    GOVERNMENT OF INDIA

    OUTCOME BUDGET

    OF

    MINISTRY OF POWER

    2008 2009

  • 8/8/2019 Outcome Budget 2008-09

    2/239

    CONTENTSPage No.

    CHAPTER - I Introduction 1

    CHAPTER - II Outcome Budget 2008-09 11

    CHAPTER - III Reforms Measures and 99

    Policy Initiatives

    CHAPTER IV Review of Past Performance 109

    CHAPTER - V Financial Review 189

    CHAPTER - VI Review of Performance of Statutory& Autonomous Bodies 198

  • 8/8/2019 Outcome Budget 2008-09

    3/239

    Executive Summary

    The Plan Outlay of the Ministry of Power for the year 2008-09 is Rs.40460.10crores which includes Internal Extra Budgetary Resources(IEBR) of CPSUs

    amounting to Rs.34460.10 crore and Gross Budgetary Support(GBS) of Rs. 6000crore. The Net Non Plan outlay of the Ministry of Power for the year 2008-09 is

    Rs.75 crore.

    The Salient features of the performance during 2007-08 and projected Outcomesof 2008-09 are as under: -

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) - During 2007-08 upto end January, 2008, electrification of 7077 villages and release of

    connections to 12 lakh BPL households has been achieved. Cumulatively

    since the introduction of the scheme till end January, 2008, theachievement is electrification of 45602 villages and release of electric

    connections to 18.7 lakh BPL households. The target for the year 2008-09

    is for electrification of 25,000 un-electrified villages and offering

    electricity connections to around 60 lakhs BPL households.

    Generation

    Central Sector electricity generation is planned and implemented throughthe various organizations. The details along with their highlights are as

    under: -

    (i) NTPC

    In 2007-08 till January 2008, NTPC has added 1240 MW of thermal

    generationcapacity comprising Sipat STPP-II U-4(500 MW) and Module

    III of RGPPL (740 MW), a the joint venture project of NTPC, GAIL,MSEB and Indian Financial Institutions. The outlay of Rs.13588 crores

    during 2008-09 would result in commissioning of 1320 MW (Sipat-I

    2x660 MW). The outlay will also result in substantial physical progress ofthe projects scheduled to be commissioned during the XI Plan period.

    (ii) NHPC

    In 2007-08 till January 2008 NHPC has added510 MW (65MWx8) with

    the commissioning of Omkareshwar project. During the year 2008-09,

  • 8/8/2019 Outcome Budget 2008-09

    4/239

    (iii) NEEPCO

    During the year 2008-09 the outlay of NEEPCO of Rs. 772.50 crore is

    mainly for Kameng HEP, Pare HEP and other new projects.

    (iv) THDC

    Although no capacity addition will be achieved in 2008-09, however

    substantial progress will be made for Koteshwar HEP. Further actiontowards construction of new projects of Tehri PSP and Vishnugad

    Pipalkoti HEP will also be taken.

    (v) SJVNL

    During the year 2008-09, the construction activities of Rampur H.E.P. and

    Luhri H.E.P. will achieve considerable progress. Works being carried outat Nathpa Jhakri HEP shall lead to greater availability of NJHPS for

    operation during high flood season.

    (vi) DVC

    The outlay of Rs. 6612.65 crs. during 2008-09 would result in commercialoperation of Mejia Unit (VI) ( 1 x 250 MW ). In addition, unit VII andVIII (2 x 250 MW ) of Chandrapura Thermal Power Station(Extension)

    will also get synchronized. LOA for new projects like Koderma Stage-I (

    2x500 MW ), Durgapur Steel TPS ( 2 x 500 MW), Raghunathpur TPSPhase-I ( 2x600 MW) has already been placed in the year 2007-08 and

    works for these projects will gather momentum in 2008-09. In addition,

    works on replacement/extension projects of Mejia Phase-II will progress

    substantially. LOA for Bokaro A TPS ( 500 MW) is also likely to beplaced in 2008-09. Substantial progress will also be made in joint venture

    through Maithon Power Limited (MPL) at Maithon at Right Bank Thermal

    Power Station.

    Transmission

    Till Dec. 2007, Powergrid has commissioned 4800 circuit Km. oftransmission line and achieved 7200 MVA of transformation capacityaddition. The overall outcome in the year 2008-09 with an outlay of

    Rs.8040 crores for Powergrid would be to commission 5500 Ckms. oftransmission lines involving 6285 MVA of transformation capacity.

  • 8/8/2019 Outcome Budget 2008-09

    5/239

    Ministry and Planning Commission is taken up to expedite the

    approval of the Competent Authority and thereby utilization of

    budgeted expenditure. Monthly review by Chairman, CEA of all projects. Three-stage approval process of Hydro Projects to ensure adequacy

    of Survey & Investigation and creation of all essentialinfrastructure required for commencement of construction before

    accord of final approval by the CCEA. Comprehensive quarterly review by Secretary (P) of status of all

    ongoing and new projects.

