PRECISION CAPITAL DEVELOPMENT SERVICES(PTY) LTD
PCDS – Who We Are Precision Capital Development Services (PCDS) is a specialised mining and mineral resource consultancy service provider, comprising Qualified, Mining Technical Professionals, with in-depth understanding of the mining & minerals industry and associated supporting technology.
Our niche is to leverage expertise and capabilities to compliment our clients’ business through: Process & Activity Specific Intervention; Implementation of Specialised Technical Support Services; Hands-on Project Execution; “Forward Thinking and Positive Change Processes”, i.e. actively promoting expansion beyond boundaries of current capabilities.
PROJECT MANAGEMENT OFFICE
COST ENGINEERING CONSULTANTS
HEALTH & SAFETY CONSULTANTS
MQA ACCREDITED TRAININGMINERAL RESOURCE
SPECIALISTS
Stakeholder Requirement Analysis
Selection, Definition & Design
Due Diligence Feasibility Studies Project Scope Risk / Opportunity
Review Project Execution Finalisation &
Implementation Operations
Maintenance Post-Investment
Reviews
Exploration Geology & Field Services
Mining Geology Rock Engineering Surveying Mineral Resource
Estimation 3-D Ore Body Models Mine Model Design Mine Business Plans Mineral Rights, Water
Use Licenses Competent Persons
Report
Quantity Surveying Bill of Quantities Mine Design Cost
Estimation Operating Cost
Modeling Capital Cost
Forecasting Financial Trade-off
Studies Operational and
Activity Planning Activity Based Cost
Engineering Operational Earned
Value Management
Operations Auditing MHSA Compliance DMR Compliance SHREQ Management
System Design, Development & Implementation
ISO 9001 and 14001 Accreditation
MQA Training Services
Skills development, Learnerships, Qualifications
PCDS – What We Do
PCDS – Where We Function
Establish PMO CPR Analysis &
Stakeholder Requirements
Due Diligence Establish Business
Case Feasibility Studies Engineering Designs Project Scheduling Project & Activity
Based Cost Engineering
Capital Project Execution
Commissioning & Handover
Target Generation Exploration Lease Management Licenses, Permits Geological Model Mineral Resource
Estimation & Statements
Competent Persons Reports
Environmental Studies
Geotechnical & Geohydrology Studies
Mine Design & Planning
Commence Establishment
Post Implementation Review & Audit
Compliance to Strategic Business Plan – Continuous Monitoring
Operational Controls – Technical Support Services
Mining Optimisation Earned Value
Management SHREQ Management
Systems, DMR Compliancy
MQA Training Services
LOCATE ESTABLISH MINE
Project Pipeline ResumeClient Base Date Implemented Project Scope Project Value
1 UMS Management Services (Pty) Ltd(Shaft Sinkers Group)Andrew Moore-BoyleDirector083 785 6969
September 2015 - December 2015, Ongoing Relationship
Technical Economical Assessment (TEA), Mine Design (Mine 2 4D, Studio 5D Planner), Engineering Designs, Feasibility Studies, Project Budget Estimates, Planning & Cost Forecast
R 1 808 683 455-00 New Mine Design and Feasibility Study - AFARAK Mecklenburg Chrome Mine (ZAR)
2 UMS Management Services (Pty) Ltd(Shaft Sinkers Group)
December 2015 – March 2016, Ongoing Relationship
Geological Data Auditing and 3 D Modelling of Kimberlite projects in Botswana
$ 216 458 794-40 (USD)Diamonds in Kimberlite, Botswana
3 MMS AAC Mining (Pty) LtdOtto MaraisDirector083 320 4742
2013-2016, Ongoing Relationship Pre-Feasibility Study, Mine Design Mine 2 4D, Studio 5D Planner, Project Budget Estimates, Planning & Cost Forecast
