Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and...
Transcript of Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and...
![Page 1: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/1.jpg)
Rev. 25 04/15
** Steam Dryer shown reflects original steam dryer.
**
![Page 2: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/2.jpg)
STEAM Df!YERS
STEAM SEPARATORS
MAIN fEED fLOW
DRIVINO fl.CW~
RECIRCULATION PUMP
PECO ENERCY CCU-ANY PEACH aonoM ATOMIC POWER STATION
UNITS2 AND3 UPDATED FINAL SAFOY ANALYSIS REPORT
REACTOR VESSEL INTERNAL FLOW SCHEMATIC
FIGURE 3.3.2 REV. 14 05/97
![Page 3: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/3.jpg)
I I ,, • ~ I ~
TO RECIRCULATION J "
RETURNING WATER
TURNING VANES (INLET NOZZLE)
STANDPIPE
PHILADELPHIA ELECTRIC COMPANY
PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3
UPDATED FINAL SAFETY ANALYSIS REPORT
STEAM SEPARATOR
FIGURE 3.3.3
![Page 4: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/4.jpg)
FUEL ASSEMBLY-----____,...,
FUEL SUPPORT PIECE
aJRE SUPPORT
ORIFICE
FLOW
COflTROL ROD GUIDE TUBE
FOUR-LOBED(QNE LOBE SHOWN)
FLOI
PERIPHERAL
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
FUEL SUPPORT PIECES
FIGURE 3.3.4
![Page 5: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/5.jpg)
SECTION D·O
AXIAL COMPRESSIVE BOLT LOAD: 1 25,000 LB & 300 LB BOLT SHALL
BE LOADED USING JET PUMP TENSIONER, DWG # 731 E89261, OR ENG APPVD EQUIV.
(SEE NOTE 7 AND 9)
r a
ORMNG NOZZl.E
SUCTION INLET
THROAT/ MIXING SECTION
+ B
0
l.
DIFFUSER
VIEW A·A
ENL.AAt;ED SECTIOO. 8·8 ISEE NOTE 3 AND 5l
NOTES:
1. DELETED
2. FILLER ROO OPTIONAL ON All FIELD WELDS UNLESS OTHERWISE SPECIFIED.
3. POSITION & WELD ADJUSTING SCREWS AT INSTALLATION, SUCH THAT WEDGE SEATS WITHIN RANGE SPECIFIED IN SECT 0-0.
4. FOR BEAM BOLT DETAIL SEE PBAPS DRAWING PB SDOC G-OSD-VC-269, SHEET.1.
5. FOR RESTRAINER BRACKET ADJUSTING SET SCREW CONFIGURATION SEE PBAPS DRAWING PB SDOC G-080-VC-273, SHEET 1.
8. FOR JET PUMP SLIP.JOINT CLAMP CONFIGURATION SEE PBAPS DRAWING PB SDOC G..fllO.VC-323.
7. AN llFROVED MAIN WEDGE DESIGN MAY BE UTILIZED FOR SOME JET PUMPS.
8. ECR 06-00213 HAS BEEN APPROVED FOR PBAPS UNITS 2 & 3, WHICH ALLOWS RSTORATION OF THE RESTRAINER BRACKET SURFACE CONT ACTING THE MAIN WEDGE, IF WORN AND THE WEDGE IS REPLACED.
9. ECR 06-00212 HAS BEEN APPROVED FOR PBAPS UNITS 2& 3, WHICH ALLOWS STAKING OF THE ADJUSTING SCREWS.
PEACH BOTTOM ATOMIC POWER STATION UNITS2 AND3
UPDATED ANAL SAFETY ANALYSIS
JET PUMP
FIGURE 3.3.5 Rev. 21 04/07
![Page 6: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/6.jpg)
FIGURE 3.3.6 Deleted
Rev. 25 04/15
![Page 7: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/7.jpg)
LOCATION OF PRESSURE DI?FtatNTIALS (Large arrwhead ia on the side of the higher pressure)
l. Core Plate and Cuide :rub es
2. Shroud Support ling and Lover Shroud (beneath the core plate)
3. Shroud Head (at =arked elevation)
4. Upper Shroud(juat belov the cop &uide) lttDYATE~
LI!?
