P E R U P E R U Investments of Barrick in Perœ Toronto, March 2006

Transcript of P E R U - Intranetintranet2.minem.gob.pe/web/archivos/dgm/inversiones...PIERINA MINE Ł Located in...

  • P E R UP E R U

    Investments of Barrick in PerúToronto, March 2006

  • TABLE OF CONTENTS

    Barrick in Peru

    Pierina Mine

    Lagunas Norte Mine

    Environmental Protection and Community Programs

    Conclusions

    P E R UP E R U

  • BARRICK IN PERU

    1993-1994 Barrick becomes active in Peru; Minera Barrick Misquichilca S.A. was constituted as a company 1996 - Acquired Arequipa Resources, owner of the Pierina exploration project advances 1997 - The EIA for Pierina was approved Operations began in 1998 2001 - MBM was awarded the bid regarding the Alto Chicama Concession 2004 - The EIA for Alto Chicama Lagunas Norte was approved Q-2 2005 Production began at Lagunas Norte.

    P E R UP E R U

  • LIMA

    Trujillo

    Pacific Ocean

    Cajamarca

    Arequipa

    Huamachuco

    HuarazPierina

    Alto Chicama

    Barrick in Peru

    areaenlarged

  • PIERINA MINE

    Located in the Ancash Region

    Open-pit mine Average remaining grade

    1.00 grams per tonne Production to date:

    Crushing capacity: 42,000 tonnes per day

    Total tonnes per day: 140,000

    P E R UP E R U

  • LAGUNAS NORTE

    Located in the La Libertad Region

    Open-pit mine Average grade 1.25 grams

    per tonne Production to date:

    Crushing capacity: 63,000 tonnes per day

    Total tonnes per day: 100,000

    P E R UP E R U

  • BARRICKS CONTRIBUTION TO THE REGION AND THE COUNTRY

    Gold is the countrys N° 1 export Peru is now the largest producer in South America

    and ranks 5th in the world thanks in part to Barrick´s Pierina and Lagunas Norte mines

    The company has paid over $220 million in various taxes

    Capital asset investments: $280 million to build Pierina, $340 million to build Lagunas Norte, and further sustaining capital

    Approximately $38 million in taxes will be returned to the regions based on the 2005 results

    P E R UP E R U

  • PIERINA MINE

    P E R UP E R U

  • PIERINA MINEP E R UP E R U

  • PIERINA MINEP E R UP E R U

  • PIERINA MINEP E R UP E R U

  • PIERINA LEACH PAD

    Environmental Panel

  • PIERINA PONDS

    Sediment PondCollection Pond

    Polishing Pond

  • PIERINA COLLECTION POND

  • PIERINA POLISHING POND

  • LAGUNAS NORTE / ALTO CHICAMA

    P E R UP E R U

  • Lagunas Norte ProjectLagunas Norte ProjectAlto Chicama DistrictAlto Chicama District

    Located in the District of Quiruvilca, in Santiago de Chuco,La Libertad province

    Barrick has been exploring it since 2001 It was awarded the public bid in January 2001 It belonged to Centromin Peru Similar in size and cash cost structure to Pierina Capital investment: $340 million Life of Mine: At least 10 years Reserves calculated at 8.3 million ounces of gold The Lagunas Norte-Alto Chicama process is similar

    to the one in Pierina

    P E R UP E R U

  • LAGUNAS NORTE-ALTO CHICAMA

    LAGUNAS NORTE-ALTO CHICAMA

    Trujillo

    Huamachuco

    Alto Chicama

    Lagunas Norte

    Otuzco

    Palla

    Trujillo

    Casca

    Julcan

    Cajabamba

    Sanchez Carrión

    Santiago de Chuco

    Ascope

    Viru

    0 10 20 Kilometers

    N

    Located in La Located in La Libertad, between Libertad, between the provinces of the provinces of OtuzcoOtuzco and Santiago and Santiago de de ChucoChuco, 4,100 , 4,100 meters above sea meters above sea levellevel

    The camp is located in The camp is located in QuiruvilcaQuiruvilca, at km. 132 , at km. 132 of the Trujillo of the Trujillo HuamachucoHuamachuco roadroad

    P E R UP E R U

  • LAGUNAS NORTEP E R UP E R U

  • LAGUNAS NORTEPANORAMIC VIEWP E R UP E R U

  • LAGUNAS NORTE - OPERATIONS

    PRIMARY CRUSHER SECONDARY CRUSHER

  • LAGUNAS NORTE OPERATIONSCONVEYOR BELT

  • LAGUNAS NORTE OPERATIONSLEACH PAD PHASE 0

  • LAGUNAS NORTE OPERATIONSLEACH PAD PHASE 1

  • LAGUNAS NORTE OPERATIONSPROCESS PLANT

  • LAGUNAS NORTE OPERATIONSSMELTING

  • ENVIRONMENTALPROTECTION AND

    COMMUNITY PROGRAMS

    P E R UP E R U

  • PIERINA ENVIRONMENTAL PROTECTION / PRACTICESP E R UP E R U

  • Erosion Control

    PIERINA ENVIRONMENTPIERINA ENVIRONMENTDRAINAGE IMPROVEMENT FOR DRAINAGE IMPROVEMENT FOR

    EROSION CONTROLEROSION CONTROLP E R UP E R U

    13.84 Km of erosion control structures (stone masonry and gabions)

    23 Km of erosion control structures in ravines (sedimentation ponds, stone masonry and gabions, etc.)

  • PIERINA CONCURRENT RECLAMATION

    1. Earth movement

    2. Reshaping of slopes

    3. Soil Compacting

    4. Top soil covering5. Replanted area

    P E R UP E R U

  • PIERINA - ENVIRONMENTAL PROTECTION

    Wastedumprecovery

    Remediation

  • PIERINA SOCIAL INVESTMENT

    Housing and School

    P E R UP E R U

    Houses at Mataquita

  • PIERINA SOCIAL INVESTMENT

    Irrigation

    P E R UP E R U

    Pastures

  • PIERINA SOCIAL INVESTMENTCATTLE RAISING

    Agriculture

    P E R UP E R U

  • PIERINA SOCIAL INVESTMENT

    Agriculture

    P E R UP E R U

  • LAGUNAS NORTE ENVIRONMENTEROSION CONTROL

  • LAGUNAS NORTE ENVIRONMENTAL PROTECTION

    747 sedimentation dikes with gabions and stone masonry and 27.7 km of silk fences

