1
SBAS Implementation in the Regions of ACAC and ASECNA
FP7-GALILEO-2008-4.3.1 / FP7-GALILEO-2008-4.3.4
Project with Community research funding
WP2- Service Enablers Scenarios - ASECNA
Prepared by Egis AviaPresented by Nga Bui (Egis Avia)
![Page 2: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/2.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
Outline
• Proposed ASECNA implementation steps• Economical Enablers• Africa-EU cooperation• ASECNA objectives and strategy• Technical solution for EGNOS extension over ASECNA Region• System Funding & Owner• System Operator & Service Provider• Certification• Operations
2
![Page 3: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/3.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
Proposed ASECNA Implementation Steps
3
System Operator(s) Service Provider(s)
Technical solution for EGNOS extension over ASECNA Region
Can be coupled
System Owner
LiabilityWorking Agreements
Contract
Economical Enablers ASECNA Strategy
Certification
Operations
Arica-EU cooperation
System Funding
![Page 4: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/4.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
Economical Enablers
4
SBAS applications CBA Cost allocation and cost recovery scheme
Evidence of demand
Initiatives in the region?
Depends on the technical solution
In Europe, EC funds the service, free of charge for airspace users
High operational interest: APV
approaches available without any additional
equipment on the airport
![Page 5: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/5.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
International ACAC cooperation
5
3rd Africa-EU Summit
Tripoli, Lybia, 29-30 November 2010
Adoption of the Second Action Plan (2011-2013)
3rd Thematic Partnership on Regional Economic Integration, Trade and Infrastructure
Priority n°2 : Support to Air Transport Sector and Satellite Navigation– Political impulse:
• To expedite cooperation on satellite navigation• To undertake the first steps towards the provision of
SBAS services in Africa– ASECNA formally identified as a key actor
![Page 6: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/6.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
ASECNA objectives and strategy
Operational:To reach APV-I and then LPV 200 level of performance based on the implementation of EGNOS by 2015/2016
ASECNA Strategy
ASECNA Objectives
Institutional / Governance•Management of AFI SBAS programme•Independent provision of SBAS services over its area of responsibility•Oversight of SBAS services provision in the AFI region
Approach•Step by step•Short and measurable steps•Pragmatism•Seeking for “quick wins”
![Page 7: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/7.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
ASECNA objectives and strategy
ASECNA Strategy (Approach and Landing)
Short term – 2015/16•Objective:
o To offer minimal APV certified service
Limited ASECNA area (northern area) Limited APV-I availability
•Principles:o Extension of EGNOS v2o Minimum infrastructureo European system to provide services
Medium term – 2020 onwards•Objective:
o To offer full APV I/LPV 200 certified service
Entire ASECNA area Maximised APV I/LPV 200 availability
•Principles:o Independent SBAS possibly mixed with partial EGNOS v3 extensiono Maximum AFI infrastructureo ASECNA and other African stakeholders to provide services
![Page 8: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/8.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
Technical solution for EGNOS extension over ASECNA Region
88
Phased technical solutions for EGNOS extension over ASECNA Region
Short/ Medium term To extend current European EGNOS service to the region with minimum added infrastructure
Long termIndependent SBAS possibly mixed with partial EGNOS v3 extension, with maximum AFI infrastructure
Medium termTo implement Regional Extension Module
![Page 9: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/9.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
Focus on short term technical solution
9
APV-I availability in December 2011 with current EGNOS system configuration
![Page 10: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/10.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
Focus on short term technical solution
10
Medium TermAdditional infrastruture + ionospheric assessment
Madagascar is not taken into account in the short and medium term because it is considered too far geographically
Current possible coverage area
Short term possible coverage area based
on homogeneous extension (10°)
![Page 11: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/11.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
Focus on medium term technical solution
11
REM Concept Overview
The Regional Extension Module (REM) is the solution for the integration, monitoring and control of the additional RIMS deployed for the extension.