    Periodical reviews with States on capacity addition/APDRP/village electrification.

    Periodic Inter-ministerial coordination meetings with Ministry ofPetroleum &Natural Gas; Ministry of Coal; Ministry of

    Environment & Forest; Ministry of Water Resources to expedite

    clearances for the projects. Periodic reviews with private project developers Periodic visits to States- Comprehensive individual review with the

    State Governments Periodic visits to the project sites.

    Public Information System

    Outcome Budget has been posted on the website of the Ministry of Power.

    Quarterly achievement against the Projected Outcomes will be posted on the

    Website of the Ministry of Power to disseminate information about theperformance every quarter.

  • 8/8/2019 Outcome Budget 2008-09

    6/239

    - 1 -Chapter I : INTRODUCTION

    MINISTRY OF POWER

    Chapter I

    INTRODUCTION

    The Ministry of Power is entrusted with the evolution of the general policy in thefield of Energy. Under the Allocation of Business Rules, the Ministry is responsible forthe following functions and activities: -

    i) General Policy in the electric power sector and issues relating to energy

    policy. (Details of short, medium and long-term policies in terms offormulation, acceptance, implementation and review of such policies,cutting across sectors, fuels regions and cross country flows).

    ii) All maters relating to hydroelectric power (except small/mini/micro hydel projects of and below 25 MW capacities) and thermal power andtransmission system network.

    iii) Research, development and technical assistance relating to hydro-electricand thermal power and transmission system network.

    iv) Administration of the Electricity Act, 2003 (34 of 2003) the DamodarValley Corporation Act, 1948 (14 of 1948) and Bhakra Beas ManagementBoard as provided in Punjab Re-organization Act, 1966 (31 of 1966)

    v) All matters relating to Central Electricity Authority and Central ElectricityRegulatory Commission.

    vi) Rural Electrification, Power Schemes in Union Territories and issuesrelating to power supply in the States and Union Territories.

    vii) Administrative control of Public Sector Undertakings, Statutory andAutonomous Bodies functioning under the Ministry.

  • 8/8/2019 Outcome Budget 2008-09

    7/239

    - 2 -Chapter I : INTRODUCTION

    2. Shri SushilKumar Shinde joined as Minister of Power w.e.f. 30.01.06. Shri AnilRazdan is the Secretary of Ministry of Power since 1st February 2007. There are twoAdditional Secretaries and four Joint Secretaries including one Financial Adviser.

    3. a) Shri Anil Kumar, Additional Secretary, oversees the work relating toPolicy & Planning; Reforms & Restructuring and Ultra Mega Power Projects. He is alsodesignated the Appellate Authority under Right to Infiormation Act.

    b) Shri Gireesh B. Pradhan, Additional Secretary oversees the work relatingto Transmission; Power Grid, Information Technology; Operation Monitoring;International Cooperation; Coordination and Environment clearance related issues pertaining to Power Transmission Projects; Power Finance Corporation; ProjectMonitoring Cell.

    4. Various functions and activities of the Ministry under the charge of JointSecretaries have been grouped as follows: -

    i) Hydro Power and Vigilance & Security; Resettlement and Rehabilitationissues and Environment clearance related issues pertaining to HydroPower Projects; Distribution; Accelerated Power Development & ReformsProgramme (APDRP);

    ii) Thermal, Independent Power Producers; Fuel Supply, Ash Utilisation andEnvironment clearance related issues pertaining to Thermal PowerProjects;

    iii) Rural electrification; Rajiv Gandhi Gramin Vidyutikaran Yojana; RuralElectrification Corporation, Energy Conservation, Demand SideManagement; Energy Efficiency, Training & Research; Global warmingand Clean Development Mechanism; Administration; Parliament andOfficial Language.

    iv) Financial Matters and Public Grievances.

    5. Apart from the above groups, there is a Principal Accounts Office of the Ministryheaded by the Controller of Accounts who reports and works under the supervision of theFinancial Adviser in the Ministry of Power.

  • 8/8/2019 Outcome Budget 2008-09

    8/239

    - 3 -Chapter I : INTRODUCTION

    by a Chairperson who oversees largely the development of Power Sector in the country.Presently, there are six (6) wings namely Planning, Hydro, Thermal, Grid Operation &

    Distribution, Economic & Commercial and Power System each headed by a Member ofthe Authority. There are fourteen (14) subordinate outfits of CEA located in variousparts of the country.

