P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

23
P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002 Keck AO Overview to support summit tour

description

Keck AO Overview to support summit tour. P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002. Keck AO Summit Visit. 10:30Arrive at summit Keck telescope summit visit: Acclimatize in lounge (10 min) K1 telescope optics (10 min) - PowerPoint PPT Presentation

Transcript of P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Page 1: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

P. Wizinowich & D. Le Mignantfor Keck AO Team

AOWG – June 6, 2002

Keck AO Overviewto support summit tour

Page 2: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Keck AO Summit Visit 10:30 Arrive at summit

Keck telescope summit visit: Acclimatize in lounge (10 min) K1 telescope optics (10 min) K1 AO enclosure (remove covers to look at AO bench components; demonstrate

driving components) + DSM + electronics room. (30 min) K2 dome floor laser room (20 min)

11:40 Lunch in K2 lounge 12:15 Resume tour

Break into three groups: (30 min) K2 laser room on elevation ring (only guide + 2 people at a time). PW

lead NIRC2 in K2 AO enclosure. NIRSPEC on right Nas platform.

Interferometer control room & lab (30 min) 13:20 Leave Summit

Page 3: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Keck II Left Nasmyth Platform

NIRC2

NIRSPECor Dual StarModule

ElevationRing

Enclosure withroof removed

ElectronicsRacks

AO Optics Bench

Rails to deck

NasmythPlatform

Page 4: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

AO Benc

h

Page 5: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

OBS Motion ControlScience Path:Image Rotator (ROT)Instrument fold (ISM)DSM fold (DFB)Filters (KFC)IR ADC (IDC,3)

Wavefront Sensor Path:Sodium dichroic (SOD)Field Steering Mirrors (FSM,4)Field Stop (FSS)Pupil Relay Lens (WPS)ND Filters (WND)Lenslet (WLS,2)Camera Focus (WCS)WFS Focus (FCS)

Tilt/Acquisition Path:Acquisition Fold (AFM)Acquisition Focus (AFS)Tilt Sensor Stage (TSS,3)Low Bandwidth Sensor (LBS,2)

Diagnostics:ND Filters (SND)Color Filters (SFS)Simulator/Fiber Positioner (SFP,3)

25 stages operational on K222 on K1

Digital I/O:White lightServo ampsEncoders

Page 6: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

AO Science Path

K1 ImageRotator

Tip/tiltMirror

DeformableMirror

OAP1

OAP2

IR Dichroic

To NIRC2

Page 7: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Wavefront Sensor Path

AOA Camera

AOA CameraVideo Display

Sodium dichroic/beamsplitterField Steering Mirrors (2 gimbals)

Camera Focus

Wavefront Sensor Focus

Wavefront Sensor Optics: field stop, pupil relay, lenslet, reducer optics

Page 8: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Acquisition Path

Camera optics:Field & Nikon lens

PXL Camera

Focus Stage

Beamsplitter/mirror

Fold mirror

Acquisition:plate scale = 0.125 arcsec/pixelfield = 2x2 arcmin

Diagnostics:Flip & move Nikon lensplate scale = 0.0078 arcsec/pixel

Page 9: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

LGS: Tip/Tilt & LBWF Sensors

X,Y,Z stages

Tilt Sensor& ND filter wheel

Low BandwidthWavefront SensorOpto-mechanics

Low noise PhotometricsCCD camera

Page 10: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Alignment, Calibration & Diagnostics

Wyko Phase ShiftingInterferometer:- mounted under bench looking at deformable mirror- also used for alignment

Pupil Simulator: - produces Keck telescope f/# & pupil location- pupil mask in collimated beam

Source Positioner:-selects between pupilsimulator, fiber & sky- fiber has 3 axes

Single mode fibers

Wyko video display

Page 11: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

First Laser Projection 12/01

Page 12: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

KECK

LA

S ER

Page 13: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Laser

Page 14: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Integration with Science Instruments

Name Date: 1st AO Light

Detector(# pixels & type)

Plate Scale(arcsec/pixel)

Spectral Resol’n

Notes

KCAM (UCLA)

Feb., 1999(K1 12/00)

256x256 NICMOS3

0.017 N/a Focus stage; 8-position external filter wheel; J,H,K’ internal filters

NIRSPEC(UCLA)

Feb., 2000 for spectra

1024x1024InSb

 

0.0185 low R0.013 high R

L=2000H=27000

10.6 magnification provided by 2

achromats on AO bench;to be replaced by

reflective optics this yearApr., 2000 for imaging

256x256 PICNIC for slit viewing

0.017 N/a

NIRC2(Caltech)

July, 2001 1024x1024InSb

0.01, 0.02 & 0.04

~5000 w/ grisms

Designed for AO system

Interferometer(JPL, CARA)

Mar, 2001 Hawaii     AO on both Kecks

AO Acquis’n Camera

Apr., 1999 1024x1024CCD Photometrics

0.0075 in high res mode

N/a Only tried once, normal=0.134”/pix

SHARC(UCLA)

2005? 1024x1024 Rockwell

0.017 N/a Multiple filters; cold pupil stop

OSIRIS(UCLA)

2005? 2048x2048 Hawaii2

0.02 to 0.1 per lenslet

380016x64

lenslets

OH-Suppression integral field spectrograph

Page 15: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Keck DSM: Initial Install

Primary M4

Secondary M4

Fold Mirror

Fold MirrorInconel Extraction

Beamsplitter

Visible Beamsplitter

Keck AOB

7’

5’

Page 16: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Keck Coude Train

Page 17: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Keck Basement

Page 18: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Keck Basement

Page 19: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Optics Bench Devicesobseng.

screen

wfceng.

screenAOA camera

Wavefront Controller

WFC: AOCP - CAS

AOsupervisory

control

Telescope DCS

IDL

Java User Interface

pro files

slk

autom.units

cshow

epics channels

SoftwareArchitect

ure

Page 20: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002
Page 21: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002
Page 22: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

OA

Tools

Page 23: P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002

Keck Io Video