OHIO DEPARTMENT  OF MEDICAID 

 

  

ADVANCED DATA ANALYTICS TOOL (ADAT)      

0A1260 – SUPPLEMENT ONE: SCOPE OF WORK  

    

1

Page 2: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Contents1. Overview of ADAT (Advanced Data Analytics Tool)....................................................................4

2. Project Organization and Staffing Requirements.........................................................................5

2.1. Project Staffing..................................................................................................................................5

2.2. Support Requirements (Use of State Staff)...................................................................................5

2.3. Key Roles...........................................................................................................................................6

2.4. ODM Staff............................................................................................................................................8

2.5. Proposed Work Plan and Schedule...............................................................................................9

3. Requirement Response Instructions............................................................................................10

4 Global Criterion #1 - Functional Requirements...........................................................................11

ADAT System Requirements (Program Reporting)...........................................................................11

4.2. Clinical and Health Metrics - Functional Requirements.............................................................14

4.3. Additional Functionality..................................................................................................................14

5. Global Criterion #2 - Technical Requirements............................................................................15

5.1. Systems and Application................................................................................................................15

5.2. Technical Services..........................................................................................................................20

5.3. Data Management..........................................................................................................................21

5.4. User Interface..................................................................................................................................22

5.5. Security............................................................................................................................................23

5.6. Privacy..............................................................................................................................................29

5.7. User Documentation.......................................................................................................................32

5.8. Reporting and Analytics.................................................................................................................34

5.9. OME Integration..............................................................................................................................36

6. Global Criterion #3 - Implementation Requirements..................................................................37

6.1. Project Management......................................................................................................................37

6.2. Testing..............................................................................................................................................42

6.3. Training............................................................................................................................................47

6.4. CMS Certification............................................................................................................................49

7. Global Criterion #4 - Maintenance and Operations Requirements..........................................49

7.1. Maintenance and Operations........................................................................................................50

7.2. Business Continuity/Disaster Recovery.......................................................................................51

8. Global Criterion #5 – Experience..................................................................................................57

2

Page 3: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

9. Summary of Deliverables...............................................................................................................58

TABLE OF FIGURES Figure 1 – Modernized OMES Claims Processing Flow Diagram4 Figure 2 – Claim Status and Eligibility Inquiry Processing Flow5 Figure 3 – Incident Priority Matrix20  

TABLE OF TABLES Table 1 – Monthly EDI Transaction Volumes3 Table 2 – Required Key Roles9 Table 3 – ODM Key Roles & Responsibilities11 Table 4 – EDI Standards and Compliance Requirements15 Table 5 – Translation Processing Requirements17 Table 6– Trading Partner Management Requirements19 Table 7 – Systems and Application Requirements22 Table 8 – Technical Services Requirements27 Table 9 – Data Management Requirements29 Table 10 – User Interface Requirements31 Table 11 – Security Requirements33 Table 12 – Privacy Requirements42 Table 13 – User Documentation Requirements45 Table 14 – Reporting and Analytics Requirements47 Table 15 – OMES Integration Requirements49 Table 16 – Project Management Requirements54 Table 17 – Testing Requirements59 Table 18 – Training Requirements65 Table 19 – CMS Certification Requirements67 Table 20 – Maintenance & Operations Requirements68 Table 21 – Business Continuity/Disaster Recovery Requirements71 Table 22 – Compliance Requirements77 Table 23 – High-level Project Task Groups and Descriptions80 Table 24 – Project Deliverables with Descriptions, by Task Group81 

3

Page 4: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

1. Overview of ADAT (Advanced Data Analytics Tool)  The Ohio Department of Medicaid (ODM)  seeks the services of a Contractor(s) experienced in health care analytics through this procurement. Ohio’s approach to implementing a modernized Ohio Medicaid Enterprise System (OMES) is the phased implementation and sustained operation of modular systems supporting the business operations of  the Ohio Medicaid Enterprise (OME),  consisting of ODM, the Sister  State  Agencies,  and other  Business  Associates.     The  Ohio  Department  of  Medicaid   seeks  an Advanced Data Analytics Tool as a “Software as a Solution” (SaaS) to provide the required functionality as specified in this RFP. This solution is based upon data governance principles, including:

The system architecture provides for a person-centric analysis;  The process of data acquisition from business partners is coupled with data integrity practices to 

address data quality issues as a standard improvement practice;  The Data Warehouse is strategically developed as a shared solution that allows a multi-agency 

building process;  The Data Warehouse is designed to be ‘tool agnostic’ allowing multiple tools to produce the 

same, consistent result; and All analytic tools use the ODM Enterprise Data Warehouse for a ‘Single Source of Truth’. 

To meet the different informational needs of various parts of the organization, an information system must be a coordinated and collaborative set of databases and tools.   This Supplement One will allow MCD to acquire a solution which focuses on the following reporting functions: 

Pre-aggregated Reporting: A summary data mart with a reporting tool for quick response on up to 15 dimensions by month (both date of service and date of payment must be available).   

Quality  Improvement Analytics:  Ability to summarize on various NCQA / HEDIS metrics and other nationally adopted health care improvement measures (such as CMS Adult  and Child Core Set). 

Provider Summaries: The ability to aggregate and compare similar types of providers.   Recipient Histories: A claims history for recipient must be available. Ad   Hoc   Query:   The   solution  must   include   a   user-friendly   tool   (not   requiring   significant 

programming   experience)   which   allows   individuals   to   create   their   own   reports,   subsets, extracts, etc.

Additionally, based upon the selected solution from this RFP, ODM may acquire staffing to support each analytic tool, including training, on-site assistance, data integrity monitoring, project analytic assistance, and Honest Broker services.  This acquisition process is separate from this RFP.

4

Page 5: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

2. Project Organization and Staffing Requirements The Contractor must maintain staffing strategies that ensure all requirements and service levels in the RFP are met to the satisfaction of the State. The Offeror must designate key personnel that Ohio deems both instrumental and essential to the successful performance of all RFP requirements. 

The Offeror must provide proposed organization charts  for  implementation and maintenance stages showing both the Offeror’s staff and their relationship to State staff that will be required to support the project. The organization chart must denote all key roles for this project and include a summary of each key member’s high-level responsibilities. <Response>  

2.1. Project Staffing  The Contractor must provide the necessary staffing to meet the Contract requirements, deliver quality services and satisfy Service Level Agreements (SLAs). Offerors must propose an initial Staffing Plan that meets all the requirements for staffing in the RFP Base and Supplement One. The Staffing Plan must provide details of how the Offeror will staff the ADAT project, including hours, numbers and types of personnel, and anticipated use of State project resources. <Response>  

2.2. Support Requirements (Use of State Staff) The Offeror must describe the required staffing of business and technical resources that the State will be expected to provide to support the creation of all deliverables and other project tasks. Specifically, the Offeror must address the following: 

Nature and extent of State support required in terms of staff roles, and percentage of time available; 

Assistance from State staff and the experience and qualification levels required;  Staffing for both implementation and maintenance and operations phases’ and  Other support requirements.

The State may not be able or willing to provide the additional support the Offeror lists in this part of its Proposal.   The   Offeror,   therefore,   must   indicate   whether   its   request   for   additional   support   is   a requirement   for   its  performance.   If  any  part  of   the   list   is  a   requirement,  the  State may reject   the Offeror's proposal, if the State is unwilling or unable to meet the requirements. <Response>  

5

Page 6: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

2.3. Key Roles  Table 2 below provides an example list of key roles that ODM requires for a successful implementation of   the   solution   and   ongoing   operations.   Minimum   qualifications,   experience,   and   primary responsibilities are provided for each role. ODM recognizes that one person may be assigned to multiple key roles. ODM reserves the right to approve all personnel assigned to this Contract. 

During the life of the Contract, any changes proposed to key roles must be accompanied by an updated Staffing Plan, associated resumes, references, and assumptions. The Contractor may propose staffing changes at any time, but any proposed changes are subject to ODM review and approval as required by the Replacement Personnel terms in the RFP. 

The Offeror is expected to add or modify key roles as deemed appropriate and is expected to explain why the key roles  in  its response will  best support a successful  implementation of the solution and ongoing operations. The Offeror must provide resumes and professional references demonstrating the qualifications of the candidate performing the responsibilities identified for the role.  

Table 2 – Required Key Roles Role Responsibilities Qualifications Contract or Account Manager 

Ensures Key Performance Indicators (KPIs) and deliverables are met;  

Has the authority to escalate and resolve implementation and operational issues to meet Contract expectations;  

Primary contact for:         Contract disputes.  Contractor Performance and Corrective 

Action Plans.   Contract Amendments.   Invoicing. 

None required 

Project Manager   Performs project management duties during service implementation or service upgrades including: 

Performs status reporting including performance measures. 

Proactively identifies and mitigates risks.  Manages issues, tracking response 

strategy and status.   Coordinates and integrates the work 

efforts and deliverables with the ODM PMO, ODM Contract Manager, and System Integrator. 

Manages, develops, and maintains processes related to OME system implementation, application configuration, data integration, prototyping, testing, and training. 

Enforces ODM’s change management and governance policies.

PMI Certified PMP   Demonstrate 

experience in implementing IT analytic solutions  

6

Page 7: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Operations Manager  Oversees, supports, and monitors day-to-day activities to ensure timely and effective execution; 

Coordinates maintenance activities with the ODM PMO and other impacted OME Project Managers; 

Authorizes when to escalate and resolve implementation and operational issues to meet Contract expectations; and

Reports on performance measures.

Demonstrate experience in solution operations  

Business / Subject Matter Expert 

Provides business impact analysis of all potential and accepted changes to ODM service configuration; and  

Interprets business requirements using interviews, document analysis, requirements workshops, business process descriptions, use cases, scenarios, business analysis, and workflow analysis to ensure successful implementation and configuration of ODM services.  

Demonstrate knowledge and experience working with health care metrics, federal health care reporting, HIPAA requirements, and data integrity processes  

Technical Lead  Understands the client’s systems and EDW architecture; 

Supports helpdesk inquiries with issue resolution; and 

Ensures Contractor deliverables, (e.g., product guides) are technically accurate.

Demonstrate experience with the implementation and maintenance of the proposed solution on projects of similar size and complexity 

Privacy and Security Officer (required if the solution stores ODM data off the Ohio DAS Data Network)

Provides results of independent security audit verifying the solution meets privacy and security requirements; 

Communicates status regarding plan of action to respond to identified security weaknesses; 

Reports all potential/actual breaches of security and/or HIPAA violations to ODM; and 

Partners with ODM Privacy and Security Officer in developing the incident response plans. 

Knowledge of NIST, FedRAMP and HIPAA privacy and security regulations and best practices  

References The Offeror must provide three (3) references for which each proposed key personnel candidate has successfully performed a similar role on a project(s) pertaining to the scope of work covered in this RFP. The name of the person to be contacted, phone number, client name, address, brief description of work, and date (month and year) of employment must be provided for each reference. These references must be able to attest to the candidate’s specific qualifications. The reference given must be a person within a client’s   organization   and   not   the   key   personnel’s   co-worker   or   a   contact   within   the   Offeror’s organization. <Response>  Resumes The Offeror must also include resumes of all proposed key roles in this section of the proposal. Each person identified in Table 2 of this section must be included in this section.  

7

Page 8: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Each resume must demonstrate the qualifications and experience relevant to the position proposed. Each resume must also include a work history cited under the Offeror’s corporate experience and the specific functions performed. <Response>   

2.4. ODM Staff 

Contractor staff will work in collaboration with ODM staff.  Table 3 provides a list of key ODM project personnel   anticipated   for   implementation   of   the   ADAT   solution   and   ongoing   operations.   The responsibilities presented are high-level and are not to be interpreted as all-inclusive. The Offeror must identify any additional State personnel needed to support module implementation or delivery of health care analytic and information services. 

Table 3 – ODM Key Roles & Responsibilities ODM Role Responsibilities PMO Project Manager 

Coordinates project management activities per direction from the OME PMO and the ADAT project team; 

Coordinates State resources and assignments;  Coordinates project management activities with the OME PMO;  Works collaboratively with the Project Manager;  Monitors day-to-day Design, Development, and Implementation (DDI) activities;  Provides project status reports; weekly, monthly, quarterly as required;  Facilitates the identification and response strategies for project risks and issues;   Ensures compliance with the project governance structure and OME policies and 

procedures; and Responds to requests for information or resolution of comments from the IV&V 

Contractor.PMO Business Analyst 

Assists the Project Manager in executing project management tasks;  Works collaboratively with Solution Project Manager and project staff;  Coordinates scheduling activities with stakeholders and project staff;  Assists with status reports;  Analyzes system requirements to determine adequacy with regard to OME needs; 

and  Reviews system documentation and other artifacts. 

Operations Manager  Supports the implemented solution activities from implementation through Contract close; 

Manages continued operations;   Monitors the services provided by the Contractor;  Oversees and supports day-to-day activities associated with the solution;  Works collaboratively with the OME PMO, solution Contractor, and OME or ODM 

staff and SMEs; and Manages ongoing risks and issues associated with the solution.

ADAT Analytic Lead  Takes responsibility for all activities, processes, and tasks associated with the management of the ODM ADAT;  

Collaborates with OME PMO Project Manager and Contractor Project Manager;  Provides insight and guidance to project leadership;  Responds to requests for information and questions presented by project 

8

Page 9: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

leadership; and  Participates in meetings, as necessary.

Solution Architect  Works collaboratively with the Contractor’s Solution Architect and other key project staff in the design, development, and deployment of the solution; 

Ensures OME needs for functionality are attained as reflected in the requirements for the solution; 

Establishes OME policies and procedures for the use and maintenance of the solution;  

Provides oversight for technology integration and data migration activities; and   Manages the daily technical operations including routine system maintenance and 

operation.Contract Manager  Oversees the delivery and execution of services as specified in the Contract; and 

Collaborates with Project Manager, Operations Manager and ADAT Analytic Lead to develop corrective action plans, if needed.  

Data Stream SMEs (Data Stewards)  

Provides assistance to the ADAT Analytic Lead;  Supports ODM analytic activities;  Participates in meetings, as necessary; and Responds to requests for information and questions from project staff.

2.5. Proposed Work Plan and Schedule Offerors must provide a detailed proposed Work Plan broken down by tasks and subtasks and a schedule for the performance of each task group included in each phase of the Contract.  

The task groups are listed in Table 23 of Section 9: Summary of Deliverables of this document. The schedule must allow ten (10) working days for State approval of each submission or re-submission of each deliverable. The Work Plan to be proposed must include all responsibilities, milestones, and deliverables outlined in the RFP, and must cover: 

Detailed tasks and timelines, outlining the major project phases planned by the Offeror; these must   include,   at   a  minimum,   the   timeline   and   tasks   associated   with   full   deployment   of functionality; 

A complete Work Breakdown Structure (WBS); Assigned persons and time duration for each task or subtask, showing Contractor personnel and 

State personnel separate work efforts; A network diagram showing the planned start and end dates for all tasks and subtasks indicating 

the interrelationships of all tasks and subtasks, and identifying the critical path; A Gantt chart, showing the planned start and end dates of all tasks and subtasks; Discussion of how the Work Plan provides for handling of potential and actual problems; and A schedule for all deliverables, providing a minimum of ten (10) working days of State review 

time for each item.<Response>  

9

Page 10: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

3. Requirement Response Instructions Offerors must provide a narrative overview to demonstrate a clear understanding of the scope of work and their ability to meet the requirements in the following sections. The following are instructions for completing the requirement responses. Within all the requirement tables below, the Offeror must self-assess the requirement type and then enter a Response Value in each Capability Assessment column.  

