AFTEROPTIMIZATIONSOLUTIONSLIST.
-
7/31/2019 Pilot Sites
2/22
2
OPTIMIZINGOPTIMIZATION SOLUTIONS
18 Pilot Sites have been identied by theparticipating Social Housing Organizations.
According to the Pilot ESMs implementedon this Pilot Sites, partners proposedsome Optimization suggestions in order toimprove the eciency o the measures andguarantee their perormance.Quick overview o the dierent Pilot Sitesconnected with rst inormation on theOptimization solutions that are (or will be)implemented on eld.
-
7/31/2019 Pilot Sites
3/22
3
OPTIMIZINGOPTIMIZATION SOLUTIONS
AFTER Energy Saving Measures have beenpresented in the Newsletter #2 o the project.These Energy Saving Measures (ESMs) coveran exhaustive range o interventions on thesocial housing stock aiming at improving theenergy efciency o the buildings, their economicperormance both or the Social HousingOrganizations and their tenants.
Reminder : AFTER collects and improves EnergySaving Measures
An Energy Saving Measure can be described as
ollowed.An ESM:
is implemented in order to improve the energyconsumption o a building and related to heatingaspects, warm water or electric powering orheating equipment. its impacts can eventually be monitored andevaluated regarding kWh and heating energycosts. can be optimized/infuenced/present a potential
to be improved.
These ESMs gather a large range o interventionsthat have been listed as ollows
The objective o the second phase o the AFTERProject is now to optimize these ESMs fndingactions that will correct and improve theirefciency ater their implementation.
Optimizing Energy Saving Measures
An Optimization Solution is related to an ESMwhich show potential o improvement.Thispotential can concern the 3 ollowing objectives:- improve the economic model o the ESM.- enhance the energy efciency.- increase the social perormance and the
reception o the ESM by tenants.)
As a consequence the Optimization Solution canlead to several types o actions:
- management & strategic decision- technical intervention (control, maintenance,replacement) on the systems and equipment.- improve the reception o the ESM by tenants.
The objective is still to highlight simple and low-
cost interventions that will improve the savingslinked to an Energy Saving Measure.Optimization solutions have been proposed by theAFTER participating Social Housing Organizationswith the sustain o the Scientifc partners. Theseoptimizations will be tested during the heatingseason in order to measure and to assess theirimpact on buildings.
OPERATING MANAGEMENT
RUNNING MAINTENANCE
REPLACEMENT OF SYSTEMS
RECENTLY REFURBISHED BUILDINGS
RECENT LOW ENERGY BUILDING
-
7/31/2019 Pilot Sites
4/22
4
OPTIMIZING
RAMEAUXLes Rameaux, Alle des Monts Dors
63370 LEMPDES. France.
70 dwellings. 3 low-rise horizontal blocks(3 stories) + 1 low-rise block(4 stories). Year o construction: 1970.
New energy contract with perormance objective and prot-sharing system with the operator containing :1) New prices negotiated on the gas price (withdrawal romthe historical regular price and indexation o the newprice on the evolution o the regular price in order to have acontinual delta.
2) New O&M contracts or equipment with perormanceobjectives and prot-sharing clauses.
3) Total guarantee and plan or the equipment replacement.
4) Modernization plan and ESMs identied in the originalcontract. The operator will give every year a modernizationand energy-saving plan to the SHO containing potential ESMs
to implement (and their prices).Several operators have been evaluated in order to conclude
the contract.
ENERGY SAVING MEASURE
List o interventions planned and proposed as options bythe energy supplier in the contract in order to improve theenergy perormance.
Prot-sharing clause on the energy supply and contractualclauses securizing the price o the energy (gas).
OPTIMIZATION SUGGESTION
WP3: PILOT ESM #1
OPTIMIZATION SOLUTIONS
HOW TO SECURE AN ENERGYSUPPLY CONTRACT ANDCONTRACTUALLY PLAN THEPOTENTIAL IMPROVEMENT OFTHE ENERGY EFFICIENCY FOR
YOUR HOUSING STOCK?
