Philip Burrows ATF2 project meeting 14/1/111
Plans for ATF2 IP Feedback
Philip Burrows, Colin PerryJohn Adams Institute
Oxford University
![Page 2: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/2.jpg)
Philip Burrows ATF2 project meeting 14/1/112
Outline
• Conceptual system design
• General considerations for IPFB system
• Working assumptions
• Reminder of latency issues
• Requirements on BPM signals
• Summary
![Page 3: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/3.jpg)
Philip Burrows ATF2 project meeting 14/1/113
Kicker BPM
Digital feedback
Analogue BPM processor
Driveamplifier
e-
FONT system loop (schematic)
![Page 4: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/4.jpg)
Philip Burrows ATF2 project meeting 14/1/114
Kicker BPM
Digital feedback
Analogue BPM processor
Driveamplifier
e-
FONT5 system loop (schematic)
![Page 5: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/5.jpg)
Philip Burrows ATF2 project meeting 14/1/115
Kicker BPM
Digital feedback
Analogue BPM processor
Driveamplifier
e-
FONT5 system loop (schematic)
There should be no problem (in principle) to build a similar system for operation at the ATF2 IP
![Page 6: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/6.jpg)
Philip Burrows ATF2 project meeting 14/1/116
New kicker IPBPM
Digital feedback
IPBPMelectronics
New driveamplifier
e-
IP system loop (schematic)
![Page 7: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/7.jpg)
Philip Burrows ATF2 project meeting 14/1/117
Major challenge
From our perspective, the feedback should be
straightforward!
Biggest challenge will be to obtain a 1-nanometer-level
position signal from the IPBPMs, in multi-bunch mode
Current ‘world record’ is about 8nm in single-bunch mode
(Honda-san)
see Boogert’s + Joshi’s talks of yesterday,
and next talk from Kim-san
![Page 8: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/8.jpg)
Philip Burrows ATF2 project meeting 14/1/118
General considerations
Many details need to be worked out:
• Configuration of IP BPMs
• Location (lever arm) and length (kick) allowed for kicker
• Kicker aperture (amplifier power)
• Dynamic correction range required (amplifier power)
• Details of cabling (latency):
IPBPM IPBPM electronics FONT
• Output signal of IPBPM electronics (latency, digitisation)
![Page 9: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/9.jpg)
Philip Burrows ATF2 project meeting 14/1/119
IPBPM configuration
![Page 10: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/10.jpg)
Philip Burrows ATF2 project meeting 14/1/1110
IPBPM configuration
![Page 11: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/11.jpg)
Philip Burrows ATF2 project meeting 14/1/1111
Kicker location
![Page 12: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/12.jpg)
Philip Burrows ATF2 project meeting 14/1/1112
Some working assumptions (1)
• Kicker centre ~ 0.5m upstream of IPBPM
• Kicker aperture 40mm (?)
• Kicker length ~ 15 cm (?)
• Matched 50 Ohm terminations
Half of current FONT5 sensitivity:
0.5 urad / Amp
(can easily scale from above assumptions)
![Page 13: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/13.jpg)
Philip Burrows ATF2 project meeting 14/1/1113
Some working assumptions (2)
Dynamic correction range:
• Beam size 37 nm
• Beam y jitter ~ beam size (?)
• 2 sigma correction
70 nm @ IP = 140 nrad kick
drive current = 0.15/0.5 ~ 0.3 A (per
strip)
![Page 14: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/14.jpg)
Philip Burrows ATF2 project meeting 14/1/1114
Some working assumptions (3)
Amplifier:
• Peak power = 0.3 **2 x 50 = 5 W per strip
eg. Minicircuits: 10W, 5 500 MHz
• Low latency (5 ns)
• Output can be pulsed for long bunch train
• No margin for kick
![Page 15: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/15.jpg)
Philip Burrows ATF2 project meeting 14/1/1115
Caveat
If the IP beam size, and hence the beam jitter, were
significantly larger, the amplifier power
requirements would be more serious, and the
latency correspondingly longer …
Present FONT amplifier provides 30 urad kick and
takes 35ns to do so!
![Page 16: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/16.jpg)
Philip Burrows ATF2 project meeting 14/1/1116
IPBPM electronics(Aeyoung Heo)
![Page 17: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/17.jpg)
Philip Burrows ATF2 project meeting 14/1/1117
Digitisation of IPBM signal
• Digitise I and Q signals
• Derive amplitude and phase
charge-independent position
signal
• FONT5 ADCs (TI ADS5474) clocked at 357 MHz
• Very high bandwidth sample point
• Sample time adjustment sensitivity c. 100ps
![Page 18: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/18.jpg)
Philip Burrows ATF2 project meeting 14/1/1118
FONT Digitisation
I Q
Joshi
)(cos)( REFBPMREF
BPM
A
AnI )(sin)( REFBPM
REF
BPM
A
AnQ
![Page 19: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/19.jpg)
Philip Burrows ATF2 project meeting 14/1/1119
Digitisation of IPBM signal
• Digitise I and Q signals
• Derive amplitude and phase
charge-independent position
signal
• FONT5 ADCs (TI ADS5474) clocked at 357 MHz
• Very high bandwidth sample point
• Sample time adjustment sensitivity c. 100ps
• Up- and downstream IPBPM signals needed
![Page 20: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/20.jpg)
Philip Burrows ATF2 project meeting 14/1/1120
Latency estimate
• Amplifier (as described) 5ns
• Kicker fill (15cm) 0.5ns
• Beam flight time amplifier IPBPM 2ns
• Cables (3 x 1.5m?) 23ns
• IPBPM electronics 40ns?
• Digital processing 60ns
Total 131ns
![Page 21: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/21.jpg)
Philip Burrows ATF2 project meeting 14/1/1121
IPBPM signal requirements
• Prefer ‘baseband’ signal
could deal with up to 100 MHz
• Ideally I, Q signal levels ~ 100 mV
could deal with almost any power
levels (by amplification)
• Met with Kim-san at KEK Dec 2010
![Page 22: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/22.jpg)
Philip Burrows ATF2 project meeting 14/1/1122
Summary
• Conceptual design for IP FB system• System parameters look feasible• Critical parameters:
dynamic correction range, bunch spacing• Digitisation of IPBPM I and Q signals is easiest
approach• Technical details need to be finalised:
locations of BPM + kicker, kicker aperture,
cable runs …
![Page 23: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/23.jpg)
Philip Burrows ATF2 project meeting 14/1/1123
Postscript 1
• Intra-train beam feedback requires extremely high degree of spatial correlation between the bunches
• With the current ATF2 setup (existing kicker system and 3 bunches) we occasionally see good correlations, usually after a lot of tuning
see my talk of yesterday
• May be better off extracting just 2 bunches?
![Page 24: Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.](https://reader035.fdocuments.us/reader035/viewer/2022062500/5697bfd01a28abf838caaa43/html5/thumbnails/24.jpg)
Philip Burrows ATF2 project meeting 14/1/1124
Postscript 2
• The hard part of the IPFB is achieving nanometer position resolution with the KNU BPM electronics …