M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 1
PIDILITE INDUSTRIES LTD.
PFR for Environmental Clearance (EC) of proposed Expansion project of manufacturing of Polymers
based on Vinyl Acetate Monomer, Acrylate, styrene, Ethylene monomers & Adhesives based on PVA at
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad 402309, Maharashtra.
© Goldfinch Environmental Engineering Systems Private Limited (‘Goldfinch’), July 2017
This report is released for the use of the M/s. Pidilite Industries Ltd. Regulators and relevant stakeholders
solely as part of the subject EC of Proposed expansion project of Manufacturing of Polymers based on
Vinyl Acetate Monomer, Acrylate, styrene, Ethylene monomers & Adhesives based on PVA at Plot No.: A-
22/1 & A-21/2, Mahad MIDC, Raigad 402309, Maharashtra. Information provided (unless attributed to
referenced third parties) is otherwise copyrighted and shall not be used for any other purpose without
the written consent of Goldfinch/Pidilite.
QUALITY CONTROL
Name of
Publication
Pidilite Industries Ltd. proposed expansion project to manufacture of Polymers
based on Vinyl Acetate Monomer, Acrylate, styrene, Ethylene monomers &
Adhesives based on PVA at Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad
402309, Maharashtra
Project Number Report No. 1 Version 1 Released August, 2017
Prepared By Mr. Siddhesh Karangutkar & Mr. Umesh Parab
Reviewed By Dr. Nivedita Kulkarni
Released By Mr. Anand Apte
DISCLAIMER
Goldfinch has taken all reasonable precautions in the preparation of this report as per its auditable
quality plan. Goldfinch also believes that the facts presented in the report are based on information
submitted by Pidilite and based on the technical expertise of Goldfinch as on the date it was written.
However, it is impossible to dismiss absolutely, the possibility of errors or omissions. Goldfinch therefore
specifically disclaims any liability of any form resulting from the use or application of the information
contained in this report. The information is not intended to serve as legal advice related to the individual
situation.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 2
Contents
1.0 INTRODUCTION OF THE PROJECT ................................................................... 6
1.1 Introduction of the Project .................................................................................. 6
1.2 Introduction of the Project Proponent ................................................................... 6
1.3 Brief description of nature of the project ............................................................... 7
1.4 Need for the project and its importance to the country and or region ....................... 7
2.0 PROJECT DESCRIPTION ..................................................................................... 9
2.1 Type of Project .................................................................................................. 9
2.2 Project Location ................................................................................................. 9
2.3 Details of alternate sites considered and the basis of selecting the proposed site ..... 11
2.4 Size or Magnitude of Operation ........................................................................ 11
2.6 Raw Materials .................................................................................................. 15
2.7 Resource optimization/recycling and reuse envisaged in the project ....................... 17
2.8 Availability of water its source, energy/power requirement and source ................... 17
2.8.1 Water Requirement and Source ....................................................................... 17
2.8.3 Fuel Requirement............................................................................................ 18
2.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal ...................................................................................... 18
2.9.1 Gaseous Emissions .......................................................................................... 19
2.9.2 Effluent ......................................................................................................... 19
3.1 Connectivity ................................................................................................... 25
3.2 Land Form, Land use and Land ownership ...................................................... 25
3.3 Topography ................................................................................................... 25
3.5 Soil classification ............................................................................................ 26
3.6 Climatic data from secondary sources .............................................................. 26
3.7 Social Infrastructure Availability ...................................................................... 26
4.0 Planning In Brief ........................................................................................ 27
4.1 Planning Concept ............................................................................................. 27
4.2 Land Use Planning ............................................................................................ 27
4.3 Assessment of Infrastructure Demand (Physical & Social) ..................................... 28
4.4 Amenities/Facilities .......................................................................................... 28
4.5 Population Projection ........................................................................................ 28
5.0 Existing infrastructure ................................................................................ 29
5.1 Industrial area................................................................................................. 29
5.2 Residential Area ............................................................................................... 29
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 3
5.3 Green Belt ..................................................................................................... 29
5.4 Social Infrastructure ........................................................................................ 29
5.6 Drinking Water Management ............................................................................ 30
5.7 Sewage System .............................................................................................. 30
5.8 Industrial Water Management ........................................................................... 30
5.9 Solid Waste Management ............................................................................... 30
5.10 Power Requirement & Supply / source ............................................................ 30
6.0 Rehabilitation and Resettlement (R & R) Plan ........................................... 31
6.1 Policy to be adopted (Central/State) in respect of the project affected persons ....... 31
7.0 PROJECT SCHEDULE & COST ESTIMATES ...................................................... 32
7.1 Likely date of start of construction and likely date of completion ........................... 32
7.2 Estimated project cost ..................................................................................... 32
7.3 Economic Viability ...................................................................................... 32
8.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) ........................... 33
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 4
EXECUTIVE SUMMARY
Since inception in 1959, Pidilite Industries Limited has been a pioneer in consumer and Specialty
chemicals in India. Over two-third of the company’s sales come from products and segments it has
pioneered in India. Pidilite Industries is the market leader in adhesives and sealants, construction
chemicals, hobby colors and polymer emulsions in India. Brand name Fevicol has become synonymous
with adhesives to millions in India and is ranked amongst the most trusted brands in India. Fevicol is now
the largest selling adhesives brand in Asia. Pidilite Industries Limited, has proposed an expansion project
for manufacturing of polymers based on Vinyl Acetate Monomer (VAM), Acrylate, Styrene and adhesives
based on Poly Vinyl Alcohol (PVA) to increase production to 66000 MT per year, at Plot no. A-22/1 & A-
21/2, MIDC- Mahad, Dist. Raigad, Maharashtra.
