Page 1: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 1

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

BARCELONA BARCELONA AIRPORT AIRPORT

CDM CDM PROJECTPROJECT

BARCELONA BARCELONA AIRPORT AIRPORT

CDM CDM PROJECTPROJECT

Page 2: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 2

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

WORSHOPS OUTCOMESWORSHOPS OUTCOMES ObjectivesObjectives

Proposed solutionProposed solution

RequirementsRequirements

Building Common Situational Awareness Building Common Situational Awareness The milestone AproachThe milestone Aproach

New Process ProposalNew Process Proposal Process exampleProcess example

NEXT STEPSNEXT STEPS

WORSHOPS OUTCOMESWORSHOPS OUTCOMES ObjectivesObjectives

Proposed solutionProposed solution

RequirementsRequirements

Building Common Situational Awareness Building Common Situational Awareness The milestone AproachThe milestone Aproach

New Process ProposalNew Process Proposal Process exampleProcess example

NEXT STEPSNEXT STEPS

Page 3: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 3

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

WORKSHOPS OUTCOMES: - WORKSHOPS OUTCOMES: - OBJECTIVESOBJECTIVESWORKSHOPS OUTCOMES: - WORKSHOPS OUTCOMES: - OBJECTIVESOBJECTIVES

TWRTWRMaximise throughputMaximise throughput

& Departure& DepartureSequence accuracySequence accuracy

TWRTWRMaximise throughputMaximise throughput

& Departure& DepartureSequence accuracySequence accuracy

AIRPORT AIRPORT ARR & DEP PunctualityARR & DEP PunctualityOptimum use of resourcesOptimum use of resources

AIRPORT AIRPORT ARR & DEP PunctualityARR & DEP PunctualityOptimum use of resourcesOptimum use of resources

AIRLINESAIRLINES Achieve Departure PunctualityAchieve Departure Punctuality

AIRLINESAIRLINES Achieve Departure PunctualityAchieve Departure Punctuality

HANDLINGHANDLING Achieve Departure punctualityAchieve Departure punctualityTurn around time complianceTurn around time compliance

HANDLINGHANDLING Achieve Departure punctualityAchieve Departure punctualityTurn around time complianceTurn around time complianceATFM.-ATFM.-

CTOT ComplianceCTOT Compliance

ATFM.-ATFM.- CTOT ComplianceCTOT Compliance

Page 4: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 4

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

WORKSHOPS OUTCOMES: - OBJECTIVESWORKSHOPS OUTCOMES: - OBJECTIVESWORKSHOPS OUTCOMES: - OBJECTIVESWORKSHOPS OUTCOMES: - OBJECTIVES

AGREED AGREED ULTIMATE OBJECTIVEULTIMATE OBJECTIVE::

((BCN ActorsBCN Actors))• TO OPERATE AS CLOSE AS TO OPERATE AS CLOSE AS

POSSIBLE TO POSSIBLE TO AIRPORT AIRPORT SCHEDULESSCHEDULES

Page 5: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 5

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

WORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTION

• DEVELOP A DEVELOP A PRE-DEPARTUREPRE-DEPARTURE

PROCESS BASED ON A PROCESS BASED ON A TRAFFIC TRAFFIC

MONITORMONITOR OF BOTH, OF BOTH, PLANNED AND PLANNED AND

CURRENTCURRENT AIRPORT SITUATION AIRPORT SITUATION

Page 6: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 6

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

1111 2222

WORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTION

AchieveAchieve

CCommon ommon SSituational ituational AAwarenesswareness

defining a defining a Traffic MonitorTraffic Monitor showing: showing:• Pre-departure SequencePre-departure Sequence

•Arrival movementArrival movement•Ground StatusGround Status

AchieveAchieve

CCommon ommon SSituational ituational AAwarenesswareness

defining a defining a Traffic MonitorTraffic Monitor showing: showing:• Pre-departure SequencePre-departure Sequence

•Arrival movementArrival movement•Ground StatusGround Status

ACTIONSACTIONSACTIONSACTIONS

DevelopDevelop

A A Pre Departure ProcessPre Departure Process establishing new actor rolesestablishing new actor roles based on the Traffic Monitorbased on the Traffic Monitor

DevelopDevelop

A A Pre Departure ProcessPre Departure Process establishing new actor rolesestablishing new actor roles based on the Traffic Monitorbased on the Traffic Monitor

