Overview and Status of Assembling and Commissioning the RF-System at PETRA III

12
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA III RF RF : Frequency: Frequency: f f RF RF = 499.66 MHz = 499.66 MHz Beam Power Beam Power (100mA) (100mA): P P beam beam = 759 kW = 759 kW (dipol, undulators, damping wigglers and (dipol, undulators, damping wigglers and HOM losses) HOM losses) Circumferencial Voltage:U Circumferencial Voltage:U c = 20 MV = 20 MV (in 12 7-cell cavities, power per coupler: (in 12 7-cell cavities, power per coupler: 124 kW) 124 kW) rf-Power rf-Power (100mA) (100mA): P P rf rf = 1573 kW = 1573 kW (2 transmitter á 786 kW) (2 transmitter á 786 kW) Mashine : Beam Energy: Beam Energy: E 0 0 = 6 GeV = 6 GeV Length: Length: l = 2304 m l = 2304 m Arc radius Arc radius 191.73 m and 22.918 191.73 m and 22.918 m Beam Current: Beam Current: I 0 = 100 mA = 100 mA (200 mA) (200 mA) loss per turn loss per turn U l = 7.590 MeV = 7.590 MeV Emittance (hor) Emittance (hor) ε = 1 ε = 1 nmrad ! nmrad ! Topping up Topping up Main parameter:

description

Overview and Status of Assembling and Commissioning the RF-System at PETRA III. Main parameter:. Mashine : Beam Energy: E 0 = 6 GeV Length: l = 2304 m Arc radius191.73 m and 22.918 m Beam Current: I 0 = 100 mA (200 mA) loss per turnU l = 7.590 MeV - PowerPoint PPT Presentation

Transcript of Overview and Status of Assembling and Commissioning the RF-System at PETRA III

Page 1: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e112th ESLS RF Meeting

1st October, 2008 at DIAMOND

Overview and Status of Assembling and Commissioning the RF-System at PETRA III

RFRF::Frequency:Frequency: f fRFRF = 499.66 MHz = 499.66 MHzBeam Power Beam Power (100mA)(100mA):: P Pbeambeam = 759 kW = 759 kW (dipol, undulators, damping wigglers and (dipol, undulators, damping wigglers and

HOM losses)HOM losses)

Circumferencial Voltage:UCircumferencial Voltage:Ucc = 20 MV = 20 MV (in 12 7-cell cavities, power per coupler: 124 (in 12 7-cell cavities, power per coupler: 124

kW)kW)

rf-Power rf-Power (100mA)(100mA):: P Prfrf = 1573 kW = 1573 kW (2 transmitter á 786 kW)(2 transmitter á 786 kW)

Mashine: Beam Energy: Beam Energy: EE0 0 = 6 GeV= 6 GeV Length: Length: l = 2304 ml = 2304 m Arc radiusArc radius 191.73 m and 22.918 191.73 m and 22.918 mm Beam Current: Beam Current: II00 = 100 mA (200 mA) = 100 mA (200 mA) loss per turnloss per turn UUll = 7.590 MeV = 7.590 MeV Emittance (hor)Emittance (hor) ε = 1 nmrad !ε = 1 nmrad ! Topping upTopping up

Main parameter:

Page 2: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e212th ESLS RF Meeting

1st October, 2008 at DIAMOND

the new experiment hall

one of 34 moduls on girderone of 34 moduls on girder

1m grounding: >6000 m1m grounding: >6000 m33 concrete concrete

Around 850 concrete mixers came to DESY when the concrete monolithic slab (280 m x 24 m x 1 m) of the new PETRA III experimental hall was poured. It took nearly 60 hours without any interruption.

Page 3: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e312th ESLS RF Meeting

1st October, 2008 at DIAMOND

Changes at the RF system- removal of all 16 cavities and reinstallation of 12 cavities- assembly of new klystron modulators (HV power supplies

instead of tubes)- removal of all old electronic and cables and replace by new

technique (ELWIS)- reconstruction of the waveguide distribution system- development, test, assembly and commissioning of new

control-, regulation- and diagnostictechnique- new high voltage power supply - commissioning of both 500 MHz systems

• design and construction of feedback-cavities• assembly and commissioning of the feedback-system

2007-07-02

2008-09-27

Page 4: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e412th ESLS RF Meeting

1st October, 2008 at DIAMOND

changes by time

2007-07-02 2008-09-272008-09-272007-09-13

hall SLhall SL

2007-11-162007-11-162007-07-02

tunnel SLtunnel SL

2008-09-272008-09-27

Page 5: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e512th ESLS RF Meeting

1st October, 2008 at DIAMOND

transmitter power supply

klystrons

outdoor outdoor equipmeequipmentnt hall SLhall SL

new crowbarnew crowbar

• • data of 1 system: 80kV / 38Adata of 1 system: 80kV / 38A• • work largely donework largely done• • system tested as possible yetsystem tested as possible yet• • tested with klystrons at 60kV / 20Atested with klystrons at 60kV / 20A

Page 6: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e612th ESLS RF Meeting

1st October, 2008 at DIAMOND

RF-system of PETRA III

Waveguide Power Distribution

7-cell cavities

MT

Waveguide Power Distribution

400 kW Load

Interconnection Line

MT

.

WG-Shutter

100 kW Load

400 kW Load

400 kW Load

800 kW Klystron

4-Port

Circulator

Phase-Shifter

Transmitter Hall PETRA-SR Transmitter Hall PETRA-SL

PETRA Tunnel

3 dB Hybr. Coupler

Normally each

transmitter drives its

own 6 cavities.

Option to run one

transmitter on all 12 cavities.

800 kW Klystron

3 dB Hybr. Coupler

100 kW Load

WG-ShutterPhase-Shifter

3 dB Hybr. Coupler

3 dB Hybr. Coupler

Waveguide-Shutter

7-cell cavities

WG-ShutterWG-Shutter

800 kW Klystron

800 kW Klystron

4-Port

Circulator

100 kW Load 100 kW

Load

400 kW Load

Phase-Shifter

Phase-Shifter

Phase-

Shifter

prototypeprototype

Page 7: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e712th ESLS RF Meeting

1st October, 2008 at DIAMOND

Waveguide Power Distribution

3,0 4,8 6,0 7,0 7,8

to SR

from transmitter SL

Interconnection Line

Page 8: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e812th ESLS RF Meeting

1st October, 2008 at DIAMOND

Feedback Kicker-Cavity

60

1010336

- Modified DAΦNE / PSI design- 8 ports- tuneable: 1315 – 1435 MHz- bandwidth: 140 MHz- R/Q: 73 Ω- quality factor (unloaded): 230- 8 pieces made at DESY

1435 MHz

1315 MHz

6

14

Page 9: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e912th ESLS RF Meeting

1st October, 2008 at DIAMOND

Feedback Kicker-Cavity

Page 10: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e1012th ESLS RF Meeting

1st October, 2008 at DIAMOND

Feedback Kicker-Cavity

Page 11: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e1112th ESLS RF Meeting

1st October, 2008 at DIAMOND

next steps

• tunnel closed: 27st oct. (for magnet power supply tests)• testing the software system• commisioning of llrf system• interlock tests• conditioning of the cavities• high power tests• adjustment of waveguide system at high power

• 2009: feedback adjustment with beam

• beam for users

Page 12: Overview and Status of Assembling and  Commissioning the RF-System at PETRA III

Stefan Wilke, DESY MHF-e1212th ESLS RF Meeting

1st October, 2008 at DIAMOND

The MHF-e team

2007-04-25

thank you