Park Avenue Solar Solutions, LLC
Bla dfo d Sola P oje t O e ie a d Des iptio
The Bla dfo d Sola P oje t aka the P oje t is to e lo ated at app o i atel 1 3 N. Bla dfo d Road, Bla dfo d, MA. The p oposed P oje t ould o up app o i atel a es of la d the Site a d o sist of a ou d 1,3 kilo atts DC of sola odules.
The Site, u e tl a a t ho e e th ee sepa ate dist i utio a d t a s issio li es oss it, a d it su ou ds a su statio . The P oje t itself ill o sist of a olle tio of app o i atel 1 sola photo oltai PV odules ea h app o i atel 3 feet 6 feet i di e sio that a e g ouped i to a a s tilted a d fa i g south. These statio a a a s a e st u g togethe fo i g a se ies of o s o ie ted east to est. Ele t i it olle tio a d dist i utio li es u de g ou d li k the sola odules to a olle tio house ith i e te a d t a sfo e e uip e t hi h i tu ill t a s it the ele t i it to the e isti g dist i utio li es alo g No th Bla dfo d Road. I the Site itself, li es ill e pla ed i o duit a d u ied i t e hes alo g the pe i ete of the P oje t pu sua t to the ele t i al ode. No othe utilities a e eed o the Site.
The p i ipal o po e ts of the P oje t a e sola odules. The ake a d odel of the sola odules u e tl p oposed Pa k A e ue Sola Solutio s ill e ost likel ade Ha ha‐Q‐Cells,
ho e e this is to e dete i ed. Des iptio s of these odules a e atta hed. The sola odules ill e ou ted o a a ki g s ste a ufa tu ed do esti all , ost likel s e ed i to the g ou d. The a ki g s ste u e tl p oposed to e used ill e p odu ed RBI Ra ki g a d the spe ifi atio s fo s e s ste a e atta hed. It is a ti ipated that the odules ill e o o e tha 1 feet at the highest. The a ki g s ste ill ot o e i.e. it is fi ed a d ot t a ki g . The AC po e p odu ed the Ha ha odules ill e i e ted ost likel the Sole t ia SGI XT, a ufa tu ed i La e e, MA. The d a i gs a d spe ifi atio sheets fo the i e te is atta hed. The po e ill the e t a sfo ed the t a sfo e to the app op iate oltage fo the e isti g dist i utio li es.
It is a ti ipated that the P oje t ill p o ide o l positi e e efits to the to , the state a d the glo al e i o e t. It is esti ated to ge e ate e ough lea , i sta ta eousl e e a le, a d e issio ‐f ee e e g to po e hu d eds of ho es. The odules f o hi h this lea ele t i it is p odu ed p odu e o e issio s, ake o oise, do ot o e, a d use o ate . Fu the it is esti ated that the p oposed P oje t ill displa e app o i atel hu d eds of thousa ds of pou ds of CO a uall .
The P oje t ill also p o ide et e e ue i the fo of sig ifi a t p ope t ta es to the To of Bla dfo d. The P oje t ill use o se e , ate , a d ot u de the oads o s hools. Lo al o t a to s a d ai te a e pe so el ill also e used to the e te t feasi le. I sho t, e o o i all , the P oje t ill ha e a sig ifi a t, et positi e fis al i pa t o the To .
Pote tial Ope atio al I pa ts of the P oje t De elop e t I pa t State e t
Ope atio of the P oje t is passi e a d the ope atio al i pa ts of the fa o the e i o e t, ea eside es, oads, et . is e pe ted to e de i i is. Belo please fi d a su a of t affi
i pa ts, p oposed fe i g, lighti g, sig age, utilities, oise, t a sfo e oils, a d soil i pa ts.
O e u de o st u tio , esides pe iodi ai te a e, e uip e t epla e e t a d o ito i g of P oje t output ia Sol e ie a e ‐ ased o ito i g s ste , the odules a d othe
p i a o po e ts do ot e ui e di e t ha dli g. E ept du i g the app o i atel ‐3 o th
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
![Page 3: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/3.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
o st u tio pe iod eathe depe de t the e should e i i al i pa t to the t affi flo o safet of No th Bla dfo d Road. As i di ated a o e, gi e the si pli it of the ope atio s of the P oje t, the e is little ai te a e e ui ed o t affi asso iated. It is a ti ipated that e o d o thl la a e, if e essa , a d i‐a ual lea i g of the odules, little o o ai te a e should e e ui ed. A ai te a e o o st u tio ehi les ill e pa ked o site a d o pe a e t pa ki g a eas a e o te plated u e tl . Atta hed is a p oposed Ope atio s a d Mai te a e Pla .
The e ti e ope atio sola odules, olle tio houses a d a ess la es ill e fe ed i o de to p o ide fo safet a d se u it , i a o da e ith appli a le e ui e e ts. The fe e u e tl p oposed is a 6‐foot hai li k fe e. I side the fe e a ou d the e ti e pe i ete ill e a app o i atel 1 ‐foot ide pe i ete a ess oad. A ess to the P oje t ill e li ited to Pa k A e ue Sola Solutio s pe so el o o t a to s, ai te a e pe so el, a d To e e ge pe so el. Coded o ke ed lo k o es ill e pla ed at ea h e t poi t/gate to the site. Lo al e e ge pe so el poli e a d fi e ill ha e the odes as ill Pa k A e ue Sola Solutio s’ lo al o t a to s o poi ts of o ta t. A ‐hou e e ge u e to ea h Pa k A e ue Sola Solutio s ill e pla ed o sig age at the gates, if e ui ed the To .
Su je t to the Fi e Depa t e t’s app o al, the o l o ‐site lighti g Pa k A e ue Sola Solutio s p oposes to ha e o site ould e at the olle tio house a d the gate e t a es, a d this ill e i o fo a e ith all p o isio s of the Zo i g B la . These ould e fo use the Fi e Depa t e t a d fo he a ightti e a ess is eeded. The light s it hes ould e i lo ked o es, a essi le o l e e ge pe so el a d Pa k A e ue Sola Solutio s e plo ees o o t a to s. The lights the sel es ould e as lo ‐to‐the‐g ou d as e essa a d a gled to a ds the g ou d.
Pa k A e ue Sola Solutio s ill also oo di ate its safet sig age i a o da e ith the app o al of the Bla dfo d Fi e Depa t e t a d i o fo a e ith the Zo i g B la . Pa k A e ue Sola Solutio s e o e ds that the sig s alo g the fe e should e at least 1 i hes lo g 1 i hes high ith the o ds, fo i sta e, Da ge High Voltage ‐ Keep Out i th ee ho izo tal li es of hite lette s agai st a a kg ou d field of ed a d la k. The sig s should e o o e tha feet apa t. The e ill e a sig at the p i ipal e t gate ide tif i g the o e of the P oje t a d a e e ge o ta t u e . With espe t to a dato sig s, E e sou e states that the follo i g sig s e pla ed at the site: [a] pe a e t pla ue o di e to shall e i stalled at the utilit e e ue ete a d at the Poi t of Co o Coupli g PCC ith a a i g a out the ge e ato s i stalled. If the PCC is at a pad ou ted t a sfo e , the pla ue ust e o the ight doo of the t a sfo e . If the e te al utilit
dis o e t s it h is ot adja e t to the utilit e e ue ete , a pe a e t pla ue shall e p o ided at the utilit e e ue ete a d the PCC lo ati g the s it h. If the e te al utilit dis o e t s it h is ot adja e t to PCC, a pe a e t pla ue shall e p o ided at the PCC lo ati g the s it h. All pla ues as des i ed i NEC .1 , .1 , 6 . 6, 6 . a d . shall e i stalled he appli a le.
Be o d i o ele t i al de a d fo ope atio of the i e te s a d t a sfo e s, it is ot a ti ipated that a utilities o pu li se i es ill e eeded. The p i a utilit o e tio fo the sola po e ill e the fa ilities’ i te o e tio ith the dist i utio li es alo g No th Bla dfo d Road. The i e te s ill also e o e ted to telepho e li es so thei p odu tio a e o ito ed E e sou e a d Pa k A e ue Sola Solutio s e otel . The P oje t o tai s o o ks fo the olle tio , t a s issio , t eat e t a d disposal of se age. The e ill e o dis ha ge of o ta i a ts i to the ai o i to the g ou d o ate . The e ill e o s ste s, fa ilities a d e uip e t fo e ei i g, ha dli g, sto i g a d p o essi g a aste o aste‐ ate . No se age, aste o ai o ta i a ts ill e
![Page 4: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/4.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
ge e ated at all as a esult of the sola po e ge e atio p o ess. The e a e o ate ithd a als asso iated ith the ope atio of the P oje t as pla ed. Du i g the ope atio s phase of the P oje t, Pa k A e ue Sola Solutio s a ti ipates that it ill lea the odules t i e pe ea , if eeded, ith ate o , if e essa , a o ga i lea si g age t, ith ate t a spo ted o s all t u ks.
Fu the , the e a e o a ti ipated egati e oise i pa ts f o the P oje t. Both the i e te a d the t a sfo e e it less oise tha the NEMA TR1 Sta da d dBA a d gi e thei dista e f o the ea est eside e a d the fa t that the o l ope ate du i g da ‐ti e hou s, it is ot a ti ipated that
the e e a egati e oise i pa ts f o the P oje t. The sola odules do ot o e – the a e fi ed i pla e o the a ki g s ste – a d ake o oise.
The e should also e li ited di e t i pa t o the la d a d soils f o the p oposed P oje t. The la d as logged histo i all a d the pa els ill o l o up app o i atel a es of the ‐plus a e site. The PV odules a e ou ted a o e g ade, allo i g fo g ass to e p opagated elo a d et ee the a a ta les. Fu the , it is ei g p oposed that the u used po tio of the la d e put i to a
pe a e t o se atio est i tio .
