Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute...

53
Philip Burrows SiD Workshop, SLAC 2/03/09 1 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia

description

Philip Burrows SiD Workshop, SLAC 2/03/093 The Good News! ‘Public’ draft of LoI:

Transcript of Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute...

Page 1: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/091

Status of the SiD LoI

Philip BurrowsJohn Adams Institute

Oxford University

Hiro Aihara, Mark Oreglia

Page 2: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/092

Thanks!

To the very many SiD colleagues who have worked hard to provide results + material for the LoI!

i.e. ALL of you!

Page 3: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/093

The Good News!‘Public’ draft of LoI:

http://hep.uchicago.edu/~oreglia/SiDLOI/sidloi_v0.94withDAQ.pdf

Page 4: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/094

This Workshop

• Invite comments + feedback on LoI

• Dedicated talks on each section

• Talks on benchmarking results

• Sessions for revision + editing

• Dedicated session for general discussion – Tuesday 17.00

Page 5: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/095

Outline

• Reminder of LoI scope

• History of drafting process

• Status of LoI

• Suggested action plan for completion

Page 6: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/096

Reminder of scope (Yamada Oct. 3 2007)

‘Loi should contain:

information on proposed detector, its overall philosophy, its sub-detectors and alternatives, and how these will work in concert to address the ILC physics questions’

Page 7: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/097

Reminder of scope (Yamada Oct. 3 2007)

‘Evaluation of detector performance should be based on physics benchmarks … some same for all LoIs … some chosen to emphasise the particular strengths of the proposed detector’

Page 8: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/098

Reminder of scope (Yamada Oct. 3 2007)

‘discussion of integration issues with the machine …

state of technological developments for the components …

alternative technological options …further R&D should be identified … with

timelines and milestones …a preliminary cost estimate’

Page 9: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/099

Reminder of scope (Yamada Oct. 3 2007)

‘In addition, should present:structure of group …resource needs and evolution in time …

enable the reader to judge the capacity and seriousness of the groups to carry out the work until the EDR’

Page 10: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0910

Additional questions (IDAG June 22 2008)

1. Sensitivity of different detector components to machine background as characterized in the MDI panel.

2. Calibration and alignment schemes.3. Status of an engineering model describing the support structures and

the dead zones in the detector simulation4. Plans for getting the necessary R&D results to transform the design

concept into a well-defined detector proposal.5. Push-pull ability with respect to technical aspects (assembly areas

needed, detector transport and connections) and maintaining the detector performance for a stable and time-efficient operation.

6. A short statement about the energy coverage, identifying the deterioration of the performances when going to energies higher than 500 GeV and the considered possible detector upgrades.

7. How was the detector optimized: for example the identification of the major parameters which drive the total detector cost and its sensitivity to variations of these parameters.

Page 11: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0911

IDAG Mandate (Yamada June 24 2008)

1. Are the physics aims of the detector convincing for an experiment at ILC?

2. Is the detector concept suited and powerful enough for the desired physics aims and the expected accelerator environment? Namely, is the arrangement of the employed detector components adequate?

3. Do the mechanism for the push-pull operation, related alignment and calibration methods enable the desired switching process?

4. Is the detector feasible? Namely, is the required R&D for the selected technologies advancing fast enough so that they can be completed during the design phase? Are the estimated cost and the way to obtain it reasonable when examined at the time of LOI?

5. Is the group powerful enough to accomplish the required design work through the technical design phase?

Page 12: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0912

Executive summary (Nov. 08)

YIKES!

Page 13: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0913

Updated executive summary

$%*&£*%$£!!!!

