AACE International’s Professional Practice Guide to...

13
AACE Internaonal’s Professional Pracce Guide to Producvity TABLE OF CONTENTS - Page 1 Chapter 01: General Producvity Management Documenting the Schedule Basis, Edward E. Douglas III, CCC, PSP, AACE Transactions, 2005 1. A Conceptual Aspect of Project Management: Point of No Return, Dr. Yash P. Gupta, AACE 2. Transactions, 1981 A Definition Of Productivity, ML Boyle, Cost Engineering Journal, 1973 3. A Productivity Challenge in a Utility’s Reliability Construction Program, H. Leon Ellis; Dr. Saied 4. Gouda, PE; Scott Trowbridge, PE, AACE Transactions, 1993 A Program to Improve Productivity of Field Directed Construction Operations, Michael H. Cas- 5. ten, AACE Transactions, 1981 An Industry Ripe With Paradox Emerges As A Productivity Paradigm, Xerox Engineering Sys- 6. tems, Cost Engineering Journal, 1994 Can the Mystery of Productivity be Solved?, Ralph P. O’Neal, Jr., CCE, AACE Transactions, 7. 1990 Construction Performance Benchmarking Measurement, Hans E. Picard, AACE Transactions, 8. 2002 Construction Productivity, James D. Whiteside, II PE, AACE Transactions, 2006 9. Construction Productivity and Progress Control, Robert E. Sheffield, CCE, AACE Transactions, 10. 1978 Construction Productivity as a Competitive Edge, Dr. Hans E. Picard, AACE Transactions, 1998 11. Construction Productivity Management, R Cardell, Cost Engineering Journal, 1986 12. Construction Productivity: A Survey of Industry Practices, George F. Jergeas; Mohammad S. 13. Chishty; Marko J. Leitner, AACE Transactions, 2000 Construction Productivity: An Auditing and Measuring Tool, George F. Jergeas; Robert Mc- 14. Tague, AACE Transactions, 2002 Construction Productivity: Continuous Improvement Is Normal, Dr. Richard E. Larew, PE CCE, 15. AACE Transactions, 1996 Productivity, AB Lorenzoni, Cost Engineering Journal, 1979 16. Productivity Defined, Jean-Claude Huot, AACE Transactions, 1981 17. Revisiting Lost Productivity: A Primer and Update for the Industry, John J. Ciccarelli, PE CCE 18. PSP; Michael J. Bennink, PE CCE PSP, AACE Transactions, 2010 Understanding the Word “Productivity”: What It Means And What Is Behind It, Marjatta 19. Strandell, AACE Transactions, 1982

Transcript of AACE International’s Professional Practice Guide to...

Page 1: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 1

Chapter 01: General Productivity Management

Documenting the Schedule Basis, Edward E. Douglas III, CCC, PSP, AACE Transactions, 20051.A Conceptual Aspect of Project Management: Point of No Return, Dr. Yash P. Gupta, AACE2.Transactions, 1981A Definition Of Productivity, ML Boyle, Cost Engineering Journal, 19733.A Productivity Challenge in a Utility’s Reliability Construction Program, H. Leon Ellis; Dr. Saied4.Gouda, PE; Scott Trowbridge, PE, AACE Transactions, 1993A Program to Improve Productivity of Field Directed Construction Operations, Michael H. Cas-5.ten, AACE Transactions, 1981An Industry Ripe With Paradox Emerges As A Productivity Paradigm, Xerox Engineering Sys-6.tems, Cost Engineering Journal, 1994Can the Mystery of Productivity be Solved?, Ralph P. O’Neal, Jr., CCE, AACE Transactions,7.1990Construction Performance Benchmarking Measurement, Hans E. Picard, AACE Transactions,8.2002Construction Productivity, James D. Whiteside, II PE, AACE Transactions, 20069.Construction Productivity and Progress Control, Robert E. Sheffield, CCE, AACE Transactions,10.1978Construction Productivity as a Competitive Edge, Dr. Hans E. Picard, AACE Transactions, 199811.Construction Productivity Management, R Cardell, Cost Engineering Journal, 198612.Construction Productivity: A Survey of Industry Practices, George F. Jergeas; Mohammad S.13.Chishty; Marko J. Leitner, AACE Transactions, 2000Construction Productivity: An Auditing and Measuring Tool, George F. Jergeas; Robert Mc-14.Tague, AACE Transactions, 2002Construction Productivity: Continuous Improvement Is Normal, Dr. Richard E. Larew, PE CCE,15.AACE Transactions, 1996Productivity, AB Lorenzoni, Cost Engineering Journal, 197916.Productivity Defined, Jean-Claude Huot, AACE Transactions, 198117.Revisiting Lost Productivity: A Primer and Update for the Industry, John J. Ciccarelli, PE CCE18.PSP; Michael J. Bennink, PE CCE PSP, AACE Transactions, 2010Understanding the Word “Productivity”: What It Means And What Is Behind It, Marjatta19.Strandell, AACE Transactions, 1982

