    Shell Beaufort and Chukchi SeaProgram: Arctic Panel Discussion

    Pete Slaiby

    Vice President, Shell Alaska

    September 27, 2010

  • 8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2

    2/9

    2

    2011 Proposed Operations

    Drill two offshore wells during briefopen water drilling season (July-October)

    Shallow hazards surveying (futuredrill site clearance)

    Ecological science data gathering(offshore and onshore)

    Offshore ice gouge surveying &geotech soil sampling to support

    needed infrastructure technology

    Marine mammal monitoringsupporting operations The Noble Discoverer anchored in Dutch Harbor, Alaska in 2007

  • 8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2

    3/9

    3

    Shell Three-Tier Oil Spill Response

    Nearshore

    Vessels- Barge- Work boats- Skimming vessel- Mini barges

    Skimmers & Pumps

    Booms

    Misc Equipment- Decon connex- Workshop/Tool connex

    Offshore

    Vessels- OSRV (Nanuq)- Arctic Tanker- Work boats- Vessel of Opportunity

    Skimmers & Pumps

    Booms

    Onshore

    Vessels- landing craft and utility

    vessels

    Booms

    Misc Equipment- Storage and tools

  • 8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2

    4/9

    4

    Oil Spill Contingency Plan Support

    State and Federal Standards reviewed and approved

    World class Contingency Plan reviewed by BOEM, EPA, US Coast Guard,FWS, NMFS, North Slope Borough and upheld in court(s)

    Worst Case Discharge Scenario for 2011 significantly lower than requiredResponse Planning Standard

    Shell response capabilities exceed required Response Planning Standard

    SINTEF (oi

    l in ice research) study and trials

  • 8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2

    5/9

    5

    Proposed Sub-sea Containment System Development

    Submitted new commitments to

    BOEM May (5th) 2010

    System to capture and recover

    hydrocarbons from well controlincident

    Leveraging GOM DW Industry

    Solution

    Will be ready for 2011 SeasonAvailable for on site deployment

    Containment

    Dome

    Hydraulically

    powered pump

    Flare Boom

    Multi-Phase

    Hose

    Support

    Vessel

    Temp Oil

    Storage

    Mooring Line

    Anchor

    Leak

    Pinch

    ValveWater Outlet

    Overboard

    Oil/Water

    Separator

    Gas/Liquid

    Separator

    Post BP Macondo Additions Second rig relief well capability BOP testing every 7 days instead Use of second set of shear rams Sub-sea remote operating panel

    relocation ROV/Diver options on/near site

  • 8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2

    6/9

    6

    Trans-AlaskaPipeline

    Beaufort Sea137 Leases

    Chukchi Sea275 Leases

    Conservative estimates: 25 billionbarrels of oil and 120 TCF of gas in

    Alaska Arctic (MMS mean estimate)

    Most material OCS hydrocarbonoutside of Deepwater GOM OCS

    Exceeds east/west coast OCS

    resources combined

    National economic benefits

    Hundreds of millions with Alaskans/offshore service providers

    137 Beaufort leases - $84M; 275

    Chukchi leases - $2.1 Billion; Total

    investment to date: $3.5 billion

    Shell Size of the Prize

  • 8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2

    7/9

    7

  • 8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2

    8/9

    8

    Baseline Science Supports Exploration in Alaska

    $500 Million and growing (Shell $50M)

    5000 independent scientific studies since1973

    5 years of marine mammal monitoring

    Tagging studies walrus and seals

    First air quality station in OCS

    Beaufort

    Ongoing offshore, nearshore, and onshore

    ecological characterization studies

    Traditional knowledge studies

    Health impact assessments

    Up to $5 million annual science initiative

    with North Slope Borough

  • 8/8/2019 Pete Slaiby Oil Spill Comm Sept 27 2010-Vers 2

    9/9

    9

    Stakeholder Solutions

    Finding common ground withthe people of the North Slope

    Over 400 meetings withstakeholders since 2006

    Incorporating feedback: airpermit, discharge, drillingblackouts during whaling inBeaufort Sea

    Revised program reflects oursocial performance goal:

    Minimize impacts to people and theenvironment where we work