    AFTEROPTIMIZATIONSOLUTIONSLIST.

  • 7/31/2019 Pilot Sites

    2/22

    2

    OPTIMIZINGOPTIMIZATION SOLUTIONS

    18 Pilot Sites have been identied by theparticipating Social Housing Organizations.

    According to the Pilot ESMs implementedon this Pilot Sites, partners proposedsome Optimization suggestions in order toimprove the eciency o the measures andguarantee their perormance.Quick overview o the dierent Pilot Sitesconnected with rst inormation on theOptimization solutions that are (or will be)implemented on eld.

  • 7/31/2019 Pilot Sites

    3/22

    3

    OPTIMIZINGOPTIMIZATION SOLUTIONS

    AFTER Energy Saving Measures have beenpresented in the Newsletter #2 o the project.These Energy Saving Measures (ESMs) coveran exhaustive range o interventions on thesocial housing stock aiming at improving theenergy efciency o the buildings, their economicperormance both or the Social HousingOrganizations and their tenants.

    Reminder : AFTER collects and improves EnergySaving Measures

    An Energy Saving Measure can be described as

    ollowed.An ESM:

    is implemented in order to improve the energyconsumption o a building and related to heatingaspects, warm water or electric powering orheating equipment. its impacts can eventually be monitored andevaluated regarding kWh and heating energycosts. can be optimized/infuenced/present a potential

    to be improved.

    These ESMs gather a large range o interventionsthat have been listed as ollows

    The objective o the second phase o the AFTERProject is now to optimize these ESMs fndingactions that will correct and improve theirefciency ater their implementation.

    Optimizing Energy Saving Measures

    An Optimization Solution is related to an ESMwhich show potential o improvement.Thispotential can concern the 3 ollowing objectives:- improve the economic model o the ESM.- enhance the energy efciency.- increase the social perormance and the

    reception o the ESM by tenants.)

    As a consequence the Optimization Solution canlead to several types o actions:

    - management & strategic decision- technical intervention (control, maintenance,replacement) on the systems and equipment.- improve the reception o the ESM by tenants.

    The objective is still to highlight simple and low-

    cost interventions that will improve the savingslinked to an Energy Saving Measure.Optimization solutions have been proposed by theAFTER participating Social Housing Organizationswith the sustain o the Scientifc partners. Theseoptimizations will be tested during the heatingseason in order to measure and to assess theirimpact on buildings.

    OPERATING MANAGEMENT

    RUNNING MAINTENANCE

    REPLACEMENT OF SYSTEMS

    RECENTLY REFURBISHED BUILDINGS

    RECENT LOW ENERGY BUILDING

  • 7/31/2019 Pilot Sites

    4/22

    4

    OPTIMIZING

    RAMEAUXLes Rameaux, Alle des Monts Dors

    63370 LEMPDES. France.

    70 dwellings. 3 low-rise horizontal blocks(3 stories) + 1 low-rise block(4 stories). Year o construction: 1970.

    New energy contract with perormance objective and prot-sharing system with the operator containing :1) New prices negotiated on the gas price (withdrawal romthe historical regular price and indexation o the newprice on the evolution o the regular price in order to have acontinual delta.

    2) New O&M contracts or equipment with perormanceobjectives and prot-sharing clauses.

    3) Total guarantee and plan or the equipment replacement.

    4) Modernization plan and ESMs identied in the originalcontract. The operator will give every year a modernizationand energy-saving plan to the SHO containing potential ESMs

    to implement (and their prices).Several operators have been evaluated in order to conclude

    the contract.

    ENERGY SAVING MEASURE

    List o interventions planned and proposed as options bythe energy supplier in the contract in order to improve theenergy perormance.

    Prot-sharing clause on the energy supply and contractualclauses securizing the price o the energy (gas).

    OPTIMIZATION SUGGESTION

    WP3: PILOT ESM #1

    OPTIMIZATION SOLUTIONS

    HOW TO SECURE AN ENERGYSUPPLY CONTRACT ANDCONTRACTUALLY PLAN THEPOTENTIAL IMPROVEMENT OFTHE ENERGY EFFICIENCY FOR

    YOUR HOUSING STOCK?