-
7/31/2019 Pilot Sites
5/22
5
OPTIMIZING
JABURKOVEJ.Jaburkov 1,3,5,
736 01 HAVIROV. Czech Republic.
36 apartments. Building national type T02B, 4overground oors.Year o construction 1962
Web tools and energy inormation:
Remote reading o heating energy and hot and cold waterconsumption in individual apartments and visualisation oconsumption data to tenants on internet user web portal ingraphical and numerical orm plus outputs o comparisonwith previous periods consumption and with the otherapartments consumption anonymously.
Wireless radio requency meters o heating energy (RFthermometers), hot, cold water consumption are installed inapartments. Consumption data are transmitted via gatewayto application server where are stored and processed.Consumption is visualised on the web portal in real timeater each reading several times per day (hour).
ENERGY SAVING MEASURE
Web portal use and impact improved thanks to directcommunication with the tenants on new supports andocusing particular targets: certicates in the entrance,
visualization tools, personal advising or the most energy-consuming tenants by the sta o the SHO, competition andpedagogic approach o the inormation.
OPTIMIZATION SUGGESTION
WP3: PILOT ESM #2
OPTIMIZATION SOLUTIONS
HOW TO IMPROVE THEEFFICIENCY OF A COMMON WEBINFORMATION TOOL ABOUTENERGY CONSUMPTIONS THANKSTO DIRECT COMMUNICATIONTOWARDS TENANTS?
-
7/31/2019 Pilot Sites
6/22
6
OPTIMIZINGWP3: PILOT ESM #3
OPTIMIZATION SOLUTIONS
HERNINGH2-College,7400 Herning. Denmark.
66 dwelling or students.Year o construction: 2009.
College buildings. Target group = students (which meanrequent transers, some period o vacancy in the dwellingsand other characteristics regarding the use o the buildingand its energy equipment).
H2 College is a pioneers work: the rst passive housebuilding or Danish SHOs.Located or maximum sunlight. Pre-abricated elements.Double fow Ventilation system, heavily insulated, lowenergy windows and geothermal heat-system. Production ohot water and electricity rom own Hydrogen Plant.
ENERGY SAVING MEASURE
Energy data shows an unacceptable huge dierence betweenhighest and lowest consumption among Tenants. In order tochange/improve this situation Tenant inormation is plannedto be distributed October 2012. The Inormation will providesome general guidelines or living in a passive house aswell as more technical inormation o the equipment inthe dwelling. At the moment it is not possible to separate
the energy consumption in what is used or the ventilationsystem (incl. an coils) and what is used or personalequipment - computers, Hi Fi, tv etc .
OPTIMIZATION SUGGESTION
HOW TO REDUCE THEDIFFERENCE BETWEENLOWEST AND HIGHEST ENERGY
CONSUMPTIONS IN A LOW-ENERGY BUILDING IMPROVINGTHE CONTENT OF THEINFORMATION DELIVERED(SPECIAL TARGET: STUDENTS)?
-
7/31/2019 Pilot Sites
7/22
7
OPTIMIZINGWP4: PILOT ESM #1
OPTIMIZATION SOLUTIONS
MLADIMladi 25736 01 HAVIROV. Czech Republic.
66 appartments.Panel apartment building.National typology: OP1.11Year o construction: 1983
Hydraulic balancing o the heating system.
Regulation o pressure:In the building 149 valves have been replaced with valve type99-RK, valve VE4262H.In the basement manual regulation valve STAF DN80 anddierential Pressure Regulator DA516 in size DN 80 have
been installed.
ENERGY SAVING MEASURE
Check o the heating system scheme.Detect imperections and errors in the scheme. Proposethe correct positioning and dimensions o heating circuitelements, especially the pressure regulators: circulationpump overloaded causing excessive energy consumption orits activity. New positioning or a capillary pipe in the scheme
between circulation pump, manual valve, and the dierentialpressure regulator in to reduce the over-consumption o thecirculation pump.