The proposed project falls under classification 5(f) of schedules listed in EIA notification SO1533 dated
14/09/2006. Its appraisal category is B-1.
Project Synopsis:
Sr. No Parameters Description
1. Category as per EIA Notification 5 (f ) B-1
2. Latitude 18° 6'32.59"N
3. Longitude 73°28'18.96"E
4. Proposed Production Capacity
Existing Capacity:
Products : 41100 TPA
Proposed Capacity For expansion
Products : 24900 TPA
Total after expansion
Products : 66000 TPA
5. Total Plot Area 28744.00 Sq.m.
6. Green Belt Area Existing 2995 Sq.m + proposed 1677 Sq.m
7. Fresh Water Requirement Existing 202 CMD + Proposed 121 CMD
Total: 323 CMD
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 5
Sr. No Parameters Description
8. Effluent Quantity
(Trade + Domestic)
Trade Effluent: Existing 42.5 CMD + Proposed 25.5 CMD
Total: 68.0 CMD
Domestic: Existing 8.0 CMD + Proposed 1.0 CMD
Total: 9 CMD
9. Trade Effluent Treatment
Effluent treatment plant of designed capacity 50.0 CMD
consisting primary, secondary and tertiary treatment
followed by RO and Evaporator. During proposed
expansion it will be upgraded to Capacity of 80.0 CMD for
the treatment of 68.0 CMD. Out of total effluent 48.0
CMD effluent will be sent to CETP and 20 CMD will be
treat in RO and permeate will be reused for the cooling
tower and gardening.
10. Domestic Waste water Treatment Domestic wastewater treatment in proposed STP of
capacity 15 CMD
11. Fuel requirement at full load
No Boiler or Thermopack at the site. Steam is being
supplied by own adjacent plant located at A 21 Plot
Steam requirement:
Steam requirement
Existing - 8000 kg/day. Proposed - 5000 Kg/Day.
Total = 13000 kg/day
12. Power Requirement Existing power (Connected load): 1750 KW
Additional power required: 250 KW
13. Dispersion of emission DG Sets, No DG set at the site, DG power is tapped from our sister
concern (Pidilite A21 site).
14. Work Force Existing 222 Nos. + Additional 28 Nos.
Total: 250 Nos.
15. Total Capital Cost the project Existing facility cost 66.68 Cr + Additional 16.63 Cr
Total 83.31 Cr.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 6
1.0 INTRODUCTION OF THE PROJECT
1.1 Introduction of the Project
Pidilite Industries Ltd. (Hereafter being referred as Pidilite for brevity in this text) proposed expansion
project to manufacture of polymers based on Vinyl Acetate Monomer (VAM), Acrylate, Styrene and
adhesives based on Poly Vinyl Alcohol (PVA).
