Partnering & Pavement Preservation -A Contractors Perspective-
AACE Meeting June 05, 2008
Mormon Lake, Arizona
![Page 2: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/2.jpg)
Before you can Partner a Decision needs to be made as
to what Pavement Preservation Strategy or
Strategies will be Utilized!
![Page 3: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/3.jpg)
Preventative Maintenance or
Corrective Maintenanceor
Both
What is Pavement Preservation?
![Page 4: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/4.jpg)
Pavement Management System
What do you do?Pavement Condition Index (PCI)
Visual InspectionMaintenance Experience
Rehabilitation - Performance HistoryInitial Cost Dictates
![Page 5: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/5.jpg)
What about the pavement condition?
![Page 6: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/6.jpg)
Pre-maintenance; What about Patching?
![Page 7: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/7.jpg)
Pre-maintenance; What about Crack Sealing?
![Page 8: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/8.jpg)
Pavement Preservation – Scrub Seal Application
![Page 9: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/9.jpg)
Pavement Preservation - Slurry Seal Application
![Page 10: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/10.jpg)
Pavement Preservation - Micro Surface Application
![Page 11: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/11.jpg)
Pavement Preservation - Chip Seal ApplicationPavement Preservation - Chip Seal Application
![Page 12: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/12.jpg)
Pavement Preservation - Hot Mix - Thin O/L Application
![Page 13: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/13.jpg)
Pavement Preservation - Multi-layered System ApplicationPavement Preservation - Multi-layered System Application
![Page 14: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/14.jpg)
Don’t Expect Miracles• Pre-maintenance is Mandatory
• Consider Climatic Region (Const. Date)
• Binder Design Variables
• Mix Design Variables
• Construction Procedures (Details)
• Consider Traffic Conditions
• DON’T LET THE VARIABLES GET YOU DOWN!
![Page 15: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/15.jpg)
Partnering ConceptsCost Issues/Considerations
Lets Try to Reduce Initial Cost!
![Page 16: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/16.jpg)
a) Inter-Agency Agreementsb) Concurrent Biddingc) Tag-on Contracts d) Renewable Contractse) JOC’sf) Specificationsg) Early Biddingh) Project Schedulingi) Construction Criteriaj) Materials Indexing
![Page 17: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/17.jpg)
Inter-Agency Agreements
Is this option possible?
What are the liability issues for the lead agency?
![Page 18: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/18.jpg)
Concurrent Bidding PracticeAsphalt-Rubber Chip Seal Cost Comparison
Example:
Individual Project Cost - $ 4.87 per s.y.* Total square yards = 68,800
Partnering Project Cost - $ 4.23 per s.y.* Total square yards = 404,000
![Page 19: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/19.jpg)
Tag-on Contract
Communication - Tag-on Usage Unknown!* Lead Agency Price to all Participants
Communication – Tag-on Usage Known!* Similar Pricing as Concurrent Bidding
![Page 20: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/20.jpg)
Renewable Contractsand
JOC’s
![Page 21: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/21.jpg)
Specifications – Consistency!
Early Bidding - Contractors are Hungary!
Project Scheduling - Start and Cutoff Dates?
Construction Criteria - Production Limitations!
Materials Indexing - Equality at Bid Time!
![Page 22: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/22.jpg)
Additional Cost Considerations
Agency:• Budget and Fiscal Year• Project Size• Pre Maintenance Costs
Contractor:• Asphalt Cement and Fuel (Big Cost)• Mobilization Costs
• Scheduling & Construction (Mother Nature)
• Partnering Risks!• Extended Warranties?
![Page 23: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/23.jpg)
Did You Know:When PG Asphalt Cement Rises $100.00 per ton,
The Per Square Yard Cost of a Slurry Seal Rises-An Average of $0.14 Per Square Yard.
The Per Square Yard Cost of a Micro Surface Rises-
An Average of $0.22 Per Square Yard.The Per Square Yard Cost of a Chip Seal Rises-
An Average of $0.25 Per Square Yard.The Per Square Yard Cost of a Hot Mix O/L Rises-
An Average Cost of _______ Per Square Yard?
![Page 24: Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.](https://reader036.fdocuments.us/reader036/viewer/2022081603/56649ccf5503460f9499ba73/html5/thumbnails/24.jpg)
Discussion!