Page 2: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 2

Increasing Onsite Production, Andrew G. Smith, CCE, AACE Transactions, 198720.Productivity And Management: The Challenge For Survival, Delmar R. Rediger, Cost Engineer-21.ing Journal, 1986Productivity—An Updated Concept of Management, H. Murray Hohns, AACE Transactions,22.1979Project Performance in a Changing Environment, Murtala A. Oladapo, AACE Transactions,23.2000Productivity Issues, Melanie L. Longmore; Doug Major; Jose L. Maldonado, AACE Transac-24.tions, 2002Productivity Management, Dr. James M. Neil, CCE, AACE Transactions, 198725.The Megaproject And Productivity, MA Muspratt, Cost Engineering Journal, 198426.Construction Labor Productivity Changes in Bell Canada, Christopher Beckman, AACE Trans-27.actions, 1979Construction Production Factors in International Areas, Dr. Enno Koehn; Chih-Shing Pan; Jen-28.Yuan Liu; Rana P. Pingili; Sirichai Tanratanawong, AACE Transactions, 1995Construction Productivity in Developing Global Regions, Enno Koehn, PE; Sanjay A. Jagushte,29.AACE Transactions, 2005International Labor Productivity, JK Yates; S Guhathakurta, Cost Engineering Journal, 199330.Labor Productivity in Third World Environments, Dr. James E. Rowings, Jr.CCE; Hashiem, AACE31.Transactions, 1986Labor-Productivity For Overseas Construction-Projects, EJ Mark, Cost Engineering Journal,32.1975Incremento En La Productividad De Los Recursos Humanos Para Abatir Los Costos De Con-33.struccion (SPANISH), Jorge Boysselle De La Mora, AACE Transactions, 1973Productivity in the U.K. Construction Industry, Les Ruddock, AACE Transactions, 199134.Variation in Construction Productivity: Developing Countries, Enno “Ed” Koehn; Sheikh Arif35.Ahmed; Satyanarayana Jayanti, AACE Transactions, 2000A Performance-Based Procurement System Used by the State of Wyoming, Dean T. Kashiwagi,36.PE; Ziad Al-Sharmani, Cost Engineering Journal, 1997Construction Labor Productivity During Nuclear Power Plant Construction, William B. Murray,37.AACE Transactions, 1980

