Facilities Traceability
Brett Vogt, P.E.Project Consulting Services, Inc.
Mind the Gap Between As-Built Redline Drawings and Documentation
Ever Seen This?
Can you read it all?
Problems• 49 CFR 192 and 49 CFR 195 require asset-level
traceability for pipelines and pipeline-related facilities
• Redlines are the only as-built deliverables with traceability data for facilities
• Redlines are prone to illegible data, and sometimes incompleteness or inaccuracy
• Systems to ensure data is traceable, verifiable, and complete are inefficient
A Data Problem• 49 CFR 192 and 49 CFR 195 require asset-level
traceability for pipelines and pipeline-related facilities
• Redlines are the only as-built deliverables with traceability data for facilities
• Redlines are prone to illegible data, and sometimes incompleteness or inaccuracy
• Systems to ensure data is traceable, verifiable, and complete are inefficient
Data Standards
Final Data Set
Data Collection
Data Validation
What it looks like
Engaging Stakeholders
• Highlight the standards: – “reliable, traceable, verifiable, complete”
• Explore how technology can make existing systems more robust
• Customize processes to projects• Agree on a standard data collection
process
Data Collection
• Provide P&IDs and ISOs specifically created for traceability to be completed on a tablet or laptop
• Inspectors complete the traceability P&IDs and ISOs on the tablet or laptop
• Completed P&IDs and ISOs submitted to a central repository
Data Validation
• Validate data entered on P&IDs and ISOs versus data from documentation– Algorithm looking for gaps in traceability
against documents in an EDMS• Flag discrepancies and report immediately
– Correct discrepancies on as-built reports– Find missing documentation
The Deliverable• Close gaps discovered in Data Validation
phase• Build an interactive “job book” with report
hierarchy:– Facility map– P&IDs– ISOs
• Link to key traceability documentation for all components
• “Job book” can be searched with keywords
Demonstration
Lessons Learned• Complete traceability is possible in a facility
– Requires engagement for filling in gaps found in the validation and reporting process
• Technology adoption is always a challenge, and experience managing field personnel is critical to build trust
• Be able to support inspectors that do not embrace the system during transition
Conclusion• Asset-level traceability is required on
pipeline facilities• Plan for traceability in facilities• Introduce the end goals and any necessary
technology as early as possible• Complete traceability is possible in facilities
by combining planning, technology, and communication to the entire project team