Requirement Types Requirement types referenced in this RFP include the following:  

Functional – Functional requirements of a solution.  Optional – A preferred functional requirement, but not required. Non-functional – Characteristics of the solution not related to specific business needs. Responsibility – Responsibilities of the Contractor throughout the contracted engagement.  Business Operations – Operational tasking of the Contractor.

Response Values The following are  Response Values  for each requirement  type.  Complete the Capability  Assessment column in the requirements tables using the following values:  

Functional values include: o “Standard Service”:   Requirement  must   be   fully  met  with   functionality   that   can   be 

presented for business use with minimal effort. This would include managing or creating new business rules or process flows via tools provided as part of the proposed solution.  

o “Unique Service”: Requirement will be met with functionality that can be presented for business use only after a new component or plug-in is developed. New components or plug-ins would be created in a programming or scripting language and leverage low-level application infrastructure such as API’s, messaging, integration technologies, or services to  exchange  data  or   execute   logic  within   the   solution.   This  would   also   include   any updates the Offeror would make to the core code as part of a future release or service pack. 

o “Not Supported”: Requirement  will   not   be  met   as   part   of   the   Offeror’s   proposed solution.

o Non-functional/Business Operations/Responsibility values are: o “Accept”: Offeror agrees to the requirement. o “Accept with modification”: Offeror agrees to meet the requirement but with a 

proposed modification. o “Not Supported”: Offeror declines to meet the requirement. Note: “Accept with modification” and “Not supported” responses to requirements must   be   documented   as   exceptions   in   the   respective   narrative   sections. Requirements  met   with   proposed  modifications  must   be   identified   by   specific requirement references as part of the Offeror’s response narrative. 

All requirements must contain one (1) of the values identified above. Any requirement without a Capability   Assessment response   value   will   be   considered   to   be  “Not Available”  or  “Not Supported” as appropriate for the requirement type. 

Rationales for self-assessments made by the Offerors are to be included as part of the narrative responses for this section. 

10

Page 11: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

4 Global Criterion #1 - Functional Requirements This  section provides the requirements,  which define the ADAT divided  into the business capability categories as outlined in the description of the Conceptual Module Architecture of the OMES in the RFP Base. 

The Offeror must provide a narrative overview to demonstrate a clear understanding of the scope of work  and   their   ability   to  meet   the   functional   requirements   in   this   section.  Offerors  must  use   the response   sections   below   to   provide   specific   details   of   the   proposed   approach   to   meeting   the requirements in each requirement category. 

ADAT System Requirements (Program Reporting) The State is seeking the services of a Contractor that can work with ODM as a business partner and trusted advisor.  Below are the requirements to be fulfilled by the Contractor.  

Table 4 – ADAT System Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

ADAT-010.000.010  The solution must be able to handle up to ten years of data (claims, eligibility, auxiliary data), with at least 75 million claims per year.

Functional  <Response> 

ADAT-010.000.020  The solution must closely utilize field naming conventions used from the source systems.

Non-functional  <Response> 

ADAT-010.000.030  The solution must be updated weekly to support near real-time reporting.

Functional  <Response> 

ADAT-010.000.040  The solution’s tools, methodologies, and technology must address speed, efficiency, and capacity issues with potentially 80 analysts accessing the system at the same time, with the expectation of calculating complex queries in real time.

Functional  <Response> 

ADAT-010.000.050  The solution must access the Enterprise Data Warehouse as a Single Source of Truth for consistent reporting across the Advanced Data Analytics Tool.

Functional  <Response> 

ADAT-010.000.060  Although extracts of data are not the preferred method of sharing data, the solution must allow extracts to be created.  The creation of such extracts must be recorded (code used, person performing, and date/time).

Functional  <Response> 

ADAT-010.000.065  In addition to extracts, the preferred method to share data would be for an API (application programming interface) to allow access by additional analytic tools or have the ability to write / create materialized views of the data which auto-refresh once the database is updated.

Functional <Response> 

11

Page 12: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

ADAT-010.000.070  The system must have the ability to share data with additional business intelligence tools (i.e. the tables can be accessed by SAS or R to do additional analytics without creating extracts / imports). 

Optional <Response> 

ADAT-010.000.080  The system must have the capacity to continually build, modify, and add new quality metrics and data sources.

Functional  <Response> 

ADAT-010.000.090  The system must be able to aggregate by various time periods (months, quarters, fiscal years, calendar years, etc) and by both Service Dates and Date of Payment.

Functional  <Response> 

ADAT-010.000.100  The system must be able to identify the most recent status of claim (present status of the claim after adjustments).

Functional  <Response> 

ADAT-010.000.110  The system’s tools, methodologies and technology must have the ability to be used in creative data visualization, including dashboards.

Optional  <Response> 

ADAT-010.000.120  System must meet State and Federal Security requirements (Encryption of data).

Functional  <Response> 

ADAT-010.000.130  Data must be secured by role-based access and encrypted at rest.

Functional  <Response> 

ADAT-010.000.140  System must have tools / reports which allow monitoring of the system during loads and operations.

Functional  <Response> 

 The Offeror  must  describe  its  proposed approach to  meeting each of  the requirements  above.  The narrative response for this category must be organized to successfully address all the requirements in the category. Any requirement not clearly addressed in the response may negatively affect the Offeror’s scoring. Any exceptions must be identified using specific requirement references. <Response>  

4.1. Claims and Eligibility Functions - Requirements  Program reporting capabilities must include the following: 

A Quick Access solution for standard organization metrics and questions;  Recipient and Provider Histories; Ad hoc querying across eligibility,  claims,  and provider dimensions (including subsetting and 

importing of lists); and Generating extracts.

Below are the requirements to be fulfilled by the Contractor.  

Table 5 – Translation Processing Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

ADAT-020.000.010  The solution must provide ‘quick access’ (response within 1 minute)  to information (a set of pre-aggregations) for up to 15 dimensions (e.g. provider types, service locations, program categories, diagnoses, age, county, fund code, etc.), time periods (e.g. date of 

Functional  <Response> 

12

Page 13: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

service, date of payment, monthly, yearly, etc), and metrics (payment, units of service, months of eligibility, etc.).

ADAT-020.000.020  The ‘quick access’ solution must include natural language processing queries (e.g. ‘Google-like’ searching parameters).

Optional <Response> 

ADAT-020.000.030  The solution must allow users to design and generate ad hoc reports (summaries and record details), including eligibility counts (unduplicated members, member months, average counts by various demographics and program elements), payment and claim summaries, and utilization of services.

Functional  <Response> 

ADAT-020.000.035 The solution must be able to download the reports in standard formats, including but limited to .CSV, .XLSX, .TXT, etc.

Functional  <Response> 

ADAT-020.000.040  The solution must be able to report on various health care metrics, including payment, utilization,  admissions, emergency department visits, enrollment, clinical conditions, etc.  

Functional <Response> 

ADAT-020.000.045  The Offeror must also describe how analysts can update and customize the metrics in ADAM-020.000.040 (or add new metrics).

Functional  <Response> 

ADAT-020.000.060  The solution must provide Provider Payment Histories (template for minimal user action to generate report for legal or at request) upon request.

Functional <Response> 

ADAT-020.000.070  The solution must provide Recipient Payment Histories upon request.

Functional <Response> 

ADAT-020.000.080  The solution must provide Fiscal Summaries (Monitoring of payments by provider, program, capitation payments (rate cells) or clinic area).

Functional  <Response> 

ADAT-020.000.090  The solution must be able to provide a program enrollment report (current and historical) upon request.

Functional  <Response> 

ADAT-020.000.100  The solution must provide a Managed Care Summary report upon request.

Functional  <Response> 

ADAT-020.000.110  The information must be accessible to other systems to assist with rate setting, budgeting functions, audits, legal request or other data sharing activities.

Optional <Response> 

ADAT-020.000.120 The solution must adhere to role-based access, fine-grained security and system use for monitoring (audits) as established by ODM Data Governance.

Functional  <Response> 

ADAT-020.000.130  The solution must provide the ability for authorized users to create subsets of data (e.g., user defined lists, study populations, outlier groups, exception records) for use in subsequent analytic steps and actions.

Functional  <Response> 

ADAT-020.000.140 The solution must provide the ability for authorized users to import lists and data to augment information and queries.

Functional  <Response> 

ADAT-020.000.150 The solution must allow the State to pull records with details to verify summary reports / analytics.

Functional  <Response> 

 

13

Page 14: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

The Offeror must describe its proposed approach to meeting each of the functional expectations above. The narrative response for this category must be organized to successfully address all the requirements in   the  category.  Any   requirement  not  clearly  addressed   in   the   response  may  negatively  affect   the Offeror’s scoring. Any exceptions must be identified using specific requirement references. <Response>    

4.2. Clinical and Health Metrics - Functional Requirements A program reporting module must include the following: 

The ability to generate national health care metrics, including but not limited to, the following:  

 Requirement ID Requirement Description Requirement

Type Capability Assessment

ADAT-030.000.010  The solution must be able to generate NCQA-certified HEDIS metrics (with allowable adjustments), CMS Adult and Child core set, and preventable events.

Functional  <Response> 

ADAT-030.000.020  The solution must be able to run the healthcare measurement systems in ADAT-030.000.010 with allowable adjustments, at different points of time, at provider level, etc.  (to allow the State to analyze focal points of change to improve clinical performance).

Functional  <Response> 

  

4.3. Additional Functionality The Ohio Department of Medicaid recognizes that health care analytics is a rapidly changing field.  The Department  seeks   to  be  at   the   forefront  of  understanding  the  elements  necessary   to   improve   the quality of health for our clients, at the same time, being good stewards of the resources the public has entrusted us with.  A proposed solution that presents additional analytical or reporting elements besides the functionality required in Section 4.1 through 4.3   will be considered.   Up to three such functions / analytical abilities may be offered by the Offeror as part of the proposal.   

  Requirement ID Requirement Description Requirement

Type Capability Assessment

ADAT-040.000.010 This RFP also allows for up to three health care analytical (currently existing in the solution) functions to be scored during the evaluation process.  Please note these functions and how they can enhance an organization’s ability for program / fiscal / utilization monitoring or reporting.

Optional <Response> 

14

Page 15: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

ADAT-040.000.020 This RFP also allows for up to three health care analytical (currently existing in the solution) functions to be scored during the evaluation process.  Please note these functions and how they can enhance an organization’s ability for program / fiscal / utilization monitoring or reporting.

Optional <Response> 

ADAT-040.000.030 This RFP also allows for up to three health care analytical (currently existing in the solution) functions to be scored during the evaluation process.  Please note these functions and how they can enhance an organization’s ability for program / fiscal / utilization monitoring or reporting.

Optional <Response> 

 

5. Global Criterion #2 - Technical Requirements This   section   contains   requirements   that  define   the   technical   and  architectural   expectations  of   the modules comprising the OMES.  Although this RFP is for the acquisition of a “Software as a Solution” computing health care program reporting tool, the tool must fit within a reporting system which must provide consistent responses with the other tools, but also maintain the security and technical cohesion required for an enterprise solution.  These requirements are based upon general needs for integration, interoperability, and administration.   Based upon the functionality of the various parts of ADAT and solution design (e.g. where data resides), various requirements may be less applicable based upon the final design.

The   Offeror  must   provide   a   narrative   overview   to   demonstrate   their   capability   and   approach   to delivering   the   services   identified  in   this  section.  Offerors  must  use   the  response  sections  below to provide   specific   details   of   the  proposed   approach   to  meeting   the   technical   requirements   in   each requirement category. 

5.1. Systems and Application The Advanced Data Analytics Tool is not an independent OMES module.   However, the tool primarily receives its data from the ODM Enterprise Data Warehouse, which houses OMES information.  As such, the  Solution   /  Offeror  will   collaborate  with   the  System  Integrator   (SI),  which   is   the  module  which transfers data between OMES modules and the EDW in order to receive data from the EDW.  

Systems   and   Application   requirements   describe   the   architecture   and   implementation   expectations including the management of data across the OMES, technical documentation, and provision of other non-functional technical components that facilitate an efficient implementation.  Expected activities related to Systems and Application include:  

Collaboration with the System Integrator (SI) and other OMES module contractors to coordinate integration; 

Utilization of rules-based, modular, reusable, and configurable components;  Support for online and browser-based web capabilities; 

15

Page 16: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Development and maintenance of project artifacts to support system-related planning, design, development, and implementation; and

Support for non-disruptive configuration changes and system upgrades. 

Contractors must resolve production defects and issues according to ODM Severity and Priority. Severity defines the extent to which a particular incident could create an impact on the application or system. The following are incident Severity classifications for the OMES:  

Critical: A defect must be classified as “Critical” if complete failure or significant degradation of service of a module or support module affects all users of the module or support module.  

High: A defect must be classified as “High” if failure or degradation of service of a module or support module, with a State accepted work-around.  

Medium: A defect must be classified as “Medium” if there is degradation of a service, without a failure, and with a State approved work-around.  

Low: A defect must be classified as “Low” if it is a non-substantial defect that does not present an interruption in service.  

Impact measures the effect of an incident on business processes. The impact can be evaluated based on several criteria: 

The number of affected users;  The potential financial losses;  The number of affected services;  Breaches of regulations or laws; and  The reputation of the organization. 

Incident Priority signifies the urgency to fix an incident. Priority is determined by taking into account the severity and impact of an incident. Any business stakeholder including the Project Managers, Business Analysts, and the Product Owner can define the priority of incidents. The following are incident Priority classifications for the OMES: 

Priority 1: An Incident priority must be classified as “Priority 1” if complete failure or significant degradation of service of a module or support module affects all users of the module or support module. 

Priority 2: An  Incident  priority  must  be classified as “Priority  2”  if   failure or  degradation of service of a module or support module, with a State accepted work-around affects a majority of all users of the module or support module.

Priority 3: An Incident  priority  must be classified as “Priority  3”  if  degradation of  a  service, without a failure, and with a State approved work-around affects less than half of all users of the service.

Priority 4: An Incident priority must be classified as “Priority 4” if a non-substantial Incident or Defect that does not present an interruption in service affects less than half of all users of the service.

Priority 5: An Incident priority must be classified as “Priority 5” if a non-substantial Incident or Defect that does not present an interruption in service affects little to no users of the service.

Figure 3 depicts the Incident Priority Matrix for the OMES. 

16

Page 17: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

 Figure 3 – Incident Priority Matrix

 Below are the Systems and Application requirements to be fulfilled by the Contractor.  

Table 7 – Systems and Application Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

OMES-100.000.010  The Contractor must facilitate requirements validation and design sessions with the SI contractor and the State. 

Responsibility  <Response> 

OMES-100.010.010  The Contractor must provide system availability for their solution in accordance with State-defined SLAs. (Please see Attachment Two – Special Provisions) 

Responsibility  <Response> 

OMES-100.010.020  The solution must provide authorized users with secure, role-based access to the provided tool(s). 

Functional  <Response> 

OMES-100.010.030  The Contractor must notify and obtain approval from the State prior to scheduling expected maintenance. Any outage for maintenance must be planned and approved through the Change Management approval process. Expected system uptime is 24/7/365 days a year (except for scheduled outages or loads).

Responsibility  <Response> 

OMES-100.010.040  The Contractor must document any expected maintenance window timeframes. 

Responsibility  <Response> 

OMES-100.010.050  The Contractor must notify the State immediately of any unplanned or emergency maintenance windows. 

Responsibility  <Response> 

OMES-100.030.010  The Contractor must develop artifacts associated with its solution in compliance with the Centers for Medicare and Medicaid Services (CMS) and Health Insurance Portability and Accountability Act (HIPAA) standards and requirements. 