  • 7/31/2019 Pilot Sites

    5/22

    5

    OPTIMIZING

    JABURKOVEJ.Jaburkov 1,3,5,

    736 01 HAVIROV. Czech Republic.

    36 apartments. Building national type T02B, 4overground oors.Year o construction 1962

    Web tools and energy inormation:

    Remote reading o heating energy and hot and cold waterconsumption in individual apartments and visualisation oconsumption data to tenants on internet user web portal ingraphical and numerical orm plus outputs o comparisonwith previous periods consumption and with the otherapartments consumption anonymously.

    Wireless radio requency meters o heating energy (RFthermometers), hot, cold water consumption are installed inapartments. Consumption data are transmitted via gatewayto application server where are stored and processed.Consumption is visualised on the web portal in real timeater each reading several times per day (hour).

    ENERGY SAVING MEASURE

    Web portal use and impact improved thanks to directcommunication with the tenants on new supports andocusing particular targets: certicates in the entrance,

    visualization tools, personal advising or the most energy-consuming tenants by the sta o the SHO, competition andpedagogic approach o the inormation.

    OPTIMIZATION SUGGESTION

    WP3: PILOT ESM #2

    OPTIMIZATION SOLUTIONS

    HOW TO IMPROVE THEEFFICIENCY OF A COMMON WEBINFORMATION TOOL ABOUTENERGY CONSUMPTIONS THANKSTO DIRECT COMMUNICATIONTOWARDS TENANTS?

  • 7/31/2019 Pilot Sites

    6/22

    6

    OPTIMIZINGWP3: PILOT ESM #3

    OPTIMIZATION SOLUTIONS

    HERNINGH2-College,7400 Herning. Denmark.

    66 dwelling or students.Year o construction: 2009.

    College buildings. Target group = students (which meanrequent transers, some period o vacancy in the dwellingsand other characteristics regarding the use o the buildingand its energy equipment).

    H2 College is a pioneers work: the rst passive housebuilding or Danish SHOs.Located or maximum sunlight. Pre-abricated elements.Double fow Ventilation system, heavily insulated, lowenergy windows and geothermal heat-system. Production ohot water and electricity rom own Hydrogen Plant.

    ENERGY SAVING MEASURE

    Energy data shows an unacceptable huge dierence betweenhighest and lowest consumption among Tenants. In order tochange/improve this situation Tenant inormation is plannedto be distributed October 2012. The Inormation will providesome general guidelines or living in a passive house aswell as more technical inormation o the equipment inthe dwelling. At the moment it is not possible to separate

    the energy consumption in what is used or the ventilationsystem (incl. an coils) and what is used or personalequipment - computers, Hi Fi, tv etc .

    OPTIMIZATION SUGGESTION

    HOW TO REDUCE THEDIFFERENCE BETWEENLOWEST AND HIGHEST ENERGY

    CONSUMPTIONS IN A LOW-ENERGY BUILDING IMPROVINGTHE CONTENT OF THEINFORMATION DELIVERED(SPECIAL TARGET: STUDENTS)?

  • 7/31/2019 Pilot Sites

    7/22

    7

    OPTIMIZINGWP4: PILOT ESM #1

    OPTIMIZATION SOLUTIONS

    MLADIMladi 25736 01 HAVIROV. Czech Republic.

    66 appartments.Panel apartment building.National typology: OP1.11Year o construction: 1983

    Hydraulic balancing o the heating system.

    Regulation o pressure:In the building 149 valves have been replaced with valve type99-RK, valve VE4262H.In the basement manual regulation valve STAF DN80 anddierential Pressure Regulator DA516 in size DN 80 have

    been installed.

    ENERGY SAVING MEASURE

    Check o the heating system scheme.Detect imperections and errors in the scheme. Proposethe correct positioning and dimensions o heating circuitelements, especially the pressure regulators: circulationpump overloaded causing excessive energy consumption orits activity. New positioning or a capillary pipe in the scheme

    between circulation pump, manual valve, and the dierentialpressure regulator in to reduce the over-consumption o thecirculation pump.