Since inception in 1959, Pidilite Industries Limited has been a pioneer in consumer and Specialty
chemicals in India. Over two-third of the company’s sales come from products and segments it has
pioneered in India. Pidilite Industries is the market leader in adhesives and sealants, construction
chemicals, hobby colours and polymer emulsions in India. Brand name Fevicol has become synonymous
with adhesives to millions in India and is ranked amongst the most trusted brands in India. Fevicol is now
the largest selling adhesives brand in Asia. Pidilite Industries Limited, has proposed an expansion project
for manufacturing of polymers based on Vinyl Acetate Monomer (VAM), Acrylate, Styrene and adhesives
based on Poly Vinyl Alcohol (PVA) to increase production to 66000 MT per year, at Plot no. A-22/1 & A-
21/2, MIDC- Mahad, Dist. Raigad, Maharashtra.
As per the EIA Notification S.O. 1533 dated 14th
September 2006, proposed activity is covered under
Synthetic Organic Chemical Industry 5 (f) and needs prior environmental clearance. Further, as the
proposed industry is under category B. Since it is located in a notified industrial area the project will not
need public approval and is under category B1.
1.2 Introduction of the Project Proponent
List of directors along with their designation is given in Table 1-1
Table 1-1: List of Directors and their designations
Name of Director Designation
Shri M B Parekh Executive Chairman
Shri N K Parekh Non-Executive Vice Chairman
Shri Bharat Puri Managing Director
Shri Bansi S Mehta Independent Director
Shri Ranjan Kapur Independent Director
Shri A B Parekh Whole time director
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 7
Shri A N Parekh Whole time director
Shri Sanjeev Aga Independent Director
Shri Uday chander Khanna Independent Director
Smt Meera Shankar Independent Director
Shri Sabyasachi Patnaik Whole time director
Shri Vinod Kumar Dasari Independent Director
1.3 Brief description of nature of the project
The proposed expansion will be carried out on Plot No. A-22/1 & A-21/2 at Mahad MIDC, Raigad, with
land admeasuring 28744.0 Sq. m to manufacture of polymers having existing capacity of products 41100
TPA and after expansion having capacity of 66000 TPA.
1.4 Need for the project and its importance to the country and or region
The proposed project is needed to serve increasing demand from local and international market. The
finished product will earn foreign exchange, which is beneficial to economical grown of country. The
project will generate extra employment to the youths. Overall the project will be beneficial to counties
economic and social growth.
Projection for next years
Year Capacity Growth Average Gap
2017 - 18 41100 8% 43824 -2724
2018 - 19 41100 8% 47330 -6230
2019 - 20 41100 8% 51116 -10016
2020 - 21 41100 8% 55206 -14106
2021 - 22 41100 8% 59622 -18522
2022 - 23 41100 8% 64392 -23292
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 8
1.5 Demands-Supply Gap
Competition in the Indian Chemical market swelled in recent years, with increasing generic penetration.
This had many companies opting out of low-margin segments, as competition resulted in lower prices.
This created a gap between demand and supply. Such unusual price hikes take place when there is
withdrawal of some of the key competitors, which leads to demand override and as a consequence prices
start soaring in a free-pricing market.
1.6 Imports vs. Indigenous Production
The proposed products, including production of Specialty chemicals having high demand in the export
market. Also their demand is increasing in the domestic market. Production of these products are
domestically reduces the need to import these in future along with significant scope for export in these
products.
1.7 Domestic /Export Markets
The finished goods will be sold in domestic market and would be largely exported to the Regulated
International Market as per demand all over the world.
1.8 Employment Generation due to the project
We estimate that 28 additional persons would be required for additional production.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 9
2.0 PROJECT DESCRIPTION
2.1 Type of Project
Proposed project is an expansion project to manufacture of Polymers falling in category 5(f) B-1 of EIA
notification 2006. The existing capacity of products 41100 TPA and after expansion having capacity of
66000 TPA
2.2 Project Location
Pidilite has a manufacturing unit at Plot No A-22/1 & A-21/2, Mahad MIDC, Raigad. Major factories
adjacent to the manufacturing unit are Ashok Alochem, Laxmi Organics and Pidilite A21 unit on East side.
The proposed site is well connected by road to Mumbai- Goa National Highway (NH 66) at distance of 1.5
Km. Nearest railway station is at Veer which is 17 km away from site. The nearest airport is Mumbai at
180 km.