Responsibility  <Response> 

OMES-100.030.030  The Contractor must develop and maintain project artifacts, to support all system-related planning, design, development, and implementation activities, including but not limited to the following: 

Deliverable Expectation Document;  HIPAA Statement;

Responsibility  <Response> 

17

Page 18: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Project Kickoff Presentation; Project Management Plan; Project Work Plan: Schedule/Milestone & 

Burn  Down Charts; Master Test Plan;  Requirements Traceability Matrix (RTM); Business Continuity, Disaster Recovery, 

Contingency Plans; Configuration Management Plan; Operational Readiness Plan; Security Plan; Solution Design Document(s); Solution Documentation; User Manual; Inquiry and Issue Management Plan; Solution Implementation Plan; Solution Operations Plan; Service Transition Plan; Trading Partner Management Plan; Project Status Report; and Operational Performance Reports.

OMES-100.030.040  The Contractor must maintain the following items for reference. They must be maintained for each environment and access to these items must be granted by the State. 

List of application servers and their usage;  List of web servers and their usage; List of ESB and its usage; Network IP and port details; Environment variables;   Hyperlinks; Document links; Contact details; and On-call support.

Responsibility  <Response> 

OMES-100.040.010  The Contractor must provide service performance monitoring. 

Responsibility  <Response> 

OMES-100.040.020  The Contractor must make SLA monitoring and reporting tools available to the State. 

Responsibility  <Response> 

OMES-100.040.060  The solution must track performance metrics including but not limited to: 

Load errors; Transaction or processing errors; Logins; Login failures; and Response time.

Non-functional  <Response> 

OMES-100.040.070  The solution must monitor and report on critical system performance parameters (e.g., resource availability, CPU utilization, etc.). 

Non-functional  <Response> 

OMES-100.040.110  The solution must provide an online system to authorized users, including: 

Role-based reports and dashboards 

Non-functional  <Response> 

18

Page 19: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

containing real time and historical items; Access to the complete end-to-end 

transaction history of a transaction; and Access to the reports repository.

OMES-100.040.120  The solution must provide real-time notifications when State-defined system thresholds are met and communicate the findings via an agreed upon method and frequency. 

Non-functional  <Response> 

OMES-100.040.130  The solution must provide a report of notification thresholds met and a list of users notified as a result. 

Non-functional  <Response> 

OMES-100.040.140  The solution must provide a weekly report summarizing all identified system and application issues and potential risks with content in a format approved by the State. 

Non-functional  <Response> 

OMES-100.050.010  The Contractor must provide support for system issues according to Information Technology Infrastructure Library (ITIL) standards or equivalent best practices. 

Responsibility  <Response> 

OMES-100.050.020  The Contractor must provide a minimum of 45 business days of post-implementation support through staff dedicated specifically to monitoring and immediately responding to issues, following implementation and acceptance of the proposed solution.  

Responsibility  <Response> 

OMES-100.050.030  The solution must provide a monthly summary report of system changes including enhancements and defect resolutions.

Non-functional  <Response> 

OMES-100.050.040  The Contractor must ensure adequate technical support coverage is available 24 hours a day with a State- approved incident tracking system. Support may be delivered via SMS, online chat, e-mail, any combination thereof, or any other medium as agreed upon between the parties. 

Responsibility  <Response> 

OMES-100.050.050  The Contractor must accept the State’s final determination regarding issue priority in all cases. 

Responsibility  <Response> 

OMES-100.050.060  The Contractor must notify the State of critical issues within 30 minutes of discovery. 

Responsibility  <Response> 

OMES-100.050.070  The Contractor must resolve all production issues as per State-defined SLAs. 

Responsibility  <Response> 

OMES-100.050.080  The solution must support non-disruptive configuration changes. 

Non-functional  <Response> 

OMES-100.050.090  The solution must support and monitor non-disruptive upgrades. 

Non-functional  <Response> 

OMES-100.050.100  The Contractor must coordinate changes introduced to its solution and participate in end-to-end impact analysis for changes introduced by other OMES modules. 

Responsibility  <Response> 

OMES-100.050.120  The Contractor must provide continuous services during scheduled availability hours. 

Non-functional  <Response> 

19

Page 20: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

OMES-100.050.150  The Contractor must follow State-defined certificate (e.g., secure shell key replacement) renewal schedules. 

Responsibility  <Response> 

 The Offeror  must  describe   its  proposed approach  to  meeting  each of   the  Systems and  Application requirements above. The narrative response for this category must be organized to successfully address all   the   requirements   in   the  category.  Any   requirement  not  clearly   addressed   in   the   response  may negatively affect the Offeror’s scoring. Any exceptions must be identified using specific requirement references. <Response>   

5.2. Technical Services Technical  Services  requirements   include  support   for  documentation and correspondence needs  and role-based workflow functionality. Expected activities related to Technical Services include:  

Providing workflow capabilities necessary to operate the Contractor’s solution; and  Collaboration with the SI and other OMES module contractors to ensure seamless information 

transition. Below are the Technical Services requirements to be fulfilled by the Contractor. 

Table 8 – Technical Services Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

OMES-120.000.020  The solution must support log-in ID verification associated with State-identified applications, documents, and transactions, based on State-defined business rules. 

Non-functional  <Response> 

OMES-120.010.010  The solution must provide the ability to store, index, and retrieve all electronic files associated with user and system activities. 

Functional  <Response> 

OMES-120.010.020  The solution must provide the ability to store all artifacts (e.g., solution-generated outputs, attachments, system activity reports, generated correspondence). 

Non-functional  <Response> 

OMES-120.020.010  The solution must provide Workflow Management functionality to support the module's business functions and operations as required by the State. 

Functional  <Response> 

OMES-120.030.110  The solution must integrate with the State's secure e-mail system to support correspondence via electronic formats. 

Optional<Response> 

 The   Offeror   must   describe   its   proposed   approach   to   delivering   each   of   the   Technical   Services requirements above. The narrative response for this category must be organized to successfully address all   the   requirements   in   the  category.  Any   requirement  not  clearly   addressed   in   the   response  may negatively affect the Offeror’s scoring.  Any exceptions must be identified using specific requirement references. <Response>  

20

Page 21: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

5.3. Data Management Data Management supports the conversion, capture, maintenance, processing, validation, and logging of data in accordance with State-defined business rules. Expected activities related to Data Management include:  

Gathering and maintenance of data required for Program Reporting functions;  Tracking, auditing, and monitoring of data changes; and  Collaboration with the State and other OMES module contractors to develop enterprise data 

models. Below are the Data Management requirements that must be fulfilled by the Contractor. 

Table 9 – Data Management Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

OMES-130.000.002  The solution must access the ODM EDW for all data necessary to support the Program Reporting function.  The ODM EDW resides on the Innovate Ohio Platform, which is an Hadoop system using PySpark language and utilizes the following database and Cloudera open source products: Hive, Impala, Streamsets, Flume, HBase, Kalka, Hue and Sqoop.

Functional  <Response> 

OMES-130.000.004  The Contractor must work with the SI contractor and the DAS EDW team to assure that all necessary data for the Program Reporting function are acquired from OMES modules

Functional  <Response> 

OMES-130.000.006  The solution must detail the Maintenance and Operation plan post implementation.

Functional  <Response> 

OMES-130.000.008  If the Offeror’s solution requires the data to be moved to external servers, the Contractor must assume all risk for security, provide security certification, detail process for security breech, and obtain approval from ODM CISO regarding the level of security provided etc. 

Functional  <Response>

OMES-130.000.020  The solution must support processing and transfer of data in accordance with State-defined SLAs. 

Non-functional  <Response> 

OMES-130.000.080  The Contractor must ensure all fields are configurable to State-defined business rules. 

Responsibility  <Response> 

OMES-130.000.100  The Contractor must provide a cross reference mapping document for all fields and values current as of the last release of the solution, stored in a location accessible to the State. 

Responsibility  <Response> 

OMES-130.010.010  The solution must track and maintain detailed audit logs for all changes, views of data, and activity within the solution to support audit requirements, based on State-defined business rules. 

Non-functional  <Response> 

OMES-130.010.020  The Contractor must ensure audit logs are available to be reviewed by State-authorized users. The audit logs must be kept available in accordance with the ODM-IPP 4501 Records Management policy. 

Responsibility  <Response> 

OMES-130.020.040  The Contractor must collaborate with the Systems Integrator (SI) contractor to develop requirements for 

Responsibility  <Response> 

21

Page 22: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

the conversion of data, including data elements, format, and frequency, from the current MMIS modules and existing data sources to the solution. 

OMES-130.020.050  The Contractor must convert all required data from existing data sources into the solution in a format that supports all State-defined business processes. 

Responsibility  <Response> 

 The   Offeror   must   describe   its   proposed   approach   to   delivering   each   of   the   Data  Management requirements above. The narrative response for this category must be organized to successfully address all   the   requirements   in   the  category.  Any   requirement  not  clearly   addressed   in   the   response  may negatively affect the Offeror’s scoring.  Any exceptions must be identified using specific requirement references. <Response>  

5.4. User Interface Below are the User Interface requirements that must be fulfilled by the Contractor. 

Table 10 – User Interface Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

OMES-160.000.070  The Contractor must provide licenses as required by the State to allow users access to perform business functions supported by the module.  

Responsibility  <Response> 

OMES-160.001.010  The solution must adhere to all State and federal accessibility requirements, or their successors. 

Non-functional  <Response> 

OMES-160.001.020  The solution must comply with section 508 of the Rehabilitation Act/WCAG 2.0 AA. 

Non-functional  <Response> 

OMES-160.001.030  The solution must comply with section 1194.22 of the Code of Federal Regulations, “Web-based intranet and internet information and applications”. 

Non-functional  <Response> 

OMES-160.005.020  The solution must allow authorized users to securely upload files through the UI. 

Non-functional  <Response> 

OMES-160.005.030  The solution must provide the ability to upload multiple files and display the progress of the upload. 

Non-functional  <Response> 

OMES-160.005.050  The solution must validate and scan for potential security threats (e.g., malware, viruses) before accepting and uploading files. 

Non-functional  <Response> 

OMES-160.006.010  The solution must provide notice to users attempting to access a component or content unavailable due to maintenance, system issue, or other reason, informing the user of the reason for non-availability and an expected service resumption time. 

Non-functional  <Response> 

OMES-160.006.020  The solution must display error messages that are understandable to end users, in addition to the technical details. 

Non-functional  <Response> 

 

22

Page 23: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

The Offeror must describe its proposed approach to meeting each of the User Interface requirements above.   The   narrative   response   for   this   category   must   be   organized   to   clearly   address   all   the requirements in the category. Any requirement not clearly addressed in the response may negatively affect the Offeror’s scoring. Any exceptions must be identified using specific requirement references. <Response>   

5.5. Security Security  includes functionality and requirements that need to be satisfied to achieve security of the solution. Expected activities related to Security include:  

Compliance with State and Federal security guidelines;  Utilization of Identity Access Management (IdAM); and  Integration of Single Sign-On (SSO) access.

Below are the Security requirements that must be fulfilled by the Contractor.  

Table 11 – Security Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

OMES-140.000.010  The Contractor must provide the State an annual report from a qualified, independent, external IT security contractor for a Vulnerability Assessment and Network Penetration Test covering all Contractor and subcontractor networks that access State data and information. 

Responsibility  <Response> 

OMES-140.000.020  The Contractor must provide the State a monthly report of the results of its monthly vulnerability scans covering all Contractor and subcontractor networks that access State data and information. 

Responsibility  <Response> 

OMES-140.000.030  The Contractor must provide resources who are lawful permanent residents as defined in 8 U.S.C. 1101 (a)(20) or who are protected individuals as defined by 8 U.S.C. 1324b(a)(3). This includes any corporation, business association, partnership, society, trust, or any other entity, organization, or group that is incorporated to do business in the U.S.  It also includes any governmental (federal, State, local) entity. 

Non-functional  <Response> 

OMES-140.000.040  The solution must support encryption of data at rest.  Non-functional  <Response> OMES-140.000.045  The solution must decrypt encrypted data only when 

necessary to perform supported business functions. Functional  <Response> 

OMES-140.000.050  The solution must require all connections to enforce Transport Layer Security (TLS 1.2 or above). 

Non-functional  <Response> 

OMES-140.000.060  The solution must require a minimum of 256-bit encryption (Advanced Encryption Standard (AES) preferred). 

Non-functional  <Response> 

OMES-140.000.070  The solution must utilize encryption of the database,  Non-functional  <Response> 

23

Page 24: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

including security that contains encryption keys to be a minimum of 2048 bits. 

OMES-140.000.080  The solution must utilize encryption of the database and require methods used by relational databases to be Federal Information Processing Standard (FIPS) Publication 140-2 (FIPS 140-2) certified or higher. 

Non-functional  <Response> 

OMES-140.000.090  The Contractor must provide network connectivity for the State-approved personnel at its offices and facilities during the life of the Contract, at the Contractor's expense. This can be secure guest Wi-Fi or some other State-approved method. 

Responsibility  <Response> 

OMES-140.000.270  The Contractor must employ secure data transmission protocols in accordance with Department of Administrative Services (DAS) security guidelines when accessing State systems and networks remotely. 

Responsibility  <Response> 

OMES-140.000.330  The Contractor must coordinate with the State to determine specific actions required of Business Associates for mitigation of any breach, in accordance with applicable federal law/guidance. These actions must include notification to the appropriate individuals, entities, or other authorities. Notification or communication to any media outlet must be approved in writing by the State prior to any such communication being released. The Contractor must report all mitigation activity to the State and must preserve all relevant records and evidence. 

Responsibility  <Response> 

OMES-140.000.340  The Contractor must prepare security related administrator documentation. Distribution of administrator documentation must be limited to technical resources responsible for the administration and security of the information system. Administrator documentation must contain: 

Details regarding the secure configuration, installation, and operation of the information system; 

Effective use and maintenance of security functions/mechanisms; and 

Known vulnerabilities regarding configuration and the use of administrative or privileged functions. 

Responsibility  <Response> 

OMES-140.000.350  The Contractor must provide the access logs to the State, when requested. 

Responsibility  <Response> 

OMES-140.010.010  The Contractor must provide a Security Plan, which complies with all State and federal enterprise information security policies, standards, security initiatives, and regulations. 

Responsibility  <Response> 

OMES-140.010.020  The Contractor must develop and implement a Security Plan consistent with State-approved deliverable schedule. The Contractor must thereafter maintain annually a Security Plan for review, comment, and approval by the Medicaid Information Security and 

Responsibility  <Response> 

24

Page 25: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Privacy Officers, that, at a minimum, must include and implement processes for the following items related to the system and services: 

Security policies;  Logical security controls (privacy, user access 

and authentication, user permissions, etc.);  Technical security controls and security 

architecture (communications, hardware, data, physical access, software, operating system, encryption, etc.); 

Security processes (security assessments, risk assessments, incident response, etc.); 

Documentation that describes the technical controls used for the following: 

Network segmentation.  Perimeter security.  Application security.  Intrusion management.  Monitoring and reporting.  Host hardening.  Remote access.  Encryption of data at rest and in transit 

on servers, databases, and PCs.  Interface security.  Security patch management.  Secure communications over the 

Internet. Managing network security devices. 

Documentation of the following:  Sensitive data classification.  PHI/PII/SSI data elements.  Security test procedures.  CMS Information System Risk 

Assessment.  Detailed diagrams depicting all security-related 

devices and subsystems and their relationships with other systems for which they provide controls; and

Annual updates to all security policies, controls processes, and documentation based on current NIST SP 800-53, NIST Cybersecurity Framework, all other relevant State and federal regulations, and State of Ohio Information Security Standards and Policies. 