REM :Is linked to EGNOS core system (Europe)
Is based on additional RIMS covering a service area outside ECAC
Provides a level of monitoring and control to the Region
Is able to be isolated from European network and processing
European Processing Area
REM 1 REM 2
REM 3
![Page 12: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/12.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
Focus on medium term technical solution
12
Proposed architecture (based on previous study)
REM 1 Iono corrections
![Page 13: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/13.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
System Funding & Owner
Short term Medium term Long term
MEDA program
Schedule
System funding
RIMS extension (MEDA)
Additional infra + Iono
assessment
Independent SBAS
Technical solution
Homogeneous extension (10°)
4 scenarios:•States•ASECNA•EC•Mixed funding
EGNOS V3+
European Commission
4 scenarios:•States•ASECNA•EC•Mixed funding
African Stakeholders?
(States, ANSPs…?)
System owner
European Commission
Regional Stakeholders?
ARG-1 region
Northern ASECNA
Coverage area
Africa
European Commission
ASECNA (except
Madagascar)
Regional Stakeholders?
?
European Commission
?
Regional Stakeholders?
European Commission
Europe (ECAC)
++
Current EGNOS
System (V2.2)
Operationfunding
![Page 14: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/14.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
System Operator & Service Provider
14
Short term Medium term Long termSchedule
System operator
RIMS extension (MEDA)
Additional infra + Iono assessment
Independent SBAS
Technical solution
Homogeneous extension (10°)
EGNOS V3+
Regional EGNOS Operator
System service provider
ESSP (SPU)
++
Current EGNOS
System (V2.2)
Regional EGNOS Service Provider
First step
ESSP (SOU)
?
AFIEGNOS Operator
AFIEGNOS Service Provider
TBD
TBD
CooperationCooperation
Second step
TransferTransfer
CooperationCooperation
![Page 15: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/15.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
System Operator & Service Provider
15
The Regional EGNOS Operator should be in charge of:Regional infrastructure (RIMS, network, control center)
Managing regional sites hosting the infrastructures and associated logistics aspects
Some maintenance activities
• First line maintenance and troubleshooting activities• Planned maintenance activities
Regional system performance monitoring
The Regional EGNOS Service Provider should be in charge of:
Relationship with regional users
NOTAM generation
Regional end user performance monitoring
![Page 16: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/16.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
CertificationReminder of the European Model
16
ESSP certified as ANSP
Audits to maintain certificate
Certificate
EC
EC, ICAO
EC, ICAO
EASA
Industry
ESSP
ICAO, RTCA
ANSP NSA
EASA
NSA
Mutual recognition
(SES)
NSA
NSA ↔ NSA
ESSP
![Page 17: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/17.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
CertificationSystem ICAO and SES
Service Provider SES
Application ICAO and SES
Airworthiness EASA
System and application certification can rely on ICAO Applicable to ASECNA
Airworthiness: Based on each State regulations?
Based on new common regulations (associated entity to be defined – UEMOA, CEMAC, CAFAC, other)?
Based on other regulations (Europe, US, . JAR, EASA standards transposition)
17
![Page 18: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/18.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
CertificationIn case of a regional operator and service provider:
Will it be certified?
Based on which regulations?
ASECNA could be in charge of deployment of regulation applicable to each member state
AAMACs Role is to establish and maintain uniform regional safety acceptable
Could endorse the role of aviation safety agency as well as Regional Supervisory Authority
18
Short term Medium term Long termSchedule
System service provider
ESSP (SPU)
Regional EGNOS Service Provider
ARG-3 SBAS
Service Provider
TransferTransfer
Certification French NSA
Recognition by States out
of ECAC
To be defined at ACAC level
To be defined at ACAC level
![Page 19: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/19.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
OperationsEach ANSP in ACAC will be in charge of
Procedure availability (from design to publication)
Training (ATC)
Procedures (ATC)
Validation and broadcast of NOTAM for APV EGNOS operations
NOTAM generation to be clarified (Part of Phase B ESA Study):Upgrade of ESSP tool?
Development of a new tool dedicated to the region?
• If a dedicated tool is developed for ACAC region, who will operate it?
ASECNA?
Regional Service Provider?
19
![Page 20: Outline](https://reader036.fdocuments.us/reader036/viewer/2022081603/56814049550346895dabbbe2/html5/thumbnails/20.jpg)
SIRAJ Final Workshop - Rabat 28th May 2012
THANK YOU FOR YOUR ATTENTION
QUESTIONS?
20