`
Figure 2-1 : Satelite Image of the Site
Corner Latitude Longitude
A 18° 6'27.02"N 73°28'19.62"E
B 18° 6'29.95"N 73°28'16.69"E
C 18° 6'31.44"N 73°28'16.30"E
D 18° 6'33.72"N 73°28'16.09"E
E 18° 6'34.87"N 73°28'16.40"E
F 18° 6'36.85"N 73°28'21.00"E
G 18° 6'36.54"N 73°28'23.11"E
center 18° 6'32.59"N 73°28'18.96"E
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 10
Figure 2-2 : Mahad MIDC Map
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 11
The project site is situated in Mahad MIDC. It is a notified industrial area where the land is owned
by Maharashtra Industrial Development Corporation (MIDC) and leased to the Company. The land
is meant for industrial activity.
Land Ownership: Land is owned by Maharashtra Industrial Development Corporation (MIDC) and
leased to the Company for 99 years.
2.3 Details of alternate sites considered and the basis of selecting the proposed site
The proposal is for expansion in the existing products at same manufacturing unit using existing
infrastructure only hence consideration of alternate site is not done.
2.4 Size or Magnitude of Operation
The products manufactured and their capacities proposed are shown in below Table
Table 2-1: Existing and Proposed Production Capacity.
Proposed products for
Environmental Clearance
Proposed products quantity (MT/A)
Existing Proposed Total
Polymeric based on VAM,
Acrylate, Styrene monomers
and Adhesive based on PVA
41100 24900 66000
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 12
2.5 PROCESS DESCRIPTION:
Polymers based on Vinyl Acetate Monomer, Polyvinyl Alcohol, Styrene, Acryate Etc.
• The required quantity of Monomers is received in overhead mixing vessel/ or Reactor. Water and
Surfactants are charged and emulsion is prepared.
• Requisite quantity of surfactants, activator/catalyst are charged to the reactor.
• Monomer emulsion is then added to the reactor over a period of time maintaining moderate
temperature under atmospheric pressure.
• After the reaction , the contents are cooled , filtered and packed as product . If necessary . water
and other additives are added to the reactor prior to filtration .
• No gases are generated and vented during the process.
Process Flow Diagram:
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 13
Material Balance
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 14
Chemical reaction
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 15
2.6 Raw material required along with estimated quantity, likely source, marketing area of final
Product/s, mode of transport of raw material and finished product
Raw Materials:
The detailed raw material list for proposed products as per selected capacity is detailed below for all
reactants, solvents and support chemicals.
Source for Raw Material Procurement:
Raw Materials are easily available in the local market, from Mumbai and Gujarat.
Mode of Transport of Raw Materials: Raw Material and finished goods will be transported through
Trucks/ Tankers.
Storage at the site: Raw Materials will be stored in storage yard at the project site. Location of storage
yard is demarcated in Layout Plan.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 16
Table 2-3: Details of Raw material Quantity
Sr.
No.
Chemicals /
Items
Unit Capacity
, MT
Consump
tions in
MT per
day
Storage Physical
State
(Solid /
Liquid /
Gas)
Max.
qty.
stored at
any
point of
time
Days of
Storage
Source
of
Supply
Means
of
Transpor
t
(By Road
/ Ship /
Air)
1 Styrene MT 46.7X2 16 Tanks Liquid 93.4
5 Local Road
2 Dibutyl Maleate MT 15.7X2 1.6 Tanks Liquid 31.4
20 Local Road
3 Dibutyl Pthalete MT 15.7 0.8 Tanks Liquid 15.7 20 Local Road
4 Diocyl Maleate MT 15.7 0.8 Tanks Liquid 15.7 20 Local Road
5 Vinyl Acetate
Monomer
MT 193 12 Tank Liquid 193 15 Local Road
6 Methyl
Methacrylate
MT 15 3.2 Tank Liquid 15 5 Local Road
7 Butyl acrylate MT 200 24 Tank Liquid 200 8 Local Tanker
8 2-Ethyl Hexyl
acrylate
MT 15 4.8 Tank Liquid 15 3 Local Tanker
9 Ethyl acrylate MT 87 8 Tank Liqid 87 10 Local Tanker
10 Polyvinyl Alcohol MT 35 4.8 Bags Solid 35 7 Local By Truck
11 Acrylonitrile MT 15 1.6 Tank Liquid 15 9 Local Tanker
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 17
2.7 Resource optimization/recycling and reuse envisaged in the project
Most energy efficient technology is selected. In proposed expansion project, domestic waste water will
be treated in proposed STP of capacity 15 CMD and this treated water will be recycle.