OMES-140.010.030  The Contractor must develop a Security Plan detailing how security must be controlled during the implementation, maintenance, and operations of the System and Services and contain the following: 

High-level description of the program and projects; 

Security risks and concerns;  Security roles and responsibilities; 

Responsibility  <Response> 

25

Page 26: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Program and project security policies and guidelines; 

Security-specific project deliverables and processes; 

Security team review and approval process;  Security-Identity management and access; 

Control for Contractor and State joiners, movers, and leavers; 

Data Protection Plan for personal/sensitive data within the projects; 

Media Protection processes for hardware and electronic media with ePHI; 

Business continuity and disaster recovery plan for the projects; 

Infrastructure architecture and security processes; 

Application security and industry best practices for the projects; 

Vulnerability and threat management plan (cyber security); 

Description of a process with which the Contractor must provide the State with a continuously current copy of production data;

Information Security Controls document including the security policies and technical controls that the Contractor must implement, as requested by the State, on Contractor managed systems, supported servers, and the LAN within the scope of this agreement; and 

The Contractor must submit a draft document for State review and approval during the transition period. 

OMES-140.020.010  The Contractor must provide a security solution which complies with Minimum Acceptable Risk Standards for Exchange (MARS-E) 2.0. 

Responsibility  <Response> 

OMES-140.020.020  The Contractor must comply with an existing State approval process to establish a Contractor account on State systems. 

Responsibility  <Response> 

OMES-140.020.070  The Contractor must comply with State of Ohio and Medicaid policies for all systems implemented or deployed. 

Non-functional  <Response> 

OMES-140.020.080  The Contractor must comply with State Security and Privacy policies and standards. 

Responsibility  <Response> 

OMES-140.020.090  The Contractor must comply with all regulatory requirements which would apply to the State, when required to carry out an obligation of the State under 45 Code of Federal Regulations (CFR) 164 Subpart E. 

Non-functional  <Response> 

OMES-140.020.110  The Contractor must ensure communications between modules are in compliance with State Security requirements. 

Responsibility  <Response> 

OMES-140.020.120  The Contractor must perform security compliance  Responsibility  <Response> 

26

Page 27: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

testing on a quarterly basis and report the results of the testing along with any recommended remediation to the State after the end of the calendar year. 

OMES-140.020.130  The Contractor must demonstrate the solution is secure and in compliance with industry standards for privacy and security (e.g., HIPAA), as part of a State-approved System Security Plan. 

Responsibility  <Response> 

OMES-140.020.140  The solution must adhere to typical control questions required by National Institute of Standards and Technology (NIST) (currently SP 800-053) with online reporting. 

Non-functional  <Response> 

OMES-140.020.150  The Contractor must maintain security documentation such as security and infrastructure records as required by Ohio Revised Code (ORC) section 149.433. Security documentation must be available for review by authorized personnel only. 

Responsibility  <Response> 

OMES-140.020.160  The Contractor must not send, take, or make available remotely   (directly  or   indirectly),  any State   information including   data,   software,   code,   intellectual   property, designs   and   specifications,   system   logs,   system   data, personal or identifying information and related materials out of the United States in any manner, except by mere travel outside of the U.S. by a person whose personal knowledge   includes   technical   data;   or   transferring registration, control, or ownership to a foreign person, whether  in the U.S.  or abroad,  or disclosing (including oral  or  visual  disclosure)  or   transferring   in   the  United States  any State article  to an embassy,  any agency or subdivision   of   a   foreign   government   (e.g.,   diplomatic missions);   or   disclosing   (including   oral   or   visual disclosure)   or   transferring   data   to   a   foreign   person, whether in the U.S. or abroad. 

Responsibility  <Response> 

OMES-140.030.010  The solution must be compatible and capable of interfacing with a COTS-based IdAM solution. 

Non-functional  <Response> 

OMES-140.030.020  The solution must utilize the State's enterprise IdAM solution to authenticate user security checks (e.g., session token expiration, credentials, coarse-grained authorization), as per the current CMS MITA, and other State and federal guidelines. 

Non-functional  <Response> 

OMES-140.030.030  The solution must integrate with the Enterprise Identity, Credential, Access, and Session Management Solution (IdAM), using web services. 

Non-functional  <Response> 

OMES-140.030.040  The Contractor must provide IdAM technical support during the implementation and operations phases of the Contract. 

Responsibility  <Response> 

OMES-140.030.050  The solution must provide audit capabilities relative to IdAM. 

Non-functional  <Response> 

OMES-140.030.060  The Contractor must map current roles into applicable Contractor solution roles where they overlap. 

Responsibility  <Response> 

OMES-140.030.070  The solution must synchronize the user role/access level  Non-functional  <Response> 

27

Page 28: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

identifiers with the authorization system. OMES-140.030.080  The solution must follow the State security policies and 

standards for password complexity. Non-functional  <Response> 

OMES-140.030.110  The solution must lock a user out after a State-identified number of failed log-in attempts. 

Non-functional  <Response> 

OMES-140.030.120  The solution must enforce a configurable limit of consecutive invalid access attempts per user, and protect against further, possibly malicious user authentication attempts (e.g., locks the account/node until release by an administrator, for a configurable time period) and delays the next login prompt according to a configurable delay algorithm. 

Non-functional  <Response> 

OMES-140.030.130  The solution must lock the user out of their session if the user remains idle for a configurable State-defined period of time. 

Non-functional  <Response> 

OMES-140.030.140  The solution must, upon detection of inactivity of an interactive session, prevent further viewing and access to the solution by terminating the session until the user re-establishes access through identification and authentication procedures. 

Non-functional  <Response> 

OMES-140.030.150  The solution must track and generate alerts for unauthorized access of data and information that is deemed sensitive, confidential, or personal in compliance with program policies. 

Non-functional  <Response> 

OMES-140.030.170  The solution must provide the ability for authorized administrators to assign restrictions or privileges to users/groups. 

Non-functional  <Response> 

OMES-140.030.220  The Contractor must notify the State within 48 hours about terminations or transfers of Contractor employees with access rights to State systems, data, and facilities. 

Responsibility  <Response> 

OMES-140.030.240  The Contractor must provide the State reports on a State-defined schedule (e.g., weekly) and on demand, listing personnel with current and historical authorized access to facilities and secure areas. 

Responsibility  <Response> 

OMES-140.030.250  The Contractor must provide a report demonstrating account management practices (e.g., HIPAA and PHI/PII/SSI training) upon request of the State. 

Responsibility  <Response> 

OMES-140.030.260  The solution must support workforce security awareness through such methods as security reminders (at log on or screen access), training reminders, online training capabilities, and training tracking. 

Non-functional  <Response> 

OMES-140.030.270  The Contractor must meet all testing requirements and guidelines per State-defined security standards, including positive and negative role-based testing. 

Responsibility  <Response> 

OMES-140.030.280  The Contractor must perform end to end system testing with full load capacity and production level IdAM security controls when integrating with other solutions. 

Responsibility  <Response> 

OMES-140.040.010  The solution must integrate with the Single Sign-On (SSO) functionality provided by the State, using State standards for login and authentication. 

Non-functional  <Response> 

28

Page 29: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

OMES-140.040.020  The solution must support SSO and properly authenticate the user as they access various connected solutions (e.g. IdAM, Financial). Provide security functionalities (e.g., identity, credentials, access, session management) and meet current MITA and other State and federal guidelines. 

Non-functional  <Response> 

OMES-140.040.030  The solution must establish and maintain user role definitions as defined and approved by the State. 

Non-functional  <Response> 

OMES-140.040.040  The solution must provide a bi-directional interface with the State and other Contractor-provided identity authentication services. 

Non-functional  <Response> 

OMES-140.040.050  The solution must provide a bi-directional interface with OMES’ Contractor systems for secure data communications. 

Non-functional  <Response> 

OMES-140.040.060  The solution must allow for user roles, as defined by the State, to be synced with other authorized external entities. 

Non-functional  <Response> 

OMES-140.040.070  The Contractor must provide training as part of any turnover phase, whether to the State or another contractor, including all system documentation and artifacts. 

Responsibility  <Response> 

 The Offeror must describe its proposed approach to meeting each of the Security requirements above. The narrative response for this category must be organized to successfully address all the requirements in   the  category.  Any   requirement  not  clearly  addressed   in   the   response  may  negatively  affect   the Offeror’s scoring. Offerors must also refer to Supplement 3 – State Information Security, Privacy, and Data Handling Requirements  of   this   RFP   in   responding   to   this   category.  Any  exceptions  must   be identified using specific requirement references. <Response>   

5.6. Privacy Privacy   is   focused on the  protection of  Medicaid  data,  such as  Protected  Health   Information (PHI), Personally Identifiable Information (PII), and State Sensitive Information (SSI), ensuring the security and confidentiality of the information against unauthorized access, use, or threats/hazards to the integrity of the sensitive information. Expected activities related to Privacy include:  

Establishment and maintenance of physical, technical, and administrative safeguards to prevent unauthorized access to PHI, PII, or SSI;

Limitation of use, distribution, or disclosure of PHI, PII, or SSI;  Compliance with Federal privacy and data security requirements;  Compliance and cooperation with any HIPAA privacy related requests; and   Determination,   reporting,   and   response   to   any   actual,   attempted,   or   suspected   theft   of, 

accidental disclosure of, loss of, or inability to account for any PHI, PII, or SSI.

Below are the Security requirements that must be fulfilled by the Contractor. 

29

Page 30: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Table 12 – Privacy Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

OMES-150.000.050  The Contractor must cooperate with any attempt by the State to monitor Contractor's Compliance as reasonably requested by the State from time to time. 

Responsibility  <Response> 

OMES-150.000.080  The Contractor must comply in all respects with U.S. statutes, regulations, and administrative requirements regarding its relationships with non-U.S. governmental and quasi-governmental entities including, but not limited to the export control regulations of the International Traffic in Arms Regulations (ITAR) and the Export Administration Act (EAA), the anti-boycott and embargo regulations and guidelines issued under the EAA, and the regulations of the U.S. Department of the Treasury, Office of Foreign Assets Control, and HIPAA Privacy Rules. 

Responsibility  <Response> 

OMES-150.000.090  The Contractor must, when handling confidential employee or citizen data associated with Personal Identifiable Information (PII), comply with data handling privacy requirements associated with HIPAA and as further defined by The United States Department of Health and Human Services Privacy Requirements. 

Responsibility  <Response> 

OMES-150.000.100  The solution must provide the ability to restrict distribution of data and information that is deemed sensitive, confidential, or personal (e.g., PHI/PII/SSI) in situations where it would normally be distributed, based on State-defined business rules. 

Non-functional  <Response> 

OMES-150.000.110  The Contractor must comply with all applicable State and federal regulations including, but not limited to 45 CFR Parts 160 through 164 (HIPAA), and Title 42 CFR 431.300, 431.302, 431.304, 431.305, 431.306, and 435.945. 

Responsibility  <Response> 

OMES-150.000.140  The Contractor must ensure PHI/PII/SSI is not used or disclosed except as authorized by the State or as otherwise required under HIPAA regulations, State and federal Medicaid confidentiality standards, and any other applicable State or federal law or policy. 

Responsibility  <Response> 

OMES-150.000.150  The Contractor must implement sufficient safeguards and comply with Subpart C of 45 CFR Part 164 pertaining to electronic PHI/PII/SSI to prevent the use or disclosure of PHI/PII/SSI.  

Responsibility  <Response> 

OMES-150.000.160  The Contractor must implement safeguards to protect all paper and electronic PHI/PII/SSI created, received, maintained, or transmitted on behalf of the State. 

Responsibility  <Response> 

OMES-150.000.170  The Contractor must, in accordance with applicable State and federal guidance, report to the State any inappropriate use or disclosure of PHI/PII/SSI. The 

Responsibility  <Response> 

30

Page 31: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Contractor must detail the process that must be used to meet this requirement. 

OMES-150.000.180  The Contractor must, in accordance with applicable State and federal guidance, report to the State any breaches of unsecured PHI/PII/SSI as required in 45 CFR 164.410. The Contractor must detail the process that will be used to meet this requirement in compliance with NIST SP 800-61. 

Responsibility  <Response> 

OMES-150.000.190  The Contractor must, in accordance with applicable State and federal guidance, report to the State any security incident wherein the Contractor has knowledge or reasonably should have knowledge under the circumstances. 

Responsibility  <Response> 

OMES-150.000.200  The Contractor must detail the process used to report security incidents to the State, in compliance with NIST SP 800-61. 

Responsibility  <Response> 

OMES-150.000.220  The Contractor must comply with 45 CFR 164.502e(i)(ii) and 164.308(b)(2), as applicable, with respect to the use or disclosure of PHI/PII/SSI. 

Non-functional  <Response> 

OMES-150.000.230  The Contractor must obtain and provide to the State a written agreement from all of its agents and subcontractors that create, receive, maintain, or transmit PHI/PII/SSI from or on behalf of the Contractor or the State, stating their compliance with State and federal regulations, including but not limited to 45 CFR 164.502e(i)(ii) and 164.308(b)(2), as applicable. 

Non-functional  <Response> 

OMES-150.000.240  The Contractor must make available to the State such information as State may require to fulfill its obligations to provide access to or provide a copy of any information or documents with respect to PHI/PII/SSI pursuant to HIPAA and regulations promulgated by the United States Department of Health and Human Services, including, but not limited to 45 CFR 164.524 and 164.528 and any amendments thereto. 

Responsibility  <Response> 

OMES-150.000.250  The Contractor must make any amendments to PHI/PII/SSI as directed, or agreed to, by the State pursuant to 45 CFR 164.526, or take other steps as necessary to satisfy State's obligations under 45 CFR 164.526. In the event that the Contractor receives a request for amendment directly from an individual, agent, or subcontractor, the Contractor must notify the State prior to making any such amendment(s). The Contractor's authority to amend information is explicitly limited to information created by the Contractor. 

Responsibility  <Response> 

OMES-150.000.260  The Contractor must cooperate with the State in responding to any HIPAA privacy related requests. 

Responsibility  <Response> 

OMES-150.000.270  The Contractor must make available to the State and the Secretary of the U.S. Department of Health and Human Services any and all internal practices, documentation, books, and records related to the use and disclosure of PHI/PII/SSI received from the State or PHI/PII/SSI 

Responsibility  <Response> 

31

Page 32: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

created or received on behalf of the State. Such access is for the purposes of determining compliance with the HIPAA Rules. 

OMES-150.000.280  The Contractor must, upon termination of this Agreement and at the direction of the State, return to the State and destroy all PHI/PII/SSI in the Contractor's possession stemming from this Agreement as soon as possible, but no later than 90 calendar days, and must not keep copies of the PHI/PII/SSI except as may be requested by the State or required by law. If the Contractor, its agents, or its subcontractors destroy any PHI/PII/SSI, the Contractor must provide to the State documentation evidencing such destruction. Any PHI/PII/SSI retained by the Contractor must continue to be extended the same protections set forth in, HIPAA regulations, and this Agreement for as long as it is maintained. 

Non-functional  <Response> 

OMES-150.000.290  The solution must comply with U.S. Department of Health & Human Services privacy and data security requirements, including but not limited to the Privacy Rule and the Security Rule of the Health Insurance Portability and Accountability Act (HIPAA). 

Non-functional  <Response> 

OMES-150.000.300  The solution must provide the ability to identify information as confidential (e.g., PHI/PII/SSI), and only make it accessible to authorized users. 