OPTIMIZATION SUGGESTION
HOW TO IMPROVE THEBALANCING OF A HEATING
SYSTEM CORRECTINGDEFICIENCIES IN ITS SCHEMEAND/OR VERIFYING THE REALIMPLEMENTATION OF THESCHEME?
-
7/31/2019 Pilot Sites
8/22
8
OPTIMIZINGWP4: PILOT ESM #2
OPTIMIZATION SOLUTIONS
RIESIVIa Riesi 5,10043 Orbassano. Italy.
1 Apartment Block, 51 dwellings,traditional constructionYear o construction: 1995.
A new heating system based on three condensing boilers(Brand: Baltur - Model: Supergenio MC115, power: 115kW each) and a smart metering system with adapter wereinstalled in a quite recent building (1995). Tenants stillcomplain about thermal discomort, higher costs than beoreand too many dierences o consumption rates amongapartments.A better periodic control and cleaning o the boilers, boilersume, exchanger, pumps and valves control has beenplanned in order to nd solutions or this problem.
ENERGY SAVING MEASURE
Regulation o the temperature settings and calibration othe heating curves (slop and level, rom 0.8 point to 2) once amonth.The eects o these optimizatons and adjustments regardingthe comort and the bills o the tenants will be analyzed tond the good settings.
OPTIMIZATION SUGGESTION
HOW TO GUARANTEE THETHERMAL COMFORT AND THE
ECONOMIC PERFORMANCEOF A HEATING SYSTEM FORTENANTS THANKS TO A BETTERCALIBRATION OF ITS OUTPUTS?
-
7/31/2019 Pilot Sites
9/22
9
OPTIMIZINGWP4: PILOT ESM #2
OPTIMIZATION SOLUTIONS
REVOLUCIJETrg revolucije 161420 TRBOVLJE. Slovenia.
14 storey. Building with walls and acadebricks, at roo. 52 dwellings.Year o construction: 1970.
Hydraulic balancing o the heating system.
Connecting valves were built-in on return fow line.Balancing valves Danoss ASV-PV (adjustable dierentialpressure regulators) and Danoss ASV-I (adjustableshutter valves and metering valves) were installed. In allappartments radiator valves were switched or new Danossthermostatic valves with additional ne regulation. At theend complete system was balanced and regulated with newlyinstalled valves.
ENERGY SAVING MEASURE
Special context: SPEKTER doesnt own the heating stationand, as a consequence, limited actions are possible on thesystem. Regulation o the system and thermal insulation osome district heating station parts will be discussed with thecompany managing the district heating.
Tenants awareness on how to use thermostatic valves andventilation with lower temperature o the system will be apreerred lever to optimize the ESM i direct intervention onthe system is not possible.
OPTIMIZATION SUGGESTION
HOW TO INCREASE TENANTSAWARENESS REGARDING
THE USE OF NEW THERMOSTATICVALVES AFTER A SYSTEMREGULATION (to be confrmed)?
-
7/31/2019 Pilot Sites
10/22
10
OPTIMIZINGWP5: PILOT ESM #1
OPTIMIZATION SOLUTIONS
AIGUILLADE44, rue du Colombier63000 CLERMONT-FERRAND. France.
1 long low-rise block.7 stories or 196 dwellings.Year o construction: 1965
District Heating Season belonging to the Clermont-FerrandMunicipality but with an outsourcing o public services orthe heating system operator.
Two energy-saving and energy-perormance aspects :
1) New energy mix (substitution o a 100% gas system with acombined system 78% wood - 22% gas).
2) Perormance improvement with action on sub-stations bythe SHO.
ENERGY SAVING MEASURE
Modication o the requested heat fow ater a reurbishmento the building in order to maximize the economic eciencyreducing the standing charge linked to the access o thedistrict heating system.This optimization solution improves the eciency o a
renewable-based model that is part o the legal obligationsor Auvergne Habitat and optimize its general environmentalstrategy regarding energy.
OPTIMIZATION SUGGESTION
HOW TO COUPLE AND
OPTIMIZE ENVIRONMENTALAND ECONOMIC EFFICIENCY INA RENEWABLE ENERGY-BASEDHEATING SYSTEM (WOOD)?