5. Core Averaged Pover Fuel !undle (~t boctom of channel vall)
6. ~axi=u• Pover Fuel Bundle (only for the g Noraal and Upset Condi tioiu)
7. Top Cu.ide
8. Steam Dryers.
9. Fro: points (a) to (b) the I rrcveraible* mcl
.Elevation Preaaur• Drop• fro• che Shroud Read to Water L&Tel. Total. Shroud Hud U • Su= of Irn'Vu:aible + !lcnticm
RE:CiltCU'U.TION ~"'E
* 'Flow cer.:s
en
"' < Ao ,.. ~
llC Ill w..a :&ca o:z: ·= a:a :c =-:c 11.1 ... = >< .. < :ic
©
g caw 111..a QC CZ ·= en 111s:a en
en > en < <~ < 0. w 0. ,.. w= ,. IQ ... IQ
c u
~
cw r~© 0 IQ .:= ... ..a cw a:g
~~ ...... == oc.: DC ~· u u
~
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
LOCATION OF TABULATED PRESSURE DIFFERENTIALS
FIGURE 3.3. 7 REV. 13 01/95
![Page 8: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/8.jpg)
REV. 25 APRIL 2015
UNIT 3
![Page 9: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/9.jpg)
POWER = 4030 MWt FLOW = 110% RATED COREFLOW
PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3
UPDATED FINAL SAFETY ANALYSIS RPORT
UNIT 2 TRANSIENT PRESSURE DIFFERENTIALS
FOLLOWING A STEAM LINE BREAK
FIGURE 3.3.8A REV. 25 APRIL 2015
![Page 10: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/10.jpg)
CORE
± HIGH IRRADIATION
ZONE
SHROUD-TO-SHROUD SUPPORT DISCOITllUITY REGION
SECTION A-A
20 INCHES (TYPICAL OF 20 HOLES)
REGION OF SHROUD SUPPORT PLATE MAXIMUM STRAIN
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
THERMALSHOCKTRAN~ENT
ANALYSIS ZONES
FIGURE 3.3.9
![Page 11: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/11.jpg)
ASME Ill DESIGN LIMIT
NUMBER OF CYCLES
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND3 UPDATED FINAL SAFETY ANALYSIS REPORT
MATERIALS BEHAVIOR GRAPH-CYCLES VERSUS STRESS FOR STAINLESS STEEL
FIGURE 3.3.1 0
![Page 12: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/12.jpg)
FUEL
ORO GUIDE TUBE
SEPARATORS
STANDPIPES
TOP PLATE
BOTTOM PLATE
SHROUD
HEAD
FLANGES
DRYER & VESSEL
STABILIZER
VESSEL
VESSEL
VESSEL
VESSEL
SHROUD SUPPORT TOP OF SKIRT
CRD HOUSING
SKIRT
BOTTOM HEAD
PEDESTAL
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
ANALYTICAL MODEL OF THE REACTOR VESSEL INTERNALS
FIGURE 3.3.11
![Page 13: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/13.jpg)
. }-
I
r-0.1
C=O C•O
4 ________ _,
C•0.15
3
p
2 Peak amplitude
Resonant amplitude
C•0.3535
1
-1--
0.5 1.0 1.5 2.0 25 3.0 r
The amplification bclor "as a function ol the frequency r.itio t> for \•arioua :amounts of viscous dampinl:).
