7 facts you probably didn’t know about us:
1. Thought Leadership 2. Track Record 3. Expertise 4. Knowledge Transfer 5. Insight 6. Capacity 7. Credentials
Hover over the titles above to show more information
Hover over the titles above to show more information
Benefits of using P3M3
Maturity level Reliable P3M
baseline
Integrated assurance
Recognises achievements
Accepted maturity
level
Comparison of
capabilities
ACPs
Continual progression
Focus on the organisation
Objective assessment
Investment justification
Validation provided
Service quality
Reduces costs
Baselines Benchmarks
Discovering Diagnostics
Prioritising Certification
Hover over the titles in the diagram to show more information
P3M3
Portfolio Management
Programme Management
Project Management
Control Benefits Finance StakeholderRisk Governance Resources
Hover over the titles in the diagram to show more information
It generally takes between 12 and 18 months to move up a maturity level and establish the organisation’s capability at that new level.There are no shortcuts up the maturity levels, though there are techniques that can be used to accelerate the movement through the lower levels. Ultimately the whole organisation and system may need to change and this takes time.
Level 1Awareness
Level 2Repeatable
Level 3Defined
Level 4 Managed
Level 5 Optimised
Level 0Unaware
Hover over the titles in the diagram to show more information
The P3M3 model is 3 dimensional including the 5 levels associated with CMMI1. It has 7 perspectives which are the main process groups associated with P3M. They exist within each of the 3 models and are the basis for reporting. The perspectives were added in the 2008 version.
In the 2015 version threads have been added. These are used to enable better systemic strengths and weaknesses that may be affecting all the perspectives. There are a minimum of 9 and up to 13 threads, depending on the scope of an assessment.
Hover over the Thread, Perspective and Level headings to reveal more information
Lack of control Poor process
Waste Low productivity
For more information [email protected]