PBN UPDATE

07‐10 April 2015

Page 2: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Major highlights 

13 May 2015 2

Page 3: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Key PBN Related Outcomes• States urged to comply with A37‐11 targets• States to continue to support ICAO           PBN initiatives with resources

• ICAO to develop additional PBN provisions aligned with the Aviation System Block Upgrades (ASBUs), GANP and GASP)

• Need for continuous implementation support– PBN Training and Education– Implementation projects– Flight Procedures Programme

13 May 2015 3

Page 4: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

So where are we today?

13 May 2015 4

Page 5: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Global PBN Instrument Approach Growth 

13 May 2015 5

Page 6: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Global PBN SID & STAR Growth

13 May 2015 6

Page 7: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

PBN Versus Conventional Routes

13 May 2015 7

Page 8: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

A37‐11 PBN Global Targets

• States complete a PBN Implementation Plan to achieve:

– Approach procedures with vertical guidance (APV (Baro‐VNAV) including LNAV‐only minima for all instrument runway ends by 2016:

• 30% by 2010, 70% by 2014

– Straight‐in LNAV only procedures as an exception to the above where there is:

• no local altimeter setting; and • no aircraft equipped for APV with max certified mass of 5700kg or more

13 May 2015 8

Page 9: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Only 102 States (or 53%) 

have a PBN Implementation 

Plan

Global Implementation Status

Page 10: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Global Implementation Status (2)

10

0 10 20 30 40 50 60 70 80 90 100

Global PBN Implementation(percent of Instrument PBN Runways)

69%

53%2010

30%2014

19%2016

Although 69% of all instrument runways have at least 1 PBN approach. . . 

. . . only 30% of ICAO Member States are on track to meet the 

2014 targets of Assembly Resolution A37‐11

6 June 2014

Page 11: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

What has ICAO done to help  States with implementation? . . .

13 May 2015 11

Page 12: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Coordination with RO’s• PBN Focal points• PBN TF’s – awareness and coordination among States 

• Implementation Projects• Go‐Teams

13 May 2015 12

Page 13: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Flight Procedures Programme (FPP)

• Beijing, China– Upgraded to Regional Sub‐Office

• Dakar, Senegal– FPP Office established 2014 (covers all African States)

• MID Region?

13

Page 14: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

ICAO/IATA PBN GO Teams• Expert Teams Visits to address specific implementation issues

– Phase I (PBN Requirements Assessment) completed – Phase II (Airspace Design and Operations Approvals) will be completed in early 

July (Last visit to China)

• Future GO Team Visits will be specific to Region and State requirements for PBN Implementation– On request basis

• Focus/Services provided will be:– PBN Assessments / Gap Analysis– PBN Plan Development– Training– Implementation Assistance

Completed Global Visits Phase (I and II)

Thailand (2) UAE (2)Mexico KenyaGermany IndiaEcuador RussiaSouth Africa USA (CAR/SAM)

Page 15: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

15

PBN Documentation Framework• PANS Ops Volume II• PBN Manual (Doc 9613) 4th Edition• RNP AR Procedure Design Manual         

(Doc 9905)• PBN Ops Approval Manual (Doc 

9997)*• Manual on PBN Use in Airspace 

Design (Doc 9992)*• CDO Manual (Doc 9931)• CCO Manual (Doc 9993)*• GNSS Manual (Doc 9849)• Procedure QA Manual (Vol 1 to Vol 6) 

(Doc 9906)* New 

Page 16: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

PBN Productsto assist with implementation

• PBN related Publications and Annexes– Bundled specifically for Stakeholders– Hard and soft copies

• eLibrary Solutions• PBN ikit• CBT Training (iLearn)

16

Available through ICAO e‐store: www.store1.icao.int 

Page 17: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

PBN Products and Services• PBN Start• PBN Training• PBN Publication and Bundles

• PBN Workshops• PBN Implementation Assistance

• PBN Financial Aid

13 May 2015 17

Provided through ICAO HQ, Regional Offices, FPPs, ICAO Authorized 

Training Centers, On‐line ICAO Store

Page 18: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

18

• Endorsement of Instrument procedure design organizations

• Consistent with other endorsements (training)

• To assist States with PBN Implementation

• Organizations  approved by ICAO :

– Airways New Zealand– ASAP s.r.o. (Slovakia)– CAAC Central‐Southern Airport Design & Research 

