Work Request Follow Up Report
PM1 – Paper Machine
Suction Roll Vacuum Pump NDE Bearing defect
Aug 2008
![Page 2: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/2.jpg)
Suction Roll Vacuum Pump (Bearing Defect) AE1 - Suction Roll Vacuum Pump
3108-MP-22-POH Pump Outboard brg HorizTrend Display of Early brg wear
-- Baseline -- Value: .325 Date: 16-Nov -06
0 100 200 300 400 500 600 700
0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
Days: 16-Nov-06 To 20-Aug-08
PK A
ccel
erat
ion
in G
-s
BEARING REPLACED
BEARING DAMAGE Date:
Time: Ampl:
20-Aug-08 10:02:59 .231
The trend above shows before and after the pump NDE brg was replaced.
RM
S V
eloc
ity in
mm
/Sec
Frequency in Orders
AE1 - Suction Roll Vacuum Pump3108-MP-22-POV Pump Outboard brg Vert
0 10 20 30 40 50 60 70 80
0 0.10.20.30.40.50.6
Max Amp .60
20-Aug-08
08-Jul-08
28-May-08
Multiple spectrum shows before and after the pump brg was replaced.
02-Apr-08
19-Feb-08
21-Dec-07
19-Nov -07
25-Oct-07
27-Sep-07
21-Aug-07
18-Jul-07
12-Jun-0716-May-07
BEARING DEFECT
NOW OK
![Page 3: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/3.jpg)
Suction Roll Vacuum Pump – Damaged Non Drive End Bearing. Images above taken from the non drive end pump bearing clearly show the bearing had started to spall, also present is some skidding / galling damage, caused by inadequate lubrication.
![Page 4: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/4.jpg)
Work Request Follow Up Report
Yankee Dryer Drive (Left) Motor –Bearing Damage
Motor Replaced
March 2007
![Page 5: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/5.jpg)
Yankee Dryer Motor (Left) ( Motor bearing damage)
PM2 - Yank ee Dryer Drive & (Left)??? -MIP Motor Inboard Brg (Peakvue)
Trend Display of WA VEFORM P-P
-- Baseline -- Value: 25.75 Date: 29-Dec-06
0 10 20 30 40 50
0
4
8
12
16
20
24
28
32
36
40
Days: 29-Dec-06 To 14-Feb-07
Pk-P
k W
avef
orm
in G
-s
ALERT
FA ULT
Date: T ime: Ampl:
14-Feb-07 11:22:52 2.761
BEA RING DEFECT - BEFORE MOTOR REPLACEMENT
NEW MOTOR FITTED
The trend above shows before and after the motor was changed due to a severe bearing damage on the motor, caused by electrical erosion.
PK A
ccel
erat
ion
in G
-s
Frequency in CPM
PM2 - Yank ee Dryer Drive & (Left)??? -MIV Motor Inboard Brg Vert
0 20000 40000 60000 80000 100000
Max A mp 1.78
Plot Scale
0
2
11:22:4714-Feb-07
10:00:3719-Jan-07
16:11:5929-Dec-06
MOTOR BEA RING DEFECTS
NEW MOTOR FITTED
Multiple spectrum shows before and after the motor was changed.
![Page 6: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/6.jpg)
Damaged Yankee Motor bearing NDE
Above photos are taken from the damaged NDE yankee motor bearing SKF 6316, severe electrical erosion is the cause of the damage to the inner and outer races, what is worrying that this bearing was an insulated bearing which should stop stray eddy currents passing through the bearing, however in this case it has not worked.
