SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO-2008-4.3.1 / FP7-GALILEO-2008-4.3.4 Project with Community research funding WP2- Service Enablers Scenarios - ASECNA Prepared by Egis Avia Presented by Nga Bui (Egis Avia ). Outline. Proposed ASECNA implementation steps - PowerPoint PPT Presentation

Transcript of Outline

Page 1: Outline

1

SBAS Implementation in the Regions of ACAC and ASECNA

FP7-GALILEO-2008-4.3.1 / FP7-GALILEO-2008-4.3.4

Project with Community research funding

WP2- Service Enablers Scenarios - ASECNA

Prepared by Egis AviaPresented by Nga Bui (Egis Avia)

Page 2: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

Outline

• Proposed ASECNA implementation steps• Economical Enablers• Africa-EU cooperation• ASECNA objectives and strategy• Technical solution for EGNOS extension over ASECNA Region• System Funding & Owner• System Operator & Service Provider• Certification• Operations

2

Page 3: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

Proposed ASECNA Implementation Steps

3

System Operator(s) Service Provider(s)

Technical solution for EGNOS extension over ASECNA Region

Can be coupled

System Owner

LiabilityWorking Agreements

Contract

Economical Enablers ASECNA Strategy

Certification

Operations

Arica-EU cooperation

System Funding

Page 4: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

Economical Enablers

4

SBAS applications CBA Cost allocation and cost recovery scheme

Evidence of demand

Initiatives in the region?

Depends on the technical solution

In Europe, EC funds the service, free of charge for airspace users

High operational interest: APV

approaches available without any additional

equipment on the airport

Page 5: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

International ACAC cooperation

5

3rd Africa-EU Summit

Tripoli, Lybia, 29-30 November 2010

Adoption of the Second Action Plan (2011-2013)

3rd Thematic Partnership on Regional Economic Integration, Trade and Infrastructure

Priority n°2 : Support to Air Transport Sector and Satellite Navigation– Political impulse:

• To expedite cooperation on satellite navigation• To undertake the first steps towards the provision of

SBAS services in Africa– ASECNA formally identified as a key actor

Page 6: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

ASECNA objectives and strategy

Operational:To reach APV-I and then LPV 200 level of performance based on the implementation of EGNOS by 2015/2016

ASECNA Strategy

ASECNA Objectives

Institutional / Governance•Management of AFI SBAS programme•Independent provision of SBAS services over its area of responsibility•Oversight of SBAS services provision in the AFI region

Approach•Step by step•Short and measurable steps•Pragmatism•Seeking for “quick wins”

Page 7: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

ASECNA objectives and strategy

ASECNA Strategy (Approach and Landing)

Short term – 2015/16•Objective:

o To offer minimal APV certified service

Limited ASECNA area (northern area) Limited APV-I availability

•Principles:o Extension of EGNOS v2o Minimum infrastructureo European system to provide services

Medium term – 2020 onwards•Objective:

o To offer full APV I/LPV 200 certified service

Entire ASECNA area Maximised APV I/LPV 200 availability

•Principles:o Independent SBAS possibly mixed with partial EGNOS v3 extensiono Maximum AFI infrastructureo ASECNA and other African stakeholders to provide services

Page 8: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

Technical solution for EGNOS extension over ASECNA Region

88

Phased technical solutions for EGNOS extension over ASECNA Region

Short/ Medium term To extend current European EGNOS service to the region with minimum added infrastructure

Long termIndependent SBAS possibly mixed with partial EGNOS v3 extension, with maximum AFI infrastructure

Medium termTo implement Regional Extension Module

Page 9: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

Focus on short term technical solution

9

APV-I availability in December 2011 with current EGNOS system configuration

Page 10: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

Focus on short term technical solution

10

Medium TermAdditional infrastruture + ionospheric assessment

Madagascar is not taken into account in the short and medium term because it is considered too far geographically

Current possible coverage area

Short term possible coverage area based

on homogeneous extension (10°)

Page 11: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

Focus on medium term technical solution

11

REM Concept Overview

The Regional Extension Module (REM) is the solution for the integration, monitoring and control of the additional RIMS deployed for the extension.

