“Promoting Traditional Build”
Concrete Blocks
Topics to cover
Supply
Thermal Bridging – CBA Details
Sustainability
…then lunch
The Market
Govt. InitiativesResponse
Capacity
How can manufacturers respond?
• Re-open moth balled plants
• Extended Working Hours
• Speed-up curing regimes
• Build winter stock levels
The Market
Its not rocket science!!
It’s a concrete block
The Market
The Market
New Output
Concrete Blocks
Topics to cover
Supply
Thermal Bridging – CBA Details
Sustainability
Concrete Blocks
Are greener than you may think
• Cements Content only 9% *1
• 19% of above are ‘alternative’cement’s
• Aggregates are often ‘surplus’ dust from quarries
• Blocks can be 100% recycled aggregate
*1 WRAP Resource Efficiency Action Plan
Concrete Blocks
• Embodied Energy 6Kg CO2 /t blocks *2
That is 7 times less than softwood
That is 30 times less than steel
That is 40 times less than plastic
*2 Uni. Bath Inventory of Embodied Energy 2008 (Excludes Calorific Value of wood)
Are greener than you may think
Concrete Blocks
• Manufacturing waste is re-used (WRAP)
• Energy used in manufacture only 21kW.hrs/t
• Less than 2% wastage on site
• Delivery average 60 miles from 100 plants across the UK
Are greener than you may think
• CO2 Footprint does not need to measured
from the Port of entry
Localism
Local Supply
Local Plant
Local Materials
Local Labour
So why Concrete Blocks?
Off the shelf
Ease of use
BRE Green Guide A / A+Recyclable on site to granular
Traditional
Known Practice
Building Reg Compliant
Competitive build costMade locally
Concrete Blocks
Topics to cover
Supply
Thermal Bridging – CBA Details
Sustainability
Thermal Bridging
What is it?
Thermal Bridging
Thermal Bridging
Is it significant?
Who does it?
Window and door jambs
Window and door lintels
Window SillsParty wall junction
Eave / wall junction
Corner
Thermal Bridging
Gable Wall Junction
Ground Floor / Wall
Ground Floor / Party wall
Intermediate Floor / wall
Ceiling / Party Wall
Thermal Bridging
1
Calculating the Y value
• Total Building Envelope
• Length of Junction
• Psi Value (Ψ)
Thermal Bridging
SAP 2009
Table K 1
Thermal Bridging
Part L1a Analysis
End &
Mid Unit
Y = 0.053Y = 0.0788 / 0.0722
Part L1a Analysis
Part L1a Analysis
Part L1a Analysis
APA www.constructivedetails.co.uk
CBA www.cba-blocks.org.uk
Register to receive detailsAny Questions?