2.8 Availability of water its source, energy/power requirement and source
2.8.1 Water Requirement and Source
Total fresh water requirement after expansion of the project for domestic and industrial activity during
operation phase will be 323 CMD for first day and afterwards it will be reduced to 294 CMD. The water
supply is from MIDC. The details of water requirement are given in Table 2-4
Table 2-4: Details of Raw water consumption
Sr.
No. Units
Existing requirement
CMD
Proposed
CMD
Total
CMD
A Process 110 66 176
B Utilities
1 Cooling water 70 42 112
2 Boiler make up -- -- --
D Domestic 10 2 12
E Gardening 12 11 23
Total 202 121 323
Recycle water
From STP + RO 9 + 20
Net Water requirement 294
2.8.2 Power Requirement
Power requirement for project made available through State Electricity Board. Present Power sanctioned
load is 1750 KW. Additional 250 KW power will be required for proposed expansion.
12 Acrylic acid MT 50 3.2 Tank Liquid 50 16 Local Tanker
13 Methacrylic acid MT 25 2 Tank Liquid 25 25 Local Tanker
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 18
2.8.2.1 Emergency power
There are no DG sets at the site. DG power is tapped from our sister concern (Pidilite A21 site).
2.8.3 Fuel Requirement
As there are no DG and Boiler at the site, hence there is no requirement of fuel at the site.
2.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal
2.9.1 Gaseous Emissions
Details of gaseous emissions from Process and Flue gas are given in Table 2-5
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 19
Table 2-5: Details of emissions from process and flue gas
Existing Proposed
A From fuel burning:
1 Number of stacks
vents
: Nil Nil
2 Type of fuel and its
quantity (Separately
for each other)
: Steam is being supplied by own
adjacent plant located at A 21 Plot
Continue to utilize steam
from our adjacent unit
located at A 21 plot.
B From process : No gaseous emission from process.
2.9.2 Effluent
The quantity of effluent generated proposed project is given in Table 2.7
Table 2-7: Details of Effluent Generation
S. No. Units
Effluent
generation
Qty.
Existing
Effluent
generation
Qty.
Proposed
Effluent
generation
Qty.
Total
A Process 30 18 48.0
B Utilities
1 Cooling water 12.5 7.5 20.0
2 Boiler - - -
Total 42.5 25.5 68.0
C Domestic 8 1 9
Out of total effluent, 48.0 CMD effluent will be sent to CETP and 20 CMD will be reused in cooling tower
and gardening.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 20
Water Balance:
Particulars Consumption (CMD) Loss (CMD) Effluent (CMD)
Water
Requirement Existing Proposed Total Existing Proposed Total Existing Proposed Total
Domestic
10 2 12 2 1 3 8
(To STP)
1
(To STP)
9
(To STP)
Industrial
process
110 66 176 80.0 48.0 128.0 30.0 18.0
48.0
Cooling Tower 70 42 112 57.5 34.5 92.0 12.5 7.5 20.0
Gardening 12 11 23 12 11 23 - - -
Total 202 121 323 151.5 94.5 246.0 50.5 26.5 77.0
Water
Recycled
9 +
20
48.0 to
CETP
and 20
to RO Total fresh
water
required
294
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 21
Treatment Scheme for Trade Effluent
The effluent from process washing after pre-treatment, utilities blow downs, floor washing, canteen and
other amenities are collected under gravity. Collected effluent will be pumped to equalization tank of
ETP. A screen shall be provided at the inlet of tank for removal of bigger size suspended matters.
The collected effluent in equalization tank shall be subject to air scouring for equalization and acid/alkali
dosing for neutralization. There will be two tanks for the purpose; one under equalization &
neutralization while other is under operation.
The neutralized and equalized effluent shall be pumped to primary clarifier mixer, where Poly Aluminium
Chloride solution along with Flocculent shall be added for flocculation and coagulation. Coagulated
effluent shall be passed through primary clarifier, in which solid liquid separation take place. Clear
overflowing water free of suspended particles will be sent to secondary treatment. Settled sludge in the
clarifier shall be removed periodically from the bottom for dewatering. Dewatered sludge shall be sent
for disposal in TSDF, while filtrate water shall be recycled in to the system in feed well of clarifier.
Effluent from primary clarifier shall be fed to aeration tank of secondary treatment system. The effluent
passes through Pressure Sand Filter and GAF before going to MBR (Membrane Bio- Reactor). MBR is
compact built purification system combining a biological degradation with membrane separation step.
The effluent is fed to the aerated bioreactor where organic components are oxidized by activated sludge.