Fu the , ith espe t to pote tial gla e f o the sola pa els a d the P oje t, the P oje t should ot e eadil isi le to a su ou di g a utte s see the atta hed Site Pla . Rega dless, sola pa els
a e desig ed to a so su light athe tha to efle t it, ith t pi all % of i ide t light ei g efle ted. Refle tio s f o sola pa els a e s alle tha di e t su light o , fo i sta e, sola efle tio s f o ate .
Gla e effe ts due to efle tio f o sola pa els ge e all ot taki g i to a ou t the su ou di g fo est a e e pe ted to e i i al a d o pa a le to glass fa ades. Sola pa els ge e all appea da ke tha glass i ea l all o ditio s. T pi al soili g of the sola pa el su fa e ill fu the edu e the o se ed light efle tio , a d this also has a effe t o the effi ie of the pa el. Di e t sola efle tio s ill ot o u he the su is o s u ed louds.
Fi all , the efle tio of a glass su fa e is highl depe de t o the a gle of i ide e a d su fa e o ditio s. It is u de stood that as the a gle of i ide e i eases, the a ou t of efle ted light also i eases. Gi e that the pa els should e a gled at a ou d deg ees, the ould ot p odu e a di e t efle tio of the su at g ou d le el.
It is ot elie ed that the pa els ithi the P oje t ill ause a gla e o e s. I su a , the isual i pa ts o a utte s should e i i al.
Fi all , p io to o e ial ope atio , Pa k A e ue Sola Solutio s o a affiliate shall p o ide fi a ial assu a e i a a ou t as dete i ed a thi d‐pa t e gi ee to suffi ie tl o e the osts to e o e a d de o issio the P oje t.
![Page 5: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/5.jpg)
Q.PLUS L-G4.1 330-340
1 APT test conditions: Cells at -1000 V
against grounded, with conductive me-
tal foil covered module surface, 25 °C,
168 h2 See data sheet on rear for further
information.
Q.ANTUM SOLAR MODULE
The Q.ANTUM solar module Q.PLUS L-G4.1 with power classes up to 340 Wp is the strongest module of its type on the market globally. Powered by 72 Q CELLS solar cells Q.PLUS L-G4.1 was specially de-signed for large solar power plants to reduce BOS costs. Only Q CELLS offers German engineering quality with our unique triple Yield Security.
THE IDEAL SOLUTION FOR:
Ground-mounted
solar power plants
ANTI PID TECHNOLOGY
(APT)
HOT-SPOT PROTECT
(HSP)
TRACEABLE QUALITY
(TRA.Q™)
YIELD SECURITY
151 modules tested
Best polycrystallinesolar module 2013
Q.PRO-G2 235
MOD:27898 photon.info/laboratory
LOW ELECTRICITY GENERATION COSTS
Higher yield per surface area and lower BOS costs thanks to
higher power classes and an efficiency rate of up to 17.4 %.
INNOVATIVE ALL-WEATHER TECHNOLOGY
Optimal yields, whatever the weather with excellent low-light
and temperature behavior.
ENDURING HIGH PERFORMANCE
Long-term yield security with Anti-PID Technology1,
Hot-Spot-Protect and Traceable Quality Tra.Q™.
LIGHT-WEIGHT QUALITY FRAME
High-tech aluminum alloy frame, certified for
high snow (5400 Pa) and wind loads (2400 Pa).
A RELIABLE INVESTMENT
Inclusive 12-year product warranty and 25-year linear
performance guarantee2.
![Page 6: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/6.jpg)
MECHANICAL SPECIFICATION
Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE
Typical module performance under low irradiance conditions in comparison to
STC conditions (25 °C, 1000 W/m2).
IRRADIANCE [W/m²]
RELA
TIV
E E
FFIC
IEN
CY [
%]
200 400 600 800 1000
110
100
90
80
Irradiance [W/m²]
Rela
tive
eff
icie
ncy
[%]
Format 78.5 in × 39.4 in × 1.38 in (including frame)
(1994 mm × 1000 mm × 35 mm)
Weight 52.9 lb (24 kg)
Front Cover 0.13 in (3.2 mm) thermally pre-stressed glass with anti-reflection technology
Back Cover Composite film
Frame Anodised aluminum
Cell 6 × 12 Q.ANTUM solar cells
Junction box 3.35-4.13 in × 2.36-3.15 in × 0.59-0.67 in (85-105 mm × 60-80 mm ×
15-17 mm), Protection class ≥ IP67, with bypass diodes
Cable 4 mm² Solar cable; (+) ≥ 47.24 in (1200 mm), (-) ≥ 47.24 in (1200 mm)
Connector Amphenol H4 UTX, IP68
C-SI MODULES (L) FOR DA A SHEETS
≥ 47.24'' (≥ 1200 mm)
39.4''
(1000 mm)
51.5'' (1308 mm)
78.5'' (1994 mm)
1.38" (35 mm)
Junction bo×
4 × Mounting slots (DETAIL A)8 × Drainage holes 0.12 × 0.24" (3 × 6 mm)
Cable with
connectors
Frame
6 × Grounding holes, Ø 0.18'' (4.5 mm)
DETAIL A0.63" (16 mm)
0.33" (8.5 mm)1.0" (25.5 mm)
37.4''
(949 mm)
4 × Drainage holes 0.47 × 0.47" (11.9 × 11.9 mm)
DETAIL B0.39" (10 mm)
0.28" (7 mm)0.98" (25 mm)
4 × Mounting slots system Tracker (DETAIL B)
37.4''
(950 mm)
15.7'' (400 mm)5.91''
(150 mm)
Certified
UL 1703
(254141)
PROPERTIES FOR SYSTEM DESIGNMaximum System Voltage V
SYS[V] 1500 (IEC) / 1000 (UL) Safety Class II
Maximum Series Fuse Rating [A DC] 15 Fire Rating C / Type 1
Max Load (UL)2 [lbs/ft2] 75 (3600 Pa) Permitted module temperature
on continuous duty
-40 °F up to +185 °F
(-40 °C up to +85 °C)
Load Rating (UL)2 [lbs/ft2] 33 (1600 Pa) 2 see installation manual
QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION
Number of Modules per Pallet 29
Number of Pallets per 40' Container 22
Pallet Dimensions ( L × W × H ) 81.3 × 45.3 × 46.9 in
(2065 × 1150 × 1190 mm)
Pallet Weight 1671 lbs (758 kg)
NOTE: Installation instructions must be followed. See the installation and operating manual or contact our technical service department for further information on approved installation and use
of this product.
EFF
ICIE
NC
Y R
ELA
TIV
E
TO
NO
MIN
AL
PO
WER
[%
] 100
95
90
85
80
75
155 25200 10
YEARS
97
Q CELLS
Industry standard for tiered warranties*
Industry standard for linear warranties*
*Evaluation of the 10 PV companies with the largest production
capacity in 2014 (Status: September 2014)
ELECTRICAL CHARACTERISTICS
POWER CLASS 330 335 340
MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 (POWER TOLERANCE +5 W / -0 W)
Min
imum
Power at MPP2 PMPP [W] 330 335 340
Short Circuit Current* ISC [A] 9.49 9.54 9.59
Open Circuit Voltage* VOC [V] 46.55 46.81 47.07
Current at MPP* IMPP [A] 8.91 8.97 9.03
Voltage at MPP* VMPP [V] 37.02 37.33 37.63
Efficiency2 η [%] ≥ 16.5 ≥ 16.8 ≥ 17.1
MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NOC3
Min
imum
Power at MPP2 PMPP [W] 244.7 248.4 252.1
Short Circuit Current* ISC [A] 7.65 7.69 7.73
Open Circuit Voltage* VOC [V] 43.44 43.68 43.92
Current at MPP* IMPP [A] 6.99 7.04 7.09
Voltage at MPP* VMPP [V] 35.01 35.29 35.56
11000 W/m², 25°C, spectrum AM 1.5 G 2 Measurement tolerances STC ± 3%; NOC ± 5% 3 800 W/m², NOCT, spectrum AM 1.5 G * typical values, actual values may differ
TEMPERATURE COEFFICIENTS
Temperature Coefficient of ISC α [% / K] + 0.04 Temperature Coefficient of VOC β [% / K] − 0.29
Temperature Coefficient of PMPP γ [% / K] − 0.40 Normal Operating Cell Temperature NOCT [°F] 113 ± 5.4 (45 ± 3 °C)
IEC 61215 (Ed. 2); IEC 61730 (Ed. 1), Application class A
This data sheet complies with DIN EN 50380.
Spe
cific
atio
ns s
ubje
ct t
o te
chni
cal c
hang
es ©
Hanw
ha Q
CELL
S G
mbH
Q.P
LU
S L
-G4
.1_3
30
-34
0_2
01
5-0
9_R
ev0
2_N
A
At least 97 % of nominal power during first year. Thereafter max. 0.6 % degra-
dation per year.At least 92 % of nominal power after
10 years.At least 83 % of nominal power after
25 years.
All data within measurement tolerances.Full warranties in accordance with the warranty terms of the Q CELLS sales organisation of your respective country.
Hanwha Q CELLS USA Corp.
300 Spectrum Center Drive, Suite 1250, Irvine, CA 92618, USA | TEL +1 949 748 59 96 | EMAIL [email protected]
![Page 7: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/7.jpg)
3-PH TRANSFORMERLESS
STRING INVERTERSSGI 225SGI 250SGI 266SGI 300SGI 500
COMMERCIAL INVERTERS
COMMERCIAL INVERTERS
Yaskawa - Solectria Solar’s SMARTGRID 225-500 series of inverters is compliant
with NEC 2014 690.11 & 690.12 arc fault and rapid shutdown requirements.