Page 7: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 7

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

3333

WORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTIONWORKSHOPS OUTCOMES: PROPOSED SOLUTION

DesignDesign Performance IndicatorPerformance Indicator

System System

DesignDesign Performance IndicatorPerformance Indicator

System System

ACTIONSACTIONSACTIONSACTIONS

Page 8: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 8

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

USERS REQUIREMENTSUSERS REQUIREMENTSUSERS REQUIREMENTSUSERS REQUIREMENTS

The departure sequence will be organised using a departure The departure sequence will be organised using a departure list & an arrival list:list & an arrival list:

Independent or merged according to users needsIndependent or merged according to users needs

Updates will be done in advance at relevant time events and Updates will be done in advance at relevant time events and milestonesmilestones

Each player will provide specific data and time estimatesEach player will provide specific data and time estimates Data should be extracted from current applicationsData should be extracted from current applications Avoiding manual data inputsAvoiding manual data inputs

The departure list will be sorted by TOBTThe departure list will be sorted by TOBT Specific items could be added for each actor (Specific items could be added for each actor (Actor Actor

preferred profilepreferred profile))

The departure sequence will be organised using a departure The departure sequence will be organised using a departure list & an arrival list:list & an arrival list:

Independent or merged according to users needsIndependent or merged according to users needs

Updates will be done in advance at relevant time events and Updates will be done in advance at relevant time events and milestonesmilestones

Each player will provide specific data and time estimatesEach player will provide specific data and time estimates Data should be extracted from current applicationsData should be extracted from current applications Avoiding manual data inputsAvoiding manual data inputs

The departure list will be sorted by TOBTThe departure list will be sorted by TOBT Specific items could be added for each actor (Specific items could be added for each actor (Actor Actor

preferred profilepreferred profile))

Page 9: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 9

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

USERS REQUIREMENTSUSERS REQUIREMENTSUSERS REQUIREMENTSUSERS REQUIREMENTS

DEPARTURE LIST :DEPARTURE LIST : Call-signCall-sign Tail number (aircraft registration)Tail number (aircraft registration) Aircraft TypeAircraft Type Flight StatusFlight Status Parking PositionParking Position Boarding GateBoarding Gate ETTAETTA

SOBTSOBT C/EOBTC/EOBT C/ETOTC/ETOT ATOTATOT ADESADES Number of PassengersNumber of Passengers SIDSID

InboundInbound delaydelay && delaydelay codecode

DEPARTURE LIST :DEPARTURE LIST : Call-signCall-sign Tail number (aircraft registration)Tail number (aircraft registration) Aircraft TypeAircraft Type Flight StatusFlight Status Parking PositionParking Position Boarding GateBoarding Gate ETTAETTA

SOBTSOBT C/EOBTC/EOBT C/ETOTC/ETOT ATOTATOT ADESADES Number of PassengersNumber of Passengers SIDSID

InboundInbound delaydelay && delaydelay codecode

Page 10: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 10

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

USERS REQUIREMENTSUSERS REQUIREMENTSUSERS REQUIREMENTSUSERS REQUIREMENTS

ARRIVAL LIST :ARRIVAL LIST : Call-signCall-sign Tail number (aircraft registration)Tail number (aircraft registration) Aircraft TypeAircraft Type Flight StatusFlight Status Parking PositionParking Position Arrival GateArrival Gate ETTAETTA

SOSTSOST C/ELDTC/ELDT C/EOSTC/EOST AOSTAOST ADEPADEP Number of PassengersNumber of Passengers

Inbound delay & delay codeInbound delay & delay code

ARRIVAL LIST :ARRIVAL LIST : Call-signCall-sign Tail number (aircraft registration)Tail number (aircraft registration) Aircraft TypeAircraft Type Flight StatusFlight Status Parking PositionParking Position Arrival GateArrival Gate ETTAETTA

SOSTSOST C/ELDTC/ELDT C/EOSTC/EOST AOSTAOST ADEPADEP Number of PassengersNumber of Passengers