!
-
7/31/2019 Pilot Sites
11/22
11
OPTIMIZINGWP5: PILOT ESM #2
OPTIMIZATION SOLUTIONS
HEINHEIMERHeinheimer Strae 57-61D-64289, Darmstadt. Germany.
30 dwellings.Simple amily house rom the 50s with 5storeys.Year o construction: 1957.
Heating system (without DHW) with a central standard boilerrom 1982.Exchange o the boiler with a new gas caloric value boiler(lower fow temperature) and adaption o the perormance.
VIESSMANN; VITODENS 200-W (3 times - or every entrance).Natural gas central heating system with 3 caloric boiler.
ENERGY SAVING MEASURE
Radiators were not replaced and were sized according to theold supply temperature. Hydraulic balancing will ensuredthat each radiator gets the same amount o heat.
OPTIMIZATION SUGGESTION
HOW TO ADJUST AND OPTIMIZE
A HEATING SYSTEM AFTER THEIMPLEMENTATION OF A NEW GASCALORIFIC BOILER BUTWITH RADIATORS ADAPTED TOTHE OLD SUPPLY TEMPERATURE?
-
7/31/2019 Pilot Sites
12/22
12
OPTIMIZINGWP5: PILOT ESM #3
OPTIMIZATION SOLUTIONS
PASSONIVia Passoni 1410146 Turin. Italy.
1 Preab building, 4 oors each, 12 dwellings.Year o construction: 1978
Substitution o the two old twin boilers (Brand: Ferroli,Model: Linea II, power: 98 kW each) with one newCondensing boiler (model: YGNIS VARFREE 100, September2008, power: 92 kW). This boiler serves only the heatingsystem; tenants have single boiler (electrical, most o the
time) to produce DHW in their apartments.
ENERGY SAVING MEASURE
Removal o the heat exchanger (in order to obtain a lowertemperature o return water and highest eciency) isimpossible because o the warranty o the system.Installation o an insulation cap or the heat exchanger whois not insulated can be a good compromise between the
present situation and the removal o the heat exchanger.This low cost intervention (300-500 euro) identied thanks toa RCx process could be disseminated ont he whole housingstock o ATC.
OPTIMIZATION SUGGESTION
HOW TO IMPROVE A NEW
HEATING SYSTEM (CONDENSINGBOILER) WITH SPECIFIC LOW-COSTINTERVENTIONS ON MISSINGINSULATION?
-
7/31/2019 Pilot Sites
13/22
13
OPTIMIZINGWP6: PILOT ESM #1
OPTIMIZATION SOLUTIONS
BERGSONPlace Bergson63000 CLERMONT-FERRAND. (63). France. .
142 dwellings. 3 low-rise horizontal blocks (9stories + 4 stories+ 9 stories).Year o construction: 1967
Linked with a reurbishment 3 years ago.
Replacement o the ventilation system : not a classicalControlled Mechanical Ventilation (CMV) but a HybridVentilation with a control humidity measure to regulate thenatural ventilation process.
Objective :
1)less energy consumption.
2)no hot air permanent extraction that reduce the energyperormance o the building.
ENERGY SAVING MEASURE
The mechanical ventilation system (based on static pressureand on hourly settings) is adjusted with dierent settings onits dierent parts (an, ducts, extractors) in order to see the
impacts on fow rates, hygrometry and electric consumptiono the ventilation system.
OPTIMIZATION SUGGESTION
HOW TO IMPROVE THEPOTENTIAL OF AN HYBRID
VENTILATION SYSTEM AFTERREFURBISHMENT REGARDINGBOTH CONSUMPTION ASPECTSAND AIR QUALITY FOR TENANTS?
!
-
7/31/2019 Pilot Sites
14/22
14
OPTIMIZINGWP6: PILOT ESM #2
OPTIMIZATION SOLUTIONS
DESTINNOVEE.Destinnov 1a,1b,1c736 01 HAVIROV. Czech Republic.
National type: OP1.11Number o apartments: 68Preabricated buildingOverground oors: 8Year o construction: 1960
Global retrotting in 2010.