This series boasts an industry leading 97.5% CEC weighted efficiency which
translates into significantly greater energy production and cost savings over
the lifetime of the system. The SGI line has been deployed in a large number
of commercial and utility-scale PV systems across North America ranging from
200kW to multi-MW. Our customers find these to be the most cost-effective,
reliable, and efficient inverters in the market. This product family offers
utility options such as voltage and frequency ride through, controlled ramp
rates, reactive power control, and real power curtailment. Such critical utility
options, combined with unsurpassed efficiencies and the lowest nighttime
tare losses in the industry, earmark the SGI series as the premier inverter for
next generation large commercial systems.
FEATURES
• Compliant with NEC 2014 690.11 & 690.12 arc fault and rapid shutdown requirements when coupled with ARCCOM combiner
• 97.5% CEC efficiency
• Parallel power stages
• Fuse and breaker subcombiner options
• Modbus communications
• User-interactive LCD
• Real power curtailment
OPTIONS
• Uptime guarantee
• Stainless steel enclosure
• Web-based monitoring
• Built-in cellular connectivity
SOLECTRIA.COM
![Page 8: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/8.jpg)
Co
py
rig
ht
© Y
as
ka
wa
- S
ole
ctr
ia S
ola
r. A
ll i
nfo
rma
tio
n s
ub
jec
t to
ch
an
ge
wit
ho
ut
no
tice
. D
ece
mb
er
20
16
DO
CR
-07
02
43
-K
MADE IN THE USA
SPECIFICATIONS SGI 225 SGI 250 SGI 266 SGI 300 SGI 500
DC Input
Absolute Maximum Input Voltage 600 VDC
Max Power Input Voltage Range (MPPT)* 300-500 VDC
Maximum Operating Input Current 768 A 853 A 908 A 1026 A 1721 A
Maximum PV Power 292.5 kW 325 kW 345.8 kW 390 kW 650 kW
Strike Voltage 390 V
AC Output
Nominal Output Voltage 480 VAC, 3ø+/PE
AC Voltage Range -12%/+10%
Continuous Output Power 225 kW 250 kW 266 kW 300 kW 500 kW
Continuous Output Current480 VAC 271 A 301 A 320 A 360 A 602 A
600 VAC — 240 A — — —
Maximum Backfeed Current 0 A
Nominal Output Frequency 60 Hz
Output Frequency Range 57-60.5 Hz
Power Factor Adjustable 0.9 leading / 0.9 lagging, factory set at 1
Fault Current Contribution (1 Cycle RMS) 325.2 A 361.2 A 384 A 432 A 722 A
Total Harmonic Distortion (THD) @ Rated Load < 3%
Performance
Peak Efficiency 98.0% 97.9%
CEC Efficiency (480 VAC) 97.5% 97.0%
Tare Loss 28 W 32 W
Ambient Temperature Range (full power) -40°F to +122°F (-40°C to +50°C)
Storage Temperature Range -40°F to +158°F (-40°C to +70°C)
Relative Humidity (non-condensing) 5-95%
Audible Noise < 60 dBA @ 5 m
Safety Listings & Certifications UL 1741/IEEE 1547, CSA C22.2#107.1, FCC part 15 B
Maintenance Outage Factor 0.1
Testing Agency ETL
Mechanical
Transformer Standard, fully-integrated
AC Breaker/DC Disconnect Fully-integrated
Dimensions (H x W x D) 79 in. x 109 in. x 41 in. (2007 mm x 2769 mm x 1042 mm)
Shading Set Back 137 in. (3480 mm) at 30˚ solar elevation
Weight 5170 lbs (2346 kg) 5650 lbs (2563 kg) 6980 lbs (3167 kg)
Enclosure Rating Type 3R
Enclosure Finish Polyester powder coated steel; optional 316 stainless steel
Subcombiner Options
Fuses or Breakers
6 positions, 225-400 A 8 positions, 225-400 A
12 positions, 110-200 A 16 positions, 110-200 A
Fuses Only 24 positions, 70-100 A 32 positions, 70-100 A
Communication
Data Logger Hardware Standard, Integrated
SolrenViewTM Monitoring Service Optional
Optional Revenue Grade Monitoring (Integrated) 400 A 800 A
Optional SolZoneTM Sub-Array Monitoring (DC Current) 6 zones 8 zones
Optional Cellular Communication SolrenView AIR
Communication Interface RS-485 SunSpec Modbus RTU
Warranty
Standard 5 year
Optional 10, 15, 20 year; extended service agreement; uptime guarantee*At nominal AC voltage
www.solectria.com | [email protected] | 978.683.9700
![Page 9: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/9.jpg)
Park Avenue Solar Solutions, LLC
G ee i h A e ue, d Floo G ee i h, CT ● ‐ ● .altuspo e . o
Ope atio s a d Mai te a e O&M Fo Pla A. SCOPE OF SERVICES
The ai te a e se i es fo the sola photo oltai PV s ste S ste ill o sist of the follo i g: I. Co pletio of a a ual p eve tative ai te a e syste he k Basi P eve tative
Mai te a e PM Se vi es
Se i e shall pe fo se i‐a ual p e e tati e ai te a e site isits t i e pe ea , du i g hi h Se i e shall o du t a tho ough i spe tio a d pe fo asi o site p e e ti e a d o e ti e ai te a e of PV s ste e uip e t, i ludi g i i g, ou ti g s ste s, PV pa els, i e te s o i e o es a d othe e uip e t i a o da e ith est i dust p a ti es, a d the e uip e t a ufa tu e s’ e o e ded O&M guideli es. This does ot i lude ashi g o lea i g of PV odules .
Se i e shall test the S ste , i ludi g st i g le el ope i uit oltage a d DC ope ati g a pe age tests.
Se i e shall e ali ate o epla e the DAS se so s a d ete s i o plia e ith all a ufa tu e i st u tio s, at least o e e e t o ea s. NOTE: The e ali atio of the DAS se so s ould e i luded as pa t of the PM duties; ut epla e e t of se so s a d ete s ould e o du ted
o a ti e & ate ials asis, as e ui ed . Se i e shall o du t i e te p e e tati e ai te a e i o plia e ith all
a ufa tu e’s ope atio guideli es; lea i e te a i et ai e ts; a d lea a d ha ge the i e te ai filte s i o plia e ith all a ufa tu e ’s guideli es, as e essa .
Se i e shall he k the to ue a d e‐tighte s e s/ olts o the odules, a ki g, g ou ds, a d i e te s i o plia e ith all a ufa tu e’s guideli es.
Se i e shall e o e a ate ials e.g., t ash, i d ests, et . that a e fou d u de the PV a a odules o st u ti g ai flo . This e ludes a ee, ho et, o asp ests, hi h a e ui e a p ofessio al e te i ato .
Se i e shall suppl , o ause to e supplied, all goods a d ate ials, i ludi g spa e pa ts a d othe asi o su a les, e ui ed to ope ate a d ai tai the S ste . Note: ate ials a d e uip e t supplied Se i e fo this pu pose ill e p o ided o a ti e a d ate ials T&M asis as set fo th i a sepa ate pa e t s hedule a d the a e ot i luded i the ase O&M o t a t a ou t.
Se i e ill ge e ate a d deli e a o plete PM Repo t fo ea h site i spe tio , hi h ill detail the o ditio s of a ious s ste o po e ts a d a defi ie ies fou d, list the asi ai te a e ite s esol ed, a d i lude a ti e a d ate ials esti ate fo a fu the o ‐ asi o e ti e epai ite s that ill e ui e fu the atte tio . The epo ts ill also o tai photog aphs depi ti g site o ditio s, p o le a eas, a d p e e tati e/ o e ti e easu es take .
Se i e ill suppl a I spe tio & PM epo t te plate, hi h p o ides additio al detail of the spe ifi ite s that a t pi all e e aluated a d add essed u de Se i e ’s p e e tati e ai te a e p og a . The epo ts that ill e ge e ated fo the S ste follo i g ea h site isit ill e
su sta tiall si ila to the te plate.
II. No ‐Basi Repai s a d Coo di atio of Wa a ty Se vi e fo a y Cove ed E uip e t Failu e T&M Se vi es
![Page 10: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/10.jpg)
Park Avenue Solar Solutions, LLC
G ee i h A e ue, d Floo G ee i h, CT ● ‐ ● .altuspo e . o
Should the eed a ise, Se i e shall additio all p o ide te h i al assista e i the ad i ist atio a d/o e e utio of a epai s/ epla e e t of PV s ste o po e ts o e ed u de a ufa tu e s’ a a ties e.g. i e te , sola odules ; o epai o epla e a PV s ste o po e ts
that a e othe ise da aged o defe ti e a d ot o e ed u de a a ufa tu e s’ a a ties. The la o , ate ials, a d e uip e t p o ided to o plete a su h o ‐ asi ajo epai s o to p o ide a a t ad i ist atio ill e supplied o a T&M asis.
III. Co pletio of se vi e a d epai alls pla ed y SLG T&M Se vi es
Se i e ill espo d to oth e e ge a d o ‐e e ge se i e alls, a d a out
the e essa epai s to the S ste a d epla e e t of a defe ti e/da aged pa ts, o po e ts a d othe a esso ies. The la o , ate ials, a d e uip e t p o ided to o plete a su h o ‐ asi epai alls ill e supplied Se i e o a T&M asis.