Inbound delay & delay codeInbound delay & delay code

Page 11: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 11

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

EXTERNAL FRONT-ENDEXTERNAL FRONT-END

INTERFACEINTERFACEINTERNAL FRONT-ENDINTERNAL FRONT-END

INTERFACEINTERFACE

PROCESSESPROCESSESPROCESSESPROCESSES

CDMCDMCDMCDM

USERS REQUIREMENTSUSERS REQUIREMENTSSYSTEM ARQUITECTURESYSTEM ARQUITECTUREUSERS REQUIREMENTSUSERS REQUIREMENTS

SYSTEM ARQUITECTURESYSTEM ARQUITECTURE

SHAREDSHAREDDATADATABASEBASE

SHAREDSHAREDDATADATABASEBASE

AIRPORTAIRPORTAIRPORTAIRPORT

ATCATCATCATC

ATFMATFMATFMATFM EURO-EURO-HANDLINGHANDLING

EURO-EURO-HANDLINGHANDLING

SPANAIRSPANAIRSPANAIRSPANAIR

IBERIAIBERIAIBERIAIBERIA

WEB FRONT-ENDWEB FRONT-END

INTERFACEINTERFACEIntranetIntranet

Page 12: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 12

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

BUILDING BUILDING COMMON COMMON

SITUATIONAL SITUATIONAL AWARENESSAWARENESS

BUILDING BUILDING COMMON COMMON

SITUATIONAL SITUATIONAL AWARENESSAWARENESS

Page 13: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 13

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

The milestoneThe milestoness approach approach to update theto update the TRAFFIC MONITORTRAFFIC MONITORThe milestoneThe milestoness approach approach to update theto update the TRAFFIC MONITORTRAFFIC MONITOR

I - WHEN ?I - WHEN ?Update milestonesSet Alarm milestones

I - WHEN ?I - WHEN ?Update milestonesSet Alarm milestones

II - WHAT ?II - WHAT ?Which data?What accuracy

level?

II - WHAT ?II - WHAT ?Which data?What accuracy

level?

III - WHO ?III - WHO ? Determine data

owner

III - WHO ?III - WHO ? Determine data

owner

IV - HOW ?IV - HOW ?Establish data

source

IV - HOW ?IV - HOW ?Establish data

source

V - Update rules ?V - Update rules ?Agree updating

rules

V - Update rules ?V - Update rules ?Agree updating

rules

Tries to Tries to answer 5 answer 5

key key QuestionsQuestions

Tries to Tries to answer 5 answer 5

key key QuestionsQuestions

Page 14: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 14

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

SOBTSOST

ACFTACFT not on ground not on ground ACFTACFT not on ground not on ground

Operations Planning

ExecutionExecution

Airborne

Airline Airline HandlingHandling

ATFMATFMATCATC

Airport Airport data basedata base

ATCATC

Turn around

BarcelonaBarcelonaBarcelonaBarcelona

Airport Airport Airline Airline

Handling Handling ATCATC

Planning Planning

EOBT CTOT ATOT

ELDT EOST TOBT

AOST XTTA TOBT

Flight StatusFlight StatusFlight StatusFlight Status

Outstation

The TRAFFIC MONITORThe TRAFFIC MONITORThe TRAFFIC MONITORThe TRAFFIC MONITOR

ATC ATFM Airport Handling

Airline

ATC ATFM Airport Handling

Airline

Page 15: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 15

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

BCNBCN

CDGCDG

IBE4512IBE4512IBE4512IBE4512

UPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT At planned phaseAt planned phaseUPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT At planned phaseAt planned phase

DEP IBE4512 DEP IBE4512 SOBTSOBT

SOBT SOBT BCN/CDG BCN/CDG

(CONOPER) (CONOPER) -24Hrs-24Hrs

CONOPER

DOWLOADS THE SCHEDULED

DEPARTURE TIME

(SOBT) FOR IBE 4512IBE 4512

BCN TO CDG THE DAY BEFORE

CONOPER

DOWLOADS THE SCHEDULED

DEPARTURE TIME

(SOBT) FOR IBE 4512IBE 4512

BCN TO CDG THE DAY BEFORE

SOBTSOBTSOBTSOBT

Page 16: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 16

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

EET=1h.40’

EET=1h.40’

BCNBCN

CDGCDG

IBE4512IBE4512IBE4512IBE4512

BRUBRU

IBE3512IBE3512IBE3512IBE3512

FPL (ARO-FPL (ARO-BCN)BCN)

DEP IBE4512 DEP IBE4512 SOBTSOBT

(CONOPER) (CONOPER) -24Hrs-24Hrs

CONOPER

- ROTATION INFORMATION LINKS IBE4512 TO IBE3512 ARRIVAL

CONOPER

- ROTATION INFORMATION LINKS IBE4512 TO IBE3512 ARRIVAL

SOST SOST BRU/BCN BRU/BCN

(CONOPER) (CONOPER) -24Hrs-24Hrs DEP IB3512 = DEP IB3512 =

EET+ATXI+STTAEET+ATXI+STTA

- 3Hrs- 3Hrs

- 2Hrs 3O’- 2Hrs 3O’