![Page 7: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/7.jpg)
Work Request Follow Up Report
Saturation Reactor Pump Damage Bearing
Bearings Replaced
Dec 2007
![Page 8: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/8.jpg)
Saturation Reactor Pump ( Damaged Pump Bearings) AE2 - Saturation Reactor Pump
SRP -PIP Pump inboard brg (Peakvue)Trend Display of WAVEFORM P-P
-- Baseline -- Value: 11.90 Date: 18-Jan-07
0 50 100 150 200 250 300 350
0
10
20
30
40
50
60
70
80
90
Days: 18-Jan-07 To 20-Dec-07
Pk-
Pk
Wav
efor
m in
G-s
ALERT
FAULT
Date: Time: Ampl:
20-Dec-07 08:56:25 77.43
The trend above shows the sharp increase in levels due to a damaged pump bearing.
PK
Acce
lera
tion
in G
-s
Frequency in kCPM
AE2 - Saturation Reactor PumpSRP -PIH Pump Inboard brg horiz
0 40 80 120 160 200 240
0
1
2
3
45
Max Amp 4.15
18-Jan-07
14-Feb-07
19-Mar-07
Multiple spectrum shows increase in levels due to damaged pump bearing.
18-Apr-07
17-May-07
13-Jun-07
20-Jul-07
22-Aug-07
26-Sep-07
26-Oct-07
20-Nov -07
Damaged Pump Bearing
20-Dec-07
![Page 9: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/9.jpg)
Analysis of Bearing Damage Pump Drive End Bearing. Summary Major spalling has occurred on the inner and outer races of the pump drive end bearing, this bearing takes all the axial load of the pump as the other bearing is of roller design. High axial thrusting maybe the cause of this bearing defect. It should be noted that this pump suffers from high levels of cavitation, this maybe a factor in causing the pump to thrust more than normal. It will be interesting to see how long the next set of bearings last.
![Page 10: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/10.jpg)
Work Request Follow Up Report
PM1 – Paper Machine
Yankee Main Drive Motor Severe Bearing Distress
May 2008
![Page 11: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/11.jpg)
Yankee Main Drive Motor (Bearing Defect) PM1 - Yankee Dryer Driv e & Drum
3326-MD04A-MIP Motor Inboard Brg (Peakvue)Trend Display of WAVEFORM P-P
0 100 200 300 400 500 600
0
4
8
12
16
20
24
28
32
36
40
44
Days: 17-Nov-06 To 28-May-08
Pk-
Pk
Wav
efor
m in
G-s
ALERT
FAULT
Date: Time: Ampl:
28-May-08 10:11:29 5.443
The trend above shows before and after the motor was replaced
PK
Acce
lera
tion
in G
-s
Frequency in Orders
PM1 - Yankee Dryer Drive & Drum3326-MD04A-MIP Motor Inboard Brg (Peakvue)
0 5 10 15 20 25 30
0 0.40.81.21.62.0Max Amp
1.14
28-May-08
02-Apr-08
19-Feb-08
Multiple spectrum shows before and after the motor was replaced.
21-Dec-07
19-Nov -07
25-Oct-07
27-Sep-07
21-Aug-07
18-Jul-07
12-Jun-07
17-Apr-07
16-May-07
13-Mar-07
SEVERE BEARING DISTRESS
MOTOR NOW OK
![Page 12: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/12.jpg)
Yankee Drive Motor – Damaged Drive End Bearing. Images above taken from the drive end motor bearing clearly show the bearing was under severe distress the balls and races had just started to pick up, the root cause of this problem was a lack of quality grease.
![Page 13: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/13.jpg)
Work Request Follow Up Report
LBKP HD Cleaner Pump Worn Coupling
Coulping Replaced
Dec 2007
![Page 14: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/14.jpg)
LBKP HD Cleaner Pump ( Worn Coupling) AE2 - LBKP HD Cleaner Pump
LBHDCP -PIH Pump Inboard brg horizTrend Display of Overall Value
-- Baseline -- Value: 2.492 Date: 18-Jan-07
0 50 100 150 200 250 300 350
0
5
10
15
20
Days: 18-Jan-07 To 20-Dec-07
RM
S V
eloc
ity in
mm
/Sec
The trend above shows before and after the worn coupling was replaced. Multiple spectrum shows reduction in levels after the coupling was replaced.