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
µ {T) FOR VARIOUS AMOUNTS OF VISCOUS DAMPING
FIGURE 3.3.12
-~-
![Page 14: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/14.jpg)
PBAPS UFSAR
Figure 3.4.1
Deleted
![Page 15: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/15.jpg)
\ I
SHEA7H ~
COUPLING AELE~.Sc HANOL~ !LCWE=ll
0
0
0
0
0
0
0
0 iJ
0 \j
0 \)
~
()
\l ~
~
0
0
0
0
NEUTRON ABSORBER
HAFNIUM RODS
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROL ROD - ISOMETRIC OURALIFE 160
FIGURE 3.4.IA REV. 9 01/91
![Page 16: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/16.jpg)
SHEATi-i
0 a 0
CJ 0 \)
0 0 0 ()
0 ()
0 ~
(LOWER)
COUFUNG SOCKET
/UPPER HANDLE
NEUTRON ABSORB !IA.FNIUM RODS (D-190}
or
NEUTRON ABSORB HAFNIUM STRIPS (D-230)
VELOCITY LIMITER
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER ST A TION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROL ROD - ISOMETRIC DURALIFE 190, 230
FIGURE 3.4.18 REV. 9 01/91
![Page 17: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/17.jpg)
LOBE
SQUARE TYPE ABSORBER TUBE
ABSORBER CAPSULE
CROSS·Si::CTION OF 8 41 C ABSORBER TUSE AND CAPSULE
SECTION A·A · ILLUSTRATION OF ABSORBER
TUBE·ANO TIE ROD CONFIGURATION
GAP
BORON CARBIDE POWDER
ABSORBER TUBES
COUPLING SCOkET
UPPER HANDEL
---- COUPLING RELEASE rn-~.o.....c;;;.QQ. HANDLE CLOWER>
ILLUSTRATION OF
---VELOCITY LIMITER
TYPICAL MARATHON CONTROL ROD <BYR/2·-4 D·LATTICE>
PECO ENERGY COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AHO 3 . UPOA TED FINAL SAFETY ANALYSIS REPORT
F~ 3."4.IC
CONTROL ROO MAR.tTHON
REV. 14 0~/~7
![Page 18: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/18.jpg)
-·
COUPLING RELEASE HANDLE SHOWN RAISED AGAINST SPRING FORCE
COUPLING SOCKET
,
COUPLING SPUD
CONTROL ROD ASS EMBLY
UNLOCKING TUBE
INDEX TUBE· DRIVE
/ COUPLED CONDITION
ACTUATING SHAFT
SPRINGS RETURN (LOCK PLUG)
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND3 UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROL ROD TO CONTROL DRIVE COUPLING - ISOMETRIC
FIGURE 3.4.2
![Page 19: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/19.jpg)
14' in. 3TROKE
FUEL SUPl"OllT CASTING
COllE SUP'l"OllT P'l.ATE
INSERT
VELOCITY LIMITER
l~I WITHDRAW
CONTROL ROD DRIVE HOUSING
PECO ENERGY· CCU-ANY PEACH BOTIOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SA,ETY ANALYSIS REPORT
CONTROL ROD VELOCITY LIMITER -ISOMETRIC
FIGURE 3.4.3 REV. 14 05/97
![Page 20: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/20.jpg)
BOTTOM Of REACTOR VESSEL
DRIVE HOUSING
DRIVE CYLINDER
DRIVE llSUT Liii( -----'"'\
BALL CNCCK VALVE
COUPLING SPUD
llD[I TUIE
DRIVE WITMDRH Liii(
ARllOWS SllDW HTU FLOW WHU TffE OlllYE IS II TM( WITNDllAWAL llQDE OF OPEIUIDll
P1t • REACTOll P'llESSUllE PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND3 UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROL ROD DRIVE. SIMPLIFIED COMPONENT ILLUSTRATION
PIGUH 3.4.4
![Page 21: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/21.jpg)
mn vs WITHDRAW LINB
PISTON TUBE TO PISTON TUBE HEAD WELD
RING FLANGE BOLT
GUIDE TUBE
("")
0 r. ,... COTTER PIN 2
COLLET·FINGERSf:: COLLET-SPRING
COLLET ·PISTON ANO RINGS
DRIVE PISTON ANO SEALS HOUSING TO FLANr.F WELD FLANGE_H..;.UB:;.._ ___ _
v.,."'ILI_ VESSEL PORTS
DRIVE INSERT LINE
DRIVE MAIN FLANGE
WELDED_ PLUG
POSITION INDICATOR HOUSING
PHILADILPHIA ILICTllC COMPANY PIACH BOTTOM ATOMIC POWIR STATION
UNITS 2 AND3 UPDATID PINAL IAPITY ANALYSIS RIPORT
CONTROL ROD DRIVE, SCHEMATIC DIAGRAM
FIGURI 3.4.5
![Page 22: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/22.jpg)
REV. 23 04/11
PENETRATIONS (INSIDE a OUTSIDE)
CAPPED ------ ,-... .
~
4" CRD RETURN LINE / RPV NOZZLE CAPPED _/'
EQUALIZINB VALVES AND FILTERS
: : : - --- : :.::t:========== I
[XHAUST l'R ' Spsi H£AD£HOll1PM
COOi.iNC PR• 15
HEADER ~-I l p
DRIVE PR•2'0 HEADEROZ4 ....