Next the aqueous sludge passes through the membrane filtration unit, separating water from the sludge.
The sludge returns to the bioreactor while permeate is discharged or sent to RO. RO reject will be treated
in evaporator & the salts will be disposed to CHWTSDF.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 22
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 23
Treatment Scheme for Domestic Wastewater
2.9.3 Details of Hazardous and Non Hazardous wastes
The types of Hazardous wastes generated from the project, method of disposal is shown in below
table below
Table 2-7: Details of Proposed Solid waste along with the Category and disposal method
Hazardous Wastes
1 Type of waste Category
No. Qty. Total Disposal
Existing Additional
1 Spent oil 5.1 400 Lit/ A 242 Lit/A 642 Lit/A
Sale to
authorized
recycler
2 Waste residue
containing oil 5.2 0.003 MT/A 0.002 MT/A 0.005 MT/A
Sale to
authorized
recycler
3
Waste/residue
(Adhesive)
&
residue including filters
23.1
600 MT/A
&
6.7 MT/A
362.4 MT/A
&
4.0 MT/A
962.4 MT/A
&
10.7 MT/A
CHWTSDF
4
Discarded
containers/barrels
&
liners used for
HW/Chemicals
33.3
1855 Nos./ A
&
4017 Nos./ A
1125 Nos./A
&
2433 Nos./A
3000 Nos./A
&
6450 Nos./A
Sale to
authorized
recycler
5
ETP Sludge and Salts
from evaporator
35.3
38.6 MT/A 24.00 MT/A 62.6 MT/A CHWTSDF
6 Spent Carbon from ETP 28.3 -- 8.00 MT/A 8.00 MT/A CHWTSDF
Non Hazardous & other Wastes
1 Type of waste Qty. Total Disposal
Existing Additional
1 Waste paper, Pallet,
Sweeping material, Etc. 5.0 MT/M -- 5.0 MT/M Sale
2 E-Waste -- 0.3 MT/A 0.3 MT/A Sale to authorized
dismantlers / Recyclers.
3 Battery waste -- 0.4 MT/A 0.4 MT/A
Returned to battery
manufacturer through
authorized dealer on buy
back procurement
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 24
2.10 Schematic representations of the feasibility drawing which give information of EIA purpose.
Project Identification
What environmental impacts are normally associated with such type of projects being
proposed?
Pre-feasibility Analysis
Is the Project feasible from an environment point of view?
Project Design
(a) What negative environmental impacts could arise if the proposed project is implemented with
proposed design?
(b) Is there alternative design with less environmental impacts?
Project Appraisal
Have all the environmental concerns associated with the project been eliminated?
Project Implementation
What environmental concerns might arise at the implementation phase of the project?
Preparation of an Environment Monitoring and Evaluation Plan
(a) What environment monitoring indicators are required to ensure that the
implementation of components of the project will be executed within environmentally
sound limits?
(b) What is required to ensure that the recommended environmental control
measures will be implemented and enforced?
(c)
(Prepare a comprehensive environment monitoring and management plan)
Post EIA Monitoring and Environment Audit
(a) Is the implementation of components of the project being executed in an
environmentally sound manner?
(b) Are all the recommended environmental control measures being implemented and
enforced?
(d) Are there any environmental impacts that were earlier not anticipated when EIA was done?
( Identify gaps and corrective action )
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 25
3.0 SITE ANALYSIS
3.1 Connectivity
• Proposed unit is planned at Plot No. A-22/1 & A-21/2, Mahad MIDC, Raigad, Maharashtra.
• The nearest city from the site is Mahad at a distance of 6.5 Km.
• The nearest railway station is Veer at 17 Km
• The nearest airport is at Mumbai at 180 km.
• Site is well connected to Mumbai Goa national highway (NH 66).
3.2 Land Form, Land use and Land ownership
The proposed land is situated in approved chemical zone of MIDC where land use is industrial. Land is
owned by MIDC and is leased for 99 years.
3.3 Topography
The industry is located at Latitude – 18° 6'32.59"N and Longitude- 73°28'18.96"E. Toposheet of the
site is shown below. The study area (10 km radius) around the project site exhibits flat terrain.
Figure 3.1: Toposheet Showing Project site and 10Km of area
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 26
3.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area
under CRZ), shortest distances from the periphery of the project to periphery of the forests, national
park, wild life sanctuary, eco sensitive areas, water bodies (distance from HFL of the river), CRZ.