ALERT
FAULT
Date: Time: Ampl:
20-Dec-07 09:28:39 5.605
Coupling Replaced
PK A
ccel
erat
ion
in G
-s
Frequency in kCPM
AE2 - LBKP HD Cleaner PumpLBHDCP -PIH Pump Inboard brg horiz
0 30 60 90 120
0 0.30.60.91.21.5Max Amp
1.73
20-Dec-07
20-Nov -07
26-Oct-07
14-Feb-07
19-Mar-07
18-Apr-07
17-May-07
13-Jun-07
26-Sep-07
20-Jul-07
22-Aug-07
18-Jan-07
![Page 15: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/15.jpg)
Work Request Follow Up Report
PM1 – Paper Machine
1st Felt Guide Roll Bearing Damage
Aug 2008
![Page 16: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/16.jpg)
1st Felt Roll (Bearing Damage) PM1 - 1st Felt Guide Roll
R1007 -D1P Bearing Drive Side (Peakvue)Trend Display of WAVEFORM P-P
0 100 200 300 400 500 600 700
0
3
6
9
12
15
18
21
24
Days: 17-Nov-06 To 20-Aug-08
Pk-
Pk
Wav
efor
m in
G-s
ALERT
FAULT
Date: Time: Ampl:
20-Aug-08 10:50:30 1.313
The trend above shows before and after the roll bearings were replaced
PK
Acce
lera
tion
in G
-s
Frequency in Orders
PM1 - 1st Felt Guide RollR1007 -D1V Bearing Drive Side Radial
0 10 20 30 40 50
0 0.10.20.30.40.5
Max Amp .27
20-Aug-08
09-Jul-08
08-Jul-08
Multiple spectrum shows before and after the roll bearings were replaced.
28-May-08
02-Apr-08
19-Feb-08
21-Dec-07
19-Nov-07
25-Oct-07
27-Sep-07
21-Aug-07
18-Jul-0712-Jun-07
NEW ROLL BEARINGS
![Page 17: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/17.jpg)
1st Felt Roll – Damaged Drive End Bearing. Images above taken from the drive end roll bearing clearly show the bearing was under distress and just started to spall, inner race was polished and corroded suggesting inadequate lubrication and water ingress.
![Page 18: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/18.jpg)
Work Request Follow Up Report
PM1 – Paper Machine
3102-MP-46 Btm Ply Machine Chest Dis Pmp
Motor bearing defect
Aug 2007
![Page 19: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/19.jpg)
Btm Ply Machine Chest Dis Pump (Bearing defect) AE1 - Btm Ply Machine Chst Dis PmP
3102-MP-46-MIV Motor Inboard Brg VertTrend Display of Early brg wear
-- Baseline -- Value: .124 Date: 16-Nov -06
0 40 80 120 160 200 240 280
0
1
2
3
4
5
6
7
Days: 16-Nov-06 To 21-Aug-07
PK
Acce
lera
tion
in G
-s
ALERT
FAULT
Date: Time: Ampl:
21-Aug-07 09:01:03 .119
MOTOR REPLACED
MOTOR BEARING DAMAGE The trend above shows before and after the motor was replaced.
PK A
ccel
erat
ion
in G
-s
Frequency in CPM
AE1 - Btm Ply Machine Chst Dis PmP3102-MP-46-MIP Motor Inboard Brg (Peakvue)
0 20000 40000 60000
0 0.10.20.30.40.50.6
Max Amp .68
16-Nov -06
29-Dec-06
12-Feb-07
Multiple spectrum shows before and after the motor was replaced.