    7. In addition, there are five Statutory Bodies, six Public Sector Undertakings, threeJoint Venture Corporations, two Autonomous Bodies (Societies) under the administrativecontrol of the Ministry of Power. These are: -

    a) STATUTORY BODIES (Non-Commercial) :

    Central Electricity Regulatory Commission (CERC), New Delhi

    The Central Electricity Regulatory Commission (CERC), an independent statutorybody with quasi-judicial powers, was originally constituted on 25th July 1998 under theElectricity Regulatory Commissions Act, 1998 and has been continued under TheElectricity Act, 2003. The Commission consists of a Chairperson and four otherMembers including the Chairperson, Central Electricity Authority as an ex-officiomember. The main functions of CERC include regulation of tariff of generatingcompanies owned or controlled by the Central Government or if such generatingcompanies enter into or otherwise have a composite scheme for generation and sale ofelectricity in more than one State, regulation and determination of tariff of inter-Statetransmission of electricity, issuing licenses to persons to function as transmission licenseeand electricity traders with respect to their inter-State operations, adjudicating upon

    disputes involving generating companies or transmission licensee, specifying Grid Codehaving regard to Grid Standards; to specify and enforce the standards with respect toquality, continuity and reliability of service by licensees and fixing the trading margin inthe inter-State trading of electricity, if considered, necessary.

    Appellate Tribunal for Energy (ATE), New Delhi

    By virtue of Section 110 of Electricity Act, 2003, an Appellate Tribunal for

    Electricity has been set up to hear appeals against the orders of the adjudicating officer orthe appropriate Commission under the Act of 2003. The Tribunal also has original jurisdiction to hear petitions under Section 121 and of the Act. This Tribunal has beenestablished by the Central Government i.e. Ministry of Power, Govt. of India w.e.f. 7thApril, 2004 notified vide S.O. 478 (E). Delhi is the headquarters of the Tribunal. TheAppellate Tribunal consists of a Chairperson, one Judicial Member and two Technical

  • 8/8/2019 Outcome Budget 2008-09

    9/239

    - 4 -Chapter I : INTRODUCTION

    framework of the Energy Conservation Act (EC Act), 2001 with the primary objective ofreducing energy intensity of the Indian economy. BEE co-ordinates with designated

    consumers, designated agencies and other organizations; recognizes, identifies andutilizes the existing resources and infrastructure, in performing the functions assigned toit under the EC Act. The EC Act provides for regulatory and promotional functions.

    b) STATUTORY BODIES (Commercial) :

    Damodar Valley Corporation (DVC), Calcutta

    Damodar Valley Corporation, the first major multi-purpose integrated rivervalley project of the country conceived in line with Tennessee Valley Authority (TVA)came into existence on July 7, 1948 by an Act of Central Legislature. In keeping withindustrialization in DVC commend area, power generation, transmission and distributiongained priority for providing electricity to the core industries like Steel, Coal, Railwaysand other industries/consumers to respective State Electricity Boards. With the passageof time and shift in national priorities, power generation with associated transmission andbulk activities gained priority in Damodar Valley Corporation. Other objectives of DVC,

    however, received due attention and services as part of its overall responsibilities andcommitment. The emphasis on power aspect gained importance since last 3/4 yrs. whenMinistry of Power, Government of India started advocating for setting up of thermal power plants at or near pitheads and transmit power rather than transporting coal andadvise DVC to work towards adequate capacity addition during 11 th Plan in order toneed the Power Vision 2012 of Government of India. At present, Damodar ValleyCorporation is supplying power within the covered area of 24,235 sq.k.m. known as theDVC Command Area and also exporting power to other States beyond the DamodarValley. DVC has also committed to supply power for the commonwealth games to beheld in Delhi.

    Bhakra Beas Management Board (BBMB), Chandigarh

    Bhakra Management Board (BMB) was constituted under Section 79 of the

    Punjab Re-Organisation Act, 1966 for the administration, maintenance and operation ofBhakra Nangal Project w.e.f. Ist October, 1967. BBMB is statutory body under thesupervision of Government of India. However, Government of India does not have anyfinancial stake in this Body. The Government of India transferred the Beas ProjectWorks, on completion, from Beas Construction Board (BCB) to BMB as per Section 80of the Act and Bhakra Management Board was renamed as Bhakra Beas Management

  • 8/8/2019 Outcome Budget 2008-09

    10/239

    - 5 -Chapter I : INTRODUCTION

    States. BBMB also provides Engineering and related technical and consultancy servicesin various fields of Hydro Electric Power and Irrigation Projects.

    c) PUBLIC SECTOR UNDERTAKINGS:

    NTPC Limited

    NTPC was set up in 1975 as a Central Sector generating company for thedevelopment of thermal power. The Corporation has grown rapidly to become the largest

    thermal generating company in India. However, in addition to attaining large size, theoperations of the company have also become diverse and are now not limited to thermalpower only. Company has diversified into hydro power, power trading, coal mining etc.In order to embody its diverse operations the company has been rechristened as NTPCLimited. As on 31.03.2007 the authorized share capital of NTPC is Rs.10,000 crores and paid up capital is 8245.50 crores. The Corporation is at present engaged in operatingthirteen (15) coal based power projects and seven (7) gas/liquid based power projects.NTPC has as on 31.12 2007, commissioned 28644 MW.