    OPTIMIZATION SUGGESTION

    HOW TO IMPROVE THEBALANCING OF A HEATING

    SYSTEM CORRECTINGDEFICIENCIES IN ITS SCHEMEAND/OR VERIFYING THE REALIMPLEMENTATION OF THESCHEME?

  • 7/31/2019 Pilot Sites

    8/22

    8

    OPTIMIZINGWP4: PILOT ESM #2

    OPTIMIZATION SOLUTIONS

    RIESIVIa Riesi 5,10043 Orbassano. Italy.

    1 Apartment Block, 51 dwellings,traditional constructionYear o construction: 1995.

    A new heating system based on three condensing boilers(Brand: Baltur - Model: Supergenio MC115, power: 115kW each) and a smart metering system with adapter wereinstalled in a quite recent building (1995). Tenants stillcomplain about thermal discomort, higher costs than beoreand too many dierences o consumption rates amongapartments.A better periodic control and cleaning o the boilers, boilersume, exchanger, pumps and valves control has beenplanned in order to nd solutions or this problem.

    ENERGY SAVING MEASURE

    Regulation o the temperature settings and calibration othe heating curves (slop and level, rom 0.8 point to 2) once amonth.The eects o these optimizatons and adjustments regardingthe comort and the bills o the tenants will be analyzed tond the good settings.

    OPTIMIZATION SUGGESTION

    HOW TO GUARANTEE THETHERMAL COMFORT AND THE

    ECONOMIC PERFORMANCEOF A HEATING SYSTEM FORTENANTS THANKS TO A BETTERCALIBRATION OF ITS OUTPUTS?

  • 7/31/2019 Pilot Sites

    9/22

    9

    OPTIMIZINGWP4: PILOT ESM #2

    OPTIMIZATION SOLUTIONS

    REVOLUCIJETrg revolucije 161420 TRBOVLJE. Slovenia.

    14 storey. Building with walls and acadebricks, at roo. 52 dwellings.Year o construction: 1970.

    Hydraulic balancing o the heating system.

    Connecting valves were built-in on return fow line.Balancing valves Danoss ASV-PV (adjustable dierentialpressure regulators) and Danoss ASV-I (adjustableshutter valves and metering valves) were installed. In allappartments radiator valves were switched or new Danossthermostatic valves with additional ne regulation. At theend complete system was balanced and regulated with newlyinstalled valves.

    ENERGY SAVING MEASURE

    Special context: SPEKTER doesnt own the heating stationand, as a consequence, limited actions are possible on thesystem. Regulation o the system and thermal insulation osome district heating station parts will be discussed with thecompany managing the district heating.

    Tenants awareness on how to use thermostatic valves andventilation with lower temperature o the system will be apreerred lever to optimize the ESM i direct intervention onthe system is not possible.

    OPTIMIZATION SUGGESTION

    HOW TO INCREASE TENANTSAWARENESS REGARDING

    THE USE OF NEW THERMOSTATICVALVES AFTER A SYSTEMREGULATION (to be confrmed)?

  • 7/31/2019 Pilot Sites

    10/22

    10

    OPTIMIZINGWP5: PILOT ESM #1

    OPTIMIZATION SOLUTIONS

    AIGUILLADE44, rue du Colombier63000 CLERMONT-FERRAND. France.

    1 long low-rise block.7 stories or 196 dwellings.Year o construction: 1965

    District Heating Season belonging to the Clermont-FerrandMunicipality but with an outsourcing o public services orthe heating system operator.

    Two energy-saving and energy-perormance aspects :

    1) New energy mix (substitution o a 100% gas system with acombined system 78% wood - 22% gas).

    2) Perormance improvement with action on sub-stations bythe SHO.

    ENERGY SAVING MEASURE

    Modication o the requested heat fow ater a reurbishmento the building in order to maximize the economic eciencyreducing the standing charge linked to the access o thedistrict heating system.This optimization solution improves the eciency o a

    renewable-based model that is part o the legal obligationsor Auvergne Habitat and optimize its general environmentalstrategy regarding energy.

    OPTIMIZATION SUGGESTION

    HOW TO COUPLE AND

    OPTIMIZE ENVIRONMENTALAND ECONOMIC EFFICIENCY INA RENEWABLE ENERGY-BASEDHEATING SYSTEM (WOOD)?

    !