Non-functional  <Response> 

OMES-150.000.310  The solution must ensure that all data considered to be PHI/PII/SSI is secured while in transit and at rest (via encryption or an industry standard method of secure file transport). 

Non-functional  <Response> 

OMES-150.000.320  The Contractor must ensure that documentation does not contain any PHI/PII/SSI. 

Responsibility  <Response> 

OMES-150.000.330  The Contractor must cooperate with the State in responding to all privacy related requests dealing with the rights of the individual under the HIPAA regulations. 

Responsibility  <Response> 

 The Offeror must describe its proposed approach to meeting each of the Privacy requirements above. The narrative response for this category must be organized to successfully address all the requirements in   the  category.  Any   requirement  not  clearly  addressed   in   the   response  may  negatively  affect   the Offeror’s scoring. Offerors must also refer to Supplement 3 – State Information Security, Privacy, and Data Handling Requirements  of   this   RFP   in   responding   to   this   category.  Any  exceptions  must   be identified using specific requirement references. <Response>  

5.7. User Documentation User   Documentation   is   related   to   the   development   and   ongoing  maintenance   of   documentation, including   user   manuals   and   other   operational   documents.   Expected   activities   related   to   user documentation include:  

32

Page 33: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Development of and updates to user documentation compliant with State standards;  Development and updates of a user manual that details the operational and processing features 

provided by the solution;  Implementation   of   documentation   updates   following   the   defined   Contractor   change 

management process; and  User access to current and historical user documentation. 

Below are the User Documentation requirements that must be fulfilled by the Contractor.  Table 13 – User Documentation Requirements

Requirement ID Requirement Description Requirement Type

Capability Assessment

OMES-170.000.010  The Contractor must create and maintain end user documentation consistent with any current State standards. 

Responsibility  <Response> 

OMES-170.000.020  The Contractor must provide all user documentation in a format that facilitates efficient and dynamic updating and dissemination of new or modified data. 

Responsibility  <Response> 

OMES-170.000.030  The Contractor must provide end user documentation to the State on request in an electronic format agreed to by the State. 

Responsibility  <Response> 

OMES-170.000.040  The Contractor must provide user documentation that details the operational and processing features provided by the solution. 

Responsibility  <Response> 

OMES-170.000.050  The Contractor must describe all reports generated within the business area or function in the user documentation. 

Responsibility  <Response> 

OMES-170.000.060   The Contractor must provide illustrations of windows and screens used in the module, with all data elements on the screens identified by number and ability to configure, in each end user manual. 

Responsibility  <Response> 

OMES-170.000.070  The Contractor must provide descriptions of error messages for all field edits, including the necessary steps to correct such errors. 

Responsibility  <Response> 

OMES-170.000.080  The Contractor must provide online hyperlinks referencing Medicaid and non-Medicaid policies in the documentation. 

Responsibility  <Response> 

OMES-170.000.090  The Contractor must exclude, at State's discretion, Contractor's trademarks, logos, and identifying information in or on all documentation. 

Responsibility  <Response> 

OMES-170.000.100  The Contractor must provide and use a writing style guide for all documentation, creating consistency among all documents. 

Responsibility  <Response> 

OMES-170.000.110  The Contractor must use acronyms only where necessary and identify ones used in end user instructions, and ensure that they are consistent with windows, screens, reports, and the data dictionary. 

Responsibility  <Response> 

OMES-170.000.120  The Contractor must ensure that abbreviations and acronyms are defined and consistent throughout the documentation. 

Responsibility  <Response> 

33

Page 34: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

OMES-170.000.130  The Contractor must use consistent field names for the same data on different records throughout the documentation. 

Responsibility  <Response> 

OMES-170.000.140  The Contractor must implement documentation updates following the defined Contractor change management process. 

Responsibility  <Response> 

OMES-170.000.150  The Contractor must maintain and provide updates to user documentation, consistent with current solution version, within a State-approved timeframe. 

Responsibility  <Response> 

OMES-170.000.160  The Contractor must provide updated user documentation, including but not limited to end user manuals, internal procedure manuals, and operating procedure manuals, at a minimum of every 3 months and following every release, or as directed by the State. 

Responsibility  <Response> 

OMES-170.000.170  The Contractor must identify revisions and maintain date of the most recent revisions made when updating user documentation. 

Responsibility  <Response> 

OMES-170.000.180  The Contractor must provide authorized users access to current and all previous versions of user documentation. 

Responsibility  <Response> 

OMES-170.000.190  The Contractor must maintain and make available revision history of user documentation updates. 

Responsibility  <Response> 

 The   Offeror   must   describe   its   proposed   approach   to   meeting   each   of   the   User   Documentation requirements above. The narrative response for this category must be organized to successfully address all   the   requirements   in   the  category.  Any   requirement  not  clearly   addressed   in   the   response  may negatively affect the Offeror’s scoring.  Any exceptions must be identified using specific requirement references. <Response>    

5.8. Reporting and Analytics Reporting   and   Analytics   includes   capabilities   to   provide   data   extracts,   operational   reporting,   and systems performance monitoring, logs, and alerts to monitor the functioning of the system. Expected activities related to Reporting and Analytics include: 

Reporting needed to support module administration; Systems and application reporting; Enabling of standard and ad-hoc reports in State-defined flexible formats; Role-based user access to reporting functionality and documentation; and Presentation   of   data,   including   configurable   dashboards   and   key   aggregated   current   and 

historical operational data for analysis.The Contractor must provide a complete list of tools that must be included in the system to facilitate the presentation of data. 

Below are the Reporting and Analytics requirements that must be fulfilled by the Contractor. 

34

Page 35: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Table 14 – Reporting and Analytics Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

OMES-180.000.010  The solution must produce standard, and ad hoc reports with flexible, user-established parameters (e.g., record selection, field inclusion, sort, and grouping). 

Functional  <Response> 

OMES-180.000.020  The solution must follow standard report naming conventions, as defined by the State. 

Functional  <Response> 

OMES-180.000.030  The solution must include a catalog of available reports and their intended use. 

Functional  <Response> 

OMES-180.000.050  The solution must produce all reports and data extracts necessary to support the business functions and processes provided by the solution. 

Functional  <Response> 

OMES-180.000.060  The solution must provide the ability to produce reports and data extracts necessary to support the business functions and processes provided by other OMES components. 

Functional  <Response> 

OMES-180.000.090  The solution must provide the ability to schedule data extracts and reports, based on State-defined business rules.  

Functional  <Response> 

OMES-180.000.130  The solution must support ad hoc and other reporting needs without risk of operational performance degradation. 

Non-functional  <Response> 

OMES-180.000.170  The solution must include tools to facilitate the presentation of data as accepted by the State. 

Non-functional  <Response> 

OMES-180.000.200  The solution must include dashboard and report items to display key aggregated current and historical  data for analysis purposes. 

Functional  <Response> 

OMES-180.000.210  The solution must provide authorized users role-based access to configurable dashboards displaying State-defined data elements. 

Functional  <Response> 

OMES-180.010.020  The Contractor must generate standard and ad hoc reports, in a State-approved format of performance supporting data at a State-defined frequency, for example: 

Key performance indicators (KPIs) and related service-levels targeted vs. actual results; 

KPIs and related service levels prior period report comparisons; 

KPIs and service levels reported as non-compliant; 

KPI corrective action plans (CAP) and estimated compliance date; and 

KPI resolution date and detailed corrective status for all CAP resolutions.

Responsibility  <Response> 

 The  Offeror  must  describe   its  proposed  approach   to  meeting  each  of   the  Reporting  and  Analytics requirements above. The narrative response for this category must be organized to successfully address all   the   requirements   in   the  category.  Any   requirement  not  clearly   addressed   in   the   response  may 

35

Page 36: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

negatively affect the Offeror’s scoring.  Any exceptions must be identified using specific requirement references.  <Response>  

5.9. OME Integration The Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.   It will receive its information from the ODM Enterprise Data Warehouse through the System Integrator.   As the OME informational system adapts, the Solution will need to adapt to meet the changing needs of the organization.  

Below are the OMES Integration requirements that must be fulfilled by the Contractor. Table 15 – OMES Integration Requirements

Requirement ID Requirement Description Requirement Type

Capability Assessment

EDI-140.000.020  Testing / Transition plan (System testing, UAT testing, System Integration, performance testing and Unit testing): The testing / transition plan will be used to create a consistent and coherent management plan of action that will be used to guide the testing and transition activities of the Project. The plan must include sufficient detail to give the State an understanding of how the Offeror’s knowledge and approach will manage the testing / transition, guide testing/ transition execution, document planning assumptions and decisions. The following items must be considered: 

Facilitate communication among stakeholders/ trading partner; 

Define key management review as to content, scope and schedule; 

Provide a baseline for progress measurement and testing / transition control; 

Testing with trading partners when requested or required; and 

Document, Report, Communicate and Share all activities of testing with ODM. 

Responsibility  <Response> 

EDI-140.000.035  The solution must utilize State-specified OMES components (the Systems Integration module) to access data necessary to support ADAT operations (e.g. claims, provider, reference, financial , etc).  

Responsibility  <Response> 

OMES-110.000.010  The Contractor must collaborate with the SI module contractor and other impacted OMES module contractors to coordinate integration of their components with other components within the Ohio Medicaid Enterprise System (OMES) environment. 

Responsibility  <Response> 

OMES-110.000.030  The solution must support flexibility for upgrades or replacement components in the future and be capable 

Functional  <Response> 

36

Page 37: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

of exposing system components for use by other State agencies or other entities. 

OMES-110.000.040  The Contractor must collaborate with the State’s SI contractor for the integration of the solution with systems integrator, other OMES modules, systems, and components, and any external systems deemed necessary by the State for the exchange of information in support of solution functions. 

Responsibility  <Response> 

OMES-110.010.040  The solution must have the ability to exchange files through secure file transfer protocol (SFTP) with other systems through the State’s FTP/SFTP service. 

Functional  <Response> 

OMES-110.010.070  The solution must provide the ability to invoke a service locally or remotely within a timeframe approved by the State. 

Functional  <Response> 

OMES-110.010.080  The solution must provide the ability to invoke services in a variety of protocols. The choice of protocol must not restrict the behavior of the service (i.e., binding to a specific protocol takes place at run-time/deployment-time, not at design or development). 

Functional  <Response> 

OMES-110.010.110  The Contractor must implement a solution capable of performing configurable tasks, based on State-defined business rules. 

Non-functional  <Response> 

 The   Offeror   must   describe   its   proposed   approach   to   delivering   each   of   the   OMES   Integration requirements above. The narrative response for this category must be organized to successfully address all   the   requirements   in   the  category.  Any   requirement  not  clearly   addressed   in   the   response  may negatively affect the Offeror’s scoring.  Any exceptions must be identified using specific requirement references. <Response> 

 

6.Global Criterion #3 - Implementation Requirements  

This section describes Implementation Requirements that drive deployment of the solution through the execution of  project   activities   (e.g.,  project  management  planning,   solution  testing,   training),  while ensuring timely and successful certification support for other modules.  

The   Offeror  must   provide   a   narrative   overview   to   demonstrate   their   capability   and   approach   to delivering   the   services   identified  in   this  section.  Offerors  must  use   the  response  sections  below to provide specific details of the proposed approach to meeting the implementation requirements in each requirement category. 

6.1. Project Management 

37

Page 38: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Project Management activities include establishing and maintaining processes in coordination with the ODM PMO, developing and maintaining the project schedule, and completing other project deliverables in coordination with ODM and other module contractors to support the various phases of the project lifecycle. Expected Project Management activities include:  

Full implementation of all business requirements in accordance with the project schedule, and State-defined SLAs;

Submission of the Deliverable Expectations Document (DED) and deliverables identified by the State for all project phases, following a State-approved requirements and deliverable tracking method; 

Submission of a project governance structure;  Submission of a detailed Staffing Plan;  Maintaining appropriate staffing levels;  Application of Project Management methodology and System Development Life Cycle (SDLC) 

methodology following industry standards;  Development and implementation of a Change Management process; and  Development and implementation of Corrective Action Plans as needed.  

The ADAT solution is being implemented as a part of the OMES modernization effort. The ADAT solution project  manager   is   expected   to   follow   industry   standards   and  produce   the   necessary   artifacts   to communicate   status,   schedule,   dependencies,   risks,   and   issues.   The   ODM  Organizational   Change Management (OCM) process will be used to evaluate how the new ADAT solution will impact current business operations and determine the best way to minimize the impacted. The project manager must communicate and coordinate with the ODM PMO, as well as other module PMs. 

The Contractor  must  develop  a  Project  Management  Plan   (PMP)   to  propose  and establish   industry recognized project management processes in collaboration with the ODM PMO. These requirements identify   the   expectations   and   approval   processes   for   development   and  maintenance  of   all   project deliverables. These requirements also include staffing expectations, project status reporting processes and other support activities as needed for each phase of the project lifecycle.  

Below are the Project Management requirements that must be fulfilled by the Contractor. Table 16 – Project Management Requirements

Requirement ID Requirement Description Requirement Type

Capability Assessment

ADAM-200.000.010 During JAD sessions, Contractor must complete discussions with sufficient time to allow for the group to review decisions and assignments.  These notes / minutes must be submitted to group for confirmation within 24 hours.

Responsibility  <Response> 

OMES-200.000.040  The Contractor must utilize State-approved Project Management and SDLC methodologies that follow industry best practices. 

Responsibility  <Response> 

OMES-200.000.050  The Contractor must adhere to State-defined Project Management standards and procedures during the course of the Contract. 

Responsibility  <Response> 

OMES-200.000.060  The Contractor must provide all deliverables identified by the State for each of the following project phases: 

DDI Initiation and Planning; 

Responsibility  <Response> 

38

Page 39: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Solution Planning;  Solution Configuration, Build, and Test; and  Solution Deployment.

OMES-200.000.065  The Contractor must maintain all project deliverables through the life of the Contract, at a frequency determined by the State. 

Responsibility  <Response> 

OMES-200.000.070  The Contractor must develop a comprehensive Deliverable Expectations Document (DED) for all deliverables identified by the State, including an outline of each deliverable, and representative draft content, to be approved by the State Project Manager.  

Responsibility  <Response> 

OMES-200.000.080  The Contractor must submit all deliverables identified by the State, to the State Project Manager for review and approval.  

Responsibility  <Response> 

OMES-200.000.090  The Contractor must address State's feedback and make requested changes within 5 business days, following a 10 day review period of the DED/deliverable by the State Project Manager. All updated deliverables are subject to final acceptance by the State Project Manager within 10 business days after resubmission. 

Responsibility  <Response> 

OMES-200.000.100  The Contractor must provide a deliverable walkthrough within 5 days of the first 10 day review period.  

Responsibility  <Response> 

OMES-200.000.100  The Contractor must make project documents available to the State and Contractor staff, utilizing a State-approved repository. 

Responsibility  <Response> 

OMES-200.000.110  The Contractor must provide a release and maintenance calendar that is maintained and stored in a location accessible to the State. 

Responsibility  <Response> 

OMES-200.000.130  The Contractor must participate in State Integration Project Management Meetings. 

Responsibility  <Response> 

OMES-200.000.150  The Contractor must collaborate with the ODM PMO to support OCM activities as required by the State. 

Responsibility  <Response> 

OMES-200.010.010  The Contractor must create a Project Management Plan for acceptance by the State. The Project Management Plan must include: 

Communications Management Plan;  Cost Management Plan;  Project Change Management Plan;  Project Work Plan;  Quality Management Plan;  Requirements Management Plan; Risk and Issues Management Plan;  Schedule Management Plan;  Scope Management Plan; and  Staffing Plan. 

