PROJECT TITLE

1IMPLEMENTATION OF PID CONTROLLER USING SCADA SYSTEMSMuhammad Owais khanRana sharjeel ahmedSadaf sheeraz

2

PROJECT SUGGESTED BY: ZEE ENTERPRISES

2Scheme of PresentationOBJECTIVE & SCOPE

BLOCK DIAGRAM

METHODOLOGY

COMPONENT LIST

CONCLUSION

3Objective & Scope of ProjectBasically our project is consist of two Parts:

i): Designing Of a Trainer (We are designing an Industrial Automation Trainer For BAHRIA UNIVERSITY).

ii): Gas Booster Plant. (Which is Implementation Of PID Controller and a practical use of our Trainer).

44 i) Energy Monitoring. Following Electrical Data Will Be Monitored Remotely.

Line to Line Voltages.Line to Neutral Voltages.Line Current.Apparent, Active And Reactive power Trend Of All Parameters.Total Active Energy / Reactive Energy.Power Factor.Frequency.

5Objective & Scope of Project

62. Remote Monitoring Of VFD.Our HMI Program Will Be Able To Remotely Monitor The Important Parameters Of VARIABLE FREQUENCY DRIVE (VFD).3. Remote Motor Controlling.Our System will be able to Start/Stop Motors and save the History of Motors that how many times our Motor stopped and what were the Reasons. Objective & Scope of Project7Objective & Scope of Project4. P.I.D Application.Our Main Application is to design a PID Controller Using PLC And Control it Remotely Through HMI. For This Purpose, we are designing a prototype of GAS BOOSTER Plant.

This Plant will Automatically Boost the pressure if and only if the pressure of gas goes below than our required pressure. And when the system meets the required pressure, the system will automatically off. We will also interface this Plant to SCADA system to set the required pressure remotely and for monitoring purpose.Block Diagram8

89Methodology

SCADA TRAINERGAS BOOSTER PLANTProject ProgressWe have Successfully completed seventy (70) % of our work and we are hopeful to complete all of our work on 15th 20th April to take part in Exhibition which is expected to be held on 26th April.1010Project Timeline11TASK STATUSEXPECTED PLC PROGRAMMINGCOMPLETEDHMI PROGRAMMINGCOMPLETEDTRAINER DESIGNINGCOMPLETEDPLANT DESIGNINGCOMPLETEDINSTALLTION OF EQUIPMENTSNOT COMPLETED08-Apr-15WIRING OF TRAINER & PLANTNOT COMPLETED12-Apr-15TESTINGNOT COMPLETED15-Apr-15REPORT WRITINGNOT COMPLETED10-May-15

Project Costing12DESCRIPTIONQTY.RATETOTAL HMI 7" with Ethernet KINCO12500025000PLC K506EA-30AT KINCO14700047000Frequency Inverter 0.75Kw, 380V11850018500Energy Analyzer PD194E-9S411220012200Pressure Sensor11200012000Hooter110001000Bacon Light 220v310003000CT 30/5 Amp312203660CT Push Button3400400Emergency Push14504502A SP MCB24208406A TP MCB1750750Panel And Plant21000010000134,800

Project Photographs13