PH/DT MCP & MNO. Xavier Pons on behalf of MCP team – 25/03/2013. Commitment: To assure the availability of Atlas, CMS, Alice and LHCb magnets. To assure the preventive and corrective maintenance of the experiment magnets . Magnet ON-Call Standby service 24/24 h, 7/7 d, 365/365 y - PowerPoint PPT Presentation

Transcript of PH/DT MCP & MNO

Page 1: PH/DT  MCP & MNO

PH/DT MCP & MNO

Xavier Pons on behalf of MCP team – 25/03/2013

Page 2: PH/DT  MCP & MNO

PH/DT MCP & MNO

Commitment:

- To assure the availability of Atlas, CMS, Alice and LHCb magnets.

- To assure the preventive and corrective maintenance of the experiment magnets.

- Magnet ON-Call Standby service 24/24 h, 7/7 d, 365/365 y

- When beam is ON, we provide support for other magnet control and systems related to control and instrumentation

Page 3: PH/DT  MCP & MNO

PH/DT MCP & MNO

Page 4: PH/DT  MCP & MNO

PH/DT MCP & MNO

Alice LHCb Atlas CMS

Solenoide Dipole Dipole Toroids End-caps Solenoide Solenoide

Technology Resistive Resistive Resistive Superconducting Superconducting Superconducting Superconducting

               

Nominal Current 30 kA 6 kA 6 kA 20.5 kA 20.5 kA 7.6 kA 19.5 kA

Nominal Field 0.5 T 0.7 T   3.9 T 4.1 T 2.6 T 4 T

Nominal voltage 130 V 639 V 730 V        

Inductance   1 H 2 H 5.14 H 1.09 H 1.35 H 14 H

Atlas Magnet Simplified Representation

Page 5: PH/DT  MCP & MNO

PH/DT MCP & MNO

Magnets System

Service cavern

Experimentalcavern

SolenoidProcess

Control Units

ExternalCryogenics

Process Control

Surface

MCS

HardwiredLogic

1

HardwiredLogic

2

APC1 APC2

ACS1 ACS2

FACQMSSToroid

Detector SafetySystem

DSS

Sa

fety

co

ntr

ols

Pro

tect

ion

sig

na

ls

Sa

fety

co

ntr

ols

Pro

tect

ion

sig

na

ls

Se

nso

rs/A

ctu

ato

rs Slow DumpRequests

ExternalCryogenicsSupervisor

Detector ControlSystem

DCS

CERN wide area

WEBMonitoring

ExternalCryogenicsSupervisor

MagnetSupervisor

MagnetSupervisor

Central control room

ToroidProcess Control

Units

VacuumProcess

Control Units

Se

nso

rs/A

ctu

ato

rs

Se

nso

rs/A

ctu

ato

rs

ANS

Hardwir.Logic 1

Hardwir.Logic 2

APC1 APC2

ACS1 ACS2

FACQMSS

Solenoid

Sa

fety

co

ntr

ols

Pro

tect

ion

sig

na

ls

Sa

fety

co

ntr

ols

Pro

tect

ion

sig

na

ls

Database

ProximityCryogenics

Process Control

Se

nso

rs/A

ctu

ato

rs

Detector control roomMagnet and

Cryogenics controlroom

Data Server

LocalMagnet

SupervisorMagnet

control roomin USA 15

ATLAS OVERALL MAGNET CONTROL LAYOUT

MDS

PLC

PVSSHLM. ALTERA

PROGR. LOGIC ARRAY

Page 6: PH/DT  MCP & MNO

PH/DT MCP & MNO

MCS SLOW CONTROL – PLC +SCADA

Page 7: PH/DT  MCP & MNO

PH/DT MCP & MNO

MSS – MAGNET SAFETY SYSTEM

The purpose of the MSS is to detect anomalies endangering the safety of the magnet and to take appropriate action in order to bring the magnet into a safe state. • Maximum availability/reliability• Dedicated sensors• Multiple detection techniques/Overlapping sensors• Redundancy• Galvanic Isolation• Fail-safe operation

QuenchHeaters

Vacuum

MSSACS/LCS/API/APC

PowerConverter

MSSPower Supply/

Batteries

DSS Cryogenics

MSSMonitoring

MSSAnnunciator

MagnetEmergency

Stops

MCS

CircuitBreaker

CERNPower3 sources

Inhibit

Fault

Trigger

Status

Status

Isolate

Status

Start-up test,operator SD, etc...

Open

Status

Chassis status,cable trace, etc...

Remote resetStatus

Redundantpower

E-stops

Events, values...