Responsibility  <Response> 

OMES-200.010.020  The Contractor must provide a detailed project schedule with projected time frames. 

Responsibility  <Response> 

OMES-200.010.030  The Contractor must agree that all future changes to the approved project schedule must be submitted to the State for review and approval using the State-approved 

Responsibility  <Response> 

39

Page 40: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

change management process. OMES-200.010.050  The Contractor must deliver the baselined Work Plan as 

part of the Project Management Plan. Responsibility  <Response> 

OMES-200.010.060  The Contractor must develop a work plan and a project Work Breakdown Structure (WBS) or product backlog to include both Contractor and State milestones and tasks. 

Responsibility  <Response> 

OMES-200.010.070  The Contractor must include at a minimum: tasks, resources, deliverables, task dependencies, percent complete, planned start, planned finish, actual start, and actual finish columns in the WBS product backlog. 

Responsibility  <Response> 

OMES-200.010.080  The Contractor must collaborate with the ODM PMO to establish the Change Management process. 

Responsibility  <Response> 

OMES-200.010.090  The Contractor must provide a detailed project management process, approved by the State, within a State-approved timeframe. 

Responsibility  <Response> 

OMES-200.010.100  The Contractor must provide a project governance structure that identifies State resources required to implement and operate the project. 

Responsibility  <Response> 

OMES-200.020.020  The Contractor must identify all key positions in the project governance structure, with specific descriptions of roles and responsibilities, time devoted to the project during all project phases, and the percentage of time the project staff member must work onsite. 

Responsibility  <Response> 

OMES-200.020.030  The Contractor must specify the person assigned to each of the key positions identified. 

Responsibility  <Response> 

OMES-200.020.050  The Contractor must provide a Project Manager (PM) and other key personnel onsite as required by the State, to attend meetings and conduct project work as required,. 

Responsibility  <Response> 

OMES-200.020.060  The Contractor must provide support teams for all general activities and tasks including operations, administration, maintenance, and technical support. 

Responsibility  <Response> 

OMES-200.020.070  The Contractor must provide ongoing administration support required to manage software updates, patches, and data management for their proposed solution. 

Responsibility  <Response> 

OMES-200.020.090  The Contractor must remove any project personnel, if requested by the State, as agreed between the parties. The key personnel must be replaced within 15 business days after the position is vacant, unless a longer period is approved by the State. The Contractor must replace key personnel, subject to approval by the State, regardless of the reason for replacement. 

Responsibility  <Response> 

OMES-200.020.120  The Contractor must ensure that the project table of organization is updated within 5 business days of any staffing changes and stored in a location accessible to the State. 

Responsibility  <Response> 

OMES-200.020.130  The Contractor must describe the documentation and process for knowledge transfer used to ensure continuity in business knowledge through any staff changes or reassignments. 

Responsibility  <Response> 

40

Page 41: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

OMES-200.030.010  The Contractor must prepare and submit weekly updates to the project schedule. Weekly updates must include an executive summary highlighting the updates to the schedule and call attention to any areas of risk. 

Responsibility  <Response> 

OMES-200.030.020  The Contractor must update and present the Work Plan to the State on a weekly basis. 

Responsibility  <Response> 

OMES-200.030.030  The Contractor must document all issues using the State-approved issue management process. 

Responsibility  <Response> 

OMES-200.030.040  The Contractor must provide the status of the project to the State PMO according to the schedule outlined in the Project Plan. The Contractor must include the following in the weekly and monthly status reporting for the lifecycle of the project:  

Issues and Risk Management;  Milestone status;   Earned Value;  Velocity Management Report;  Change Management;  Action Items Management;  Project Meeting Minutes;  Staffing changes; and  Key Project Indicators including Cost 

Performance Index (CPI) and Schedule Performance Index (SPI).

Responsibility  <Response> 

OMES-200.030.050  The Contractor must create a dashboard with standards for reporting active project risks, issues, and action items based on State-identified levels of criticality. Any critical status reporting must be accompanied by a Corrective Action Plan (CAP). 

Responsibility  <Response> 

OMES-200.030.060  The Contractor must maintain a decision log using a State-provided template for all project decisions. 

Responsibility  <Response> 

OMES-200.030.070  The Contractor must provide a State-approved deliverable tracking method to ensure all project related deliverables have been accounted for, scheduled, and coordinated with the State PMO. All deliverables must be approved by the State. 

Responsibility  <Response> 

OMES-200.030.080  The Contractor must provide, upon State's request, a CAP within 5 business days, for any milestones or deliverables which are missed or projected to be missed, that includes the following information: 

Root cause;  Impact on schedule, scope, and costs;  Milestone recovery strategy;  Milestone recovery date;  Project recovery strategy; and Project recovery date. 

Responsibility  <Response> 

OMES-200.030.090  The Contractor must ensure the established Change Management process is followed with stakeholder input to address scope, schedule, or cost changes. 

Responsibility  <Response> 

OMES-200.030.100  The Contractor must accomplish full implementation of all business requirements in accordance with the State-

Non-functional  <Response> 

41

Page 42: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

approved project schedule, and with State-defined SLAs starting from the project kick-off meeting. 

OMES-200.030.110  The Contractor must analyze and document project lessons learned on an ongoing basis, hold a walkthrough meeting of the results, and provide an evaluation report within a State-approved timeframe of each module implementation date. 

Responsibility  <Response> 

OMES-200.040.010  The Contractor must provide a Turnover Plan to address the transition approach for operations, services, and module components. 

Responsibility  <Response> 

OMES-200.040.020  The Contractor must report the status of transition activities to the State during the turnover phase, at a frequency defined by the State. 

Responsibility  <Response> 

OMES-200.040.030  The Contractor must turnover all program data to the State upon close out of the Contract or request of the State. 

Responsibility  <Response> 

OMES-200.040.040  The Contractor must maintain system and operations to ensure continuity of State business functions during turnover. 

Responsibility  <Response> 

OMES-200.040.050  The Contractor must cooperate with the incumbent MMIS Contractor and the successor contractor(s) as necessary during turnover activities. 

Responsibility  <Response> 

 The   Offeror  must   describe   its   proposed   approach   to  meeting   each   of   the   Project  Management requirements above. The narrative response for this category must be organized to successfully address all   the   requirements   in   the  category.  Any   requirement  not  clearly   addressed   in   the   response  may negatively affect the Offeror’s scoring.  Any exceptions must be identified using specific requirement references. <Response>  

6.2. Testing Testing includes actions related to the verification of the solution, necessary to ensure the system is fully tested and vetted prior to being promoted into the production environment. Expected activities related to Testing include: 

Setup and maintenance of testing environments; Support for Operational Readiness Review (ORR); and Promotion of functionality from a test environment to production environment. 

Below are the Testing requirements that must be fulfilled by the Contractor. Table 17 – Testing Requirements

Requirement ID Requirement Description Requirement Type

Capability Assessment

OMES-220.000.010  The Contractor must provide support staff and technical expertise to assist testing activities. 

Responsibility  <Response> 

OMES-220.000.030  The Contractor must provide authorized users access to the testing tool. 

Responsibility  <Response> 

42

Page 43: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

OMES-220.000.040  The solution must allow a tester to easily manipulate the system date for temporal testing within all testing environments. 

Non-functional  <Response> 

OMES-220.010.010  The Contractor must include an overview of their testing methodology as part of the Master Test Plan. 

Non-functional  <Response> 

OMES-220.010.020  The Contractor must document the approach to testing throughout the life cycle of the project as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.030  The Contractor must specify the solution functionality that is in and out of scope for testing as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.040  The Contractor must define the test strategy as part of the Master Test Plan, including objectives and required types of testing for each of the testing activities. 

Responsibility  <Response> 

OMES-220.010.050  The Contractor must specify, as part of the Master Test Plan, each of the facilities and tools to be used, Contractor resources required, and State resources required, for each testing cycle. 

Responsibility  <Response> 

OMES-220.010.060  The Contractor must include the testing schedule as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.070  The Contractor must describe how, and at which phase, other Contractor products are incorporated in the overall testing schedule, as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.080  The Contractor must include roles and responsibilities throughout all testing phases as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.090  The Contractor must include the strategy for maintaining testing environments to facilitate all testing activities, as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.100  The Contractor must describe how it maintains the test environments, including loading test data routinely used to perform its automated processes (e.g., system parameters, system lists, reference tables, edits, disposition, security tables), as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.110  The Contractor must explain the strategy to be used for creating and populating the test database and maintaining data during iterative testing, as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.120  The Contractor must explain the strategies for collaboration and sharing of test cases with the State, its staff, and its designees to support applicable testing cycles, as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.130  The Contractor must explain how pass-fail criteria and time frames are established as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.140  The Contractor must explain the process used to establish phase entry and exit criteria (e.g., numbers and types of defects, defect severity/priority), as part of the Master Test Plan. 

Responsibility  <Response> 

43

Page 44: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

OMES-220.010.150  The Contractor must explain the processes and procedures for releasing testing results, data analysis, and review and approval of test results, as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.160  The Contractor must define procedures/workflows for notifying the State of problems discovered in testing, testing progress, and adherence to the test schedule, as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.170  The Contractor must define the defect resolution process as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.180  The Contractor must describe the format and content of test progress and defect reports as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.190  The Contractor must describe how test scenarios, test cases, and test results are traced to requirements, as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.200  The Contractor must describe as part of the Master Test Plan, the approach to regression testing at all levels when defects are resolved. 

Responsibility  <Response> 

OMES-220.010.210  The Contractor must include a description of the process used for identification and preparation of data required for the System Integration test effort, including a description of the use of prior system-migrated and transformed data during test, as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.220  The Contractor must describe how services are tested as part of the Master Test Plan. 

Responsibility  <Response> 

OMES-220.010.230  The Contractor must describe, as part of the Master Test Plan, support that is assigned and provided to the State and other OMES module contractor staff, for the UAT testing phase. 

Responsibility  <Response> 

OMES-220.010.240  The Contractor must provide a walk-through of the Master Test Plan before submitting it to the State for approval. 

Responsibility  <Response> 

OMES-220.020.010  The Contractor must provide test environments as appropriate for all test phases, to address all testing activities. 

Responsibility  <Response> 

OMES-220.020.020  The solution must provide for visual distinction between test and production environments and data. 

Non-functional  <Response> 

OMES-220.020.030  The Contractor must provide authorized users access to necessary testing environments as required for testing onsite, from State offices, and remotely during the DDI phase and throughout the life of the Contract. 

Responsibility  <Response> 

OMES-220.020.040  The Contractor must integrate version control in all environments. 

Responsibility  <Response> 

OMES-220.020.050  The Contractor must ensure that the test environment(s) are scalable in their size, files, databases, processing, and reporting, as appropriate for the activity in the environment. 

Responsibility  <Response> 

OMES-220.020.060  The Contractor must perform test environment data  Responsibility  <Response> 

44

Page 45: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

refreshes as defined in the State-approved Data Management Plan. 

OMES-220.020.070  The Contractor must provide a process for extracting data from the production environment and importing into non-production environments. 

Responsibility  <Response> 

OMES-220.020.080  The Contractor must provide a process for masking, sanitizing, scrambling, or de-sensitizing sensitive data PHI/PII/SSI, when extracting data from the production environment into State-specified non-production environments for purposes such as training. 

Responsibility  <Response> 

OMES-220.020.090  The Contractor must make test environments available to support testing activities of other OMES modules. 

Responsibility  <Response> 

OMES-220.030.010  The Contractor must perform and support testing throughout the project. Testing must address the following activities, at a minimum: 

Unit Testing; System; Integration Testing;  Interface Testing; Performance Testing;  Regression Testing; User Acceptance Testing (UAT);  Operational Readiness Tests (ORT); and  Operational Readiness Review (ORR).

Responsibility  <Response> 

OMES-220.030.020  The Contractor must perform performance testing of the application(s) with expected production load prior to implementation, until State-required results are achieved. 

Responsibility  <Response> 

OMES-220.030.030  The Contractor must develop comprehensive positive and negative test cases for all phases of testing. 

Responsibility  <Response> 

OMES-220.030.040  The Contractor must provide the State and its designees access to test cases through a testing tool to facilitate execution of applicable testing cycles. 

Responsibility  <Response> 

OMES-220.030.050  The Contractor must resolve abnormal results that arise during the execution of State-identified test cycles (e.g., DDI, operations, UAT), consistent with State-defined SLAs. 

Responsibility  <Response> 

OMES-220.030.060  The Contractor must maintain test results in the testing tool and provide reports to the State after each test cycle and upon request by the State. 

Responsibility  <Response> 

OMES-220.030.070  The Contractor must provide test results, which include the number of test scenarios, cases, scripts executed, and the pass/fail ratio. 

Responsibility  <Response> 

OMES-220.030.080  The Contractor must submit the number of defects identified and corrected along with their severity ranking after each test cycle and upon request by the State. 

Responsibility  <Response> 

OMES-220.030.090  The Contractor must perform end-to-end regression testing for all defects identified and provide regression testing results. 

Responsibility  <Response> 

OMES-220.030.100  The Contractor must track and report weekly on the  Responsibility  <Response> 

45

Page 46: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

defects identified and the progress made toward resolution of defects, including metrics on number of tests completed, number deferred or cancelled, results of the tests executed, defects identified by severity, and corrections undertaken. 

OMES-220.030.110  The Contractor must prepare and deliver a Requirements Traceability Matrix (RTM) with test results and Contractor certification of successful test completion, to the State for each phase of testing. 

Responsibility  <Response> 

OMES-220.040.010  The Contractor must provide an end-to-end demonstration of the system including any changes or enhancements prior to UAT. 

Responsibility  <Response> 

OMES-220.040.020  The Contractor must have processes in place to load production and other State-identified data into the UAT environment at the State's request, as necessary to perform its automated processes. 

Responsibility  <Response> 

OMES-220.040.030  The Contractor must ensure that UAT is conducted on a fully tested and operations-ready module component, including all software features. 

Responsibility  <Response> 

OMES-220.040.040  The Contractor must ensure that UAT is conducted in a controlled environment separate from all other environments using cycle times determined mutually by the Contractor and the State. 

Responsibility  <Response> 

OMES-220.050.010  The Contractor must participate in an Operational Readiness Review (ORR) prior to solution implementation. The ORR involves validating all the operations and hardware, software, and the connectivity aspects of the solution. This review must involve comparing all operational components of the replacement system against the ORR checklists. 

Responsibility  <Response> 

OMES-220.050.020  The Contractor must perform Operational Readiness Testing that includes a test of actual data processing in a fully operational environment. End-to-end MMIS functionality must be fully tested, including other State-identified system components. 

Responsibility  <Response> 

OMES-220.050.030  The Contractor must demonstrate, through the ORR task that the solution is ready to perform all functions, meeting all reporting requirements, using a properly functioning data communications network, meeting system performance requirements, and has demonstrated back up capacity. 

Responsibility  <Response> 

OMES-220.050.040  The Contractor must submit the ORR plan and ORR checklists to the State for review and approval consistent with the State-approved deliverable schedule, and update them at a frequency agreed upon by the Contractor and the State. 

Responsibility  <Response> 

OMES-220.050.050  The Contractor must receive written approval from the State before making a change to the ORR plan or checklists. 

Responsibility  <Response> 

OMES-220.050.060  The Contractor must participate in ORR testing that  Responsibility  <Response> 

46

Page 47: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

includes a volume test of 30 calendar days of production capacity volumes to demonstrate that the solution and staff are prepared for full production. 