ARO BCN

RECEIVES FPL FROM IFPSIOBTIOBT AT LEAST 3Hrs. IN ADVANCE

ARO BCN

RECEIVES FPL FROM IFPSIOBTIOBT AT LEAST 3Hrs. IN ADVANCE

- SOSTSOST FOR IB3512 DOWNLOADED THE PREVIOUS DAY

- SOSTSOST FOR IB3512 DOWNLOADED THE PREVIOUS DAY

AIRLINE OPS

- Should have planned its departure from BRUBRU to arrive in BCNBCN in due time

AIRLINE OPS

- Should have planned its departure from BRUBRU to arrive in BCNBCN in due time

IOBTIOBTIOBTIOBT

SOBTSOBTSOBTSOBT

STTA=45’ STTA=45’ ATXI=5’ATXI=5’

UPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT At outstationAt outstationUPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT At outstationAt outstation

Page 17: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 17

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

EET=1h.40’

EET=1h.40’

BCNBCN

CDGCDG

IBE4512IBE4512IBE4512IBE4512

BRUBRU

IBE3512IBE3512IBE3512IBE3512

FPL IB4512FPL IB4512

DEP IBE4512 DEP IBE4512 SOBTSOBT

CONOPER CONOPER -24Hrs.-24Hrs.

A first EOBT EOBT can be calculated from inbound traffic info.:

- FPLFPL- ATFM- ATFM

A first EOBT EOBT can be calculated from inbound traffic info.:

- FPLFPL- ATFM- ATFM

CONOPER CONOPER -24Hrs.-24Hrs.

IB3512 SOBTIB3512 SOBTFPL IB3512 FPL IB3512 (ARO-BCN)(ARO-BCN)

- 3Hrs- 3HrsEOST EOST IB3512IB3512EOST EOST IB3512IB3512

SAM/SRM SAM/SRM IB3512IB3512

- - 3Hrs3Hrs

EOBT IB4512EOBT IB4512

ARO BCNARO BCN

- Should Should have received BRU DEP FPLFPL from IFPS- COULD - COULD have also received BRU DEP CTOTCTOT from TACT

ARO BCNARO BCN

- Should Should have received BRU DEP FPLFPL from IFPS- COULD - COULD have also received BRU DEP CTOTCTOT from TACT

IOBTIOBTIOBTIOBT

SOBTSOBTSOBTSOBT

EOBTEOBTEOBTEOBT

FPL & ATFM MESSAGES ALREADY IN BCN ARO DATABASE

FPL & ATFM MESSAGES ALREADY IN BCN ARO DATABASE

NEW MESSAG

E

NEW MESSAG

E

UPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT At outstationAt outstationUPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT At outstationAt outstation

Page 18: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 18

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

EET=1h.40’

EET=1h.40’

BCNBCN

CDGCDG

IBE4512IBE4512IBE4512IBE4512

BRUBRU

IBE3512IBE3512IBE3512IBE3512

FPL IBE4512FPL IBE4512

DEP IBE4512 DEP IBE4512 SOBTSOBT

Outstation departure information, via MVT messages will provide accurate updates for both:

- ON STAND- OFF BLOCK

Outstation departure information, via MVT messages will provide accurate updates for both:

- ON STAND- OFF BLOCK

IB3512 SOBTIB3512 SOBT

- 3Hrs- 3Hrs

CONOPER CONOPER -24Hrs.-24Hrs.

CONOPER CONOPER -24Hrs.-24Hrs.

IOBTIOBTIOBTIOBT

SOBTSOBTSOBTSOBT

EOBTEOBTEOBTEOBT

FPL IB3512FPL IB3512

SAM/SRM SAM/SRM IB3512IB3512

EOSTEOSTEOSTEOST

MVT MVT IB3512IB3512

COST COST IB3512IB3512

TOBTTOBTTOBTTOBT

UPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT isis airborneairborneUPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT isis airborneairborne

IB3512IB3512

Page 19: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 19

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

EET=1h.40’

EET=1h.40’

BCNBCN

CDGCDG

IBE4512IBE4512IBE4512IBE4512

BRUBRU

IBE3512IBE3512IBE3512IBE3512

FPL IBE4512FPL IBE4512

DEP IBE4512 DEP IBE4512 SOBTSOBT

ATC airborne, SACTA updates, to inbound flights can be used for improved accuracy for both:

- ON STAND- OFF BLOCK

ATC airborne, SACTA updates, to inbound flights can be used for improved accuracy for both:

- ON STAND- OFF BLOCK

IB3512 SOBTIB3512 SOBT

- 3Hrs- 3Hrs

CONOPER CONOPER -24Hrs.-24Hrs.