CHAJIGING l«J0-1500 p>• HEADER
lllJP"
NOH ALL llUIU•!lllNH ARI APPilDXlllAlf RP-REACTORPUS!URl
SCRAlll'ILOT AIR i HEADER VF-1-~i-
r-=~"~ m~ --r-...;-cxi---i-
1
_3_.31i<ial/Drive l 'i\:'.,., I ! I
; DRAIN ! t._ ___________ __;
NOTE : "TH lS IS A S.IMPUFIEb l\...LUSTftATION. Fott SPECIFIC PEACM SO't\oM DES IGrN IN~MAT\Ot-4 REFER TO "l\-CE S"<STEM P•l.b's
PEACH BOTTOM ATOMIC POWER STATION
UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROL ROD DRIVE HYDRAULIC CONTROL SYSTEM
SIMPLIFIED COMPONENT ILLUSTRATION UNITS 2 AND 3
FIGURE 3.4.6
![Page 23: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/23.jpg)
PBAPS UFSAR
Figure 3.4.7 thru 3.4.8
Deleted
![Page 24: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/24.jpg)
2 - 0-RING ICRD FLANGE FACE 1 3 - 0-RING !INSERT ANO WITHDRAW PORTSI 4 - STRAINER S - FLAT HEAD SCREW iSTRAINfR-MOUNTINGJ 6 - DOWEL ALIGNMENT PIN 7 - 0-RING SPACER 8 - NAMEPLATE 9- SOCKET-HEAD CAP SCR[W !RING FLANGE MOUNTING)
11- POSITION INDICATOR PROBl 13 - FILLISTER-HEAD SCREW !POSITION INDICATOR
PROBE MOUNTING! H - LOCKWASHER !FOR PAR r 131 15 - PISTON TUBE 16 - NUT !PISTON TUBE1 17 - RING FLANGf 18 - 0-RING I PISTON TUBE I 19-CYUNOER, TUBE, ANO FLANGE 20- BALL !CHECK VALVE) 21 - BALL RETAINER 22 - 0-RING jBALL RETAINERJ 13 - SET SCREW PLUG !COOLING WATER ORIFICE) 24- DRIVE PISTON 15- BAND 16- INDEX TUBE 11 - SEAL RING !COLLET PISTON - INTERNAL) 18 - SEAL RING !COLLET PISTON - EXTERNAL) 19 - COLLET AND PISTON 30 - SPRING WAS HE RS 31 - COLLET sPRING 31 - SPLIT BUSHING !STOP PISTON) 33 - STOP PISTON 34 - SE"L RING !STOP PISTON) 35- BARREL 36 - COTTER PIN !STOP PISTON) 37 - PLUG !GUIDE CAPJ 38 - FILLISTER-HEAD SCREW !GUIDE CAP PLUG
MOUNTING) 39 -GUIDE CAP 40 - DRILLED FILLISTER-HEAD SCREW IOUTER FILTER
MOUNTING) 41- INNER FILTER 41- ROD 43- TUBE 44 - BAND 4S - FILTER !OUTER! 46 - SPUD 50 - SEAL RING HNNER FIL TERI Sl - COLLET HOUSING !PORTION OF OUTER TUBE) 51 - SPACER {PART OF CYLINDER, TUBE, ANO FLANGE I 53 - BUFFER ORIFICES IN PISTON TUBE (TYPICAL) 54 - POSITION INDICATOR SWITCHES 55 - INDEX TUBE NOTCH 56 - OUTER TUBE !PART OF CYLINDER, TUBE, ANO
FLANGE) 57 - INNER CYLINDER !PART Of CYLINDER, TUBE, ANO
FLANGE) SS- THERMOCOUPLE !PART OF POSITION INDICATOR PROBE) S9 - STUD !PORTION OF PISTON TUBE J 60 - COLLET FINGER {PART OF COLLET
ANO PISTON! 61 - INDICATOR TUBE !PART Of PISTON TUBE) 62 - INNER SEALS {DRIVE PISTON-BUFFER
SEALS) 63 - INTERNAL BUSHING !DRIVE PISTON) 64 - EXTERNAL BUSHING !DRIVE PISTON! 6S - OUTER SEA.LS !DRIVE PISTON)
66 - INSERT PORT (INSERT ANO SCRAll lllLET/ WITHDRAW OUTLET)
67 - RING W.GNET (PART Of DRIVE PISTmo 68 - CABLE IPOSITION INDICATOR) 69 - PORT TD COLLET PISTON !WITHDRAW
PRESWRE TO COLLET PISTON) 70 - WITHDRAW PORT (WITHDRAW INLET/
INSERT OUTLET AND SCRAll DISCHARGE) 71 - INNER SEALS (DRIVE PISTON - DRIYE
DOWll SEALS!