Se i e shall also o ito Sol e ie o a dail asis a d ill e ei e S ste ‐spe ifi otifi atio s f o Sol e ie . Upo e eipt of a otifi atio of a e o f o Sol e ie , Se i e shall e o e d to a ou se of a tio a d a out a o k o a T&M asis. B. OTHER CONDITIONS
Se i e ill p o ide ai te a e se i es utilizi g o l ualified, e pe ie ed, a d o pete t
te h i ia s. Mai te a e se i es ill e p o ided o all o ki g da s f o to , Mo da to F ida . P o isio of a aila ilit of se i e te h i ia s o Satu da s, Su da s o othe holida s ill e ade i ase of e ige .
A ti ities that a e supple e ta to the ope atio al po tio s of the S ste , a d a e ot the
espo si ilit of Se i e u less othe ise spe ified he ei , i lude: g ass ai te a e; e o al of i asi e egetatio , de is a d o usti le ate ials; s o e o al; o ito i g fo a i al a ti it a d elated da age. G ass ai te a e ill ost likel i lude egula o i g, ithi the S ste a ea a d the la ds aped a eas outside the pe i ete fe e. A a ea o the outside of the pe i ete fe e ill likel e o ed egula l to e su e that o ood egetatio ould e o e esta lished he e it ould ause da age to the fe e o shade the sola odules. Additio all , if fe i g, se u it a d o u i atio s s ste s, i te al la e a s, site e t a e d i e, olle tio houses, HVAC e uip e t, a o asio all eed epai s. This o k ill e i ple e ted as e essa a i di idual o tea
p ope l t ai ed to add ess the issue, o o a T&M asis the Se i e .
C. DELIVERABLES SUMMARY
. Se i‐A ual I spe tio /S ste he k.
. Ca out p e e tati e ai te a e easu es.
. Ge e ate site photos.
. P o ide itte o se atio s of s ste o ditio s a d defi ie ies.
. Make e o e datio s fo o e ti e epai s a d T&M esti ates to o plete.
. Ca out e e ge a d o ‐e e ge o e ti e epai s
. Re o d keepi g of all ai te a e do u e tatio .
![Page 11: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/11.jpg)
PROJECT TYPE
The project type is New Development.
The Site is located in the northwestern portion of Blandford on North Blandford Road. The project Site
consists of approximately 11.58 acres.
The applicant proposes to construct a solar panel array occupying approximately 4.34 acres of the
property with an associated driveway providing access from North Blandford Road.
STANDARD 1: No New Untreated Discharges
The project does not include any new untreated discharges.
STANDARD 2: Peak Rate Attenuation
The project has been designed such that the post-development peak rates of run-off from the project are
consistent or less than pre-development rates.
Peak Flows at Design Point #99
Storm Event Existing Conditions
(cfs)
Proposed Conditions
(cfs)
2 yr. storm
10 yr. storm
25 yr. storm
100 yr. storm
10.82
23.13
30.21
42.09
10.51
21.42
30.15
42.06
As shown in the tables above, the stormwater management system has been designed so that no negative
impact, relative to the increase in peak runoff rates, will occur to abutting properties.
STANDARD 3: Recharge
This Standard is not applicable due to no new impervious surface cover.
STANDARD 4: Water Quality
See Standard 9 for information in regards to Long Term Pollution Prevention Plan.
STANDARD 5: Land Uses with Higher Potential Pollutant Loads (LUHPPLs)
The project does not contain Land Uses with Higher Potential Pollutant Loads (LUHPPLs).
STANDARD 6: Critical Areas
The project does not require review by the Natural Heritage and Endangered Species Program due to its
proximity to a critical area.
![Page 12: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/12.jpg)
STANDARD 7: Redevelopments and Other Projects Subject to the Standards only to the
maximum extent practicable
The project is New Development; therefore this Standard is not applicable.
STANDARD 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control
Erosion control measures are shown on the attached plans. The project will be covered by a NPDES
Construction General Permit and the SWPPP will be submitted prior to land disturbance.
STANDARD 9: Operation and Maintenance Plan
This project is a private commercial solar panel array. The project developer will be responsible for the
maintenance and operation of the proposed stormwater management system.
As presented within the description of the proposed stormwater management system, several
management practices have been instituted to collect, mitigate and treat stormwater runoff from the
proposed development. These include the following:
Retention of stormwater, within the proposed stormwater basin to facilitate recharge of the
groundwater system and balancing of pre/post flows.
Construction of stormwater basin with an associated outlet to mitigate pre and post peak
development flows for all storm events (i.e. 2, 10, 25 and 100 year storm events).
All of the above items reflect mitigation measures to improve and maintain stormwater quality that will
flow as groundwater to the existing neighboring wetland system. In order to assure proper operation of
the stormwater facilities in the future, it is necessary for a stormwater maintenance program be instituted
and followed.
The project developer will be the owner of the storm water system described herein and responsible for
the required maintenance and operation of the storm water. The proposed maintenance procedures and
scheduling is as follows:
CONSTRUCTION COMPLETION MAINTENANCE
Once construction grading of the basin is completed, proper stabilization of all slopes within the Site and
specifically the basin is required. Hay mulch, geotextile fabric, and hydroseeding are required to
prevent necessary sediment transport to the basin bottom area. Haybales or siltfence will be required at
the toe of interior basin slopes to prevent siltation of the exfiltration trenches or the basin bottom until
the side slopes are stabilized.
STORMWATER BASIN MAINTENANCE
The stormwater basin is a primary element of the Site’s stormwater management program. Final
treatment and infiltration of stormwater normally occurs within this mitigation structure. At a minimum,
at 6 month intervals, the bottom of the basin requires inspection and removal of sediment if, during the
![Page 13: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/13.jpg)
inspection, an accumulation of 2” or more of sediment is found at several locations within the basin. In
addition, routine inspections are required after each major storm event of 1” of rainfall or more.
Additionally, the operation of the drainage system should be observed at least once every six months
during a major storm event to evaluate its performance and note any deficiencies that may be occurring.
Included within this report are sample inspection forms that should be completed to maintain proper
records of necessary observations and required maintenance.
If persistent ponding of the basin’s bottom is observed during routine inspections, this may indicate a
significant reduction in the available exfiltration capacity. The cause of the reduction in capacity will
need to be investigated. Additional removal of sediments and the reworking of the surface sand layer
may be required to restore the infiltration capacity.
Inspection of stormwater basin’s outlet is required. Accumulated debris, etc., is to be removed from the
vicinity of the outflow. The stormwater basin’s emergency spillway shall be inspected on a regular
basis. If there is evidence that an overflow event has occurred, the rip rap on the slope shall be
examined to determine if repairs are required following the overflow event.
Due to the design of the interior slopes of the basin to accommodate construction equipment, it is
anticipated that slope erosion should be minimal after the vegetation is established. If erosion of the
slopes occurs, loam shall be replaced and standard methods used to re-establish proper vegetation cover.
Fescues and reed canary grass seed mixtures, which are rapid growing and low maintenance, are
recommended. Hay mulch or other suitable stabilizing techniques shall be utilized during the reseeding
process.
On a bi-yearly basis the side slopes of the basin area will be mowed. The condition of the turf, the status
of controlled tree growth, and evidence of differential settlement will be evaluated and if needed,
corrective action will be taken. The outside toe of slope should be evaluated for evidence of ponding or
leakage through the embankment. If evidence of leakage is apparent, an engineer will be engaged by the
owner to evaluate the stability of the embankment and furnish recommendations regarding the structure.
SOURCE CONTROLS
In the event of a spill of petroleum products or hazardous substances, certain measures must be taken
and include the following:
A spill control and containment kit (containing, for example, absorbent materials, acid
neutralizing powder, brooms, dust pans, mops, rags, gloves, goggles, plastic and metal trash
containers, first aid equipment) should be readily available.
All spills shall be cleaned up immediately after discovery.
All measures must be taken to contain and abate the spill and to prevent the discharge of the
Hazardous Substance or Oil to storm water or off-site. (The spill area must be kept well
ventilated and personnel must wear appropriate protective clothing to prevent injury from contact
with the Hazardous Substances.)
In the event of a spill discharging to the stormwater system, the spill should be contained with
the hooded catch basins and/or oil chambers of the water quality units. Any hazardous material
![Page 14: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/14.jpg)
found within the catch basins or water quality units should be removed immediately by a
licensed liquid waste handler.
The owner should be familiar with the spill reporting requirements of the Massachusetts
Contingency Plan (310 CMR 40.0000).
Contact Numbers:
Blandford Fire Department – Emergency - 911
Office – 413-848-2874
MADEP Emergency Response - 1-888-304-1133
SNOW & ICE MANAGEMENT
Snow should be stored in areas of the site such that any snowmelt is directed and captured by the
drainage system.
Avoid disposing of snow on top of stormwater drainage swales or ditches. Snow combined with
sand and debris may block a storm drainage system, causing localized flooding. A high volume
of sand, sediment, and litter released from melting snow also may be quickly transported through
the system into surface water.
Sand shall be the primary de-icing agent.
After spring snow melt has occurred, snow storage areas should be cleaned of all trash, debris
and accumulated sands.
STORMWATER MAINTENANCE PLAN DATA SHEETS
Enclosed within the Stormwater Maintenance Plan, is a “member roster” to clearly establish the
individuals responsible for the stormwater system maintenance. Additionally, a stormwater system
inspection form has been included as an example of a method to document the required inspection and
maintenance of the stormwater system.
An operation and maintenance log should be maintained for the last three years. This should include
inspections, repairs, replacement and disposal. For disposal, the log shall indicate the type of material
and the disposal location.