13-Mar-07
17-Apr-07
16-May-07
12-Jun-07
18-Jul-07
BEARING DEFECT
NEW MOTOR FITTED
21-Aug-07
![Page 20: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/20.jpg)
Work Request Follow Up Report
PM1 – Paper Machine
3106-MP-15 MP-CW Showers Pump Pump Bearing defect - Cage
Sept 2007
![Page 21: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/21.jpg)
MP - CW Showers Pump (Bearing Defect) AE1 - MP CW Showers Pump
3106-MP-15-POP Pump Outboard brg (Peakvue)Trend Display of WAVEFORM P-P
-- Baseline -- Value: 4.250 Date: 16-Nov -06
0 40 80 120 160 200 240 280 320
0
5
10
15
20
25
30
35
Days: 16-Nov-06 To 27-Sep-07
Pk-
Pk
Wav
efor
m in
G-s
ALERT
FAULT
Date: Time: Ampl:
27-Sep-07 09:06:28 1.963
BEARING REPLACED
The trend above shows before and after the pump was replaced
PK
Acce
lera
tion
in G
-s
Frequency in CPM
AE1 - MP CW Showers Pump3106-MP-15-POP Pump Outboard brg (Peakvue)
0 8000 16000 24000 32000
0
0.3
0.6
0.9
1.2Max Amp .59
09:06:2927-Sep-07
08:45:5921-Aug-07
09:10:0318-Jul-07
Multiple spectrum shows before and after the pump was replaced.
09:05:1112-Jun-07
09:06:0016-May-07
09:13:1317-Apr-07
09:01:4413-Mar-07
NEW PUMP FITTED
![Page 22: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/22.jpg)
Work Request Follow Up Report
PM1 – Paper Machine
3106-MP-18 CW Transfer Pump Worn Coupling
Aug 2007
![Page 23: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/23.jpg)
CW Transfer Pump (Worn Coupling) AE1 - CW Transfer Pump
3106-MP-18-MIV Motor Inboard Brg VertTrend Display of 3-8xRPM
-- Baseline -- Value: .267 Date: 16-Nov -06
0 40 80 120 160 200 240 280
0
0.4
0.8
1.2
1.6
2.0
2.4
2.8
3.2
3.6
Days: 16-Nov-06 To 21-Aug-07
RMS
Velo
city
in m
m/S
ec
ALERT
FAULT
Date: Time: Ampl:
21-Aug-07 08:49:44 .361
WORN COUPLING
NEW COUPLING FITTED
The trend above shows before and after the worn coupling was replaced.
RM
S V
eloc
ity in
mm
/Sec
Frequency in CPM
AE1 - CW Transfer Pump3106-MP-18-MIV Motor Inboard Brg Vert
0 20000 40000 60000 80000
0 0.40.81.21.62.0
Max Amp 2.34
16-Nov-06
29-Dec-06
12-Feb-07
Multiple spectrum shows before and after the coupling was replaced.
13-Mar-07
17-Apr-07
16-May-07
12-Jun-07
18-Jul-07
21-Aug-07WORN COUPLING
RPM= 1480. 08:49:43 21-Aug-07
Freq: Ordr: Sp 9:
54225. 36.64 .00385
![Page 24: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/24.jpg)
Work Request Follow Up Report
Dust Removal Fan Fan Unbalance
Fan Impellor Cleaned
Sept 2007
![Page 25: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/25.jpg)
Dust Removal Fan ( Fan Unbalance) 2BR - Dust Remov al Fan
DRF -FOH Fan Outboard brg HorizTrend Display of Overall Value
-- Baseline -- Value: 11.57 Date: 18-Jan-07
0 60 120 180 240 300
4
8
12
16
20
24
28
Days: 18-Jan-07 To 26-Sep-07
RMS
Vel
ocity
in m
m/S
ec
ALERT
FAULT
Date: Time: Ampl:
26-Sep-07 12:20:05 6.396
FAN CLEANED
The trend above shows before and after the fan impellor was cleaned due to dust build up on the blades.
RM
S V
eloc
ity in
mm
/Sec
Frequency in Orders
2BR - Dust Removal FanDRF -FOH Fan Outboard brg Horiz
0 5 10 15 20
0
4
8
12
16
2024
Max Amp 23.3
18-Jan-07
14-Feb-07
19-Mar-07
Multiple spectrum shows reduction in levels after the fan was cleaned.