72 - INNER SEALS (DRIVE PISTON - DRIVE-41P SEALS I
73 - WATER PORTS Ill COLLET HOUSlllG
9'
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROL ROD DRIVE CUTAWAY ILLUSTRATION
FIGURE 3.4.9
![Page 25: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/25.jpg)
~USA"lt!' SYSTEM
---y------~ HCU~
C~NV• -rt:~ N6f°'~ I '° -e ----..---c:ioo---------.----------=-"''--"-.._____;;;;...._-=---------,-o-1----- ~cu·~
'°"H'I ~Art:*l:J('l"A~•-s6-u)·1l0.1l,,1U.,il.~.1tt.,IZ1 <.LOl.LOj ~·a:~·••"(• o-..a.t
z!E_,
Del/lfr -re-_e #£AO~~
J.J srA'''"' ,_,,.,,,.,, Rl!IW~F.eor'.._ ,,_ ;1r@ l.) .STAi.l~~i.£AK~£;r~o- 'w'r""lW?'"w·- ~C$PM"T@
.. =' .:::.:-:.:-~:. ~"- --- .......
.. .. ·--·- ....... ._ ----·--_...,94 ..... 'U ••
,. :::::::::-,::: ......... ,.,. .. .. \. ::.:-::.:: ,,_ .... ·---·-·------,. :.-_.._. .. _.. .......... , ....... ,. c. ~~.\.,.,~~-·---·"•--"*-Tiii----,. ,.. ___ ,_II&_ .... ...... .. . _ ....... _.,._ ........ .. ,. ........ ,..9 .................... ,,. ...
... Wlll•·K-•G.al••c --..-.. WllCS·n·••• ::-.: .................. -...... , .. ---
.......................... _IT IPUltM9 nat .
.................... _.,_f\AflUIDn'I.
"· ~fi1~::~~i:~i=~l~ ffi~~~..£t~~~7:'£r,;. ~ ::.:: :::._..--.:-.::-:.. ~·:.u-:i "::.,~
,,. M Ml• ... , ...... - ,_..,CIMITlll.. - •'ClollllllllL ... •M·M4•111
"· :-:, ':!:~ :::~:.~· a.1'11D VWC• LOCAfl<.t• ® t\ •.Ull Otl
......................... : ........ f\W ...... ltQlllat
"'·-" .... •. =~ _., .. Ul'fD 91 'NOi M ,_ ,_ Slll&I •tC lf'!•t•
tf.-.&,Nll'I' __ ..... ,.....,.. ...
... ~-:.:·:!:·::.::::. ·::~ (f?:~m ':'::. ·:.:. .......... . lo .........CCDIT•lffllllO
•• con. - ............ tC -- ......
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROLRODD~VEHYDRAULIC SYSTEM, PROCESS DIAGRAM
FIGURE 3.4.10
![Page 26: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/26.jpg)
,-
-
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROL ROD HYDRAULIC CONTROL UNIT - ISOMETRIC
FIGURE 3.4.11
![Page 27: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/27.jpg)
GRID PLAT ES :""':::::::::::::::-t+--~.,,.....
GRID CLAMP
---
: •--STEEL 'i FORM LINER
- CRD HOUSING
~R V:SSEL SU~ORT 1-tr--+--HANGER ROD
PEDESTAL
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND3 UPDATED FINAL SAFETY ANALYSIS REPORT
CONTROL ROD HOUSING SUPPORT -ISOMETRIC
FIGURE 3.5.1
![Page 28: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/28.jpg)
PBAPS UFSAR
Figure 3.6.1
Deleted
![Page 29: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/29.jpg)
The figures listed below are contained in the ref ere need documents and are not reproduced here.