Page 3: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 3

Chapter 02: Estimating and Planning Productivity

A Review of Methods to Estimate Haul Fleet Production, Douglas D. Gransberg, Cost Engi-1.neering Journal, 1998Conceptual Estimating Productivity Improvements at Kodak, Joseph A. Lukas, AACE Transac-2.tions, 1991D-PIPE: A Worker Hour Rates Data Warehouse for Estimating Industrial Pipe Construction,3.Mohamed Al-Hussein; Aubrey Vanderstar; Rajesh Kandanala, Cost Engineering Journal, 2005Estimating and Improving Excavation Performance, Dr. Peter J. Tarkoy, AACE Transactions,4.1990Estimating Labor Productivity, Joseph A. Brown, CCE, AACE Transactions, 19865.Estimating Labor-Productivity And Its Effect On Construction-Costs, L Dallavia, AACE Transac-6.tions, 1960Estimating Manning Levels for Process Plants, W. A. Alkhayat; Dr. A. M. Gerrard, AACE Trans-7.actions, 1984Forward Pricing Impact on Construction Projects, Brian E. Kasen; Victor C. Oblas, PE, AACE8.Transactions, 1996Productivity Aspects of Capital Cost Estimating, John W. Hackney, AACE Transactions, 19749.Up-Front Cost Estimating of Change Orders, Osama Moselhi; Ihab Assem; Khaled El-Rayes,10.AACE Transactions, 2002Utilizing Productivity Adjustment Formulas in Cost Estimating Spreadsheets, Rick Hentschel,11.AACE Document, 2000What is the U.S. Gulf Coast Baseline when Estimating Site Productivity?, Bruce E. Bradley,12.AACE Transactions, 2008Construction Cost Escalation And Labor Productivity - What Can We Do About It, Joseph An-13.drew Brown, AACE Transactions, 1971Cost Impact of Constructability Analysis in Mega Projects, Farshid Gholami; Janaka Y. Ruwan-14.pura; Mahsa Taghi Zadeh, AACE Transactions, 2010Crew Synchronization in Construction, Anamaria I. Popescu; George E. Gibson, Jr., PE; John D.15.Borcherding, PE, AACE Transactions, 1995Productivity Study for Hazardous and Toxic Waste Remediation Projects, Andrew G. Reape,16.CCE, Cost Engineering Journal, 1996

Page 4: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 4

Significant Elements of Construction Productivity, Dr. Carleton Coulter III; Victor F. Spruill,17.AACE Transactions, 1983TVA’s Project-Baselining and Improvement Process, Thomas E. Simpson, CCC; C. Robert Seay18.Jr, AACE Transactions, 1996Construction Industry Factors Impairing Productivity, P. Fazio; Don Chutter; G. Bourassa; Dr.19.Alan D. Russell, AACE Transactions, 1984Cost Indexes Without Productivity Mean Little, Wilbur L. Nelson, AACE Transactions, 196820.Rational Basis for Application of Productivity Factors in a DOE/EPCC Construction Cost Esti-21.mate, Chris Thomson, PE CCE, Cost Engineering Journal, 2009The Use of the Learning Curve, Jack H. Chellew, AACE Transactions, 197422.Unit Pricing as Index of Productivity, Jorge A. Rebata, PE, AACE Transactions, 197923.DACE Labor Productivity Norms — The New “Gulf Coast”?, Martin S. J. van Vliet, AACE Trans-24.actions, 2011Learning Curves and Work Interruptions in Construction, Vassilios Frantzolas, AACE Transac-25.tions, 1984Learning Curves: Theory And Practice, B. R. Elder, AACE Transactions, 196326.Labor Resource Planning for Construction Projects, Anubhav Bhargava; Balkiz Oztemir; Allan27.D. Chasey, AACE Transactions, 2002Resource Loading in a Multiproject Environment, Jim W. Short, CCC, AACE Transactions,28.1997The Productivity Baseline, Ronald Gulezian; Frederick Z. Samelian, AACE Transactions, 200329.Production Planning With Nonlinear Cost Considerations, W Conley, Cost Engineering Jour-30.nal, 1986Cost Estimating of Overseas Construction Projects, John G. McConville, CCC, AACE Transac-31.tions, 1994Production Rates for International Projects in Asia, Dr. Enno (Ed) Koehn, PE; Moin U. Ahmed,32.Cost Engineering Journal, 1999Production Rates for Urban/Rural Projects in Developing Areas, Enno Koehn; Faisal Ahmed,33.AACE Transactions, 2001Cost Comparison of Pacific Rim Countries, John G. McConville, CCC, AACE Transactions, 199734.Productivity of Construction in Developing Areas: India, Enno Koehn, PE; V. R. Ganapathiraju,35.AACE Transactions, 1996