CONOPER CONOPER -24Hrs.-24Hrs.

IOBTIOBTIOBTIOBT

SOBTSOBTSOBTSOBT

EOBTEOBTEOBTEOBT

FPL IB3512FPL IB3512

SAM/SRM SAM/SRM IB3512IB3512

TOBTTOBTTOBTTOBT

COST COST IB3512IB3512

SACTA SACTA ETOETO

- 4O’- 4O’

UPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT is airborneis airborneUPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES - ACFT - ACFT is airborneis airborne

NewNewNewNew

Page 20: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 20

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

EET=1h.40’

EET=1h.40’

BCNBCN

CDGCDG

IBE4512IBE4512IBE4512IBE4512

BRUBRU

IBE3512IBE3512IBE3512IBE3512

AOSTAOST

DEP IBE4512 DEP IBE4512 SOBTSOBT

ETTAETTATOBTTOBTTOBTTOBT

AFTER LANDINGAFTER LANDING:-AOSTAOST WILL UPDATE EOBTEOBT-HANDLING &/OR AIRLINE CAN STILL MODIFY EOBTEOBT-DOORS CLOSE FOR ARDTARDT INDICATION (Actual Ready Time)

AFTER LANDINGAFTER LANDING:-AOSTAOST WILL UPDATE EOBTEOBT-HANDLING &/OR AIRLINE CAN STILL MODIFY EOBTEOBT-DOORS CLOSE FOR ARDTARDT INDICATION (Actual Ready Time)

UPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES – – At BarcelonaAt BarcelonaUPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES – – At BarcelonaAt Barcelona

Page 21: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 21

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

NEW PROCESS NEW PROCESS PROPOSALPROPOSAL

NEW PROCESS NEW PROCESS PROPOSALPROPOSAL

Page 22: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 22

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

PROCESS PHASES.-PROCESS PHASES.- PROCESS PHASES.-PROCESS PHASES.-

BCNBCNBCNBCN

Dep listDep list----------SOBT----------SOBT----------SOBT----------SOBT

Dep listDep list----------SOBT----------SOBT----------SOBT----------SOBT

LOAD PLANNED DATA FROM AIRPORT LOAD PLANNED DATA FROM AIRPORT DATA BASEDATA BASE (GESLOT TR)(GESLOT TR)

SORT BYSORT BY SOBT (ScheduledSOBT (Scheduled Off Block Time Off Block Time))

Prepare the Prepare the SequenceSequence

Prepare the Prepare the SequenceSequence

Page 23: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 23

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

BCNBCNBCNBCN

Dep listDep list----------SOBT----------SOBT----------SOBT----------SOBT

Dep listDep list----------SOBT----------SOBT----------SOBT----------SOBT

FPL (DEP) -3 Hrs. (IOBT)FPL (DEP) -3 Hrs. (IOBT)

SOST (ARR)SOST (ARR)SOST (ARR)SOST (ARR)

FLIGHT PLAN ACTIVATIONFLIGHT PLAN ACTIVATION (FPL IN COM/AIS)(FPL IN COM/AIS) DELIVERS DELIVERS

INITIAL OFF BLOCK TIMEINITIAL OFF BLOCK TIME (IOBT).- (IOBT).- USUSEE ROTATION ROTATION INFORMATIONINFORMATION ((FROM FROM AIRPORT DB) AIRPORT DB) TO TO

OBTAIN SCHEDULED ON STAND TIME FOR IN-OBTAIN SCHEDULED ON STAND TIME FOR IN-FLIGHTFLIGHT (SOST)(SOST)

PROCESS PHASES.-PROCESS PHASES.- PROCESS PHASES.-PROCESS PHASES.-

Confirm flights Confirm flights and associate and associate

arrivalsarrivals

Confirm flights Confirm flights and associate and associate

arrivalsarrivals

Page 24: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 24

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

BCNBCNBCNBCN

CFMUCFMUCFMUCFMU

Dep listDep list----------SOBT----------SOBT----------SOBT----------SOBT

Dep listDep list----------SOBT----------SOBT----------SOBT----------SOBT

FPL (DEP) -3 Hrs.FPL (DEP) -3 Hrs.