REM :Is linked to EGNOS core system (Europe)

Is based on additional RIMS covering a service area outside ECAC

Provides a level of monitoring and control to the Region

Is able to be isolated from European network and processing

European Processing Area

REM 1 REM 2

REM 3

Page 12: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

Focus on medium term technical solution

12

Proposed architecture (based on previous study)

REM 1 Iono corrections

Page 13: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

System Funding & Owner

Short term Medium term Long term

MEDA program

Schedule

System funding

RIMS extension (MEDA)

Additional infra + Iono

assessment

Independent SBAS

Technical solution

Homogeneous extension (10°)

4 scenarios:•States•ASECNA•EC•Mixed funding

EGNOS V3+

European Commission

4 scenarios:•States•ASECNA•EC•Mixed funding

African Stakeholders?

(States, ANSPs…?)

System owner

European Commission

Regional Stakeholders?

ARG-1 region

Northern ASECNA

Coverage area

Africa

European Commission

ASECNA (except

Madagascar)

Regional Stakeholders?

?

European Commission

?

Regional Stakeholders?

European Commission

Europe (ECAC)

++

Current EGNOS

System (V2.2)

Operationfunding

Page 14: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

System Operator & Service Provider

14

Short term Medium term Long termSchedule

System operator

RIMS extension (MEDA)

Additional infra + Iono assessment

Independent SBAS

Technical solution

Homogeneous extension (10°)

EGNOS V3+

Regional EGNOS Operator

System service provider

ESSP (SPU)

++

Current EGNOS

System (V2.2)

Regional EGNOS Service Provider

First step

ESSP (SOU)

?

AFIEGNOS Operator

AFIEGNOS Service Provider

TBD

TBD

CooperationCooperation

Second step

TransferTransfer

CooperationCooperation

Page 15: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

System Operator & Service Provider

15

The Regional EGNOS Operator should be in charge of:Regional infrastructure (RIMS, network, control center)

Managing regional sites hosting the infrastructures and associated logistics aspects

Some maintenance activities

• First line maintenance and troubleshooting activities• Planned maintenance activities

Regional system performance monitoring

The Regional EGNOS Service Provider should be in charge of:

Relationship with regional users

NOTAM generation

Regional end user performance monitoring

Page 16: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

CertificationReminder of the European Model

16

ESSP certified as ANSP

Audits to maintain certificate

Certificate

EC

EC, ICAO

EC, ICAO

EASA

Industry

ESSP

ICAO, RTCA

ANSP NSA

EASA

NSA

Mutual recognition

(SES)

NSA

NSA ↔ NSA

ESSP

Page 17: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

CertificationSystem ICAO and SES

Service Provider SES

Application ICAO and SES

Airworthiness EASA

System and application certification can rely on ICAO Applicable to ASECNA

Airworthiness: Based on each State regulations?

Based on new common regulations (associated entity to be defined – UEMOA, CEMAC, CAFAC, other)?

Based on other regulations (Europe, US, . JAR, EASA standards transposition)

17

Page 18: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

CertificationIn case of a regional operator and service provider:

Will it be certified?

Based on which regulations?

ASECNA could be in charge of deployment of regulation applicable to each member state

AAMACs Role is to establish and maintain uniform regional safety acceptable

Could endorse the role of aviation safety agency as well as Regional Supervisory Authority

18

Short term Medium term Long termSchedule

System service provider

ESSP (SPU)

Regional EGNOS Service Provider

ARG-3 SBAS

Service Provider

TransferTransfer

Certification French NSA

Recognition by States out

of ECAC

To be defined at ACAC level

To be defined at ACAC level

Page 19: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

OperationsEach ANSP in ACAC will be in charge of

Procedure availability (from design to publication)

Training (ATC)

Procedures (ATC)

Validation and broadcast of NOTAM for APV EGNOS operations

NOTAM generation to be clarified (Part of Phase B ESA Study):Upgrade of ESSP tool?

Development of a new tool dedicated to the region?

• If a dedicated tool is developed for ACAC region, who will operate it?

ASECNA?

Regional Service Provider?

19

Page 20: Outline

SIRAJ Final Workshop - Rabat 28th May 2012

THANK YOU FOR YOUR ATTENTION

QUESTIONS?

20