Page 14: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0914

Updated executive summary

$%*&£*%$£!!!!CENSORED

Page 15: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0915

A Brief History• Oct 07: Yamada’s charge• June 08 (Warsaw): clarified scope issues w. IDAG• October 08 (SLAC): agreed basic outline and

assigned ‘responsibles’ • November 08 (Chicago): discussed status,

revised outline, timeline• December 08: collected all first-pass materials• Jan/Feb 09: 2 drafts to Advisory Groupb’marking, tracking, calorimetry, muons, cost, DAQ• February 27 09 : draft to whole SiD group

Page 16: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0916

LoI Framework1. Introduction 2. Subsystems 3. MDI + global issues 4. Phys. performance/benchmarking 5. Cost estimate 6. R&D issues

Page 17: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0917

LoI Framework (Nov. 08)1. Introduction (5) 2. Subsystems (45) 3. MDI + global issues (10) 4. Phys. performance/benchmarking (25) 5. Cost estimate (5) 6. R&D issues (5)

Total (c. 100)

Page 18: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0918

LoI Framework (Mar 08)1. Introduction (5) 152. Subsystems (45) 1003. MDI + global issues (10) 54. Phys. performance/benchmarking (25) 375. Cost estimate (5) 76. R&D issues (5) TBD

Total (c. 100) 164

Page 19: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0919

LoI Framework1. Introduction Jaros

ILC physicsSiD rationale + overviewPolarimetry and energy spectrometryILC environment +backgrounds

Page 20: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0920

Aside on energy + polarimetryPan-concept ILCnote describingE, P systems

In LoI we make keypoints and link tothis document

Page 21: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0921

LoI Framework1. Introduction Jaros

ILC physicsSiD rationale + overviewPolarimetry and energy spectrometryILC environment +backgrounds

Good shape: needs minor edit + new fig.

Page 22: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0922

LoI Framework2. Subsystems

Vertex + tracking system CalorimetersMagnetMuon systemDAQ + electronicsForward detectors

Page 23: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0923

LoI Framework2. Subsystems

Vertex + tracking system Demarteau et alCalorimeters White/Frey et alMagnet Krempetz et alMuon system Band/Fisk et alDAQ + electronics Haller et alForward detectors Maruyama/Markiewicz/Nauenberg et al

Page 24: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0924

LoI Framework2. Subsystems

Vertex + tracking system

Track digitisation session missingPerformance section needs beefing upMajor edit

Page 25: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0925

LoI Framework2. Subsystems

Calorimeters

Needs rationalisingNon-baseline appendix (?)Major edit

Page 26: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0926

LoI Framework2. Subsystems

Magnet

Good shape: minor edit

Page 27: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0927

LoI Framework2. Subsystems

Muon system

Non-baseline appendix (?)Good shape: minor edit

Page 28: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0928

LoI Framework2. Subsystems

DAQ + electronics

Good shape: minor edit

Page 29: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0929

LoI Framework2. Subsystems

Forward detectors

Good shape: minor edit

Page 30: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0930

LoI Framework3. MDI + global issues

Breidenbach, Oriuno

SiD assemblyPush-pull

Page 31: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0931

Aside on MDI issuesPan-concept MDI-D note specifying MDI

‘boundary conditions’:

See Marco’s talk for details/discussion

ILC-Note-2009-nnnMarch 2009

Version 4, 2009-02-25Functional Requirements on the Design of the Detectors and the Interaction Region of an e+e- Linear Collider with a Push-Pull Arrangement of Detectors

B.Parker (BNL), A.Mikhailichenko (Cornell Univ.), K.Buesser (DESY), J.Hauptman (Iowa State Univ.), T.Tauchi (KEK), P.Burrows (Oxford Univ.),

T.Markiewicz, M.Oriunno, A.Seryi (SLAC)