BRUBRUBRUBRU

2).- SOST (ARR)2).- SOST (ARR)

FPL (DEP- BRU)FPL (DEP- BRU) -3 Hrs.-3 Hrs.

FPL (DEP- BRU)FPL (DEP- BRU) -3 Hrs.-3 Hrs. ETOT= EOST + ETOT= EOST +

ATXO + STTA ATXO + STTA OR OR SOBT+ATXOSOBT+ATXO

ETOT= EOST + ETOT= EOST + ATXO + STTA ATXO + STTA OR OR

SOBT+ATXOSOBT+ATXO

CTOT (DEP- BRU) -2 Hrs. CTOT (DEP- BRU) -2 Hrs. (EOBT - 45´ CTOT)(EOBT - 45´ CTOT)

CTOT (DEP- BRU) -2 Hrs. CTOT (DEP- BRU) -2 Hrs. (EOBT - 45´ CTOT)(EOBT - 45´ CTOT)

USE CTOT AND/OR FPL FROM OUTBOUND STATION TO USE CTOT AND/OR FPL FROM OUTBOUND STATION TO UPDATE ARR TO BCNUPDATE ARR TO BCN (CFMU & ARO)(CFMU & ARO)

EETOTOTT CALCULATION (as a function of ARRCALCULATION (as a function of ARR,, Turnaround Turnaround, , TAXI TIME TAXI TIME & SOBT)& SOBT). .

EOSTEOST

EOST EOST EOBTEOBT

Focus on Focus on arrivals arrivals

from from outstationoutstation

Focus on Focus on arrivals arrivals

from from outstationoutstation

Use Use ATFM for ATFM for

ARR ARR UpdatesUpdates

Use Use ATFM for ATFM for

ARR ARR UpdatesUpdates

Page 25: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 25

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

BCNBCNBCNBCN

CFMUCFMUCFMUCFMU

Dep listDep list----------SOBT----------SOBT----------SOBT----------SOBT

Dep listDep list----------SOBT----------SOBT----------SOBT----------SOBT

FPL (DEP) -3 Hrs.FPL (DEP) -3 Hrs.

BRUBRUBRUBRU

EOST (ARR)EOST (ARR)

FPL (DEP- BRU)FPL (DEP- BRU) -3 Hrs.-3 Hrs.

FPL (DEP- BRU)FPL (DEP- BRU) -3 Hrs.-3 Hrs.

ETOT= EOST + ATXO + STTA OR SOBT+ATXOETOT= EOST + ATXO + STTA OR SOBT+ATXO

CTOT (DEP- BRU) -2 Hrs.CTOT (DEP- BRU) -2 Hrs.CTOT (DEP- BRU) -2 Hrs.CTOT (DEP- BRU) -2 Hrs.

CTOT (DEP- BCN) -2 Hrs.CTOT (DEP- BCN) -2 Hrs.CTOT (DEP- BCN) -2 Hrs.CTOT (DEP- BCN) -2 Hrs.

SENDSEND EEOBOBT TO CFMUT TO CFMU FOR BCN CTOTFOR BCN CTOT ALLOCATION ALLOCATION (Instead of (Instead of IIOBT from FPL)OBT from FPL)

SORT BYSORT BY C/ ETOT. C/ ETOT. (push SOBT to the bottom of the list)(push SOBT to the bottom of the list)

EOBTEOBT

Dep listDep list----------C/ETOT----------C/ETOT----------C/ETOT----------C/ETOTSOBT------------SOBT------------

Dep listDep list----------C/ETOT----------C/ETOT----------C/ETOT----------C/ETOTSOBT------------SOBT------------

New ProcessNew Process (TOBT-(TOBT-

2Hrs.!!!)2Hrs.!!!)

New ProcessNew Process (TOBT-(TOBT-

2Hrs.!!!)2Hrs.!!!)

