may be temporarily removed andreplaced later during course of restoration. General Contractor will be requiredto incorporate this work into their schedule. The systems may include, but arenot limited to the following: EMS/controls, electrical power and lighting, data,audiovisual, security, intercom, CATV, etc. Contractor to tag and loop wire toremain back to control panels, typical.

G. Any plumbing to be demolished shall have piping terminated above finishedceiling, below finished floor, and behind finished walls. All drain/waste/ventpiping to be capped and sealed at all openings per requirements of AHJ.

H. Remove existing ceiling grid, suspension wires, lighting fixtures, conduits, exitsigns, speakers, smoke detectors, curtain tracks, HVAC diffusers and returngrilles, and any other ceiling mounted apparatus in all areas of demolition, UNO.

I. Remove floor and wall covering throughout areas of demolition only as neededto facilitate new construction. Parge, float and/or prepare floor and wallsurfaces to receive new finishes.

J. Contractor to maintain or repair fire and smoke ratings of existing floor, roof andwall assemblies throughout, and remove and replace any fireproofing or fire-stopping damaged during demolition or new construction to conform to properfire rating.

K. Contractor shall provide full height temporary partitions with UL rating asneeded to separate the construction activity, noise, and dirt from adjacentareas.

L. Contractor shall coordinate any shutdown required during demolition withOwner.

DEMOLITION PLAN KEYNOTES:

1. REMOVE THE EXISTING SURFACE MOUNT DOUBLE ROLL TOILET TISSUEDISPENSER FOR RELOCATION.

2. REMOVE EXISTING SURFACE MOUNT TOILET SEAT COVER DISPENSER FORRELOCATION.

3. REMOVE THE EXISTING SIDE WALL GRAB BAR AT THE WATER CLOSET.

4. REMOVE THE EXISTING REAR WALL GRAB BAR AT THE WATER CLOSET.

5. REMOVE THE EXISTING SURFACE MOUNT SOAP DISPENSER FORRELOCATION.

6. REMOVE THE EXISTING SURFACE MOUNT PAPER TOWEL DISPENSER FORRELOCATION.

7. REMOVE THE EXISTING SURFACE MOUNT COAT HOOK FOR RELOCATION.

8. REMOVE THE EXISTING SURFACE MOUNT LAVATORY MIRROR FORRELOCATION.

9. REMOVE EXISTING (OR PORTION OF) TOILET PARTITIONS AS SHOWN.

10. REMOVE PORTION OF WALL TILE AS NEED TO EXPOSE EXISTING GRAB BARBACKING.

11. REMOVE PORTION OF FLOOR TILE AS NEEDED FOR RELATED FIXTUREREMOVAL AND RELOCATION PER THE REMODEL PLANS.

12. REMOVE EXISTING (OR PORTION OF) EXISTING METAL FRAME AND GYPSUMBOARD WALL AS SHOWN AND/OR DIMENSIONED.

13. REMOVE EXISTING LAVATORY AND RELATED PIPING AND PRESERVE ANDPROTECT THE FIXTURE FOR RELOCATION PER THE ARCHITECTURAL ANDPLUMBING REMODEL PLANS.

14. REMOVE EXISTING LIGHT FIXTURE(S) FOR RELOCATION PER THEARCHITECTURAL AND ELECTRICAL REMODEL PLANS.

15. REMOVE THE EXISTING WATER CLOSET AND RELATED PIPING ANDPRESERVE AND PROTECT THE FIXTURE FOR RELOCATION PER THEARCHITECTURAL AND PLUMBING REMODEL PLANS.

16. REMOVE THE EXISTING URINAL AND RELATED PIPING AND PRESERVE ANDPROTECT THE FIXTURE FOR RELOCATION PER THE ARCHITECTURAL ANDPLUMBING REMODEL PLANS.

17. REMOVE EXISTING MILLWORK SURFACE.

18. REMOVE EXISTING DOOR AND FRAME FOR RELOCATION.

19. REMOVE EXISTING RECESSED TOILET ROOM DISPENSER.

20. REMOVE EXISTING SHOWER GRAB BAR.

21. REMOVE EXISTING TOILET PARTITIONS, PATCH AND REPAIR WALL ANDFLOOR FINISHES TO MATCH EXISTING.

22. REMOVE EXISTING URINAL SCREEN.

23. REMOVE EXISTING CASEWORK.

24. REMOVE EXISTING BABY CHANGE TABLE FOR RELOCATION.

25. REMOVE COMPLETELY EXISTING SHOWER FINISHES, SEAT AND FITTINGS.

26. REMOVE EXISTING FLOORING AND DRAIN PER PLUMBING DEMOLITIONPLAN.

27. REMOVE EXISTING WALL MOUNTED SHELF.

28. REMOVE EXISTING LAVATORY OR SINK, COUNTERTOP AND/OR CASEWORK.

29. REMOVE AND DISPOSE OF EXISTING DOOR AND FRAME.

30. REMOVE EXISTING NON-ACCESSIBLE SHOWER CONTROLS.

DN

5'

5'-6"

5'-4"

01

0203

04 50103.6.5.1

01

0203

04 50193.6.5.1

ADD AUTO-MATIC OPENER

14

2727

13

4

3

3

1717

13

1

17

2 1

18

8 8

2727

8 8

6

5

2

6

5

1

1616

5

5

ADD AUTO-MATIC OPENER

18

6

6

4

13

MENSTLTT5010

WOMENSTLTT5019

ENVIR.SERVT5009

DN

5'

5'-10

"

5

5

9

1

12

2

12

15

22

12

15

2

2

1428&828&8

14

28&828&828&8

3

16

14

14

6

9

1

6

3

16

3

6

6

18

MENSTLTT5010

WOMENSTLTT5019

ENVIR.SERVT5009

2'-1

0"3'

-2"

8

1212

8 5

6

5

6

2727

3'-1

0"

2'-1

0"

8"

2" m

in

12

17

3 & 43 & 4

Provide 18" VertGrab Bar perStandard Detailon Sheet G2

65

27

1

213

8

CLFirst Roll

Highest Operable Part

1

23 & 43 & 4

13 13

16161616

17

1

13

1

17

1'-5

"

3 & 4

13

1

8"

2" m

in3 & 43 & 4

13

1 2

Provide 18" VertGrab Bar perStandard Detailon Sheet G2

CL First Roll

12

5

6

5

6

2727

12

3

2

17

88

3'-1

0"2'

-10"

2'12

27

56

8

14

1616

Highest Operable Part

DN11

22

22

3

3

MENSTLTT5010

WOMENSTLTT5019

ENVIR.SERVT5009 6

SCALE: 1/4" = 1'-0"1B 5019 & 5010 Remodel Plans

SCALE: 1/4" = 1'-0"1A 5019 & 5010 Demolition Plans

SCALE: 1/4" = 1'-0"1C 5019 Elev 01

SCALE: 1/4" = 1'-0"1D 5019 Elev 02

SCALE: 1/4" = 1'-0"1E 5019 Elev 03

SCALE: 1/4" = 1'-0"1F 5019 Elev 04

SCALE: 1/4" = 1'-0"2C 5010 Elev 01

SCALE: 1/4" = 1'-0"2D 5010 Elev 02

SCALE: 1/4" = 1'-0"2E 5010 Elev 03

SCALE: 1/4" = 1'-0"2F 5010 Elev 04

SCALE: 1/4" = 1'-0"3 5019 & 5010 Reflected Ceiling Plan

SEE SHEET 3.7.1 FORINTERIOR PLAN ANDELEVATION FINISHES

ASI 9 Ancillary 5th RRs 8.24.16

6