Page 5: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 5

Chapter 03: Productivity Measurement and Analyses

An Estimate-Independent Productivity Measurement System, A. Larry Aaron; Dr. H. Randolph1.Thomas, AACE Transactions, 1990Direct Labor Productivity Measurement - As Applied in Construction and Major Maintenance Proj-2.ects, AACE International, Recommended Practices, 2004A Methodology for Measuring Construction Productivity, Foster M. Burton, AACE Transactions,3.1991A More Effective Program to Monitor Productivity, Fred S. Griggs, Jr., AACE Transactions, 19804.A Proposal For The Evaluation And Measurement Of Engineering Performance And Efficiency, GW5.Moorehouse, Cost Engineering Journal, 1971An Automated Piping Isometric Pricing and Progress Measuring System, Britton L. Wolf; Marian6.Walsh, Cost Engineering Journal, 1998An Improved Technique of Productivity Measurements, Steven G. Revay, CCC, AACE Transactions,7.1984Assessing Methodologies for Quantifying Lost Productivity, Mark C. Sanders, PE; Mark F. Nagata,8.AACE Transactions, 2003Department of Energy/Savannah River Site Productivity Measurement and Continuous Improve-9.ment, Richard A. Selg, CCE; Donald C. Thomas, PE, AACE Transactions, 2004Design Manpower Request Analysis and Performance Measurement, Shawn L. Kildare; George P.10.Blank, AACE Transactions, 2003Developments in Firm-Level Productivity Measurement, Jerry L. Hamlin, CCE, AACE Transactions,11.1978Field Progress Measurement System - Direct Hire Job, SD Toth, Cost Engineering Journal, 198312.Measurement of Engineering Productivity: An Approach, Sharad Dikshit, AACE Transactions, 197313.Measurement of Physical Accomplishments: An Approach, D. Sharad, AACE Transactions, 197414.Measuring Capital Productivity, Jerry L. Hamlin, CCE, AACE Transactions, 198115.Measuring Construction Labor Productivity by Daily Visits, Dr. Iqbal Noor, PE CCE, AACE Transac-16.tions, 1998Measuring Construction Productivity, LM Chang, Cost Engineering Journal, 199117.Measuring Labor-Requirements For Different Types Of Construction, JA Mark; M Ziegler, Cost Engi-18.neering Journal, 1973

Page 6: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 6

Methods for Construction Productivity Measurement, Jeffrey S. Russell; Dr. Luh-Maan Chang,19.AACE Transactions, 1987Problems In Measuring Production Efficiency, LJ Emond, Cost Engineering Journal, 197120.Productivity: Measurement and Management, Vic Alby, PE, CCE, AACE Transactions, 199421.The Productivity Measurement of Construction Labor Using Work Sampling, Ira B. Gregerman,22.AACE Transactions, 1981Tracking and Control of Earthmoving Operations Using Spatial Technologies, Adel Alshibani, Cost23.Engineering Journal, 2008TVA’s Continuous Outage Productivity Measurement/Improvement, Dr. Hans E. Picard; C. Robert24.Seay Jr., AACE Transactions, 1996Work Sampling And Unit Man-hours, Enno Koehn, Cost Engineering Journal, 198325.Worker Productivity: Characteristics and Measurement, Ira B. Gregerman, AACE Transactions,26.1981Activity Survey Impact on Construction Productivity, Stephen G. Goranson, AACE Transactions,27.1988Craftsman Questionnaire Sampling for Construction Productivity, Luh-Maan Chang; Dr. John28.Borcherding, AACE Transactions, 1984Criteria And Techniques For Meaningful Work Sampling Productivity Studies, James B. Scarfuto,29.Cost Engineering Journal, 1985Productivity Committee Meeting and Productivity - Guess It or Measure It, Ralph P. O’Neal, Jr.30.CCE, AACE Transactions, 1989Productivity Improvement Through Work Sampling, James L. Jenkins; Daryl L. Orth, Cost Engi-31.neering Journal, 2004A Case Study: Schedule Forecast Verification With Productivity Assessment, Win G. Li, CCE PSP,32.Cost Engineering Journal, 2005A Method to Calculate the Productivity Factor, Juan Fornino Gaeta; Robert R. Ruiz Gomez, AACE33.Transactions, 1993A Model for Analyzing Jobsite Productivity, David D. Chitester, PE, AACE Transactions, 199234.A Repricing Model For Production Rate Or Quantity Revisions, Victor Zaloom, PE, Cost Engineer-35.ing Journal, 1985Analysis of Working Space Congestion from Scheduling Data, Dr. Paviz F. Rad, CCE, AACE Transac-36.tions, 1980