![Page 15: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/15.jpg)
Whitman & Bingham Associates, LLC
Registered Engineers and Land Surveyors
Stormwater Maintenance Plan
Member Roster
Completed By: Title: Date:
Director: Title:
Office Phone:
Responsibilities:
Member: Title:
Office Phone:
Responsibilities:
![Page 16: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/16.jpg)
Whitman & Bingham Associates, LLC
Registered Engineers and Land Surveyors
STORMWATER POLLUTION MAINTENANCE PLAN
INSPECTION AND MAINTENANCE REPORT FORM
(To be completed at 6 Month Intervals)
STORMWATER BASIN:
Basin ID# Depth of Sediment
in Basin
Condition of Basin
Side Slopes
Any Evidence of
Overtopping of the
Embankment?
Condition of
Outfall From
Basin
MAINTENANCE REQUIRED FOR STORMWATER BASIN:
TO BE PERFORMED BY: ON OR BEFORE:
INSPECTED BY: DATE:
![Page 17: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/17.jpg)
STANDARD 10: Prohibition of Illicit Discharges
This project is a solar panel array development. It is not anticipated that there will be any illicit
discharges into the Town of Blandford’s drainage system.
![Page 18: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/18.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
Deco issio i g Pla Su ary
The de o issio i g pla su a the pla des i es ge e all ho Pa k A e ue Sola Solutio s p oposes to esto e the sola fa the P oje t lo atio to a lea a d safe o ditio . This i ludes eti i g the ele e ts of the P oje t, esto i g the la d a d a agi g the e ess ate ials a d aste. This pla des i es the pla s fo de o issio i g the P oje t a d o tai s the follo i g
i fo atio
1. P o edu es fo dis a tli g o de olishi g the fa ilit
. A ti ities elated to the esto atio of a la d a d ate egati el affe ted the fa ilit
3. P o edu es fo a agi g e ess ate ials a d aste
Co po e ts of the P oje t ha e a esti ated useful lifeti e i e ess of t e t ea s. Whe the P oje t eases o e ial ope atio , it ill e dis a tled, a la ds a d ate egati el affe ted
the P oje t ill e esto ed, a d the site ill e left i a safe a d lea o ditio . It is diffi ult to p edi t p e ise de olitio a ti ities, p o edu es a d te h ologies that a e o e a aila le o e ti e. Assu ptio s ha e ee ade, the efo e, a d so e task des iptio s ge e alized to allo fo a deg ee of fle i ilit a d i o atio ega di g dis a tli g/ de olitio ea s a d ethods.
Follo i g the P oje t’s p oposed life spa , the P oje t a ea ill e allo ed to atu alize o its o .
1. P o edu es fo Dis a tli g the Sola Fa
De o issio i g ill o sist p i a il of dis a tli g a d e o i g fa ilities, i i g a d e uip e t as ell as la d esto atio , if e essa . This se tio also iefl add esses p o edu es fo the u likel e e t that the p oje t is a a do ed du i g o st u tio .
a. De o issio i g Afte Ceasi g Ope atio
The likel de o issio i g tasks a e follo s:
i. The fa ilit is dis o e ted f o the E e sou e et o k a o di g to state e ui e e ts a d i a o da e ith E e sou e p o edu es a d poli ies.
ii. I di idual PV odules o pa els a e dis o e ted a d e o ed f o the site, a d shipped, to the e te t possi le, to e li g fa ilities fo e li g, o fo disposal.
iii. Ele t i al a les a d e uip e t o ed Pa k A e ue Sola Solutio s shall e e o ed a d e led, eused o disposed of offsite. This i ludes all
a o e‐g ou d ele t i al st u tu es a d i i g, i e te s, o i e s, lo oltage s it h gea a d t a sfo e s a d the i te o e tio su statio e uip e t, if appli a le.
![Page 19: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/19.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
i . The olle tio houses i e te s a d t a sfo e s a d thei fou datio s if e essa shall e e o ed a d e led, e‐used o disposed of off‐site.
. All a o e‐g ade PV odule a a suppo t posts a d st u tu es shall e e o ed a d e led o disposed of off‐site.
i. The safet a d se u it fe i g shall e e o ed a d e led, e‐used o disposed of off‐site.
ii. Road o e tio s a d i te al la es a d thei su ‐ ase ate ials used fo the p oje t, d ai age st u tu es, et . a e e o ed, depe di g o the ishes of the la do e .
iii. The site ould e o e ted to othe uses i a o da e ith appli a le la d use egulatio s a d the la do e ’s ishes.
. De o issio i g Du i g Co st u tio . It is u likel that the fa ilit ill ha e to e dis a tled du i g o st u tio . Should this o u , si ila p o edu es as outli ed a o e a d th oughout the est of this epo t ega di g de o issio i g afte easi g ope atio s ould e follo ed.
. Resto atio of La ds/Wate Negati el affe ted the Sola Fa
Follo i g de o issio i g the site ill e esto ed, to the e te t possi le, to p e‐P oje t o ditio s i a o da e ith lo al la d use la s o egulatio s a d pu sua t to the la do e ’s desi es. Du i g de o issio i g it is u likel that the e ill e a loss of ha to su ou di g t ees outside of the lea ed a ea. To i i ize a pote tial dis uptio o di e t o i di e t loss to su ou di g t ees a d egetatio , s all a hi e ill e utilized to e o e the fe i g. Fu the , as lo g as p ope sedi e t o t ol st ategies a e i ple e ted, it is ot a ti ipated that de o issio i g ill ha e egati e effe ts o a etla ds.
3. P o edu es fo Ma agi g E ess Mate ials a d Waste Du i g De o issio i g
As i di ated a o e, the P oje t ill o sist of u e ous ate ials that a e pote tiall e la le, i ludi g glass, se i o du to ate ial, steel, a d i i g. Afte ope atio s ha e eased a d the P oje t is o lo ge ge e ati g po e , the o po e t pa ts afte ha i g ee dis a tled ill ideall e e led o e‐used follo i g de o issio i g. Be o d the p oje t o po e ts, it is ot a ti ipated the e ill e additio al ate ials o aste as pa t of de o issio i g.
. Mis ella eous
a. Pa k A e ue Sola Solutio s ill p o ide itte oti e to the To Ma age , the Fi e Depa t e t, a d E e sou e, a o g othe s, that it is o e i g ith de o issio i g. Gi e the elati e la k of isk i ol ed i dis a tli g the P oje t, it is ot a ti ipated that e e ge situatio s fi e, spills of ope ati g fluids, et . ill
![Page 20: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/20.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
take pla e. Ne e theless, Pa k A e ue Sola Solutio s a p epa e a detailed e e ge espo se a d o u i atio s pla p io to de o issio i g i oo di atio ith lo al a d u i ipal autho ities p io to the sta t of a de o issio i g a ti it . Su h pla ould detail o u i atio p o edu es i ludi g a list of ele a t e e ge o ta t u e s fo Pa k A e ue Sola Solutio s a d lo al fi e, poli e a d edi al age ies, di e tio s to the ea est hospital, a d e a uatio p o edu es fo ea h t pe of e e ge . Du i g de o issio i g, a o g othe thi gs, sig age ill e posted listi g e e ge o ta t u e s fo Pa k A e ue Sola Solutio s alo g ith the age ies efe e ed a o e. P io to the o e e e t of de o issio i g, a fi e espo se pla a e i ple e ted. This ill i lude the otifi atio of app op iate e e ge pe so el, i ludi g the To
Fi e Depa t e t, to e o ta ted if a fi e o u s at the site. Si ila l , a spill espo se pla a also e fo ulated p io to de o issio i g. Spills of ope ati g fluids gasoli e, diesel fuel, lu i a ts a e possi le f o o st u tio e uip e t a d ehi les.
. All o k ill e fu the a ied out i o sultatio ith the Depa t e t of E i o e tal P ote tio .
![Page 21: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/21.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
EMERGENCY RESPONSE AND COMMUNICATIONS PLAN
This E e ge Respo se a d Co u i atio s Pla Pla outli es the ge e al p o edu es follo ed fo all e e ge situatio s a d i ide ts that ould o u as a esult of the ope atio a d de o issio i g phases due to atu al auses, e uip e t failu e o hu a e o at the p oposed sola photo oltai p oje t. P oje t . Sho tl afte o e ial ope atio , Pa k A e ue Sola Solutio s a affiliate o assig Pa k A e ue
Sola Solutio s ill eet ith the lo al e e ge se i e pe so el fi e, poli e, a d EMS to e ie a d dis uss the ope atio a d de o issio i g p o esses, i ludi g u i ue e uip e t, the o e all p o ess, as ell as s hedule/phasi g. A haza dous ate ials that a e p ese t du i g ea h phase ill e dis ussed. O goi g o u i atio et ee to offi ials a d poli e, fi e, a d e e ge se i es offi ials, ill help assu e ade uate le els of p ote tio . Based o ele a t e pe ie e a d p ofessio al judg e t, Pa k A e ue Sola Solutio s elie es that the follo i g t pes of haza ds ost of hi h a e i ide tal due to i f e ue t ai te a e/ o st u tio a ti ities ha e the pote tial to o u at the P oje t site:
Fi e Wo ke a ide ts, i ludi g falls a d ele t o utio Medi al o ditio s/e e ge ies Light i g st ikes E a atio a e‐i s Spills of Haza dous Mate ials, i ludi g:
o Gasoli e o Diesel o H d auli oil o Lu i ati g oil a d g ease o Clea i g sol e ts
Pa k A e ue Sola Solutio s is o itted to p ote ti g the o u it , pe so al p ope t , a d the
e i o e t i adhe e e to all appli a le lo al, state a d fede al e e ge espo se la s a d egulatio s.