Proposed site falls under the Industrial MIDC. The land is reserved for Industrial use. Savitri
river at 2.2 km and Kaal River is at 2.4 Km from the project site.
3.5 Soil classification
Soil is the product of parent rocks. Climate, rainfall, humidity and vegetation affect the soil
formation in the Konkan region. The soil of the district is essentially derived from the Deccan trap
which is the predominant rock formation of the district. The main types of soil found in the district are
black soil, khar or salt soil, coastal alluvium and literate soils. The district is has course soil, medium
black soil, deep black soil and lateritic soil in 0.91 lakh hectares 1.43 lakh hectares, 0.80 lakh and 0.25
lakh hectares respectively.
3.6 Climatic data from secondary sources
The climate of Raigad district is typical hot and humid that of the west coast of India
characterized with plentiful and regular monsoon rainfall. The weather is oppressive in hot months
and highly humid throughout the year. The summer season is from March to May followed by the
south west monsoon season from June to September. The period from December to February is of
winter season. Region receives the rainfall from the south-west monsoon. The average annual rainfall
in the district is 2484.32 mm.
3.7 Social Infrastructure Availability
Key infrastructure such as hospitals, schools, bank, places of worship and social/
community facilities such as park, market, playground etc. education, health care, community
development, income distribution, employment and social welfare are available in nearby area of
Maharashtra Industrial Estate.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 27
4.0 Planning In Brief
4.1 Planning Concept
MIDC Industrial area, provides many basic facilities like uninterrupted water supply, power and
road network & solids disposal facility if feasible. When various sites were seen, this site appeared to
be environmentally best as also from the business angle and therefore this option was finally adopted.
This site is inside the campus of the MIDC and means safe transportation, less need of Utilities, less
constructing buildings and roads, less fuel, less water with optimization of infrastructure.
4.2 Land Use Planning
Existing land is already developed and located in a designated industrial area. The total plot
area is 28744.00 sq.m.
Table 4-2: Land Use Break Up
Sr. No. Area Area in sq. m.
Existing Proposed
1 Area used for manufacturing 1364 --
2 Safety area & Tank storage 2172 --
3 Area used for storage of raw materials/products 6007 --
4 Area used for utilities (Boilers, Thermopack,
chimneys, D G sets, Cooling towers, ETP and STP) 458 --
5. Administrative Building (Including offices, security,
Excise office) 265 --
6. Roads 4580 --
7. Open area 4841 --
8. Area used for green belt development 2995 1677
9. Area provided for Parking 3200 --
10. Area for Storm water Nala 600 --
11. Recreation Area 585 --
Total plot area 28744
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 28
4.3 Assessment of Infrastructure Demand (Physical & Social)
Key infrastructure such as hospitals, schools, bank, places of worship and social/ community
facilities such as park, market, playground etc. education, health care, community development,
income distribution, employment and social welfare are available in nearby area of Maharashtra
Industrial Estate.
4.4 Amenities/Facilities
In proposed site many basic facilities like uninterrupted water supply, Power and Road
Network & solids disposal facility if feasible are available. This site is inside the campus of the MIDC
and means safe transportation, less need of utilities, less constructing buildings and roads, less fuel,
less water with optimization of infrastructure and networking with CHWSTDF (Common Hazardous
Waste Storage Treatment and Disposal facility), Taloja, in vicinity established with support of MIDC
and MPCB.
All nearby villages are provided with drinking water from wells or Government Water Supply
Schemes RWS. Hence we do not encroach upon their supply.
4.5 Population Projection
Population plays a key role in the development of the agriculture of the region. Like other districts of
Maharashtra, Raigad is essentially a district of villages. The total population of the district as per census
2001 was 2207929 of which 75.78 per cent is rural and 24.22 per cent is urban population. Out of this
population 50.63 per cent are male and 49.38 per cent are female population. There are altogether 1919
inhabited places in the district of which 1893 are villages and 26 municipal towns.
In 2011, Raigad had population of 2,634,200 of which male and female were 1,344,345 and 1,289,855
respectively. In 2001 census, Raigad had a population of 2,207,929 of which males were 1,117,628 and
remaining 1,090,301 were females. Raigad District population constituted 2.34 percent of total
Maharashtra population. In 2001 census, this figure for Raigad District was at 2.28 percent of
Maharashtra population.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 29
5.0 Existing infrastructure
5.1 Industrial area
• Industrial Area (Processing area)
• Utilities
• Cooling tower
Non- Processing Area
• Administrative Cabins
• Security cabins
• Workers restroom
• Water reservoirs
• Temporary storage sites
• Works block etc.