Page 7: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 7

Analytical Techniques to Improve Construction Productivity, LM Chang, AACE Transactions,37.1988Analyzing Construction Productivity, Joseph J. Orczyk, PE, AACE Document, 199938.Are Any Construction Overtime “Studies” Reliable?, Richard E. Larew, Cost Engineering Journal,39.1998Assessing Performance Trends on Industrial Construction Mega Projects, Aminah Robinson40.Fayek; Stephen O. Revay, CCC; Doug Rowan; Donald Mousseau, Cost Engineering Journal, 2006Benchmarking Productivity for Electrical Projects, Min-Jae Lee; Awad S. Hanna; Jeffrey S. Rus-41.sell, AACE Transactions, 2002Construction Production Forecasting: A Modeling Approach, William Neff Patten, Cost Engi-42.neering Journal, 1987Economic Analysis and Productivity of Hazardous Waste Landfill Automation, Dr. Amarjit Singh,43.PE, AACE Transactions, 1993Estimating Cost Growth From Schedule Changes: A Regression, John V. Bielecki; Edward D.44.White, Cost Engineering Journal, 2005Labor Productivity and Manpower Forecasting, Forrest D. Clark, CCE, AACE Transactions, 198545.Large Project Dynamics, Jean-Claude Huot; Kenneth G. Cooper, AACE Transactions, 198246.Monitoring Productivity with Earned Value Analysis – A New Approach, Aldo D. Mattos; Ricardo47.Delarue, AACE Transactions, 2010Monitoring the Adequacy of the Amount and Productivity of Engineering and Construction48.Manpower, Dwight A. Zink, CCE, AACE Transactions, 1980Multiple Improvement Curve Effects Upon Productivity, Dr. Robert C. Creese; B. P. Madhu Sud-49.han, AACE Transactions, 1991Optimization of Production in Earthmoving Works, Jose P. Bendicho, AACE Transactions, 199250.Performance Management: Making It Work, Gary Cokins, AACE Transactions, 200651.Performance Measures By Means of Activity Sampling, Kurt G. R. Heinze, PE CCE, AACE Trans-52.actions, 1984Power Plant Outage Project Productivity Improvement, Hans E. Picard; Harley R. Macklin, PE,53.AACE Transactions, 1993Predicting Productivity, James M. Neil, CCE; Lee E. Knack, AACE Transactions, 198454.Project Productivity Analysis: What Is 1.0?, Charles P. Woodward, PE CCE, AACE Transactions,55.2003

Page 8: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 8

The Cumulative Effect of Change, Bob M. McCally, AACE Transactions, 200656.Continuous Improvement of Project Productivity, HR Macklin; HE Picard, Cost Engineering Jour-57.nal, 1992Demonstrated Labor Efficiency: An Effective Labor Cost Control and Analytical Tool, Bob M. Mc-58.Cally, AACE Transactions, 1998Determining Labor Productivity: A Case Study, TG Mendel, Cost Engineering Journal, 199159.Engineering Performance in the US Industrial Construction Sector, Maged E. Georgy; Luh-Maan60.Chang; Lei Zhang, Cost Engineering Journal, 2005Improving Capital Productivity, Jerry L. Hamlin, PE, CCE, AACE Transactions, 197961.Mechanical and General Construction Productivity Results, Daryl L. Orth; James L. Jenkins, AACE62.Transactions, 2003Mechanical and General Construction Productivity Results, James L. Jenkins; Daryl L. Orth, Cost63.Engineering Journal, 2004Productivity Analysis - A Case Study, Charles J. Peles, AACE Transactions, 197764.Productivity Control on Large Power Projects, Jude P. Laspa, AACE Transactions, 198065.Productivity in Power Plant Construction, Marjatta Strandell, AACE Transactions, 197666.Promoting Power Plant Construction Project Productivity, Johannes E. Picard; John Hutcheson,67.AACE Transactions, 2008The Productivity of U.S. Manufacturing, Paul C. Nystrom; Richard H. Franke, AACE Transactions,68.1977A Systems Approach to Project Management Measurements of Productivity and Cost Control,69.Howard M. Sanderson, AACE Transactions, 1976Labor Productivity Modeling With Neural Networks, Dr. James E. Rowings Jr., PE CCE; Rifat Son-70.mez, AACE Transactions, 1996Modeling Labor Productivity in Steel Fabrication, Lingguang Song; Simaan M. AbouRizk, P.Eng.,71.AACE Transactions, 2006Practical EVMS for an EPC Project, Tetsuya Yonezawa, CCE, AACE Transactions, 200572.System Dynamic Modeling of Delay and Disruption Claims, William Ibbs; Min Liu, Cost Engineer-73.ing Journal, 2005Understanding Change of Scope Effects on DBB Projects Using Systems Thinking, Stephen P.74.Warhoe, PE CCE CFCC; Paul D. Giammalvo, CCE, AACE Transactions, 2011