External Thermal Insulation Composite System (ETICS)with polystyrene EPS 70 F, thickness 140 mm.Perimeter and base area insulated with extrudedpolystyrene XPS thickness 100 mm.Insulation o basement ceiling with thermal insulationhydrophobic boards rom mineral bres thickness 80 mm.Insulation o the roo with boards rom re-retardant oampolystyrene EPS 100 S Stabil thickness 200 mm.
All old wooden windows and balcony doors have beenremoved. New multi-chamber plastic windows, balconydoors with double glazing (rame U=1,3 W/m2K, window
glass U=1,1W/m2K).Old entrance doors (metal and wooden) replaced withentrance door made o aluminium proles U=1,5 W/m2Kwith saety insulation double glass.
ENERGY SAVING MEASURE
Thermovision with diagnosis on the weak points o theinsulation. Intervention on the repetitive errors withouthaving to enter into the appartments: reinorcement o the
joints related to the windows rame.
OPTIMIZATION SUGGESTION
HOW TO IMPLEMENTSMALL COMPLEMENTARY
INTERVENTIONS ON AREFURBISHED BUILDING WITHOUTHAVING TO OPERATE WITHIN THEAPPARTMENTS?
-
7/31/2019 Pilot Sites
15/22
15
OPTIMIZINGWP6: PILOT ESM #3
OPTIMIZATION SOLUTIONS
MATHILDENMathildenstrae 36-4064285 DARMSTADT. Germany.
19 dwellings.4 storey apartment building rom the 50s,simple design.Year o construction: 1955
Global reurbishment wit the ollowing measures: Insulation of cellar ceiling, faade and roof
New Windows with heat protection glazing
New heating system with a central boiler in the cellar and
decentral heat exchanger in the dwellings Installation of an Ventilation system with supply air
through the window rame and a central system in the cellar.
ENERGY SAVING MEASURE
Ventilation system was installed that runs the entire year:
running times o the ventilation system can be adaptedto the users behavior, so as to temporarily switch o theventilation system, or example in summer.
Review of the control of the heating system as well as user
behavior are reviewed and adjusted, the heating system canpossibly shut down at night.
OPTIMIZATION SUGGESTION
HOW TO OPTIMIZE THERUNNING TIME OF THE SYSTEMS
AFTER A REFURBISHMENT FORVENTILATION AND HEATING INORDER TO REDUCE THE ENERGYCONSUMPTION?
-
7/31/2019 Pilot Sites
16/22
16
OPTIMIZINGWP6: PILOT ESM #4
OPTIMIZATION SOLUTIONS
PICCOVia Picco 53-55-62-6410078 VENERIA REALE. Italy.
4 traditional buildings, 4 oors each, 28dwellings.Year o construction: 1966
External shell insulation and windows substitution:
In the ramework o retrotting actions, an insulatedcoat o 80mm was applied to an existing building dated1960s. Existing single glazing were substituted with highperormance double glazing. At the same time, the heating
system was improved by the installation o new boilers andsolar panels (or DHW).
ENERGY SAVING MEASURE
No technical intervention can be implemented on theventilation system. Direct intervention toward the tenantsin order to keep the ESM ecient and avoid condensation.
Identication o the most perorming behavior, educationtoward tenants and monitoring o the implementation o bestpractices by the tenants.
OPTIMIZATION SUGGESTION
HOW TO IMPROVE TENANTSAWARENESS ABOUT THE IMPACT
OF VENTILATION SYSTEM IN AREFURBISHED BUILDING WHENNO TECHNICAL INTERVENTIONCAN BE IMPLEMENTED?
-
7/31/2019 Pilot Sites
17/22
17
OPTIMIZINGWP6: PILOT ESM #5
OPTIMIZATION SOLUTIONS
LYSTRUPCentervej 30-568520 LYSTRUP. Denmark.
1 story building. 14 dwellings.Year o construction: 1984
14 houses or senior housing rom 1984 are going through atotal renovation to upgrade it to a low-energy housing.