5.2 Residential Area
There is no residential area proposed at Site.
5.3 Green Belt
The project is built on an MIDC plot with plot area of 28744.0 Sq.m and existing green belt area is
2995.sq.m. & proposed green belt area will be 1677 Sq.m. There are around 2150 nos. of plants
already planted at the site.
5.4 Social Infrastructure
The basic amenities within the study area include primary schools, dispensaries, water supply, electric
supply, public telephones, hotels, banks, post offices, petrol pumps, bus services, technical training
institute and entertainment etc.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 30
5.5 Connectivity
• Proposed unit is planned at Plot No. A-22/1 & A-21/2, Mahad MIDC, Raigad, Maharashtra.
• The nearest city from the site is Mahad at a distance of 6.5 Km.
• The nearest railway station is Veer at 17 Km
• The nearest airport is at Mumbai at 180 km.
• Site is well connected to Mumbai Goa National Highway (NH 66).
5.6 Drinking Water Management
The source of water supply is from MIDC.
5.7 Sewage System
Domestic sewage will be treated in proposed STP of 15 CMD. Treated water will be reused for gardening.
5.8 Industrial Water Management
Effluent treatment plant of designed capacity 50.0 CMD is consisting of primary, secondary and tertiary
treatment followed by RO & evaporator. During proposed expansion ETP will be upgraded to capacity of 80
CMD for the treatment of 68.0 CMD of industrial effluent. Out of total effluent, 48.0 CMD effluent will be
sent to CETP. Presently 12 CMD of effluent is reused and after proposed expansion 20 CMD will be reused
in cooling tower and gardening after treatment in RO.
5.9 Solid Waste Management
Hazardous solid waste generated from the process and from ETP will be collected, stored, transported
and sent to MWML, Taloja as per Hazardous waste (Management, Handling and Transboundry
Movement) Rules 2008.
5.10 Power Requirement & Supply / source
The present connected load is 1750 KW. Additional 250 KW power is required for proposed expansion.
.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 31
6.0 Rehabilitation and Resettlement (R & R) Plan
6.1 Policy to be adopted (Central/State) in respect of the project affected persons including home
oustees, land oustees and landless.
This project does not require acquisition of land and the infrastructure. Hence, there is no any kind of
activity of Rehabilitation and resettlement carried out over it.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 32
7.0 PROJECT SCHEDULE & COST ESTIMATES
7.1 Likely date of start of construction and likely date of completion
The expansion activity is likely to start after getting Environmental Clearance and NOC/CTE from
the authorized committee.
7.2 Estimated project cost along with analysis in terms of economic viability of the project
• The total investment envisaged is Rs. 83.31 with the break-up as given below Table 7-3
Table 7-3: Cost Break-Up
Sr. No.
Particulars (Cost in Cr.)
Existing Proposed Total
1 Land 0.59 0 0.59
2 Building & Premises 11.68 4.03 15.71
3 Plant and Machinery & Equipment
52.89 11.45 64.35
4 Furniture and Fixtures 1.33 0 1.33
5 Environmental Management Included in Equipments
1.15 1.15
6 Vehicles/Misc 0.19 0 0.19
Total Cost 66.68 16.63 83.31
7.3 Economic Viability
The project has been conceived assuming that there will be a growth in demand for the proposed
products, leading to a reasonable rate of return in the medium term. The project is considered
‘bankable’.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 33
8.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
• Proposed expansion activity will provide benefits to the local people in terms of financial and
social welfare.
• Some of the product will be exported, which will fetch foreign exchange to the Nation.
• Local people will get direct financial benefit by way of employment.
• Local people will get some contract of supply and services to get indirect income.
• Company will contribute in improving education and health facilities in nearby area.
• As the company is observing treatment of all emissions as per norm, No impact on the
environment after all mitigation measures.
M/S PIDILITE INDUSTRIES LTD.
Proposed expansion project for manufacturing of polymers
Plot No.: A-22/1 & A-21/2, Mahad MIDC, Raigad - 402309, Maharashtra Pre-Feasibility Report
PFR for M/s. Pidilite industries Ltd. Prepared by Goldfinch Engineering Systems Pvt. Ltd. Page 34
Annexure –I
Plant Layout