OMES-220.050.070  The Contractor must provide the State their completed ORR checklists within timeframes established in the approved ORR plan. 

Responsibility  <Response> 

OMES-220.050.080  The Contractor must document all issues, problems, and defects for the solution identified through the ORR. 

Responsibility  <Response> 

OMES-220.050.090  The Contractor must propose solutions for all issues, problems, and defects for the solution identified through the ORR. 

Responsibility  <Response> 

OMES-220.050.100  The Contractor must participate in the development and execution of ORR Corrective Action Plans (CAP) within State-defined timeframes. 

Responsibility  <Response> 

OMES-220.050.110  The Contractor must document the completion of ORR CAPs, with sign-off by the State. 

Responsibility  <Response> 

 The Offeror must describe its proposed approach to meeting each of the Testing requirements above. The narrative response  for   this  category  must  be organized  to  address  all   the  requirements   in   the category. Any requirement not clearly addressed in the response may negatively affect the Offeror’s scoring. Offerors must describe their demonstrated experience in developing testing documentation by including sample test plans as part of their response.  Any exceptions must be identified using specific requirement references. <Response>  

 

6.3. Training Training describes the actions necessary to ensure ADAT solution users understand and can operate the intended   solution,   including   generation  of   training  plans,   planning   training   activities,   logistics,   and generation of training materials. The scope of training includes both internal and external OME users including State staff, subcontractors, Providers, and MCP staff. The selected Contractor must provide tailored training activities aligned with the needs of each specific user group. Expected activities related to Training must include:  

Development and maintenance of a Training Plan(s);  Delivery of direct hands-on training to all staff identified by ODM as needing training;  Development and maintenance of training materials in State-approved formats; Delivery of training to new staff consistent with assigned roles and responsibilities;  Delivery of in-person and on-site training for each release, at the discretion of the State; and  Analysis to tailor training to specific user roles and groups.

For the purposes of the Proposal, please assume: Initial training for the solution to 60 analysts upon deployment; Training to be performed on site (ODM training room); and Materials for each trainee.

47

Page 48: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Below are the Training requirements to be fulfilled by the Contractor. Table 18 – Training Requirements

Requirement ID Requirement Description Requirement Type

Capability Assessment

OMES-230.010.090  The Contractor must develop a Training Plan which accounts for solution modifications and provide updates to the plan within 5 business days of deploying changes to User Acceptance Testing. 

Responsibility  <Response> 

OMES-230.010.100  The Contractor must update the Training Plan with the appropriate level of detail matching that of solution modifications, as approved by the State. 

Responsibility  <Response> 

OMES-230.010.110  The Contractor must receive State approval prior to implementing changes to approved Training Plans. 

Responsibility  <Response> 

OMES-230.020.030  The Contractor must provide training materials in formats consistent with accessibility requirements of the Americans with Disabilities Act (ADA). 

Responsibility  <Response> 

OMES-230.020.040  The Contractor must review and update training curriculum and materials quarterly and upon system changes for relevance, accuracy, and consistency. 

Responsibility  <Response> 

OMES-230.030.010  The Contractor must analyze, define, and tailor training to each specific user role and group (e.g., State agency staff, other Contractor staff, providers, managed care plan staff). 

Responsibility  <Response> 

OMES-230.030.020  The Contractor must provide training to users beginning 40 business days before and completed no later than 10 business days prior to the initial implementation of the solution. 

Responsibility  <Response> 

OMES-230.030.030  The Contractor must provide State-approved staff, knowledgeable of the module and related components, to perform training. 

Responsibility  <Response> 

OMES-230.030.040  The Contractor must conduct initial, in-person, and on-site training for each release, at the discretion of the State, to train appropriate users (e.g., State agency staff, other Contractor staff, providers, managed care plan staff). 

Responsibility  <Response> 

OMES-230.030.050  The Contractor must provide training support for all user groups, in accessible locations and formats, as defined by the State. 

Responsibility  <Response> 

OMES-230.030.060  The Contractor must provide training to new staff consistent with assigned roles and responsibilities to ensure they are fully knowledgeable on operations of the solution prior to onboarding them to the project. 

Responsibility  <Response> 

OMES-230.030.070  The Contractor must provide and maintain online  Responsibility  <Response> 

48

Page 49: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

tutorials for new users describing the operational and processing features of the solution.  

OMES-230.030.080  The Contractor must provide an assessment of the participants to determine the effectiveness of training and trainee competency. 

Responsibility  <Response> 

OMES-230.030.090  The Contractor must provide a certificate to indicate the successful completion of training by a participant. 

Responsibility  <Response> 

 The Offeror must describe its proposed approach to meeting each of the Training requirements above. The narrative response for this category must be organized to clearly address all the requirements in the category. Any requirement not clearly addressed in the response may negatively affect the Offeror’s scoring. Any exceptions must be identified using specific requirement references. <Response>   

6.4. CMS Certification 

The Advanced Data Analytic Tool does not have complete functionality to meet the entire needs for CMS certification of  an  MMIS reporting and evaluation system.    The Contractor  will  be  worked with,  as necessary,   in   the   preparation   and   submission   of   evidence   and   supporting   information   for   those elements which may be included for a CMS Certification process.

 

 

7. Global Criterion #4 - Maintenance and Operations Requirements 

The   Contractor   will   be   responsible   for   the   configuration,  maintenance,   and  management   of   the proposed solution for the life of the engagement. The objectives of the maintenance and operation period include system availability, transaction performance, data security, data integrity, and effective change  management   in  partnership  with  ODM. During   the  maintenance  and  operations  phase,   the Contractor is responsible for change management activities in response to internal or external drivers.  

Operational support consists of all activities associated with the reliable operation of computer systems, including research and resolution of major and minor operational issues (e.g., system outages, rejected records, data quality problems). Contractors are expected to actively collaborate with the operators of other OMES components and to participate in corrective actions as needed to resolve implementation and operational issues that affect their components, including those that span module boundaries. 

The Offeror must provide a narrative overview to demonstrate a clear understanding and capability to deliver Maintenance and Operations (M&O) services  in this section. Offerors must use the response 

49

Page 50: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

sections below to provide specific details of the proposed approach to meeting the maintenance and operations requirements in each requirement category.  

7.1. Maintenance and Operations M&O activities ensure that the system is fully functional and performing optimally until the end of the Contract,   including the configuration,   implementation,  maintenance,  and operation of  the proposed solution. Expected activities related to M&O include:  

Providing support teams for general activities and tasks including operations, administration, maintenance, and technical support; 

Providing and supporting updates to the underlying solutions products, in response to changes in ODM business needs;

Documenting and updating Root Cause Analysis (RCA) and change requests, as needed;  Supporting   secure,   online,   role-based   inquiries,   reporting,   updates,   and   submissions   to   the 

integrated services and ancillary applications (need to be clarified with the potential acquisition of Functional Support); and 

Collaboration with other OMES module contractors, as needed. 

Below are the M&O requirements to be fulfilled by the Contractor.     

Table 20 – Maintenance & Operations Requirements Requirement ID Requirement Description Requirement

Type Capability Assessment

ADAM-030.000.005  The Contractor must support the generation and maintenance of instructions, guidance, and other materials to support use of the solution. 

Business Operations 

<Response> 

ADAM-030.000.010  The Contractor must provide a proposed process to track and publish data issues within the solution.

Functional  <Response> 

ADAM-030.000.020  The Contractor must provide a proposed process to track and publish load error monitoring within the solution.

Functional  <Response> 

ADAM-030.000.030  The Contractor must provide a proposed process to track and submit reports to appropriate staff Solution Utilization monitoring and data access monitoring within the solution.

Functional  <Response> 

ADAM-030.000.040  The Contractor must provide Data Dictionaries and Solution Use documents for the solution.

Functional  <Response> 

EDI-350.000.090  The Contractor must provide helpdesk hours of operation that meet ODM business needs, consistent with State-defined SLAs. 

Business Operations 

<Response> 

EDI-350.000.160  The Contractor must monitor operating system, web servers, application servers, software, back-up software, database servers or any other applications necessary for the operation of the solution. 

Business Operations 

<Response> 

OMES-300.000.010  The Contractor must provide system maintenance  Responsibility  <Response> 

50

Page 51: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

activities for service changes and system upgrades for their proposed solution. 

OMES-300.000.015  The Contractor must provide post-implementation support for a State-approved period of time following service changes and system upgrades. 

Responsibility  <Response> 

OMES-300.000.020  The Contractor must provide system maintenance activities necessary to correct all operational issues. 

Responsibility  <Response> 

OMES-300.000.030  The Contractor must provide system maintenance activities necessary to meet OMES performance requirements. 

Responsibility  <Response> 

OMES-300.000.040  The Contractor must provide system maintenance activities necessary to ensure audit logs, programs, and documentation are current for the solution. 

Responsibility  <Response> 

OMES-300.000.050  The Contractor must provide system maintenance activities which include the addition of new configuration settings and modifications. 

Responsibility  <Response> 

OMES-300.000.060  The Contractor must document change requests for any identified system or business process operational issues within 3 business days of discovery of the deficiency or within a timeframe determined by the State. 

Responsibility  <Response> 

OMES-300.000.070  The Contractor must provide the State with a Root Cause Analysis (RCA) document in a State-approved format within 5 business days of the discovery of a system or business process operational issue. The RCA must be continually updated until the issue is completely resolved. 

Responsibility  <Response> 

 The Offeror must describe its proposed approach to meeting each of the Maintenance and Operations requirements above. The narrative response for this category must be organized to successfully address all   the   requirements   in   the  category.  Any   requirement  not  clearly   addressed   in   the   response  may negatively affect the Offeror’s scoring.  Any exceptions must be identified using specific requirement references. <Response>   

7.2. Business Continuity/Disaster Recovery Business  Continuity   (BC)/Disaster  Recovery   (DR)  category  describes   the plans,  activities,  and testing measures required to ensure continuity and recovery of the OMES business operations during periods of system malfunction  or   a  disaster  event.     Inasmuch   as   the  proposed   solutions  are  expected   to  be Software as a Solution, but could also be addressed as an On-Premise computing solution, the issue of M&O may assume various forms depending upon each vendor’s Proposal.    The list of requirements below are primarily  viewed as essential   for  On-Premise solutions,  but  communication and technical support is expected no matter which system of delivery is proposed. These aspects are expected to be addressed in all proposals, whether it is an activity assumed to occur on site or whether it is vendor activity occurring at a separate computing site.  Expected BC/DR activities include:    

51

Page 52: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Creation and maintenance of a Business Continuity Plan (BCP) and a Disaster Recovery Plan (DRP) in accordance with State requirements, which adhere to applicable State and federal laws, rules, regulations, and guidelines; 

Annual review and maintenance of the BCPs and DRPs;  Establishment   and   maintenance   of   a   hierarchy   of   critical   services   and   infrastructure   to 

determine the order in which services will be restored;  Execution of a Business Impact Analysis (BIA) process to establish recovery standards, Recovery 

Time Objective (RTO) and Recovery Point Objective (RPO) based on business need, with State business input across all OMES modules; and 

Establishment  of  a  disaster   recovery  environment   including  backup  network  connectivity   to both the primary production and DR environments.

Below are the BC/DR requirements to be fulfilled by the Contractor. Table 21 – Business Continuity/Disaster Recovery Requirements

Requirement ID Requirement Description Requirement Type

Capability Assessment

OMES-130.000.008  The solution is expected to be a “Software as a Solution”, but can also be proposed to reside on Ohio DAS Technical Infrastructure.  If the Offeror’s solution requires the data to be moved to external servers, the Contractor must assume all risk for business continuity / disaster recovery.  If the data remains within the ODM EDW, the Contractor assumes responsibility for saving of reports / templates developed within the tool.  

Responsibility  <Response> 

OMES-310.000.010  The Contractor must develop a Business Continuity Plan (BCP) and a Disaster Recovery Plan (DRP). The BCP and DRP must address procedures for responses to emergencies and other business interruptions. 

Responsibility  <Response> 

OMES-310.000.020  The Contractor must prepare and submit for State’s approval, a comprehensive Business Continuity Plan and Disaster Recovery Plan due to the State, 30 business days prior to system go-live, on an annual basis, and after any substantive changes to the solution that would require revision to the plans. 

Responsibility  <Response> 

OMES-310.000.030  The Contractor must provide a Business Continuity Plan and a Disaster Recovery Plan which adhere to applicable State and federal laws, rules, regulations, and guidelines. 

Responsibility  <Response> 

OMES-310.000.040  The Contractor must develop, maintain, and submit in advance to the State, all proposed offsite procedures, locations, and protocols for State review and approval prior to implementation. 

Responsibility  <Response> 

OMES-310.000.050  The Contractor must explain the processes used to review, test, and update the Business Continuity Plan and Disaster Recovery Plan. 

Responsibility  <Response> 

52

Page 53: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

OMES-310.000.060  The Contractor must identify the frequency with which the Business Continuity and Disaster Recovery Plans will be reviewed and updated. 

Responsibility  <Response> 

OMES-310.000.070  The Contractor must coordinate with, and demonstrate to the State, the Business Continuity and Contingency Plan every calendar year in conjunction with the annual disaster recovery demonstration. 

Responsibility  <Response> 

OMES-310.000.080  The Contractor must ensure that if the primary environment cannot be restored, that the recovery environment be considered the new primary environment. 

Responsibility  <Response> 

OMES-310.000.090  The Contractor must, in cooperation with the State, establish and maintain a hierarchy of critical services and infrastructure to determine the order in which services will be restored. 

Responsibility  <Response> 

OMES-310.000.100  The Contractor must, in the case of a disaster, restore the solution as per State-defined SLAs. 

Responsibility  <Response> 

OMES-310.000.110  The Contractor must coordinate with the State to meet the minimum geographic offsite location requirement of at least 100 miles between the disaster recovery site and the production environment site. 

Responsibility  <Response> 

OMES-310.000.120  The Contractor must perform a Business Impact Analysis (BIA) process to establish recovery standards, RTO, and RPO based on business need, with State business input across all OMES modules, incorporating the results into the BCP and DRP. The BIA process must be subject to State approval and address the following primary goals: 

Criticality prioritization.  Resource requirements. 

Responsibility  <Response> 

OMES-310.010.010  The Contractor must in the event of a process or system malfunction, resume normal operational business functions at the earliest possible time, in accordance with the State-approved Business Continuity Plan. 

Responsibility  <Response> 

OMES-310.010.020  The Contractor must provide a Business Continuity Plan which identifies the core business processes involved in the production solution. 

Responsibility  <Response> 

OMES-310.010.030  The Contractor must include the following for each core business process identified in the Business Continuity Plan: 

Potential failures;  Risk analysis;  Impact analysis; and  Minimum acceptable levels of service/output.

Responsibility  <Response> 

OMES-310.010.040  The Contractor must include communication protocols and processes for restoring operations in a timely manner, as part of the Business Continuity Plan. 

Responsibility  <Response> 

OMES-310.010.050  The Contractor must provide triggers for activating contingency plans as part of the Business Continuity Plan. 

Responsibility  <Response> 

OMES-310.010.060  The Contractor must provide a Business Continuity Plan  Responsibility  <Response> 

53

Page 54: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

which addresses short-and-long-term restoration, relocation, and possible replacement of resources (e.g., communications, supplies, transportation, space, power and environmental controls, documentation, people, data, software, hardware). 

OMES-310.010.070  The Contractor must identify procedures for activating emergency personnel as part of the Business Continuity Plan. 

Responsibility  <Response> 

OMES-310.010.080  The Contractor must review, test, and update their Business Continuity Plan annually for the life of the Contract at no additional cost to the State. 

