Transcript of Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
1/9
1
Shell Beaufort and Chukchi SeaProgram: Arctic Panel Discussion
Pete Slaiby
Vice President, Shell Alaska
September 27, 2010
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
2/9
2
2011 Proposed Operations
Drill two offshore wells during briefopen water drilling season (July-October)
Shallow hazards surveying (futuredrill site clearance)
Ecological science data gathering(offshore and onshore)
Offshore ice gouge surveying &geotech soil sampling to support
needed infrastructure technology
Marine mammal monitoringsupporting operations The Noble Discoverer anchored in Dutch Harbor, Alaska in 2007
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
3/9
3
Shell Three-Tier Oil Spill Response
Nearshore
Vessels- Barge- Work boats- Skimming vessel- Mini barges
Skimmers & Pumps
Booms
Misc Equipment- Decon connex- Workshop/Tool connex
Offshore
Vessels- OSRV (Nanuq)- Arctic Tanker- Work boats- Vessel of Opportunity
Skimmers & Pumps
Booms
Onshore
Vessels- landing craft and utility
vessels
Booms
Misc Equipment- Storage and tools
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
4/9
4
Oil Spill Contingency Plan Support
State and Federal Standards reviewed and approved
World class Contingency Plan reviewed by BOEM, EPA, US Coast Guard,FWS, NMFS, North Slope Borough and upheld in court(s)
Worst Case Discharge Scenario for 2011 significantly lower than requiredResponse Planning Standard
Shell response capabilities exceed required Response Planning Standard
SINTEF (oi
l in ice research) study and trials
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
5/9
5
Proposed Sub-sea Containment System Development
Submitted new commitments to
BOEM May (5th) 2010
System to capture and recover
hydrocarbons from well controlincident
Leveraging GOM DW Industry
Solution
Will be ready for 2011 SeasonAvailable for on site deployment
Containment
Dome
Hydraulically
powered pump
Flare Boom
Multi-Phase
Hose
Support
Vessel
Temp Oil
Storage
Mooring Line
Anchor
Leak
Pinch
ValveWater Outlet
Overboard
Oil/Water
Separator
Gas/Liquid
Separator
Post BP Macondo Additions Second rig relief well capability BOP testing every 7 days instead Use of second set of shear rams Sub-sea remote operating panel
relocation ROV/Diver options on/near site
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
6/9
6
Trans-AlaskaPipeline
Beaufort Sea137 Leases
Chukchi Sea275 Leases
Conservative estimates: 25 billionbarrels of oil and 120 TCF of gas in
Alaska Arctic (MMS mean estimate)
Most material OCS hydrocarbonoutside of Deepwater GOM OCS
Exceeds east/west coast OCS
resources combined
National economic benefits
Hundreds of millions with Alaskans/offshore service providers
137 Beaufort leases - $84M; 275
Chukchi leases - $2.1 Billion; Total
investment to date: $3.5 billion
Shell Size of the Prize
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
7/9
7
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
8/9
8
Baseline Science Supports Exploration in Alaska
$500 Million and growing (Shell $50M)
5000 independent scientific studies since1973
5 years of marine mammal monitoring
Tagging studies walrus and seals
First air quality station in OCS
Beaufort
Ongoing offshore, nearshore, and onshore
ecological characterization studies
Traditional knowledge studies
Health impact assessments
Up to $5 million annual science initiative
with North Slope Borough
-
8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2
9/9
9
Stakeholder Solutions
Finding common ground withthe people of the North Slope
Over 400 meetings withstakeholders since 2006
Incorporating feedback: airpermit, discharge, drillingblackouts during whaling inBeaufort Sea
Revised program reflects oursocial performance goal:
Minimize impacts to people and theenvironment where we work