Focus on Focus on take off to take off to

Update Update SequenceSequence

Focus on Focus on take off to take off to

Update Update SequenceSequence

Page 26: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 26

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

BRUBRUBRUBRU

BCNBCNBCNBCN

CFMUCFMUCFMUCFMU

NEW CTOT (IF -2 Hrs. FROM COBT)NEW CTOT (IF -2 Hrs. FROM COBT)NEW CTOT (IF -2 Hrs. FROM COBT)NEW CTOT (IF -2 Hrs. FROM COBT)

HANDLINGHANDLINGHANDLINGHANDLING

MVT (DEP)MVT (DEP)MVT (DEP)MVT (DEP)

NEW ETOTNEW ETOT

COBTCOBT

Dep listDep list----------C/ETOT----------C/ETOT----------C/ETOT----------C/ETOTSOBT -----------SOBT -----------

Dep listDep list----------C/ETOT----------C/ETOT----------C/ETOT----------C/ETOTSOBT -----------SOBT -----------

USEUSE DEPARTURE MESSAGE FROM DEPARTURE MESSAGE FROM OUTSTATION FOR ACUARATE OUTSTATION FOR ACUARATE

UPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES

USEUSE DEPARTURE MESSAGE FROM DEPARTURE MESSAGE FROM OUTSTATION FOR ACUARATE OUTSTATION FOR ACUARATE

UPDATE OF TIME ESTIMATESUPDATE OF TIME ESTIMATES

COSTCOST COBT (TOBT)COBT (TOBT)

PROCESS PHASES.-PROCESS PHASES.- PROCESS PHASES.-PROCESS PHASES.-

UpdateUpdate System System withwith in-in-flight flight datadata

UpdateUpdate System System withwith in-in-flight flight datadata

COSTCOST TOBTTOBT ETOTETOT

Page 27: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 27

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

BRUBRUBRUBRU

BCNBCNBCNBCN

CFMUCFMUCFMUCFMU

HANDLINGHANDLINGHANDLINGHANDLING

MVT (DEP) ?MVT (DEP) ?MVT (DEP) ?MVT (DEP) ?

Dep listDep list----------C/ETOT----------C/ETOT----------C/ETOT----------C/ETOTSOBT -----------SOBT -----------

Dep listDep list----------C/ETOT----------C/ETOT----------C/ETOT----------C/ETOTSOBT -----------SOBT -----------

PROCESS PHASES.-PROCESS PHASES.- PROCESS PHASES.-PROCESS PHASES.-

SetSet 1st1st in-flight in-flight

data data warningwarning

!!

SetSet 1st1st in-flight in-flight

data data warningwarning

!!Check for Check for airborne airborne

updates at updates at EOST – 30´EOST – 30´

Check for Check for airborne airborne

updates at updates at EOST – 30´EOST – 30´

SACTA ?SACTA ?SACTA ?SACTA ?

Page 28: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 28

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

OBTAINOBTAIN (XTTA)(XTTA) Time of Turn Time of Turn Around fromAround from HANDLING HANDLING

&/OR Airline &/OR Airline

CTOT (NEW)CTOT (NEW)CTOT (NEW)CTOT (NEW)

TWRTWRTWRTWR

BCNBCNBCNBCN

CFMUCFMUCFMUCFMU

- HANDLING- HANDLING- Airline- Airline

- HANDLING- HANDLING- Airline- Airline

ETOT (NEW)ETOT (NEW)

Final ATCFinal ATC- SID- SID- WAKE- WAKE- Taxi- Taxi

Final ATCFinal ATC- SID- SID- WAKE- WAKE- Taxi- Taxi

COBTCOBT

FINALFINAL ATCATC IMPACT INTO THE IMPACT INTO THE SEQUENCESEQUENCE (DUE TO TAXI-TIME, (DUE TO TAXI-TIME, WAKE VORTEX & SID)WAKE VORTEX & SID)

PROCESS PHASES.-PROCESS PHASES.- PROCESS PHASES.-PROCESS PHASES.-

Ground Ground tuningtuning phasephase

Ground Ground tuningtuning phasephase

Improved take-Improved take-off listoff list sorted sorted

by TOBTby TOBT

Improved take-Improved take-off listoff list sorted sorted

by TOBTby TOBT

Departure ListDeparture List----------C/ETOT----------C/ETOT----------C/ETOT----------C/ETOTSOBT----------SOBT----------

Departure ListDeparture List----------C/ETOT----------C/ETOT----------C/ETOT----------C/ETOTSOBT----------SOBT----------

Dep`ListDep`List--------------TOBT--------------TOBT--------------TOBT--------------TOBT------ETOT--------------ETOT-------------ETOT------------ETOT-------

SOBT ----------------- SOBT -----------------

Dep`ListDep`List--------------TOBT--------------TOBT--------------TOBT--------------TOBT------ETOT--------------ETOT-------------ETOT------------ETOT-------