18-Apr-07
26-Sep-0722-Aug-07
20-Jul-07
13-Jun-07
17-May-07
RPM= 1569. 12:20:05 26-Sep-07
Ordr: Freq: Sp 9:
1.000 1568.6 5.834
![Page 26: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/26.jpg)
Work Request Follow Up Report
Trim Refiner 3102-MG10A
Motor – Drive end bearing defect
February 2007
![Page 27: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/27.jpg)
Trim Refiner 3102-MG10A ( Motor bearing defect) A E1 - Trim Refiner
3102-MG10A -MIP Motor Inboard Brg (Peakvue)Trend Display of WA VEFORM P-P
-- Baseline -- Value: 1.938 Date: 16-Nov-06
0 10 20 30 40 50 60 70 80 90
0
10
20
30
40
50
60
70
80
Days: 16-Nov-06 To 12-Feb-07
Pk-P
k W
avef
orm
in G
-s
ALERT
FA ULT
Date: T ime: Ampl:
12-Feb-07 10:12:08 2.485
NEW MOTOR FITTED
MOTOR BEA RING DA MA GE
The trend above shows before and after the motor was changed due to an inner race bearing defect on the drive end.
PK A
ccel
erat
ion
in G
-s
Frequency in Orders
A E1 - Trim Refiner3102-MG10A -MIV Motor Inboard Brg Vert
0 10 20 30 40 50 60 70 80 90
Max A mp .12
Plot Scale
0
0.3
10:12:0112-Feb-07
15:03:4119-Jan-07
10:16:3829-Dec-06
14:09:1616-Nov-06
MOTOR DE BEA RING DEFECT
NEW MOTOR FITTED
Multiple spectrum shows before and after the motor was changed.
![Page 28: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/28.jpg)
Work Request Follow Up Report
FW Shower Pump 6200-MP-10
Misalignment – Motor/Pump Re-aligned
December 2006
![Page 29: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/29.jpg)
FW Shower Pump 6200-MP-10 ( Re-Aligned) AE - FW Shower Pump
6200-MP-10-PIH Pump Inboard brg horizTrend Display of 3-8xRPM
-- Baseline -- Value: 4.638 Date: 16-Nov-06
0 10 20 30 40 50
0
4
8
12
16
20
24
Days: 16-Nov-06 To 29-Dec-06
RM
S Ve
loci
ty in
mm
/Sec
The trend above shows before and after the motor /pump was re-aligned. Multiple spectrum shows before and after the motor/pump was re-aligned.
ALERT FA ULT
Date: T ime: Ampl:
29-Dec-06 09:47:40 .781
BEFORE RE-A LIGNMENT
AFTER RE-A LIGNMENT
RM
S Ve
loci
ty in
mm
/Sec
Frequency in Orders
AE - FW Shower Pump6200-MP-10-PIH Pump Inboard brg horiz
0 10 20 30 40 50
Max A mp 18.4
Plot Scale
0
20
09:47:4129-Dec-06
13:26:1116-Nov-06
BEFORE
AFTER
![Page 30: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/30.jpg)
Work Request Follow Up Report
PM1 – 3309-MP-32 Steam /Condensate Pump
Worn Coupling
June 2007
![Page 31: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/31.jpg)
Steam / Condensate Pump – Worn Coupling AE1 - Steam & Condensate Dis Pump
3309-MP-32-MIV Motor Inboard Brg VertTrend Display of 26-70xRPM
-- Baseline -- Value: .223 Date: 29-Dec-06
0 30 60 90 120 150 180
0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
Days: 29-Dec-06 To 12-Jun-07
RM
S V
eloc
ity in
mm
/Sec
ALERT
FAULT
Date: Time: Ampl:
12-Jun-07 09:57:28 .113
WORN COUPLING
COUPLING REPLACED
The trend above shows before and after the coupling was replaced.