E erge cy Co tact I for atio
Pa k A e ue Sola Solutio s pe so el, i ludi g a spe ified E e ge Respo se Coo di ato , ill e a aila le to the P oje t a d a e utilized to assist du i g e e ge situatio s a d/o p o ide fi st aid as eeded. Fo all e e ge se i es i ludi g hospital, fi e et . all 11. Du i g ope atio of the fa ilit , a pho e u e he e a Pa k A e ue Sola Solutio s ep ese tati e a e ea hed hou s a da ill e esta lished
a d p o ided to lo al e e ge pe so el alo g ith the lo atio of the ea est hospital. I ter al Alerti g
The follo i g p o edu es ill e p es i ed fo i te al epo ti g of e e ge ies:
O e otified lo al e e ge se i e pe so el, the E e ge Respo se Coo di ato ill otif a o ‐site pe so el, i ludi g a isito s, of the atu e of the e e ge ia telepho e.
The E e ge Respo se Coo di ato ill spe if the lo atio fo the fi st espo de s, if the a e ot al ead p ese t o site. A desig ated e plo ee o o t a to ill eet the e e ge espo se pe so el at the a ess oad of the e e ge .
![Page 22: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/22.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
The E e ge Respo se Coo di ato ill otif lo al e e ge pe so el, if ot al ead p ese t, of the e e ge usi g the o ta t i fo atio to e p o ided.
The E e ge Respo se Coo di ato ill ide tif a eed fo se u it easu es at the P oje t a ea du i g the e e ge a d ill desig ate o e pe so to i ple e t.
Whe a pe so , ide tifies a e e ge situatio , o the pote tial fo a e e ge situatio , a d epo ts it to the E e ge Respo se Coo di ato o his/he desig ee, the E e ge Respo se Coo di ato ill the a ti ate the Pla .
E ter al Alerti g The follo i g p o edu es ill e p es i ed to fo e te al epo ti g of e e ge ies:
If i ediate e e ge espo se assista e is e ui ed, the E e ge Respo se Coo di ato o his desig ee ill all ‐1‐1.
A e e of a age e t o the E e ge Respo se Coo di ato o his/he desig ee a e the o l pe so s autho ized to speak o Pa k A e ue Sola Solutio s’ ehalf to outside age ies poli e, fi e depa t e t, edi al se i es et . du i g a e e ge situatio .
I the e e t of a spill of a haza dous ate ial i e ess of epo ta le li its, the spill ust e epo ted to the Depa t e t of E i o e tal P ote tio o ele a t fede al autho it
E erge cy Respo se Procedures Medi al E e ge o Pe so el I ju :
P o ide Fi st Aid to all i ju ed e plo ees o o t a to s ega dless of se e it . Fi st Aid kits ill e ai tai ed i the offi e t aile s o site. Fi st Aid kits a e to e i spe ted a d
esto ked as eeded follo i g usage. Call 11 if the i ju is se ious a d eeds i ediate edi al t eat e t. Fo lo al e e ge espo se assista e, a desig ated e plo ee o o t a to ill eet the e e ge
espo de s at the a ess oad of the to e site a d di e t the to the lo atio of the e e ge /i ju ed e plo ee.
The desig ated e plo ee o o t a to should ha e a ha d held o a ge safet flag to use to get the atte tio of the espo di g e e ge se i es.
Regula i spe tio of fi e e ti guishe s, if e ui ed the lo al fi e depa t e t, at all fa ilit lo atio s he e the a e i stalled.
Fire If a fi e e ists at a P oje t fa ilit , pe so el o o t a to s ill e i st u ted to:
1. Shutdo the fa ilit . . Rest i t the a ea.
3. Re uest assista e f o fi e fighti g pe so el, if eeded, i o t olli g the fi e. . If lo al e e ge espo se pe so el a e e ui ed, ha e a e plo ee go to the a ess oad of i ide t
site, to eet e e ge pe so el a d di e t the to the fi e. . E plo ee should ha e a ha d held o a ge safet flag to use to get the atte tio of the espo di g
e e ge se i es.
![Page 23: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/23.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
Che ical Spill/Release Cautio a la eli g ill e p o ided fo a haza dous he i als a d the asso iated Mate ial Safet Data Sheets MSDSs ill e p o ided a o di gl .
1. The MSDSs fo all haza dous ate ials o the P oje t a ea a e to e p o ided to lo al fi e depa t e ts a d e e ge se i e p o ide s upo e uest
. S all spills should e lea ed up i ediatel usi g a so e t ate ials su h as ha , sa d, so ks o pads.
3. If the spill is of su h ag itude that it a ot e o tai ed, the E e ge Respo se Coo di ato ill o ta t the app op iate autho it fo assista e.
. Pe so el a d o t a to s ill e i st u ted to epo t all spills, ega dless of se e it , to the E e ge Respo se Coo di ato .
Site Restoratio /Re ediatio If a a ide t o i ide t at the P oje t a ea e essitates site esto atio o e ediatio , the esto atio / e ediatio ill e o du ted a o di g to appli a le fede al, state a d lo al e ui e e ts. I cide t Report Afte e e a ide t o i ide t, the E e ge Respo se Coo di ato o desig ee ill o du t a post i ide t e aluatio to dete i e the follo i g:
1. Suita ilit of the o ga izatio ’s st u tu e, e uip e t, o u i atio pla s/s ste , ade ua of t ai i g, ala s ste s, se u it , spill o tai e t a d e o e p o edu es, o ito i g, et .
. If a of the a o e a e fou d to e i ade uate, the the E e ge Respo se Coo di ato ill ake e essa ha ges.
Safety Trai i g O ‐site t ai i g fo lo al e e ge pe so el a e gi e , at thei e uest, the E e ge Respo se Coo di ato o thei desig ees ega di g the o te t, e ui e e ts, a d app op iate a tio s to o pl ith the p o isio s of the Pla . The t ai i g ill o u :
1. At the P oje t a ea . Whe the e a e ha ges to the pla ;
3. At the e uest of lo al e e ge pe so el; . Whe E e ge Respo se Coo di ato dete i es.
Recordi g of Respo ders Co plai ts
1. A a d all o plai ts f o espo de s ill e kept i oth a log ook a d a ele t o i log. . Na es, add ess, telepho e u e s, the date a d ti e of all espo de s issui g a o plai t ill e
logged. 3. The atu e of the espo de ’s o plai t ill e logged.
![Page 24: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/24.jpg)
Park Avenue Solar Solutions, LLC
1 G ee i h A e ue, 3 d Floo G ee i h, CT 6 3 ● 3 6 ‐ ● .altuspo e . o
. Assu a e ill e p o ided to all espo de s that o plai t has ee itigated a d ill ot eo u .
![Page 25: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/25.jpg)
Western Massachusetts Electric Company d/b/a Eversource Energy M.D.P.U. No. 1039G Cancels M.D.P.U. No. 1039F
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
Issued by: Craig Hallstrom Filed: May 13, 2015 President Effective: June 1, 2015
Exhibit C, Page 3
Generating Facility Expedited/Standard Process Interconnection Application
Contact Information: Date Prepared: _________________
Legal Name and address of Interconnecting Customer Interconnecting Customer (print): ____________________Contact Person: ________________ Mailing Address: _______________________________________________________________ City: ________________________________State: ________________ Zip Code: __________ Telephone (Daytime): __________________ (Evening): ________________________________ Facsimile Number: ____________________ E-Mail Address: ___________________________
Customer name (if Customer is not Interconnecting Customer) ___________________________ Customer email: ___________________________ Customer telephone: ___________________ Customer Mailing Address: ________________________________________________________ City: ________________________________State: ________________ Zip Code: __________ Landowner name (if neither Interconnecting Customer nor Customer): ___________________________ Landowner email: _________________________Landowner telephone: ___________________ Landowner Mailing Address: ______________________________________________________ City: ________________________________State: ________________ Zip Code: __________ Alternative Contact Information (e.g., system installation contractor or coordinating company, if appropriate): Name: ________________________________________________________________________ Mailing Address: _______________________________________________________________ City: ________________________________State: ________________ Zip Code: __________ Telephone (Daytime): __________________ (Evening): ________________________________ Facsimile Number: ____________________ E-Mail Address: ___________________________
Ownership (include % ownership by any electric utility): _______________________________ Site Control? (Y/N) _____
2/12/17
Altus Power America, Inc. Kirt Mayland
102 Greenwich Avenue
Greenwich CT 06830
646-302-3639 646-302-3639
860-760-6993 [email protected]
Y
Mr. Chester Kellogg
[email protected] 413 329 0385
PO Box 378
Southampton MA 01073
![Page 26: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/26.jpg)
Western Massachusetts Electric Company d/b/a Eversource Energy M.D.P.U. No. 1039G Cancels M.D.P.U. No. 1039F
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
Issued by: Craig Hallstrom Filed: May 13, 2015 President Effective: June 1, 2015
Exhibit C, Page 4
Will Facility be constructed on a single parcel of land? (Y/N) _____ Authorized/Proposed generation capacity already exists (check all that apply): On Current Account On Same Legal Parcel of Land In Same Building/Structure If any apply, include existing generation capacity on design diagrams, and provide Application Number(s):
Confidentiality Statement: “I agree to allow information regarding the processing of my
application (without my name and address) to be reviewed by the Massachusetts DG Working Group that is exploring ways to further expedite future interconnections.” Yes ____ No ____ Group Study Agreement: “I understand and agree if my project becomes part of a Group Study, the Company is authorized to share my contact information and project details with other parties that are also involved in the Group Study.”
Generating Facility Information
Please provide all Pre-Application Reports (either mandatory or optional) as attachments. This
is mandatory for systems greater than or equal to 500 kW.
