Overcoming urban small cell deployment challenges
Steve Greaves, CEO Small Cells Americas 4 November 2015
![Page 2: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/2.jpg)
2
Key barriers to deployment today
Overall business case:
• Site acquisition • Suitable backhaul • Single-operator deployments
![Page 3: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/3.jpg)
3
What are we trying to achieve with small cells?
• Increase capacity per unit area
• Throughput per m² = cd * bw * η bits/sec/m² – cd = cell density in cells/m² – bw = bandwidth in Hz – η is spectral efficiency in bits/sec/Hz/cell
• Small cells: small, easy-to-install eNodeBs to increase cell density
![Page 4: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/4.jpg)
4
Site acquisition is difficult
Use fewer sites
Increase TX power
Larger form factor
Issues with planning approval
What do we seem to be doing?
![Page 5: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/5.jpg)
5
Suitable backhaul: rationale for Metnet
• High capacity of V/E-band systems
• Ease of deployment of sub-6GHz systems
• High resilience for street-level environment
• Small form factor that needs no planning approval
• Ability to scale organically and rapidly with no re-planning
• Operate in licensed spectrum that’s widely available
![Page 6: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/6.jpg)
6
Key system attributes
• Fully self-organising
• Multipoint-to-multipoint
• “De minimis” form factor
• Wide 270-degree field of view
• Only one node per site
• No frequency planning
• No antenna alignment
• Easy installation
![Page 7: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/7.jpg)
7
Deployment in London • Small cell at bottom • Antennas and backhaul at top • Helps overcome loading issues
![Page 8: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/8.jpg)
8
• Busy commercial area in Longyan
• Narrow streets with tall, reflective buildings
• Difficult RF and GPS environment
• Distributed timing provides synchronisation resilience when GPS fails
Deployment for China Mobile
![Page 9: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/9.jpg)
9
Synchronisation challenge
• Timing requirements more stringent for hetnets and virtualisation
• Significant challenge below roofline
• Separate GPS antennas add cost, planning and deployment issues
![Page 10: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/10.jpg)
10
Competing for real estate
• Overlapping small cell deployments in the same hotspots
• Limited space on limited street-level assets
• Need equal access to street furniture to promote fair competition
6"Commercial"in"confidence"
NEC ePico Small-cell and CCS Metnet Backhaul CCS MetNet 28GHz Backhaul • Dimensions: 185mm (H) x 202mm (W) x 202mm (D) • Volume: ~ 5 L • Mass: 4 Kg • AC Power. 35W NEC 4G LTE ePico Small-cell • Dimensions: xxmm (H) x xxmm (W) x xxmm (D) • Volume: 8 L • Mass: 8 Kg • AC Power xxW
4
Equipment Configuration for 1k Deployment
• Two options considered to provide flexibility for different deployment scenarios (maybe different markets?)
• Key difference is number of mounting points and level of integration that needs to be designed into the products
Separate deployments on pole, flexible deployment, but potential higher pole OPEX cost
Frontal mounting: Lower OPEX, but poor aesthetics
Airspan Synergy 2000, SBA antenna & CCS Umbra node (front & side views)
![Page 11: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/11.jpg)
11
Not just small cells…
![Page 12: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/12.jpg)
12
Neutral host model required
• Reduced time-to-market and costs
• City concessions for exclusive access to street furniture
• Pooled licensed spectrum resource for urban small cells
![Page 13: Overcoming urban small cell deployment challenges](https://reader031.fdocuments.us/reader031/viewer/2022030313/58e867db1a28ab007c8b5a2f/html5/thumbnails/13.jpg)
13
Summary
• Address planning issues to accelerate deployment
• Reduce size of form factor • Enable neutral host model