Responsibility  <Response> 

OMES-310.020.010  The Contractor must upon request by the State, execute a disaster recovery test within a State-identified timeframe. 

Responsibility  <Response> 

OMES-310.020.020  The Contractor must align their disaster recovery testing schedule with the overall OMES disaster recovery schedule, as defined by the State. 

Responsibility  <Response> 

OMES-310.020.030  The Contractor must provide a Disaster Recovery Plan which addresses recovery of technical functions, human resources, technology infrastructure and at a minimum include: 

Checkpoint/restart capabilities;  Retention and storage of back-up files; Hardware back-up for the servers;  Hardware back-up for data entry; Network back-up for telecommunications;   Telephone communications lines to the disaster 

back-up site;  Recovery prioritization list (hardware and 

software applications);  Telecommunication Voice Switch; and  Power supply to facilitate orderly system 

shutdown.

Responsibility  <Response> 

OMES-310.020.040  The Contractor must provide a Disaster Recovery Plan, which details procedures addressing events such as disasters and catastrophes. 

Responsibility  <Response> 

OMES-310.020.050  The Contractor must incorporate all State-approved offsite procedures, locations, and protocols into their Disaster Recovery Plan. 

Responsibility  <Response> 

OMES-310.020.060  The Contractor must provide a Disaster Recovery Plan, which addresses the restoration, relocation, or replacement of resources associated with the data in accordance with State-defined timeframes. 

Responsibility  <Response> 

OMES-310.020.070  The Contractor must provide a Disaster Recovery Plan which outlines the backup and recovery for all operations, both manual and automated, including all functions required to meet the backup and recovery standards: Recovery Time Objective (RTO) and Recovery Point Objective (RPO), as per State-defined SLAs. 

Responsibility  <Response> 

OMES-310.020.080  The Contractor must provide a Disaster Recovery Plan, which complies with State geographical separation 

Responsibility  <Response> 

54

Page 55: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

policies for data storage and identify the location where the data is to be stored. 

OMES-310.020.090  The Contractor must provide a Disaster Recovery Plan, which addresses backing up and storing data at a separate onshore location, at which the Contractor maintains all data in case of loss of that data in the primary environment. 

Responsibility  <Response> 

OMES-310.020.100  The Contractor must modify the Disaster Recovery Plan, software installation procedures, and operational procedures to reflect the changes implemented with new data sources, system changes, or any enhancements that will impact the disaster recovery capability. 

Responsibility  <Response> 

OMES-310.020.110  The Contractor must integrate their Disaster Recovery Plan with the Systems Integrator's Disaster Recovery Plan. 

Responsibility  <Response> 

OMES-310.020.120  The Contractor must plan, coordinate, manage, and execute disaster recovery activities with State-approved business partners. 

Responsibility  <Response> 

OMES-310.020.130  The Contractor must coordinate with and demonstrate to the State the Contractor's disaster recovery capabilities, in accordance with State-defined SLAs. 

Responsibility  <Response> 

OMES-310.020.140  The Contractor must include in their Disaster Recovery Plan, the capabilities and functionality needed to restore the solution to the current State of the OMES system, in the event of a catastrophe or disaster. 

Responsibility  <Response> 

OMES-310.020.150  The Contractor must in the event of a catastrophe or disaster, resume normal operational business functions at the earliest possible time, in accordance with State-defined SLAs and per the State-approved Disaster Recovery Plan. 

Responsibility  <Response> 

OMES-310.020.160  The Contractor must, in the event that the primary production site is deemed inoperable, notify the State and execute the Disaster Recovery Plan, in accordance with State-defined SLAs. 

Responsibility  <Response> 

OMES-310.020.170  The Contractor must provide backup network connectivity to both the primary production and disaster recovery environments with the capacity to support the solution. 

Responsibility  <Response> 

OMES-310.020.180  The Contractor must maintain or otherwise arrange for a disaster recovery environment for its system operations in the event a disaster renders the Contractor's production environment inoperable. 

Responsibility  <Response> 

OMES-310.020.190  The Contractor must perform an annual review of the disaster recovery backup environment procedures for all offsite storage and validation of security procedures. 

Responsibility  <Response> 

OMES-310.020.200  The Contractor must ensure that the availability schedules and corresponding SLAs apply to the disaster recovery environment when fulfilling the production role. 

Responsibility  <Response> 

55

Page 56: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

OMES-310.020.210  The Contractor must move technical operations to the disaster recovery environment, if the technical production site becomes unavailable during the Contract period. 

Responsibility  <Response> 

OMES-310.020.220  The Contractor must receive approval from the State prior to returning to the original production environment from the disaster recovery environment. 

Responsibility  <Response> 

OMES-310.020.230  The Contractor must provide the State a detailed report summarizing the disaster recovery event. This report must include remediation steps taken to resolve any issues discovered during the disaster recovery event. 

Responsibility  <Response> 

OMES-310.020.240  The Contractor must review, test, and update their Disaster Recovery Plan, at least annually. Testing at a minimum must include comprehensive tabletop exercises. 

Responsibility  <Response> 

OMES-310.020.250  The Contractor must execute a disaster recovery test annually for the life of the Contract at no additional cost to the State, as reflected in the State-approved Disaster Recovery Plan. 

Responsibility  <Response> 

OMES-310.020.260  The Contractor must continue to perform the disaster recovery test at its expense, until satisfactory results are received and approved by the State. 

Responsibility  <Response> 

OMES-310.020.270  The Contractor must execute a disaster recovery test, at least annually, to demonstrate the Contractor's ability to restore processing ability in accordance with the DRP and for all critical system components in a remote environment. The test must conform to State SLAs related to the amount of time that is necessary to recover from the disaster and provide proof that the recovery has been successfully completed using live data. 

Responsibility  <Response> 

OMES-310.020.280  The Contractor must ensure that the disaster recovery test includes the processing of one weekly Extract, Transform, Load (ETL) cycle and one daily ETL cycle as in place at the time of the test, and involves all major technical functions including data acquisition, data access (web portal, business intelligence capabilities), and data delivery. 

Responsibility  <Response> 

OMES-310.020.290  The Contractor must provide the State a report summarizing disaster recovery test results no later than 5 business days after the conclusion of the test. This report must include remediation steps taken to resolve any issues discovered during the test. 

Responsibility  <Response> 

 The Offeror must describe its proposed approach to meeting each of the BC/DR requirements above. The narrative response  for   this  category  must  be organized  to  address  all   the  requirements   in   the category. Any requirement not clearly addressed in the response may negatively affect the Offeror’s scoring. Offerors must describe their demonstrated experience in developing system documentation by including sample BC/DR plans as part of their response. Any exceptions must be identified using specific requirement references. 

56

Page 57: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

<Response> 

57

Page 58: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

 

8. Global Criterion #5 – ExperienceFor each of the three (3) Clients listed in Template A – 2.1.1 Mandatory Qualification #1 – Experience, the Offeror must indicate why each of these examples demonstrates that the solution being proposed will  meet the needs required  in the RFP (e.g.   large magnitude of  claims,  complex system of  health providers, health care metrics, etc.).   In addition, the Offeror must demonstrate an understanding of modern   health   claims   adjudication   and   describe   how   their   proposed   solution   facilitates   the understanding of how the system / programs are operating / meeting their objectives for ODM and the Sister State Agencies. 

<Response>

9. Summary of Deliverables This  section describes high-level  task groups and associated deliverables.  The task groups are  listed below in Table 23.  The ODM has identified several critical deliverables and milestones associated with each of the task groups which must be completed in a timely manner to ensure the project’s success. All Contract deliverables are to be aligned with associated documents of the State, where applicable.

Table 24 portrays these deliverables by task group and includes brief descriptions of each.  

Successful completion of project deliverables and milestones is monitored through deliverable SLAs and payment models are identified in the RFP. More than one payment milestone can be associated with each task group and the task group to payment milestone(s) association for ADAT solution is identified in Template B – Cost Proposal Workbook of the RFP. Offerors are not required to respond to this section. 

Table 23 – High-level Project Task Groups and Descriptions Task Group Description ADAT Initiation and Planning  Establishes   project   governance   through   the   development   of   project 

management plans and the initial project schedule. ADAT Solution Planning  Entails development of the solution plans, validation of the initial project 

schedule, and onboarding activities. Solution Configuration Design, Build, and Test 

Involves  development  of   functional  hierarchy  diagrams,   screen   layout diagrams, tables of business rules,  business process diagrams, pseudo-code,   an   entity   relationship   diagram   with   data   dictionary,   updated requirements   traceability   matrix   (RTM),   and   an   updated   basis   of decisions document. 

Solution Testing Plan Establishes the process and expectations to assure that the developed solution has been reviewed to assure that the data within the tables are valid,   the  query   results   produce  accurate   results,   and   the   solution   is sufficiently  efficient   (speed of  processing)   to  allow  the  solution  to  be approved to move into production.

58

Page 59: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Solution Deployment  Fully functional set of software satisfying the requirements and design elements of the ADAT solution.  Includes documentation describing the operation of the software, implementation map, test plan, updated RTM, updated project plan, and an updated basis of decisions document. 

ADAT Maintenance and Operations Manual

Set   of   timelines,   processes   (loads,   ETLs,   updates,   reloads,   etc.), monitoring   reviews,   communication   lines,   security   protocols,   and instructions for the Solution to be implemented and monitored and also allow integration into the entire ODM IT solution.

 

Table 24 identifies these deliverables by task group and section reference and includes brief descriptions of each.  

Table 24 – Project Deliverables with Descriptions, by Task Group Deliverable Name Description Section Reference

DDI Initiation and Planning Deliverable Expectation Document  A document that includes an outline for all 

expected   deliverables   to   set   content expectations   and   delivery   format expectations. 

6.1 Project Management 

HIPAA Statement  A   statement   conveying   an   entity’s commitment   to   comply  with   all   applicable State   regulations   including   Revised   Code 5160.45,   and   federal   regulations   including, but not limited to, 45 CFR Parts 160 through 164 (HIPAA). 

5.1 System and Application 

Project Kickoff Presentation  A   presentation   describing   the   scope, invitees,   and   attendees   for   the   project kickoff event. 

5.1 System and Application 

Project Management Plan  A formal, approved document used to guide both   project   execution   and   control   of   the project consistent with the guidance of the Project   Management   Body   of   Knowledge (PMBOK). PMP includes: 

Communications Management Plan – Used to define stakeholder groups, outline key messages, and organize outreach and engagement activities to achieve intended communication objectives.  

Cost Management Plan – Captures the approach for monitoring and controlling the budget of project operations.  

6.1 Project Management 

59

Page 60: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

Project Change Management Plan – Defines activities and roles to manage and control change during the execution and control stages of the project.  

Quality Management Plan-- Defines the acceptable level of quality, which is typically defined by the customer, and describes how the project will ensure this level of quality in its deliverables and work processes. 

Requirements Management Plan -- Contains the necessary information required to effectively manage project requirements from definition, through traceability, to delivery. 

Risk and Issues Management Plan – Outlines the process used for the identification, tracking, management, and resolution of risks and issues that could have an impact on the success of the project. 

Schedule Management Plan-- Provides initial guidance and tailors general time management planning for specific project use when performing the time management processes. 

Scope Management Plan-- Outlines what will and will not be included in the deliverables, including details of risks, constraints, and assumptions. 

Staffing Plan-- Outlines the personnel for the project, including items such as the timeframe that personnel are available, when personnel will roll off the project, and the circumstances in which a personnel member can be replaced. 

Project Work Plan: Schedule/Milestone & Burn Down Charts 

A document detailing a plan for carrying out a   process   or   procedures,   giving   lists   of intended events and times. The Project Work Plan   must   include   task   descriptions,   start dates, end dates, task estimation in hours or points, assumptions, and constraints. 

6.1 Project Management 

Solution Planning Master Test Plan  A   technical   document   that   details   a 

systematic   approach   to   testing   a   specific 6.2 Testing 

60

Page 61: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

system   such   as   a   device,   machine,   or software. 

Requirements Traceability Matrix (RTM) – Planning Phase  

A   document   that   links   requirements throughout   the   requirements   validation process   showing   how   the   State's   system requirements,   user   stories,   and   use   cases will be certified as functional and complete. 

5.1 System and Application 

Solution Configuration Design, Build, and Test Business Continuity, Disaster Recovery, Contingency Plans 

A  series  of  plans   for  continuing  operations under adverse conditions. 

7.2   Business Continuity/Disaster Recovery 

Configuration Management Plan  A   document   that   details   the   process   for identifying, controlling and managing various released   items   (e.g.,   code,   hardware, capacity,   licensing,   system   configuration documentation). 

5.1 System and Application 

Operational Readiness Plan  

A   document   detailing   the   approach   to validating   all   the   operations,   hardware, software,   and   connectivity   aspects   of   the solution to  ensure   it  will  be   fully  operable upon implementation including: 

Site Readiness Reports;   Working OMES Module (e.g., 

demonstrations of working software); and 

Operational Readiness Review.

6.2 Testing 

Security Plan  

A formal plan that defines the plan of action to secure computers, systems, and facilities. 

5.5 Security 

Solution Design Document(s)  Documentation   of   the   configuration, integration   and   reporting   agreements including:  

Configuration elements such as business rules;  

Reporting agreements (dashboards, reports, cadence); and 

Interface control documents. 

5.1 System and Application 

Requirements Traceability Matrix (RTM) – Testing Phase  

Planning   RTM   document   updated   with system integration testing (SIT) results, user acceptance testing (UAT) results. 

6.2 Testing 

Solution Documentation  

Documentation   including   the   reference guides, training materials and user guide. 

5.7 User Documentation 

Solution Deployment Inquiry and Issue Management Plan  A   document   that   describes   the   Contractor 

approach   to  management  of   inquiries   and issues via a helpdesk. The plan must include the following types of information: 

Processes associated with documenting troubleshooting requests received; 

List of operational documentation to be developed and maintained by 

5.1 System and Application 

61

Page 62: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

the Contractor, including operational manuals to identify troubleshooting resolution procedures, escalation guidelines, and FAQs; 

Methods for tracking response times and call statistics (source of claims receipt, provider type); 

Methods for tracking and reporting operational performance- add dashboards; and 

List of helpdesk operational reports and their descriptions. 

Solution Implementation Plan  

A   document   reflecting   the   final requirements, implementation approach for the solution and deployment plan. 

5.1 System and Application 

Solution Operations Plan  A   document   that   describes   all   required systems  operational  activities  and  provides guidance   on   data   management,   incident management, root cause analysis, corrective action   plans,   performance   management, system maintenance,   change  management, tools, and approaches. 

5.1 System and Application 

Service Transition Plan  A document that provides a detailed plan for turning   over   service   responsibilities   and assets at the end of the project. This   deliverable   must   conform   to   the guidance   supplied   in  Supplement Four – System Retirement and Transition Plan of this RFP, as it applies to service contracts. 

5.1 System and Application 

Training Plan  A plan for defining the strategies, tasks, and methods   that   will   be   used   to   meet   the training requirements. 

6.3 Training 

Project Status Report  A   report   used   by   the   State   to   determine project performance (including Earned Value and SLA Reports)  and to  alert   the State  of any critical schedule risks and issues. 

6.1 Project Management 

Operational Performance Reports  Documentation   to   monitor   and   provide oversight   of   ADAT   solution   including reporting of key performance indicators. 

5.1 System and Application 

 

    

62

Page 63: Overview of ADAT (Advanced Data Analytics Tool) - Ohio · Web viewThe Advanced Data Analytics Tool will be one part of the Ohio Medicaid Enterprise (OME) informational infrastructure.

 

63