  • 7/31/2019 Pilot Sites

    11/22

    11

    OPTIMIZINGWP5: PILOT ESM #2

    OPTIMIZATION SOLUTIONS

    HEINHEIMERHeinheimer Strae 57-61D-64289, Darmstadt. Germany.

    30 dwellings.Simple amily house rom the 50s with 5storeys.Year o construction: 1957.

    Heating system (without DHW) with a central standard boilerrom 1982.Exchange o the boiler with a new gas caloric value boiler(lower fow temperature) and adaption o the perormance.

    VIESSMANN; VITODENS 200-W (3 times - or every entrance).Natural gas central heating system with 3 caloric boiler.

    ENERGY SAVING MEASURE

    Radiators were not replaced and were sized according to theold supply temperature. Hydraulic balancing will ensuredthat each radiator gets the same amount o heat.

    OPTIMIZATION SUGGESTION

    HOW TO ADJUST AND OPTIMIZE

    A HEATING SYSTEM AFTER THEIMPLEMENTATION OF A NEW GASCALORIFIC BOILER BUTWITH RADIATORS ADAPTED TOTHE OLD SUPPLY TEMPERATURE?

  • 7/31/2019 Pilot Sites

    12/22

    12

    OPTIMIZINGWP5: PILOT ESM #3

    OPTIMIZATION SOLUTIONS

    PASSONIVia Passoni 1410146 Turin. Italy.

    1 Preab building, 4 oors each, 12 dwellings.Year o construction: 1978

    Substitution o the two old twin boilers (Brand: Ferroli,Model: Linea II, power: 98 kW each) with one newCondensing boiler (model: YGNIS VARFREE 100, September2008, power: 92 kW). This boiler serves only the heatingsystem; tenants have single boiler (electrical, most o the

    time) to produce DHW in their apartments.

    ENERGY SAVING MEASURE

    Removal o the heat exchanger (in order to obtain a lowertemperature o return water and highest eciency) isimpossible because o the warranty o the system.Installation o an insulation cap or the heat exchanger whois not insulated can be a good compromise between the

    present situation and the removal o the heat exchanger.This low cost intervention (300-500 euro) identied thanks toa RCx process could be disseminated ont he whole housingstock o ATC.

    OPTIMIZATION SUGGESTION

    HOW TO IMPROVE A NEW

    HEATING SYSTEM (CONDENSINGBOILER) WITH SPECIFIC LOW-COSTINTERVENTIONS ON MISSINGINSULATION?

  • 7/31/2019 Pilot Sites

    13/22

    13

    OPTIMIZINGWP6: PILOT ESM #1

    OPTIMIZATION SOLUTIONS

    BERGSONPlace Bergson63000 CLERMONT-FERRAND. (63). France. .

    142 dwellings. 3 low-rise horizontal blocks (9stories + 4 stories+ 9 stories).Year o construction: 1967

    Linked with a reurbishment 3 years ago.

    Replacement o the ventilation system : not a classicalControlled Mechanical Ventilation (CMV) but a HybridVentilation with a control humidity measure to regulate thenatural ventilation process.

    Objective :

    1)less energy consumption.

    2)no hot air permanent extraction that reduce the energyperormance o the building.

    ENERGY SAVING MEASURE

    The mechanical ventilation system (based on static pressureand on hourly settings) is adjusted with dierent settings onits dierent parts (an, ducts, extractors) in order to see the

    impacts on fow rates, hygrometry and electric consumptiono the ventilation system.

    OPTIMIZATION SUGGESTION

    HOW TO IMPROVE THEPOTENTIAL OF AN HYBRID

    VENTILATION SYSTEM AFTERREFURBISHMENT REGARDINGBOTH CONSUMPTION ASPECTSAND AIR QUALITY FOR TENANTS?

    !

  • 7/31/2019 Pilot Sites

    14/22

    14

    OPTIMIZINGWP6: PILOT ESM #2

    OPTIMIZATION SOLUTIONS

    DESTINNOVEE.Destinnov 1a,1b,1c736 01 HAVIROV. Czech Republic.

    National type: OP1.11Number o apartments: 68Preabricated buildingOverground oors: 8Year o construction: 1960

    Global retrotting in 2010.