Address of Facility: _____________________________________________________________ City: ________________________________State: ________________ Zip Code: __________ Electric Distribution Company: _______________________________________________________ Account Number: _______________________________________________________________ Meter Number: _________________________________________________________________
System Design Capacity: Nominal _____ (kW) _____ (kVA)
Maximum _____ (kW) _____ (kVA) For Solar PV provide the DC-STC rating: (kWDC) Type of Generating Unit: Synchronous _____ Induction _____ Inverter _____ Manufacturer: _____________________________ Model: _______________________________ Prime Mover: Fuel Cell Reciprocating Engine Gas Turbine Steam Turbine
Microturbine Photovoltaic Other __________________________________
Y
X
Eversource
999 999
999 999
x
Solectria SGI 500 and SGI 499
1,295.8
X
103 N. Blandford Road
Blandford MA 01008
![Page 27: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/27.jpg)
Western Massachusetts Electric Company d/b/a Eversource Energy M.D.P.U. No. 1039G Cancels M.D.P.U. No. 1039F
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
Issued by: Craig Hallstrom Filed: May 13, 2015 President Effective: June 1, 2015
Exhibit C, Page 5
Energy Source: Solar Wind Hydro Diesel Natural Gas Fuel Oil
Other _________________________ (Please Specify) For Solar PV provide the DC-STC rating: _____ (kW) IEEE 1547.1 (UL 1741) Listed? Yes ____________________________________ No _______ 1) Generating Unit Type 1 Manufacturer: Model Name and Number: Quantity: Single __ or Three __ Phase AC Rating: Nominal: _____ (kW) _____ (kVA) _____ (AC Volts)
Maximum: _____ (kW) _____ (kVA) _____ (AC Volts) 2) Generating Unit Type 2 (if applicable) Manufacturer: Model Name and Number: Quantity: Single __ or Three __ Phase AC Rating: Nominal: _____ (kW) _____ (kVA) _____ (AC Volts)
Maximum: _____ (kW) _____ (kVA) _____ (AC Volts) 3) Generating Unit Type 3 (if applicable) Manufacturer: Model Name and Number: Quantity: Single __ or Three __ Phase AC Rating: Nominal: _____ (kW) _____ (kVA) _____ (AC Volts)
Maximum: _____ (kW) _____ (kVA) _____ (AC Volts)
Need an air quality permit from DEP? Yes ____ No ____ Not Sure ____ If “yes”, have you applied for it? Yes ____ No ____
X
1,295.8
YES
Solectria SGI 500
One
X
500 500
500 500
690
690
499 499 690
499 499 690
Solectria SGI 499
One
x
X
![Page 28: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/28.jpg)
Western Massachusetts Electric Company d/b/a Eversource Energy M.D.P.U. No. 1039G Cancels M.D.P.U. No. 1039F
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
Issued by: Craig Hallstrom Filed: May 13, 2015 President Effective: June 1, 2015
Exhibit C, Page 6
Planning to Export Power? Yes ____ No ____ A Cogeneration Facility? Yes____ No ____ Anticipated Export Power Purchaser: _______________________________________________ Export Form? Simultaneous Purchase/Sale ____ Net Purchase/Sale ____ Net Metering ____ Other (Specify) _________________________________________________________________ If net metering, please refer to Schedule Z of the Standards for Interconnection of Distributed
Generation. Please note that if under the public cap, all off-takers must be a Municipality or
Other Governmental Entity (as defined in 220 C.M.R. 18.02) and therefore be certified by the
DPU.
Est. Install Date: _________ Est. In-Service Date: ________ Agreement Needed By: ________
Application Process I am opting to forego the Expedited Process. Please review this application under the Standard Process. Yes____ No ____ I hereby certify that, to the best of my knowledge, all of the information provided in this application is true: Interconnecting Customer Signature: _________________ Title: ___________ Date: _________ The information provided in this application is complete: Company Signature: ________________________ Title: _________________ Date: _________
Generating Facility Technical Detail Information on components of the generating facility that are currently Listed Equipment Type Manufacturer Model National Standard 1.
2.
3.
4.
5.
6.
Total Number of Generating Units in Facility? ________________________________________ Generator Unit Power Factor Rating: _______________________________________________ Max Adjustable Leading Power Factor? _____ Max Adjustable Lagging Power Factor? _____
X
Eversource or net metering
x x
Depending no the timing and the new DOER program, this will either be a PPA with Eversource ora net metered project
8/17 12/17 5/17
x
Representative
Representative
2.12.17
2.12.17
Inverter Solectria SGI 500 and SGI 499 IEEE 1547 UL 1741
PV Module Q-Cells TBD
2
>.99
0 0
![Page 29: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/29.jpg)
Western Massachusetts Electric Company d/b/a Eversource Energy M.D.P.U. No. 1039G Cancels M.D.P.U. No. 1039F
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
Issued by: Craig Hallstrom Filed: May 13, 2015 President Effective: June 1, 2015
Exhibit C, Page 7
Generator Characteristic Data (for all inverter-based machines) Max Design Fault Contribution Current? ______ Instantaneous ____ or RMS? ____ Harmonics Characteristics: _______________________________________________________ Start-up power requirements:______________________________________________________
Generator Characteristic Data (for all rotating machines) Rotating Frequency: _____ (rpm) Neutral Grounding Resistor (If Applicable): _____
Additional Information for Synchronous Generating Units Synchronous Reactance, Xd: _____ (PU) Transient Reactance, X’d: _____ (PU) Subtransient Reactance, X’d: _____ (PU) Neg Sequence Reactance, X2: _____ (PU) Zero Sequence Reactance, Xo: _____ (PU) kVA Base: _____ Field Voltage: _____ (Volts) Field Current: _____ (Amps)
Additional information for Induction Generating Units Rotor Resistance, Rr: _____ Stator Resistance, Rs: _____ Rotor Reactance, Xr: _____ Stator Reactance, Xs: _____ Magnetizing Reactance, Xm: _____ Short Circuit Reactance, Xd”: _____ Exciting Current: _____ Temperature Rise: _____ Frame Size: _____ Total Rotating Inertia, H: _____ Per Unit on kVA Base: _____ Reactive Power Required In Vars (No Load): _____ Reactive Power Required In Vars (Full Load): _____
Additional information for Induction Generating Units that are started by motoring
Motoring Power: ______ (kW) Design Letter: _____
Interconnection Equipment Technical Detail Date:_______
Will a transformer be used between the generator and the point of interconnection? Yes _____ No _____
Will the transformer be provided by Interconnecting Customer? Yes ____ No ____
<3% THD x
<3% per IEEE 519
10 kW
x
x
![Page 30: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/30.jpg)
Western Massachusetts Electric Company d/b/a Eversource Energy M.D.P.U. No. 1039G Cancels M.D.P.U. No. 1039F
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
Issued by: Craig Hallstrom Filed: May 13, 2015 President Effective: June 1, 2015
Exhibit C, Page 8
Transformer Data (if applicable, for Interconnecting Customer-Owned Transformer):
Nameplate Rating: ______ (kVA) Single ____ or Three ____ Phase
Transformer Impedance: _____ (%) on a ____ kVA Base
If Three Phase: Transformer Primary: ____ (Volts)____ Delta____ Wye____ Wye Grounded ____ Other Transformer Secondary: ____ (Volts)____ Delta____ Wye____ Wye Grounded ____ Other
Transformer Fuse Data (if applicable, for Interconnecting Customer-Owned Fuse): (Attach copy of fuse manufacturer’s Minimum Melt & Total Clearing Time-Current Curves)
Manufacturer: _____________ Type: ______________ Size: ________ Speed: ________
Interconnecting Circuit Breaker (if applicable):
Manufacturer: _____________ Type: ______________ Load Rating: ______ (Amps) Interrupting Rating: ______ (Amps) Trip Speed: _______ (Cycles)
Interconnection Protective Relays (if applicable): (If microprocessor-controlled)
List of Functions and Adjustable Setpoints for the protective equipment or software: Setpoint Function Minimum Maximum 1.
2.
3.
4.
5.
6.
(If discrete components)
(Enclose copy of any proposed Time-Overcurrent Coordination Curves)
Manufacturer: ________ Type: _______ Style/Catalog No.: _______ Proposed Setting: _____
Manufacturer: ________ Type: _______ Style/Catalog No.: _______ Proposed Setting: _____
Manufacturer: ________ Type: _______ Style/Catalog No.: _______ Proposed Setting: _____
1000 x
5.75 1000
1247
690
G&W Viper 400
12500 4
Phase Inst/Def Time Overcurrent 50PIP 0.05A 20A
Voltage Element 27PIP & 59PIP 12.5V 300V
Phase time Overcurrent 51pp 0.10A 3.20A
Frequency Element 81D1P 40.00HZ 65.00 HZ
![Page 31: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/31.jpg)
Western Massachusetts Electric Company d/b/a Eversource Energy M.D.P.U. No. 1039G Cancels M.D.P.U. No. 1039F
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
Issued by: Craig Hallstrom Filed: May 13, 2015 President Effective: June 1, 2015
Exhibit C, Page 9
Manufacturer: ________ Type: _______ Style/Catalog No.: _______ Proposed Setting: _____
Manufacturer: ________ Type: _______ Style/Catalog No.: _______ Proposed Setting: _____
Manufacturer: ________ Type: _______ Style/Catalog No.: _______ Proposed Setting: _____
Current Transformer Data (if applicable):
(Enclose copy of Manufacturer’s Excitation & Ratio Correction Curves)
Manufacturer: _______ Type: ______ Accuracy Class: _____ Proposed Ratio Connection: ___
Manufacturer: _______ Type: ______ Accuracy Class: _____ Proposed Ratio Connection: ___
Potential Transformer Data (if applicable):
Manufacturer: _______ Type: ______ Accuracy Class: _____ Proposed Ratio Connection: ___
Manufacturer: _______ Type: ______ Accuracy Class: _____ Proposed Ratio Connection: ___
![Page 32: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/32.jpg)
Western Massachusetts Electric Company d/b/a Eversource Energy M.D.P.U. No. 1039G Cancels M.D.P.U. No. 1039F
STANDARDS FOR INTERCONNECTION OF DISTRIBUTED GENERATION
Issued by: Craig Hallstrom Filed: May 13, 2015 President Effective: June 1, 2015
Exhibit C, Page 10
General Technical Detail Date: ________
Enclose 3 copies, or send 1 electronic copy, of site electrical One-Line Diagram showing the configuration of all generating facility equipment, current and potential circuits, and protection and control schemes with a Massachusetts registered professional engineer (PE) stamp. Enclose 3 copies, or send 1 electronic copy, of any applicable site documentation that indicates the precise physical location of the proposed generating facility (e.g., USGS topographic map or other diagram or documentation).