MSSequipment

MSSSensors

Sensorvalues

Status

SD,inhibit...

Current status,dump status...

Page 8: PH/DT  MCP & MNO

PH/DT MCP & MNO

MCS

Annunciator

16 InputsCoded cable trace

DIM1

16

16

16

16

From DIM2

From DIM3

From DIM4

16

16

16

16

From DIM8

From DIM9

From DIM10

Series connectionof opto-couplers

16

Hard-wired logicmodulescommunication

16

16

20

DIM7

MCS

Annunciator

16 inputsCoded cable trace

HLM5

ALTERA

Programmable LogicArray.

Hard-wired logic burnedin PROM.

Clockcircuit

Monitoring

Power

Status

Indication

Dumpacknowledge.

Only HLMwith DCCT!

Connectorcoding

Monitoring

HLM6

ALTERA

Programmable LogicArray.

Hard-wired logic burnedin PROM.

Clockcircuit

Monitoring

Power

Status

Indication

Dumpacknowledge.

Only HLMwith DCCT!

Connectorcoding

Monitoring

Hard-wired logicmodule 5 outputs

Hard-wired logicmodule 6 outputs

Hard-wired logicmodules 5-6combined outputs

To API.Hard-wired logicoutput signals.

To API.Alarm/stateoutput signals.

To API.Alarm/stateoutput signals.

MSS - Digital Signal Processing

Page 9: PH/DT  MCP & MNO

PH/DT MCP & MNOMSS - Analogue Signal Processing

• Analogue Input Types:

• Dual Voltage Measurement module –DVM module 2 Voltage measurements – 1 differential measurement Bipolar

• Dual Temperature Measurement module – DRM module2 Temperature measurements Configurable for PTC, NTC and SQD measurements

• Dual Bridge Measurement module –DBM module2 Bridge measurements Bipolar

Page 10: PH/DT  MCP & MNO

PH/DT MCP & MNO

Sensors –ATLAS (BT –ECTA-C –CS)

•5 types for safety:

• Voltage measurements –DVM moduleTotal:28/14 Channels/Modules (MSSA+MSSB)

• Temperature measurements –DRM moduleTotal:32/16 Channels/Modules (MSSA+MSSB)

• Supra-conducting measurements –DRM moduleTotal:36/20 Channels/Modules (MSSA+MSSB)

• Differential measurements –DVM moduleTotal:20/10 Channels/Modules (MSSA+MSSB)

• Bridge measurements –DBM moduleTotal:24/16 Channels/Modules (MSSA+MSSB)

Grand total:Total:140/76 Channels/Modules (MSSA+MSSB

Page 11: PH/DT  MCP & MNO

PH/DT MCP & MNO

CMS -SENSORS

• 4 types for safety:

• Voltage measurements –DVM moduleTotal:21/11 Channels/Modules (MSSA+MSSB)

• Temperature measurements –DRM moduleTotal:8/4 Channels/Modules (MSSA+MSSB)

• Differential measurements –DVM moduleTotal:10/5 Channels/Modules (MSSA+MSSB)

• Bridge measurements –DBM moduleTotal:5/3 Channels/Modules (MSSA+MSSB)

Grand total:Total:44/23 Channels/Modules (MSSA+MSSB)

Page 12: PH/DT  MCP & MNO

ATLAS• 8 racks• 12 chassis• 4 control boxes• 8 interface boxes• 8 power boxes• 260 modules • + Heater cicuits • A mess of cables...

MSSA onlyATLAS MSS Racks

PH/DT MCP & MNO

Page 13: PH/DT  MCP & MNO

PH/DT MCP & MNO

Why upgrade? Mean Time Before Failure - Components

• Worst case calculations - Environmental factors• Many opto-couplers (in series)• Some components no longer available – Isolation amplifier – FPGA• MSS started in 1998 – First installation 2002-2003 (CS of ATLAS – Still running)

Page 14: PH/DT  MCP & MNO

PH/DT MCP & MNO

BACK-UP SLIDES

Page 15: PH/DT  MCP & MNO

PH/DT MCP & MNO

Page 16: PH/DT  MCP & MNO

PH/DT MCP & MNO

Page 17: PH/DT  MCP & MNO

PH/DT MCP & MNO

Page 18: PH/DT  MCP & MNO

PH/DT MCP & MNO

Page 19: PH/DT  MCP & MNO

PH/DT MCP & MNO

Page 20: PH/DT  MCP & MNO

PH/DT MCP & MNO

Page 21: PH/DT  MCP & MNO

PH/DT MCP & MNO