    External Thermal Insulation Composite System (ETICS)with polystyrene EPS 70 F, thickness 140 mm.Perimeter and base area insulated with extrudedpolystyrene XPS thickness 100 mm.Insulation o basement ceiling with thermal insulationhydrophobic boards rom mineral bres thickness 80 mm.Insulation o the roo with boards rom re-retardant oampolystyrene EPS 100 S Stabil thickness 200 mm.

    All old wooden windows and balcony doors have beenremoved. New multi-chamber plastic windows, balconydoors with double glazing (rame U=1,3 W/m2K, window

    glass U=1,1W/m2K).Old entrance doors (metal and wooden) replaced withentrance door made o aluminium proles U=1,5 W/m2Kwith saety insulation double glass.

    ENERGY SAVING MEASURE

    Thermovision with diagnosis on the weak points o theinsulation. Intervention on the repetitive errors withouthaving to enter into the appartments: reinorcement o the

    joints related to the windows rame.

    OPTIMIZATION SUGGESTION

    HOW TO IMPLEMENTSMALL COMPLEMENTARY

    INTERVENTIONS ON AREFURBISHED BUILDING WITHOUTHAVING TO OPERATE WITHIN THEAPPARTMENTS?

  • 7/31/2019 Pilot Sites

    15/22

    15

    OPTIMIZINGWP6: PILOT ESM #3

    OPTIMIZATION SOLUTIONS

    MATHILDENMathildenstrae 36-4064285 DARMSTADT. Germany.

    19 dwellings.4 storey apartment building rom the 50s,simple design.Year o construction: 1955

    Global reurbishment wit the ollowing measures: Insulation of cellar ceiling, faade and roof

    New Windows with heat protection glazing

    New heating system with a central boiler in the cellar and

    decentral heat exchanger in the dwellings Installation of an Ventilation system with supply air

    through the window rame and a central system in the cellar.

    ENERGY SAVING MEASURE

    Ventilation system was installed that runs the entire year:

    running times o the ventilation system can be adaptedto the users behavior, so as to temporarily switch o theventilation system, or example in summer.

    Review of the control of the heating system as well as user

    behavior are reviewed and adjusted, the heating system canpossibly shut down at night.

    OPTIMIZATION SUGGESTION

    HOW TO OPTIMIZE THERUNNING TIME OF THE SYSTEMS

    AFTER A REFURBISHMENT FORVENTILATION AND HEATING INORDER TO REDUCE THE ENERGYCONSUMPTION?

  • 7/31/2019 Pilot Sites

    16/22

    16

    OPTIMIZINGWP6: PILOT ESM #4

    OPTIMIZATION SOLUTIONS

    PICCOVia Picco 53-55-62-6410078 VENERIA REALE. Italy.

    4 traditional buildings, 4 oors each, 28dwellings.Year o construction: 1966

    External shell insulation and windows substitution:

    In the ramework o retrotting actions, an insulatedcoat o 80mm was applied to an existing building dated1960s. Existing single glazing were substituted with highperormance double glazing. At the same time, the heating

    system was improved by the installation o new boilers andsolar panels (or DHW).

    ENERGY SAVING MEASURE

    No technical intervention can be implemented on theventilation system. Direct intervention toward the tenantsin order to keep the ESM ecient and avoid condensation.

    Identication o the most perorming behavior, educationtoward tenants and monitoring o the implementation o bestpractices by the tenants.

    OPTIMIZATION SUGGESTION

    HOW TO IMPROVE TENANTSAWARENESS ABOUT THE IMPACT

    OF VENTILATION SYSTEM IN AREFURBISHED BUILDING WHENNO TECHNICAL INTERVENTIONCAN BE IMPLEMENTED?

  • 7/31/2019 Pilot Sites

    17/22

    17

    OPTIMIZINGWP6: PILOT ESM #5

    OPTIMIZATION SOLUTIONS

    LYSTRUPCentervej 30-568520 LYSTRUP. Denmark.

    1 story building. 14 dwellings.Year o construction: 1984

    14 houses or senior housing rom 1984 are going through atotal renovation to upgrade it to a low-energy housing.