RM
S V
eloc
ity in
mm
/Sec
Frequency in kCPM
AE1 - Steam & Condensate Dis Pump3309-MP-32-MIV Motor Inboard Brg Vert
0 40 80 120 160 200 240
0 0.40.81.21.62.0
Max Amp 2.17
09:52:4129-Dec-06
11:55:1412-Feb-07
09:53:2513-Mar-07
Multiple spectrum shows before and after the coupling was replaced.
10:04:2117-Apr-07
10:19:4316-May-07
11:54:4217-May-07
09:57:2812-Jun-07
WORN COUPLING
NEW COUPLING FITTED
RPM= 2943. 10:19:43 16-May-07
Freq: Ordr: Sp 5:
41.93 14.25 .00557
![Page 32: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/32.jpg)
Work Request Follow Up Report
UTM Agitator Motor Motor bearing defect
Motor Replaced
Sept 2007
![Page 33: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/33.jpg)
UTM Agitator Motor ( Bearing damage) AE2 - UTM left side Agitator
UTM LSA -MIH Motor Inboard Brg HorizTrend Display of WAVEFORM P-P
-- Baseline -- Value: 1.433 Date: 19-Jan-07
0 50 100 150 200 250
0
10
20
30
40
50
60
Days: 19-Jan-07 To 26-Sep-07
Pk-
Pk W
avef
orm
in G
-s
ALERT
FAULT
Date: Time: Ampl:
26-Sep-07 12:37:33 2.117
The trend above shows before and after the motor was replaced due to a bearing defect.
PK A
ccel
erat
ion
in G
-s
Frequency in kCPM
AE2 - UTM left side AgitatorUTM LSA -MIH Motor Inboard Brg Horiz
0 30 60 90 120
0
0.3
0.6
0.9
1.2
1.51.8
Max Amp 1.71
26-Sep-07
20-Jul-07
13-Jun-07
19-Jan-0714-Feb-07
19-Mar-07
19-Mar-07
18-Apr-07
18-Apr-07
Multiple spectrum shows reduction in levels after the motor was replaced.
![Page 34: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/34.jpg)
Work Request Follow Up Report
PM1 - UTM Agitator
Agitator Drive End Bearing Damage
March 2007
![Page 35: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/35.jpg)
UTM Agitator – Agitator Bearing Damage A E1 - UTM A gitator
UTM A gi -A IP A gitator inboard brg (Peakvue)Trend Display of WA VEFORM P-P
-- Baseline -- Value: 29.95 Date: 19-Jan-07
0 10 20 30 40 50 60
0
5
10
15
20
25
30
35
Days: 19-Jan-07 To 13-Mar-07
Pk-P
k W
avef
orm
in G
-s
ALERT
FA ULT
Date: T ime: Ampl:
13-Mar-07 10:00:33 .368
SEVERE BEARING DAMAGE
BEA RING COLLA PSED NEW BEARING FITTED
The trend above shows before and after the agitator drive end bearing was replaced.
PK A
ccel
erat
ion
in G
-s
Frequency in Orders
A E1 - UTM A gitatorUTM A gi -A IP A gitator inboard brg (Peakvue)
0 10 20 30 40 50 60
Max A mp .75
Plot Scale
0
0.8
13:47:2119-Jan-07
11:11:2212-Feb-07
10:00:3413-Mar-07
BEA RING DAMA GE
Multiple spectrum shows before and after the agitator bearing was replaced.
![Page 36: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/36.jpg)
Work Request Follow Up Report
Wet End Hood Circ Fan Fan drive end bearing defect
Bearing Replaced
May 2007
![Page 37: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/37.jpg)
Wet End Hood Circ Fan ( Fan bearing defect) 2BR - Wet End Hood Circ Fan Drive
WEHCFD -FIV Fan Inboard brg VertTrend Display of 9-25xRPM
-- Baseline -- Value: .700 Date: 18-Jan-07
0 30 60 90 120
0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
Days: 18-Jan-07 To 17-May-07
RM
S Ve
loci
ty in
mm
/Sec
ALERT
Date: T ime: Ampl:
17-May-07 10:29:32 .08711
BEFORE BEARING REPLA CEMENT
AFTER BEARING REPLA CEMENT
The trend above shows before and after the fan bearing was changed due to a bearing defect.