Proposed Location of Protective Interface Equipment on Property: (Include Address if Different from Application Address)
Enclose copy of any applicable site documentation that describes and details the operation of the protection and control schemes.
Enclose copies of applicable schematic drawings for all protection and control circuits, relay current circuits, relay potential circuits, and alarm/monitoring circuits (if applicable).
When mailing application fee checks, please enclose a copy of this signed interconnection application form with the payment. Please enclose any other information pertinent to this Facility.
2.12.17
See attached Site Plan
![Page 33: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/33.jpg)
DATE COMMENT
REVISIONS
PR
OP
OS
ED
PH
OT
O-V
OL
TA
IC A
RR
AY
JOB #
CHKD
SCALE
DATE
DRWN
JAM
ES
A. C
LA
NC
Y
MA
PE
LIC
EN
SE
# 4
67
75
AR
C D
ESIG
NSA
LEM
CO
UN
TY
OFFIC
E
ELM
ER
, N
J 0
8318
(856)712
-216
6
FA
X: (8
56) 358-15
11
HO
US
AT
ON
IC S
OL
AR
1, L
LC
.
43 R
ES
ER
VO
IR R
OA
D
LA
KE
VIL
LE
, C
T 0
6039
SIT
E:1
03 N
. BL
AN
DF
OR
D R
D, B
LA
ND
FO
RD
, M
A 0
1008
409 N
OR
TH
MA
IN S
TR
EET
02-07-2017
JAC
AS NOTED
RCA
E-1
UTILITY WILL ISOLATE,
LOCKOUT/TAGOUT AT THIS
LOCATION AFTER SYSTEM IS
ELECTRONICALLY SEPARATED
FROM DISTRIBUTED RESOURCE(S)
ON UTILITY SYSTEM.
INTERNAL CONTROL
SEL651R-2 RelayVIPER-ST 27kV Recloser
POLE MTD. PRIMARYUTILITY METERING
CABINET (OWNED ANDORPERATED BY UTILITY)
UTILITY
RISER
POLE
UTILTY LOADBREAK
DISCONNECT SWITCH
EXISTING UTILTY
DISTRIBUTION CIRCUIT
(E) POLE
NEW POLE
CONTROL POWER
TO RECLOSER(BY UTILITY)
UTILITY
POLE MOUNTING
(BY UTILITY)
RPOI
UTILITY OWNED
AND OPERATEDCUSTOMER OWNED
(POINT OF COMMON COUPLING-PCC)
PT
CURRENT
SENSOR
UTILITY LOCKABLE
GROUNDING
TRANSFORMER
23kV
ZIG ZAG
1000kVA
25 PHASE AMPS
23kV
X/R = 7.7
4% IZ
23kV
INVERTER SETTINGS
RELAY/RECLOSER SETTINGS
PV Modules = 310 Watts STC
2090 Modules per Inverter = 647,900 watts STC
190 strings of 11 PV Modules
INVERTER 1-2
SYSTEM SIZE = 1,295,800 W DC
999,000 W AC
CANADIAN SOLAR 310W MODULES
1 SOLECTRIA SGI 500 INVERTERCUSTOMER METERING INTERNAL TO
SUB-DISCONNECTS LOCUS OR EQUAL
CONNECTED TO MONITORING SYSTEM.
- REVENUE GRADE -
CUSTOMER METERING
IN THE EVENT OF FAILURE OF THE
GROUNDING TRANSFORMER THE
CT'S WILL TRIP OUT THE RELAY
ALL CUSTOMER AC EQUIPMENT IS
SERVICE ENTRANCE RATED.
25 KAIC MINIMUM
PO
TS
LIN
E
TO
ME
TE
R L
OC
AT
ION
FULL LOSS OF RELAY POWER OR
FAILURE OF RELAY SELF-TEST WILL
RESULT IN A FAIL-SAFE TRIP OF THE
RECLOSER UNTIL MANUALLY RESET.INVERTER MAX CONTINUOUS
OUTPUT CURRENT = 602 A
602A * 1.25 = 752.5 A MIN FUSE
INVERTER MAX CONTINUOUS
OUTPUT CURRENT = 600 A
600A * 1.25 = 750 A MIN FUSE
800 A FUSED DISCONNECT
480Y/277V 3-P 3-W
PV-1 ARCCOM COMBINERCB 1-1
15 Circuits Typ. of 15 Strings
String 1-1-1
String 1-1-15
PV INVERTER 1
15A
15A
SPD
#8 BARE CU GROUND
DCAC
Power StageLC Filter
Power StageLC Filter
Power StageLC Filter
EMI Filter
DCAC
DCAC
DC Input
Contactor
DC Input
Disconnect
#2/0 GROUNDING
ELECTRODE CONDUCTOR
TO MAIN SERVICE
GROUND
GFI
Monitoring
SOLECTRIA SGI-500500-kW PV INVERTER
300-500-VDC MPPT INPUT RANGE,
1721-A DC MAX
600-VDC MAX INPUT VOLTAGE
480-VAC OUTPUT 3PH., 4W
AC OUTPUT BREAKER OPTION
602-A CONT. OUTPUT
AC BREAKER
Ne
g B
uss
CB 1-2
CB 1-3
CB 1-4
INVERTER PV-1
INTEGRAL SUB-COMBINER
CB 1-5
CB 1-6
CB 1-7
CB 1-8
DC INPUT BREAKER
SPD
SolrenView - Air
M
50O KVA TRANSFORMER
RFI FILTER
Ng
800 A FUSED DISCONNECT
480Y/277V 3-P 3-W
CB 1-9
CB 1-11
CB 1-12
CB 1-10
480V
23kV
g
g
48
0V
Yg
LV
23
-KV
Yg
HV
T-1NEW 1000KVA
CUSTOMERTRANSFORMER
X/R = 8.4IMPEDENCE = 5.75 +/-
PH
AS
E A
PH
AS
E B
PH
AS
E C
A
B
X0
X1
X2
X3
1
2
H1
H2
H3
X1
X2
X31 4
2 5
3 6
1
2
3
4
34
12
3
4
1
2
34
A
B
A
B
EATON MINI LOAD CENTER - 120V
22.5 kVa TRANS 480 DELTA PRIMARY / 208Y/120 SECONDARY
60-A RATED MAINS
6 OF 20-A 1 POLE BRANCH BREAKERS
NEMA 3R
5
6
DATA
CONVENIENCE
LIGHTS
RECEPTACLE
120V AC POWER TO
ARCOMM COMBINERS
60 A FUSED DISCONNECT
480Y/277V 3-P 3-W
120V AC POWER TO
ARCCOM COMBINERS
PV-1 ARCCOM COMBINERCB 1-1
15 Circuits Typ. of 15 Strings
String 1-1-1
String 1-1-15
PV INVERTER 2
15A
15A
SPD
#8 BARE CU GROUND
DCAC
Power StageLC Filter
Power StageLC Filter
Power StageLC Filter
EMI Filter
DCAC
DCAC
DC Input
Contactor
DC Input
Disconnect
#2/0 GROUNDING
ELECTRODE CONDUCTOR
TO MAIN SERVICE
GROUND
GFI
Monitoring
SOLECTRIA SGI-499499-kW PV INVERTER
300-500-VDC MPPT INPUT RANGE,
1715-A DC MAX
600-VDC MAX INPUT VOLTAGE
480-VAC OUTPUT 3PH., 4W
AC OUTPUT BREAKER OPTION
600-A CONT. OUTPUT
AC BREAKER
Ne
g B
uss
CB 1-2
CB 1-3
CB 1-4
INVERTER PV-1
INTEGRAL SUB-COMBINER
CB 1-5
CB 1-6
CB 1-7
CB 1-8
DC INPUT BREAKER
SPD
SolrenView - Air
M
50O KVA TRANSFORMER
RFI FILTER
Ng
CB 1-9
CB 1-11
CB 1-12
CB 1-10
1 SOLECTRIA SGI 499 INVERTER
![Page 34: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/34.jpg)
XXXXXXXXX
XXXXXXXX
XXXXXXXXX
![Page 35: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/35.jpg)
![Page 36: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/36.jpg)
![Page 37: Park Avenue Solar Solutions, LLC - Blandford … · the tasfoe e uit less oise tha the NEMA TR1 Stadad dBA ad gie v thei dista e fo the eaest esidee ad the fat that the ol opeate](https://reader033.fdocuments.us/reader033/viewer/2022042123/5e9db7a2202dff0f093d0f3b/html5/thumbnails/37.jpg)