Page 9: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 9

Chapter 04: Productivity in Manufacturing and Industrial settings

Increased Productivity Through Inventory & Production Control, Michael J. Beringer, AACE1.Transactions, 1986Industrial Construction Efficiency and Productivity, Hans E. Picard, AACE Transactions, 20002.Industrial Productivity In The United States, O. T. Zimmerman, AACE Transactions, 19663.

Chapter 05: Acceleration and other Influences on Productivity

Cause and Effect: How Schedule Acceleration Affects Productivity, Matthew Christopher Baker,1.CCT, Cost Engineering Journal, 2012Constructive Acceleration — A Global Tour, James G. Zack, Jr., FRICS CFCC, AACE Transactions,2.2011Constructive Acceleration: Waking the Sleeping Giant, Thomas F. Peters, PE, Cost Engineering3.Journal, 2005Impact of Overtime on Construction, Irwin Bromberg, PE, AACE Transactions, 19884.Impact of Overtime on Construction Labor Planning, Awad S. Hanna, PE; Kenneth T. Sullivan, Cost5.Engineering Journal, 2004Overtime In Construction, Weldon McGlaun, Cost Engineering Journal, 19736.Schedule Acceleration – What, Why and How?, Sunu Mohan, PSP EVP, AACE Transactions, 20087.Schedule Compression for Construction Projects by Interruption in LOB Scheduling, S. Moham-8.mad Amini; Gholamreza Heravi, AACE Transactions, 2009Scheduled Overtime and Loss of Productivity: Fact or Fiction? A Business Roundtable Report,9.Robert Seals, PSP; Josette Rodriguez, Cost Engineering Journal, 2006The Basics of Constructive Acceleration, James G. Zack Jr., CFCC, Cost Engineering Journal, 201210.Extended Overtime and Construction Productivity, John Smith, AACE Transactions, 197511.Construction Productivity: Major Causes of Impact, Charles A. Leonard; Dr. Paul Fazio; Dr. Osama12.Moselhi, AACE Transactions, 1988Construction Site Utilization: Impact of Material Movement and Storage on Productivity and13.Cost, Frederick B. Muehlhausen, AACE Transactions, 1991Design Phase Influences on Construction Change Order Costs, John A. Kuprenas, PE, AACE Trans-14.actions, 2007

Page 10: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 10

Factors Affecting Productivity, Leon Morrison, AACE Transactions, 197515.Factors Which Influence Productivity on Large Projects, Dr. John D. Borcherding, AACE Transac-16.tions, 1978Field Conditions Impacting Construction Budgets, John Dinatale, CCE, AACE Transactions, 198717.Field Factors Affecting Masonry Productivity, Nuntapong Ovararin; Calin M. Popescu, AACE18.Transactions, 2001Human Skills - Keys to Effectiveness, Stephen M. Roberts, Cost Engineering Journal, 199219.Impact: The Real Effect Of Change Orders, Carroll J. Collins, AACE Transactions, 197020.Impacts And Construction Inefficiency, Dwight A. Zink, Cost Engineering Journal, 199021.Impacts of Modifications to the Change Order Process, G. Steve Gardner, PE; Roy W. Block, AACE22.Transactions, 2004Impacts of Project Change Management on Project Cost and Schedule Performances, Yi Zou;23.Sang-Hoon Lee, AACE Transactions, 2006Improving Construction Productivity: The Case for Motivation, G. Douglas Jenkins, Jr.; Alexander24.Laufer, AACE Transactions, 1982Improving Productivity With Short-Interval Scheduling, Walter J. Strutt, AACE Transactions, 200125.Improving Your “Scheduling CAD” Productivity, Philip Perzanowski, CCE, AACE Transactions,26.1991Influence of Quality on Construction Costs, John A. Kuprenas, PE, AACE Transactions, 200827.Labor Productivity Factors for Hazardous Waste Sites, Donald J. Cass, CCE, AACE Transactions,28.1989Labor Productivity Impact of Varying Crew Levels, Donald J. Cass, CCE, AACE Transactions, 199229.Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction, John D.30.Borcherding; Scott J. Sebastian, AACE Transactions, 1980Management Development Leads to Increased Productivity, Karl W. Haavind, AACE Transac-31.tions, 1984Materials Management; Key to Schedule and Productivity, David M. Harper, AACE Transactions,32.1982Motivation and Productivity in the Engineering Environment, Gary L. Leach, AACE Transactions,33.1981Motivation and Productivity of Craftsmen and Foremen on Large Projects, John D. Borcherding;34.Douglas F. Garner, AACE Transactions, 1980