PK A
ccel
erat
ion
in G
-s
Frequency in CPM
2BR - Wet End Hood Circ Fan DriveWEHCFD -FIV Fan Inboard brg Vert
0 20000 40000 60000 80000 100000
0
0.1
0.2
0.3
0.40.5
Max A mp .20
14:49:4918-Jan-07
10:05:1914-Feb-07
10:08:3313-Mar-07
Multiple spectrum shows before and after the fan bearing was replaced.
10:53:3219-Mar-07
10:17:2118-Apr-07
NEW FAN BEARING FITTED
10:29:3317-May-07
![Page 38: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/38.jpg)
Work Request Follow Up Report
Wet End Combustion Fan Motor Motor – Drive end bearing Damage
Motor Replaced
February 2007
![Page 39: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/39.jpg)
Wet End Combustion Fan Motor ( Motor bearing defect) 2BR - Wet End Combustion Fan
WECF -MIV Motor Inboard Brg VertTrend Display of WA VEFORM P-P
-- Baseline -- Value: 44.59 Date: 18-Jan-07
0 3 6 9 12 15 18 21 24 27
0
10
20
30
40
50
Days: 18-Jan-07 To 14-Feb-07
Pk-P
k W
avef
orm
in G
-s
ALERT
FA ULT
Date: T ime: Ampl:
14-Feb-07 10:01:30 3.465
DEFECT BEFORE MOTOR REPLACEMENT
NEW MOTOR FITTED
The trend above shows before and after the motor was changed due to a severe bearing defect on the drive end of the motor.
Frequency in kCPM
2BR - Wet End Combustion FanWECF -MIV Motor Inboard Brg Vert
Multiple spectrum shows before and after the motor was changed.
PK A
ccel
erat
ion
in G
-s
0 40 80 120 160 200
Max A mp 4.99
Plot Scale
240
0
3
10:01:3114-Feb-07
14:43:4618-Jan-07
MOTOR BEA RING DEFECT - BEFORE REPLA CEMENT
NEW MOTOR FITTED
![Page 40: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/40.jpg)
Work Request Follow Up Report
Fan Pump Wire Layer
Motor – Drive end bearing defect
Motor Replaced
February 2007
![Page 41: Paper Case Study](https://reader038.fdocuments.us/reader038/viewer/2022102523/5695d0001a28ab9b0290800f/html5/thumbnails/41.jpg)
Fan Pump Wire Layer Motor ( Motor bearing defect) A E2 - Fan Pump Wire Layer
FPWL -M3P Motor Inboard Brg (Peak vue)Trend Display of WA VEFORM P-P
-- Baseline -- Value: 49.13 Date: 18-Jan-07
0 3 6 9 12 15 18 21 24 27
0
10
20
30
40
50
60
Days: 18-Jan-07 To 14-Feb-07
Pk-P
k W
avef
orm
in G
-s
ALERT
FA ULT
Date: T ime: Ampl:
14-Feb-07 09:34:41 2.323
BEFORE MOTOR CHA NGE
AFTER NEW MOTOR WA S FITTED
The trend above shows before and after the motor was changed due to severe bearing damage on the motor, caused by electrical erosion.
PK A
ccel
erat
ion
in G
-s
Frequency in CPM
A E2 - Fan Pump Wire LayerFPWL -M3H Motor Inboard Brg Horiz
0 20000 40000 60000 80000
Max A mp .49
Plot Scale
0
0.3
09:34:5114-Feb-07
13:32:3218-Jan-07
MOTOR BEA RING DEFECT - BEFORE REPLA CEMENT
READING A FTER NEW MOTOR WAS FITTED
Multiple spectrum shows before and after the motor was changed.