R 371 937 793-00 Petra Diamonds (ZAR)R 650 000 000-00 Capital Portion Weltevreden Declines
4 Zelpy Mining Services (Pty) LtdTienie FerreiraCOO082 326 3228
May 2014 -September 2014, Ongoing Relationship
Pre-Feasibility Studies, Project Budget Estimates, Planning & Cost Forecast
R 1 657 814 584-00 New Mine Design and Pre-Feasibility Study – Kafkraal Project, Palmietfontein
5 DMI Minerals South Africa (Pty) LtdRob De Pretto072 509 0969079 281 2530
August 2014 – Ongoing Relationship PCDS Appointed as Technical Services Department, including SHREQ System Development and Maintenance, Occupational Health & Hygiene, Licensing (Water Use, EMP), MRM functions (Rock Engineering, Surveying) – since 2014
$ 40 500 000-00 (CAN $) Operational Mining Project, Limpopo
6 Repli Investments / AGAMA CopperBêrend van Deventer083 297 6060
December 2015 – Ongoing Relationship Project Management ofProspecting Works Programme, incl. DMR Liaison and SHREQ System Development Project Design and Due Diligence study on the Opening-up of the abandoned Copperton Mine underground workings; Progressing to next phases of Feasibility Study
R 11 242 680-00 (ZAR – PWP Value only)Mining Project value TBA Copperton Mines, Prieska, Northern Cape
Project Pipeline ResumeClient Base Date Implemented Project Scope Project Value
7 Mopani Copper Mine - Group R Mining Zambia LtdAbie Mokhele083 627 9485
2012-Ongoing Capital Projects and still in Operation
Capital Project Design, Project Budget Estimates, Project Planning & Cost Forecast
$ 131 076 530-00 Vedanta KCM (USD)$ 151 556 953-00 Mopani (USD)
8 Petra Diamonds, Group T Mining (Pty) Ltd Abie Mokhele083 627 9485
2012- Ongoing Capital Projects and still in Operation
Project Budget Estimates, Planning & Cost Forecast
R 1 141 202 379-00 Petra Diamonds (ZAR)R 1 968 214 021-00 De Beers (ZAR)
9 Lubambe Copper ZambiaPierre JoubertCEO ARM
June-July 2015 Assist in; Operations Cost estimation and Forecast (Budget) for 2016
$ 117 648 730-00 Annual 2016 Budget (USD)
10 EMS Mining (Pty) Ltd 2014-2015 Various Projects Project Budget Estimates, Planning & Cost Forecast
R 524 108 158-00 (ZAR) Various Botswana and South African Clients
11 Maxwell GeoServices (Alliance Clients)AngloGold Ashanti, Sibanye, Anglo Platinum, DeBeers, Sibanye Gold, Swakop Uranium, Gold One, Goliath Gold, Rockwell Diamonds, AMIS, ASCOM PM, MSA, Galane Gold, Vedanta
MRM Software Implementation projects in alliance with Maxwell Databases, Data Acquisition Systems, QAQC Systems and Geological Consulting Services in line with SAMREC, JORC and NI43-101 Reporting Codes.
Mineral Project Values are Confidential.
12 MQA Training Clients, incl.Group T, Group R, Aveng Mining, MQA Level 1, 2, 3, 4
January 2015, Ongoing MQA Training – Mining, Safety, Engineering, Construction, MRM
Training Services Provider for SA Mining Client Base under MQA Regulations.
PCDS – Why Candy?COST ENGINEERING
Powerful Mine and Activity Planning Tool
Activity Based Work Breakdown Structure
High Level Cost Estimations
Schedules & Cash Flows to Optimize NPV
Progress Measurement, Cost Control & Earned Value Management
Providing Increased Accuracy, Control & Visibility to Owners
PCDS & Your Business? Why Choose PCDS?
Team of Professional, Skilled & Experienced Individuals able to deliver Turn-Key Projects Competitive due to our Unique Business Model and Low Overhead Cost Structure Competitive Consultancy and Services Rates Flexibility and Ability to deliver Successful Projects at any required locality
Where can PCDS be of assistance to you? Check us out @ www.pcds.co.za