Page 11: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 11

Motivational Theories and Their Application in Construction, Hassan Ali Halepota, PE CCE, Cost35.Engineering Journal, 2005Organizational Assessment for Construction Productivity Improvement, Kim Yea-Sang, AACE36.Transactions, 1993Productivity - Open vs. Closed Shop, John R. Heizelman, AACE Transactions, 198137.Productivity Improvement Through Communications: C O G, A. Larry Aaron, AACE Transactions,38.1989Productivity in Construction - With Relation to Union and Nonunion Operation, John P. Trimmer,39.AACE Transactions, 1974Productivity Incentive Schemes on Engineering Construction Sites, Don F. Parkinson, Cost Engi-40.neering Journal, 1979Project Cost Control - Behavioral Considerations, Dr. Carl Wolf, CCE; Dr. Phillip F. Ostwald, AACE41.Transactions, 1980Soft Skill Quantification (SSQ): Human Peformance vs. Metric, Edward Muzio; Deborah J. Fisher,42.PE, Cost Engineering Journal, 2009Staffing Problems on Large Construction Projects, Frank F. Moynihan, CCC, AACE Transactions,43.2004The Effect of Hot Weather on Construction Labor Productivity and Costs, Donn E. Hancher; Hes-44.ham A. Abd-Elkhalek, Cost Engineering Journal, 1998The Human Factor I: Attracting, Retaining, and Motivating Capable People, Minnesh Kaliprasad,45.CCE, Cost Engineering Journal, 2006The Human Factor II: Creating a High Performance Culture in an Organization, Minnesh46.Kaliprasad, CCE, Cost Engineering Journal, 2006The Root Causes of Poor Communication, Sue Dyer, Cost Engineering Journal, 200647.Using Pay to Motivate Construction Job Performance, Alexander Laufer; John D. Borcherding,48.AACE Transactions, 1981Weather Delays and Impacts, Donald F. McDonald Jr., Cost Engineering Journal, 200049.Is Your Schedule Late at the Starting Gate?, Abhi Basu, PE, AACE Transactions, 200550.Counter-Productivity: Its Causes and Cures, Richard E. Westney, AACE Transactions, 198851.Dollars And Sense Of Productivity, M. R. Goodes, Cost Engineering Journal, 198452.Improved Productivity Through Integrating Work Instruction with Progress Control, Stephen G.53.Revay, CCE, AACE Transactions, 1978

Page 12: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 12

Increasing the Productivity of System End-Users, Paul J. Brady, AACE Transactions, 197654.Inefficiency, Zartab Z. Quraishi, PE CCE, AACE Transactions, 200355.Labor Productivity Impacts: A Case Study, Robert D. Kelly, AACE Transactions, 200056.