    Insulation / Roo, Insulation / Walls, Insulation / Foundation,Windows & Frames / Insulation, Windows & Frames / Sun

    Protection, Photovoltaics, Ventilation and heat recovery &District heating.

    ENERGY SAVING MEASURE

    Separation between the heating recovering system and theunderfoor heating system adding a control valve or theheating coil o the ventilation system in order to make its

    control independent (to save energy at the beginning and atthe end o the heating season).

    OPTIMIZATION SUGGESTION

    HOW TO IMPROVE AREFURBISHED BUILDING DURINGTHE INTERMEDIARY SEASONTHANKS TO THE ACTION OF ITSHEAT RECOVERY VENTILATION?

  • 7/31/2019 Pilot Sites

    18/22

    18

    OPTIMIZINGWP6: PILOT ESM #6

    OPTIMIZATION SOLUTIONS

    FAKINTrg Franca Fakina 2a.1420 TRBOVLJE. Slovenia.

    8 storey building with 31 appartments madeo concrete walls.Year o construction: 1990

    Reinorced concrete building with 6cm insulation additionallyinsulated with 7cm insulation

    Composition o walls inside out:- Mortar 2,5cm- Concrete 15cm- Expanded polystyrene 6cm- Expanded polystyrene 7cm- Final faade

    U = 0,27 W/m2K (beore ESM it was 0,60 W/m2K)

    ENERGY SAVING MEASURE

    Thermography and potential elimination o small thermalbridges coupled with direct intervention toward tenants (tobe precised).

    OPTIMIZATION SUGGESTION

    HOW TO IMPLEMENT

    SMALL COMPLEMENTARYINTERVENTIONS ON AREFURBISHED BUILDING(comparing methodologies andimpacts with WP6 Pilot ESM #2)?

  • 7/31/2019 Pilot Sites

    19/22

    19

    OPTIMIZINGWP7: PILOT ESM #1

    OPTIMIZATION SOLUTIONS

    MARSLETKildevang, Langballevej 9A-9H8320 MRSLET. Denmark.

    8 New houses; New constructions.Year o construction: 2011

    Heating:Floor heating directly connected to district heating supplyDANFOSS CF2 System Wireless Floor Heating ControlSystem, DANFOSS TWA ActuatorHot water:Heat exchanger in direct connection to district heatingGEMINA TERMIX heat exchanger unitVentilation:Balanced mechanical ventilation with heat recovery and by-pass unction.NILAN Comort 250 ventilations unit, with NILAN CTS602control unit.

    Photovoltaic panels:6 photovoltaic panels placed on roo above individual dwell-ing units with individual converter.SCHCO converter

    ENERGY SAVING MEASURE

    Replacement o one comort valve o the heat exchanger orthe Domestic Hot Water. The comort valve was solicitingpermanently the heating system and consuming energy.

    OPTIMIZATION SUGGESTION

    HOW TO OPTIMIZE THE ENERGY

    CONSUMPTION REQUESTED BYDHW PRODUCTION IN A LOW-ENERGY BUILDING?

  • 7/31/2019 Pilot Sites

    20/22

    20

    OPTIMIZINGWP7: PILOT ESM #3

    OPTIMIZATION SOLUTIONS

    SAVINJSKASavinjska cesta 9b,1420 TRBOVLJE. Slovenia.

    5 storey building with 13 appartments madeo reinorced concreteYear o construction: 2006.

    Low Energy Building (LEB) components.

    10cm EPS shell insulation, min. 10cm EPS roo/ceilinginsulation and 8cm EPS basement foor insulation. Doubleglazed windows. No heat recovery or ventilation systems.

    ENERGY SAVING MEASURE

    to be determined

    OPTIMIZATION SUGGESTION

    HOW TO UPGRADE AN EXISTING

    LOW-ENERGY BUILDING TO ANEW LEVEL OF PERFORMANCE(to be confrmed)?

  • 7/31/2019 Pilot Sites

    21/22

    21

    OPTIMIZING

  • 7/31/2019 Pilot Sites

    22/22

    The sole responsibility or the content o this publication lies with the authors. It does not necessarily reect the opiniono the European Union.

    Neither the EACI nor the European Commission are responsible or any use that may be made o the inormation