    P E R UP E R U

  • LAGUNAS NORTE ENVIRONMENTAL PROTECTION

    Sediment flows are controlled in the areas below the mine

    P E R UP E R U

  • Reclamation Areas

    Sediment containment terraces below the slopes

    P E R UP E R U

    LAGUNAS NORTE ENVIRONMENTAL

    PROTECTION

  • LAGUNAS NORTE LAGUNAS NORTE ENVIRONMENTALENVIRONMENTALCHUYUGUAL TREE NURSERYCHUYUGUAL TREE NURSERY

    Local workers build Local workers build the terraces to plant the terraces to plant quenualesquenuales and pines and pines

    seedlingsseedlings

    P E R UP E R U

    Capacity for 200,000 trees per year

  • Top soil StockpileTop soil Stockpile

    LAGUNAS NORTE ENVIRONMENTLAGUNAS NORTE ENVIRONMENTTOP SOIL STRIPPING AND TRANSFER TOP SOIL STRIPPING AND TRANSFER

    CONTROLCONTROL

    Top soil accumulations before Top soil accumulations before its final transfer to stockpiles.its final transfer to stockpiles.

    P E R UP E R U

  • BUILDING TERRACES

    LAGUNAS NORTE ENVIRONMENTCOMMUNITY NURSERY AT LOS LOROS

    SEEDLINGS

    40 COMMUNITY MEMBERS BENEFIT FROM THIS PROJECTPROGRAMMED GOAL: 30.000 FOREST PLANTS

    24 HECTARES WILL BE PLANTED AS ARESULT OF THIS PROJECT

  • LAGUNAS NORTE - ENVIRONMENTTREE NURSERIES

    QuenualesQuenuales and pines seedlingsand pines seedlings

  • LAGUNAS NORTE ENVIRONMENTWATER MONITORING WITH COMMUNITY

    REPRESENTATIVES

  • LAGUNAS NORTE ENVIRONMENT

  • LAGUNAS NORTE SOCIAL INVESTMENT

    IMPROVEMENT OF THE PONCE ROAD ( 8,5 KM )EL SAUCO COMMUNITY

    65 Families will benefit from this work

    P E R UP E R U

    Participative Meeting with community

    Meeting with authorities to verify route

  • IRRIGATIONIRRIGATION

    GRAZINGGRAZINGPASTURE CUTTINGPASTURE CUTTING

    PREPARING THE LANDPREPARING THE LAND

    LAGUNAS NORTE SOCIAL INVESTMENT

    MODEL FARM AT EL SAUCO

  • LAGUNAS NORTE SOCIAL INVESTMENTWHEAT SOWING

    PREPARING THE GROUND

    READY FOR HARVESTINGMATURING PROCESS

    SOWING THE WHEAT

    10 FAMILIES WILL DIRECTLY BENEFIT FROM THIS PROJECT

  • 3 CLASSROOMS WERE BUILT AT SANAGORAN

    AFTER

    BEFORE

    80 STUDENTS WILL BENEFIT FROM THIS PROJECT

    LAGUNAS NORTE SOCIAL INVESTMENT

  • HEALTH CAMPAIGNS

    LAGUNAS NORTE SOCIAL INVESTMENT

  • TEXTILES AND LOOMS

    COMMUNITY MEETING

    CHUYUGUAL WOMEN

    SHOWING THEIR WEAVING SKILLS

    P E R UP E R U

    LAGUNAS NORTE SOCIAL INVESTMENT

  • LAGUNAS NORTE SOCIAL INVESTMENTIMPROVEMENT OF THE POTABLE WATER SYSTEM

    PAMPA VERDE

    COVERING THE MAIN PIPELINEVERIFICATION OF DELIVERY

    OF THE POTABLE WATER

    STUDENTS, TEACHERSAND MBM TECHNICIANS

  • LAGUNAS NORTE SOCIAL INVESTMENTFARM TRAINING PROGRAM

    EXPERIMENTAL FARMINGPilot Program GUINEA PIG FARMS

  • LAGUNAS NORTE SOCIAL INVESTMENTCAREER ORIENTATION FAIR - HUAMACHUCO

  • CONCLUSIONS

    P E R UP E R U

  • Barrick has been in Peru for 14 years We have has successfully participated in privatization

    processes We have been able to obtain two tax stability

    agreements one for each property. Both tax stability agreements have been respected in full

    On-going operations since 1998 Second operation started in Q-2 2005 We have invested an average of $6 million in exploration

    during the last 6 years Our investment to date in the country: $700 million

    P E R UP E R U

  • COUNTRY ADVANTAGES

    Great mining potential Good macro economic standing Country has long mining tradition, thus has

    qualified workers Exports have duplicated in one year Transparent, comprehensive and balanced

    permitting process Favorable balance of payment Legal and fiscal transparency and stability

    P E R UP E R U

  • P E R UP E R U

    Investments of Barrick in PerúToronto, March 2006