Chapter 06: When Construction Productivity is Disputed

Estimating Lost Labor Productivity in Construction Claims, AACE International, Recommended1.Practices, 2004Applying Multimedia Technology to Mitigate Claims, Dr. Liang Y. Liu; John R. Knoke, PE, AACE2.Transactions, 1995Client’s Responsibility To Contractor Relative To Labor Usage And Labor Problems, David McIn-3.tire, AACE Transactions, 1969Demystifying the Law of Lost Productivity Claims, Mark A. Sgarlata; Christopher J. Brasco;4.Christopher M. Anzidei; Adam M. Tuckman, AACE Transactions, 2010Forensic Estimating and Impact Cost Determination, Robert H. Pratt, AACE Document, 20005.Loss of Learning in Disruption Claims, David A. Norfleet, CCC, AACE Transactions, 20046.Pacing Delays — The Practical Effect, James G. Zack Jr., Cost Engineering Journal, 20007.Pacing: An Excuse for Concurrent Delay?, Ronald J. Rider; Thomas E. Finnegan, AACE Transac-8.tions, 2005Practical Issues in Loss of Efficiency Claims, Robert A. Dieterle, CCE; Thomas A. Gaines, CCC,9.Cost Engineering Journal, 2011Productivity Claims: Beyond ‘Smoke and Mirrors’, John Gerard Boyle, AACE Transactions, 200710.Quantifying the Effect of Change Orders on Electrical Construction Labor Efficiency, Dr. Awad S.11.Hanna, PE; Dr. Jeffrey S. Russell, PE; David Thomack, Cost Engineering Journal, 1998The Link Between Planning and Programming Practice and the Analysis of Delay and Disrup-12.tion Claims, Nuhu Braimah; Issaka Ndekugri, AACE Transactions, 2006The Use of Forensic Animations in Resolving Complex Disruption Claims - A Case Study, Keith13.Pickavance, AACE Transactions, 2008Use of Productivity Factors in Construction Claims, Robert Dieterle, CCE; Alfred DeStephanis,14.AACE Transactions, 1992Productivity Loss for Sewer Pipe Installation, Ancizar Portilla, CCE PSP, Cost Engineering Jour-15.nal, 2010

Page 13: AACE International’s Professional Practice Guide to ...web.aacei.org/docs/default-source/toc/toc_PPG22-E1.pdf · AACE International’s ... AACE International’s Professional Practice

AACE International’s Professional Practice Guide toProductivityTA b l E o f C o n T E n T s - Page 13

“Measured Mile” Process Project Controls to Support Equitable Recovery of Production Ineffi-16.ciency Claims, Thomas W. Presnell, CCC, Cost Engineering Journal, 2003Measured Mile Analysis and International Mega-Projects, Dan Crowley; John C. Livengood,17.AACE Transactions, 2002Measured Mile Labor Analysis, Timothy T. Calvey, PE; William R. Zollinger III, PE, AACE Transac-18.tions, 2003Statistical Evaluations of Measured Mile Productivity Claims, Michael Ross Finke, Cost Engineer-19.ing Journal, 1998The Measured Mile — a Better Way of Using an Old Tool, Glen R. Palmer, PSP, AACE Transac-20.tions, 2008The Measured Mile: Proving Construction Inefficiency Costs, Dwight A. Zink, Cost Engineering21.Journal, 1986“Mathews Curve” - A Model for Evaluating Impact, Paul R. Heather, CCE, AACE Transactions,22.1989Delay Analysis Considering Productivity, Jae-Seob Lee, AACE Transactions, 200623.Analyzing the Cumulative Impact of Changes, David D. Reichard; Cheryl L. Norwood, AACE24.Transactions, 2001Dealing With Cumulative Impact Claims, Emelyn W. Martinez, MRICS CCC, AACE Transactions,25.2010How to Prove/Disprove “Cumulative Impact” Claims, Anamaria Popescu, PE; Jeffrey L. Ottesen,26.PE PSP; Glen R. Palmer, PSP, AACE Transactions, 2007Ibbs and Leonard Curves: Comparing the Impact of Cumulative Change on Labor Productivity,27.William Ibbs; Gerald McEniry, CFCC PSP, Cost Engineering Journal, 2008Is the Theory of Cumulative Impact a Provable Reality?, Stephen P. Warhoe, PE CCE CFCC, Cost28.Engineering Journal, 2007Labor Productivity, Disruptions, and the Ripple Effect, Dr. H. Randolph Thomas, PE; Dr. Amr A.29.Oloufa, PE, Cost Engineering Journal, 1995