Insulation / Roo, Insulation / Walls, Insulation / Foundation,Windows & Frames / Insulation, Windows & Frames / Sun
Protection, Photovoltaics, Ventilation and heat recovery &District heating.
ENERGY SAVING MEASURE
Separation between the heating recovering system and theunderfoor heating system adding a control valve or theheating coil o the ventilation system in order to make its
control independent (to save energy at the beginning and atthe end o the heating season).
OPTIMIZATION SUGGESTION
HOW TO IMPROVE AREFURBISHED BUILDING DURINGTHE INTERMEDIARY SEASONTHANKS TO THE ACTION OF ITSHEAT RECOVERY VENTILATION?
-
7/31/2019 Pilot Sites
18/22
18
OPTIMIZINGWP6: PILOT ESM #6
OPTIMIZATION SOLUTIONS
FAKINTrg Franca Fakina 2a.1420 TRBOVLJE. Slovenia.
8 storey building with 31 appartments madeo concrete walls.Year o construction: 1990
Reinorced concrete building with 6cm insulation additionallyinsulated with 7cm insulation
Composition o walls inside out:- Mortar 2,5cm- Concrete 15cm- Expanded polystyrene 6cm- Expanded polystyrene 7cm- Final faade
U = 0,27 W/m2K (beore ESM it was 0,60 W/m2K)
ENERGY SAVING MEASURE
Thermography and potential elimination o small thermalbridges coupled with direct intervention toward tenants (tobe precised).
OPTIMIZATION SUGGESTION
HOW TO IMPLEMENT
SMALL COMPLEMENTARYINTERVENTIONS ON AREFURBISHED BUILDING(comparing methodologies andimpacts with WP6 Pilot ESM #2)?
-
7/31/2019 Pilot Sites
19/22
19
OPTIMIZINGWP7: PILOT ESM #1
OPTIMIZATION SOLUTIONS
MARSLETKildevang, Langballevej 9A-9H8320 MRSLET. Denmark.
8 New houses; New constructions.Year o construction: 2011
Heating:Floor heating directly connected to district heating supplyDANFOSS CF2 System Wireless Floor Heating ControlSystem, DANFOSS TWA ActuatorHot water:Heat exchanger in direct connection to district heatingGEMINA TERMIX heat exchanger unitVentilation:Balanced mechanical ventilation with heat recovery and by-pass unction.NILAN Comort 250 ventilations unit, with NILAN CTS602control unit.
Photovoltaic panels:6 photovoltaic panels placed on roo above individual dwell-ing units with individual converter.SCHCO converter
ENERGY SAVING MEASURE
Replacement o one comort valve o the heat exchanger orthe Domestic Hot Water. The comort valve was solicitingpermanently the heating system and consuming energy.
OPTIMIZATION SUGGESTION
HOW TO OPTIMIZE THE ENERGY
CONSUMPTION REQUESTED BYDHW PRODUCTION IN A LOW-ENERGY BUILDING?
-
7/31/2019 Pilot Sites
20/22
20
OPTIMIZINGWP7: PILOT ESM #3
OPTIMIZATION SOLUTIONS
SAVINJSKASavinjska cesta 9b,1420 TRBOVLJE. Slovenia.
5 storey building with 13 appartments madeo reinorced concreteYear o construction: 2006.
Low Energy Building (LEB) components.
10cm EPS shell insulation, min. 10cm EPS roo/ceilinginsulation and 8cm EPS basement foor insulation. Doubleglazed windows. No heat recovery or ventilation systems.
ENERGY SAVING MEASURE
to be determined
OPTIMIZATION SUGGESTION
HOW TO UPGRADE AN EXISTING
LOW-ENERGY BUILDING TO ANEW LEVEL OF PERFORMANCE(to be confrmed)?
-
7/31/2019 Pilot Sites
21/22
21
OPTIMIZING
-
7/31/2019 Pilot Sites
22/22
The sole responsibility or the content o this publication lies with the authors. It does not necessarily reect the opiniono the European Union.
Neither the EACI nor the European Commission are responsible or any use that may be made o the inormation