Pks for new hires

34
Product Knowledge Seminar ABOITIZLAND, INC

description

pks new hires

Transcript of Pks for new hires

Page 1: Pks for new hires

Product Knowledge Seminar

ABOITIZLAND, INC

Page 2: Pks for new hires

OUR PROJECTS

Page 3: Pks for new hires
Page 4: Pks for new hires

Location Map

Monday, April 24, 2023 Presentation Template

Page 5: Pks for new hires

Bare 1.6 MFinished 1.8 M

Page 6: Pks for new hires

Bare 1.5 MFinished 1.8 M

Page 7: Pks for new hires

Bare 2.2 MFinished 2.8 M

Page 8: Pks for new hires

Bare 2.8 MFinished 3.2 M

Page 9: Pks for new hires

Bare 1.8 MFinished 2.1 M

Page 10: Pks for new hires

Bare 3.5 MFinished 3.8 M

LAST TRANCH

Page 11: Pks for new hires

Amenities

Monday, April 24, 2023 Presentation Template

Amenities centralized at the riverside •Open Type Clubhouse•Basketball court w/ benches•Community Area w/ Pinoy childhood games•Playground •Picnic area w/ bbq station and benches•Leisure Pool•Aboitizland Community shapes in

the landscaping•Green landscaping around

Page 12: Pks for new hires

* Road Network12.5 m – spine road8-10 m – other road networks

* 3 Water Treatment Facilities (WTF)

*2 Elevated Water Tank (EWT)

Site Development

Monday, April 24, 2023 Presentation Template

Page 13: Pks for new hires

CONCRETE SHEAR WALL

Page 14: Pks for new hires

- the system produces solid concrete construction that is quick to install and structurally superior to conventional buildings.

• Concrete Shear Walls are cast-in-place vertical structural elements with a dual role of resisting both gravity and lateral loads.

Page 15: Pks for new hires

Shear Wall Panels

• pre-manufactured 6mm Hardiflex fiber cement board that are sandwich together using 100mm light gauge steel (metal studs); and then

• erected and poured at site using 3,000 psi concrete to form a monolithic structure.

Page 16: Pks for new hires

Other Applications Institutional Buildings Dormitory Buildings

School Bldg

Museum Bldg

Offices

Page 17: Pks for new hires

Steps in Housing Construction

School Bldg

Mat Foundation – is a large, thick reinforced concrete mat which transfer loads from columns and walls, to the underlying soil. It reduces differential settlements.

Page 18: Pks for new hires

School Bldg

Steps in Housing Construction

Page 19: Pks for new hires

Major Advantages

• Top quality finish - uses Hardiflex board to guarantee crack-free and smooth finish walls. - straight-to-finish, eliminates plastering.

• Tested for durability - uses 3,000psi concrete fill

• Termite proof structure - solid concrete wall - uses less wood

• More efficient floor space - no protruding columns on walls

• Higher fire rating - maximize use of fire proof materials

• Faster installation

Page 20: Pks for new hires
Page 21: Pks for new hires
Page 22: Pks for new hires
Page 23: Pks for new hires

Presentation Template

CommercialCommercial

ResidentialResidential

Page 24: Pks for new hires

Presentation Template

Area Development

Unit Type House AreaDownhill Mid Unit 150Downhill End Unit 163Uphill Mid Unit 162Uphill End Unit 175

Page 25: Pks for new hires

8 M – 10 M

Page 26: Pks for new hires

Presentation Template

Downhill Side section

Page 27: Pks for new hires

Presentation Template

Interior Garden view

Page 28: Pks for new hires

8 M – 10 M

Page 29: Pks for new hires

Presentation Template

Uphill Side section

Page 30: Pks for new hires
Page 31: Pks for new hires
Page 32: Pks for new hires

Monday, April 24, 2023

2011 Sales and Marketing Campaign

Page 33: Pks for new hires

Presentation Template

Financing Scheme In-House Financing Lot Only 20% Downpayment payable in 10 months; 80% balance

House and Lot 20% Downpayment payable up to 12 months; 80% balance

Interest Rates : 5 years @ 14% interest per annum 7 years @ 16% interest per annum 10 years @ 18% interest per annum

Bank Financing 20% Downpayment payable in 12 months; 80% Balance upon Loan

Take-out

Page 34: Pks for new hires