FIGURE NO.
3.6.2
3.6.3
3.6.4
TITLE REFERENCE/
FIGURE
Scram Reactivity and CAD Specifications, BOC5 to EOC5·1,000 MWd/t
Scram Reactivity and CAD Specifications, EOC5-1,000 MWd/t to EOC5 Unit 2
Scram Reactivity and CAD Specifications unit 3
11/2a
11/2b
19/2
PECO ENERGY COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
SUBSECTION 3.6 FIGURES
FIGURES 3.6.2 THROUGH 3.6.4 REV. 12 01/94
![Page 30: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/30.jpg)
PBAPS UFSAR
Figure 3.6.5 thru 3.6.35
Deleted
![Page 31: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/31.jpg)
PBAPS UFSAR
Con- Flo\\ (1\Ilbm/b1·)
0 10 20 JO 40 50 60 70 80 90 100 110 120 120 tf::!::±=~-l ............. ·1-+-l--+->-4-+ of-• •-+---+-.. . . ~.l-->-!-+---r-t-1- • .+--<- +--+- +-+ ~~-'--+-~-+-r-+-+--t-- 1-4-+-~- 4819
Points of Interest .:, CLTP = 4016 Mwt t Core Flow= 102.5 Mlb/hr 110 T
T T
Pt Cora Flow l~l Powarl%l !CF !ncreesed Core Flow Realon 4418
100 f 90 f
I ·r T T
80 t t
70 f +
so I i
50 + T
+ 40 + 30 l
t 20 f
0 0
PerMELLLA+
A B c 0 E F G H l J I(
L M
Nature! Orculllllon 30% Mlnlm11m Pum1 Speed
3&0 101.5 100.0 110.0 110.0 100.D
37.1 85.2 ss.o 550 56.0
54.0 100.0 100.0 100.0 21.0 21.0 21.0 100 n.s 67.l 67.l
I
I
I m
' l /
f
,,:l ...
3614
3213 ...... -::=::
2811 ... e. -.. ;i
2410 .. 5 =..
"C
" 2008 ... = ~
1606
1205
I C 11\ i1n1fo11 lmerlock I 803
402
_.___--.. r t- t-·t-1!.!i_:;:,.-~~;_t--r-~· +-+..;--t--+-t-'__._+--t-.._- • - - · -- · j - + 1--1 - 1 ~- · 0 10 20 30 40 50 60 TO
Core Flu"- (%)
BO 90 100 110 120
PEACH BOTTOM ATOMIC POWER STATION UNITS 2AND 3
UPDATED FINAL SAFETY ANALYSIS REPORT
OPERATING POWER FLOW MAP
FIGURE 3.7.1 REV. 27 04/19
![Page 32: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/32.jpg)
PBAPS UFSAR
Figure 3.7.1A
Deleted
Rev. 26 04/17
![Page 33: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/33.jpg)
PBAPS UFSAR
Figure 3.8.1 thru 3.8.3
Deleted
![Page 34: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/34.jpg)
100
' I I 128
'60 12l
600 110
500 92 S!WTOOWN MARGIN
• 73 9 400 " l _,_____ ~
z 0 ~
~ I z 0
Xe • 55 0 "' "' ..J 300 0 -: "' " POWER RANGE
I-
"' - . z SUBCRITICAL
RATED POWER ZERO POHER -'-200 37
~ CRITICAL
100 ~r 18 20°c
I ' i 0
0.6 0 .7 0.8 0.9 1.0
MODERATOR DENSITY {gm /eel
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION
UNITS 2 AND 3 UPDATED FINAL SAFETY ANALYSIS REPORT
BORON REQUIREMENTS OF THE STANDBY
LIQUID CONTROL SYSTEM
FIGURE 3.8.4 REV. 6 01/88
![Page 35: Peach Bottom Atomic Power Station, Units 2 and 3, …Peach Bottom Atomic Power Station, Units 2 and 3, Revision 27 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.3.1](https://reader030.fdocuments.us/reader030/viewer/2022041100/5ed8083bcba89e334c671d71/html5/thumbnails/35.jpg)
PBAPS UFSAR
Figure 3.8.5
Deleted