Institute (China)– China Academy of Civil Aviation Science and 

Technology (CAST)– GE Aviation (USA)– Hughes Aerospace (USA)– Ingegneria Dei Sistemi S.p.A (Italy)

PBN Endorsement – IFP Organizations

Name of Organization

Page 19: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

Future PBN SARPs and guidance

13 May 2015 19

Page 20: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

FLTOPSP  PBN Tasks• Making PBN the norm in operations rather than the exception

– Clarify that not all PBN Nav Specs require a specific approval

– This work will need some amendments to the PBN and PBN OPS Approval manuals

• Use of Area Navigation (RNAV) on Conventional Routes and Procedures

– Revise PANS‐OPS provisions to address PBN for “Overlay” instrument approaches

– Revise PANS‐OPS provisions to address PBN for en‐route “Alternate” and “Substitute” means of navigation

13 May 2015 20

Page 21: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

FLTOPSP  PBN Tasks• Create a GA framework to be used for PBN, and other approvals, equivalent to the CAT Operation Specifications.

• Develop material augmenting existing guidance on CDFA

• Address Reciprocity/Harmonization issues with PBN Operational Approvals

13 May 2015 21

Page 22: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

IFPP  PBN Main Tasks

• Provisions for: 

– GBAS CAT II/III

– GBAS with GP inoperative

– Visual procedures using PBN

– RNP AR Departures

– Fixed Radius Transitions

13 May 2015 22

Page 23: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

IFPP  PBN Main Tasks

• Provisions for Helicopter PBN operations

• PBN Charting Information/Harmonization

– PBN Box and Identification

– RNAV arrival and departure charts

• PBN with XLS final approach

• PBN Regulatory requirements13 May 2015 23

Page 24: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

NSP Main Tasks• GBAS CAT II/III (“GAST D”) SARPs validation

• Development of Galileo SARPs

• Development of Beidou SARPs

• Multi‐frequency, multi‐constellation (MFMC) issues

• Fixes to existing GNSS SARPs as required

• Development of terrestrial navaids strategy (including 

rationalization)

• Advanced RAIM

13 May 2015 24

Page 25: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

SASP Main PBN Tasks• PBN Separation Minima for Terminal Airspace

– RNP‐1, A‐RNP, RNP APCH or RNP AR APCH– Safety assessment for terminal area separation minima for surveillance and non‐surveillance airspace

• GBAS Landing System (GLS) for parallel rwy ops– Procedures and guidance required – Comparative assessment (ILS/MLS vs GLS and RNP) to derive GLS requirements

13 May 2015 25

Page 26: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

SASP Main PBN Tasks• Reduced Divergence Departures – Separation Minimum for Equivalent Lateral Separation Operation (ELSO)– Take advantage of PBN to provide more efficient operations in increasingly constrained airspace

• Stabilized RNP approaches to parallel runways– Take advantage of PBN capable aircraft– Undertake new safety assessment

13 May 2015 26

Page 27: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

ATMOPSP Main PBN Tasks • PBN Related Phraseology

– CDO and CCO 

13 May 2015 27

Page 28: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

PBNSG  Main Tasks• To further mature the PBN Concept

– Update the PBN Manual– Develop guidance material on

• Free routes• Mixed mode operations• RNP AR departures

• Coordinate with other ICAO Panels regarding:– Need for Visual RNAV procedures – A PBN toolset to address GNSS outage and reversion operations– Provisions for the judicious use of RF– PBN to XLS final– Equivalency of DME infrastructure requirements for RNAV 1 and RNP 1 

13 May 2015 28

Page 29: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

PBN PROGRAMME OFFICE• Initiates proposals on issues pertaining to the planning, management, 

policy and procedural aspects of developing the PBN programme.• Manages and oversees all PBN projects within the PBN programme.• Manages and oversees the preparation of PBN programme reports, 

presentations and publications for ANB• Leads, supervises and manages matters of intra/inter bureau and inter‐

agency coordination, internal/external audits, business planning and results‐based budgeting regarding the PBN programme.

• Leads, supervises and manages the work of the individuals assigned to PBN projects.

• Leads and oversees large scale programmes such as Asia/Pacific Regional sub‐office (APAC RSO), APAC Flight Procedure Programme(FPP) and African FPP in line with the ANB programme

13 May 2015 29

Page 30: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May

13 May 2015 30

Page 31: PBN UPDATE Meetings Seminars...• Procedure QA Manual (Vol 1 to Vol 6) (Doc 9906) * New. PBN Products to assist with implementation ... – Undertake new safety assessment 13 May