SOBT ----------------- SOBT -----------------

ETTA (ETTA (Estimated Estimated Time Time of of Turn Turn

Around)Around)

ETTA (ETTA (Estimated Estimated Time Time of of Turn Turn

Around)Around)

Page 29: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 29

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

FINAL SORTING BYFINAL SORTING BY TTOBTOBT (PUSH-BACK)(PUSH-BACK)

TWRTWRTWRTWR

BCNBCNBCNBCN

CFMUCFMUCFMUCFMU

- HANDLING- HANDLING- Airline- Airline

- HANDLING- HANDLING- Airline- Airline

Push-BackPush-Back---------TOBT---------TOBT---------TOBT---------TOBT---------TOBT---------TOBT

Push-BackPush-Back---------TOBT---------TOBT---------TOBT---------TOBT---------TOBT---------TOBT

Final ATCFinal ATC

- SID- SID- WAKE- WAKE- Taxi- Taxi

Final ATCFinal ATC

- SID- SID- WAKE- WAKE- Taxi- Taxi

PROCESS PHASES.-PROCESS PHASES.- PROCESS PHASES.-PROCESS PHASES.-

Develop Develop Push Back Push Back SequenceSequence

Develop Develop Push Back Push Back SequenceSequence

SET BOARDINGSET BOARDING WARNING!! WARNING!! 20´ BEFORE 20´ BEFORE TTOBTOBT

DETECTDETECT DOARS CLOSEDDOARS CLOSED

Dep`ListDep`List--------------TOBT--------------TOBT--------------TOBT--------------TOBT------ETOT--------------ETOT-------------ETOT------------ETOT-------

SOBT ----------------- SOBT -----------------

Dep`ListDep`List--------------TOBT--------------TOBT--------------TOBT--------------TOBT------ETOT--------------ETOT-------------ETOT------------ETOT-------

SOBT ----------------- SOBT -----------------

ETTA (ETTA (Estimated Estimated Time Time of of Turn Turn

Around)Around)

ETTA (ETTA (Estimated Estimated Time Time of of Turn Turn

Around)Around)

Page 30: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 30

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

NEXT STEPS.-NEXT STEPS.- NEXT STEPS.-NEXT STEPS.-

REFINE USERS REQUIREMENTSREFINE USERS REQUIREMENTS

Development of data baseDevelopment of data base

New business processesNew business processes

ESTABLISH A PERFORMANCE INDICATOR SYSTEMESTABLISH A PERFORMANCE INDICATOR SYSTEM Outcome indicatorsOutcome indicators

Performance DriversPerformance Drivers

DESIGN IMPLEMENTATION PLANDESIGN IMPLEMENTATION PLAN

Technical trials (off line)Technical trials (off line)

Operational trialsOperational trials

LAUNCH THE APPLICATIONLAUNCH THE APPLICATION

CHECK FOR RESULTSCHECK FOR RESULTS

CLOSE THE FEEDBACK LOOPCLOSE THE FEEDBACK LOOP

REFINE USERS REQUIREMENTSREFINE USERS REQUIREMENTS

Development of data baseDevelopment of data base

New business processesNew business processes

ESTABLISH A PERFORMANCE INDICATOR SYSTEMESTABLISH A PERFORMANCE INDICATOR SYSTEM Outcome indicatorsOutcome indicators

Performance DriversPerformance Drivers

DESIGN IMPLEMENTATION PLANDESIGN IMPLEMENTATION PLAN

Technical trials (off line)Technical trials (off line)

Operational trialsOperational trials

LAUNCH THE APPLICATIONLAUNCH THE APPLICATION

CHECK FOR RESULTSCHECK FOR RESULTS

CLOSE THE FEEDBACK LOOPCLOSE THE FEEDBACK LOOP

Page 31: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 31

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

WHEN ?WHEN ? WHEN ?WHEN ?

Page 32: Page 1 IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM TIM/8 November 1 st 2001 BARCELONA AIRPORT CDM PROJECT.

Page 32

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

IMPROVEMENT OF BARCELONA AIRPORT OPERATIONS THROUGH CDM

TIM/8 November 1st 2001

COLLABORATIVE

PRE-DEPARTURE

PROCESS

COLLABORATIVE

PRE-DEPARTURE

PROCESS

THANKS FOR YOUR

ATTENTION

THANKS FOR YOUR

ATTENTION