Page 32: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0932

LoI Framework

3. MDI + global issues Breidenbach, Oriuno

SiD assemblyPush-pull

Good shape: needs minor edit, figures to add

Page 33: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0933

LoI Framework4. Physics performance + benchmarking

Barklow, Nomerotski, GrafSimulationBenchmark reactionsPerformance results

Page 34: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0934

LoI Framework4. Physics performance + benchmarking

Barklow, Nomerotski, GrafSimulationBenchmark reactionsPerformance results

Await significant update of results [this workshop], then thorough edit

Page 35: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0935

LoI Framework

5. Cost estimate Breidenbach et al

Page 36: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0936

LoI Framework

5. Cost estimate Breidenbach et alMinor edit, figure format, physics vs.

cost

Page 37: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0937

LoI Framework

5. Cost estimate Breidenbach et alMinor edit, figure format, physics vs.

cost

6. R&D issues White/Brau

Page 38: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0938

LoI Framework

5. Cost estimate Breidenbach et alMinor edit, figure format, physics vs.

cost

6. R&D issues White/BrauLot of R&D text in document – needs

collating + rationalising in light of R&D proposals

Page 39: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0939

IDAG Mandate 1. Are the physics aims of the detector convincing for an

experiment at ILC?

Page 40: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0940

IDAG Mandate 2. Is the detector concept suited and powerful enough for the

desired physics aims and the expected accelerator environment? Namely, is the arrangement of the employed detector components adequate?

Page 41: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0941

IDAG Mandate 3. Do the mechanism for the push-pull operation, related

alignment and calibration methods enable the desired switching process?

Page 42: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0942

IDAG Mandate 3. Do the mechanism for the push-pull operation, related

alignment and calibration methods enable the desired switching process?

Good on ‘mechanics’ of push-pullMore needed on alignment + calibration?

Page 43: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0943

IDAG Mandate 4. Is the detector feasible? Namely, is the required R&D for

the selected technologies advancing fast enough so that they can be completed during the design phase? Are the estimated cost and the way to obtain it reasonable when examined at the time of LOI?

Page 44: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0944

IDAG Mandate 4. Is the detector feasible? Namely, is the required R&D for

the selected technologies advancing fast enough so that they can be completed during the design phase? Are the estimated cost and the way to obtain it reasonable when examined at the time of LOI?

Some work to do outlining R&D scope, timescale …

Page 45: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0945

IDAG Mandate5. Is the group powerful enough to accomplish the required

design work through the technical design phase?

Page 46: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0946

IDAG Mandate5. Is the group powerful enough to accomplish the required

design work through the technical design phase?

Not addressed in current draft!

Page 47: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0947

Additional IDAG questions6. A short statement about the energy coverage, identifying

the deterioration of the performances when going to energies higher than 500 GeV and the considered possible detector upgrades.

Page 48: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0948

Additional IDAG questions6. A short statement about the energy coverage, identifying

the deterioration of the performances when going to energies higher than 500 GeV and the considered possible detector upgrades.

Not addressed in current draft!

Page 49: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0949

Additional IDAG questions7. How was the detector optimized: for example the

identification of the major parameters which drive the total detector cost and its sensitivity to variations of these parameters.

Page 50: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0950

Additional IDAG questions7. How was the detector optimized: for example the

identification of the major parameters which drive the total detector cost and its sensitivity to variations of these parameters.

Cost model well described.More on ‘optimisation’?

Page 51: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0951

LoI Timeline (Nov. 08)• November 15: 1st draft subsystem reports

feedback to subsystems• December 15: 1st draft physics/benchmarking

chapteridentify and fill gaps, iterate etc.

• January 15: revised subsystem sectionsfocussed collaboration meeting early Feb?

• February 15: complete draft for collaboration review

• March 15: final draft ready• March 31: submit to Research Director

Page 52: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0952

Suggested timeline for completion• March 9: minor edits done• March 13: draft R&D chapter

draft ‘group structure’tracking + calorimetry sections

benchmarking chapter

• March 20: FINAL DEADLINE FOR MATERIAL

• March 25: final draft for review• March 31: submit to Research Director

Page 53: Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.

Philip Burrows SiD Workshop, SLAC 2/03/0953

We can do it!

To the very many SiD colleagues who have worked hard to provide results + material for the LoI!

i.e. ALL of you!