    Powergrid Corporation of India Limited (PGCIL)

    Power Grid Corporation of India Limited (POWERGRID) was incorporated as aGovernment of India enterprise on 23rd October, 1989 under the Companies Act, 1956with an authorized share capital of Rs.5,000 crore, which has been enhanced to Rs.10,000crore in 2006-07 and paid up capital as on 31.03.2007 is Rs.3826.22crores. The missionof the corporation is Establishment and Operation of Regional and National Power Gridsto facilitate transfer of power within and across the regions with reliability, security andeconomy on sound commercial principles. POWERGRID, the Central TransmissionUtility (CTU) of the country and one of the largest transmission utilities in the world, isplaying a strategic role in the Indian Power Sector and is considered as the nerve centerof Power Sector. As on December 31, 2007, POWERGRID is operating about 64,800 Cktkm of transmission lines and 110 Sub-stations having transformation capacity of about66,600 MVA. The current inter regional transmission capacity of PGCIL is 17,000 MW.

    The transmission system availability is maintained consistently more than 99% bydeploying best Operation and Maintenance practices at par with international utilities.Further, there has been no major grid disturbance in the country during last three years.

    National Hydro Electric Power Corporation (NHPC)

  • 8/8/2019 Outcome Budget 2008-09

    11/239

    - 6 -Chapter I : INTRODUCTION

    hydroelectric, wind, tidal, geothermal and gas power in all aspects, and transmission,distribution and sale of power generation at power stations. The total installed capacity of

    NHPC as on 31.12.2007 including that of NHDC is 4665 MW. The Corporation ispresently engaged in construction of 12 projects with the installed capacity of 5132 MW.

    North Eastern Electric Power Corporation (NEEPCO)

    North Eastern Electric Corporation Ltd. (NEEPCO) was constituted in 1976 underthe Indian Companies Act, 1956 with the objective of developing the power potential ofthe North Eastern Region of the country through planned development of powergeneration projects, which in turn would effectively promote the development of the North Eastern Region. Since then NEEPCO has grown into one of the pioneer PublicSector Undertaking under the Ministry of Power, Govt. of India, with an authorized sharecapital of Rs.3,500 Crs., paid up capital as on 31.03.2007 is Rs. 2659.32 Crs. NEEPCOis having an installed capacity of 1,130 MW (755 MW hydro & 375 MW thermal) as on31.12.2007, which meets more than 60% of the energy requirements of the North Eastern(N.E.) Region.

    Rural Electrification Corporation (REC)

    Rural Electrification Corporation Limited (REC) was incorporated in the year1969 to facilitate the development of power infrastructure in the rural India. Theauthorized share capital of the Corporation is Rs.1200 crore and the paid-up capital as on31.03.2007 stood at Rs.780.60 crore. The main objectives of the Corporation are to promote and finance projects aimed at Integrated System Improvement, power

    generation, promotion of decentralized & non-conventional energy sources, energyconservation, renovation & maintenance, power distribution with focus on pump setsenergization, rural households electrification and other related works in rural & urbanareas. REC , is the nodal agency for implementation of RGGVY programme, has 17 nos.of Project Offices spread all over the country.

    Power Finance Corporation (PFC)

    Power Finance Corporation Limited (PFC) was set-up in July 1986, under theCompanies Act to serve the Power Sector exclusively, under the administrative control ofthe Ministry of Power. PFC was registered as a Non-Banking Finance Company (NBFC)with the Reserve Bank of India in February 1998. PFC is also notified as a PublicFinancial Institution (PFI) under Section-4(A) of the Companies Act 1956. Theauthorized share capital of the Corporation is Rs.2000 crores and paid up capital as on31 12 2007 i R 1147 77 A f di fi i l i /

  • 8/8/2019 Outcome Budget 2008-09

    12/239

    - 7 -Chapter I : INTRODUCTION

    d) JOINT VENTURE CORPORATIONS

    Tehri Hydro Development Corporation (THDC)

    THDC, a Joint Venture Corporation of the Govt. of India and Govt. of U.P., wasincorporated as a Limited Company under the Companies Act,1956, in July88 todevelop, operate and maintain the Tehri Hydro Power Complex and other Hydro Projects.THDC is presently responsible for the implementation of the Tehri Hydro PowerComplex (2400 MW), VishnuGad Pipalkoti Project (444 MW) and six other new HydroElectric Projects, with total installed capacity of 695 MW. The Corporation has an

    authorised share capital of Rs.4000 Cr. and paid up capital as on 31.12.2007 is 3184.62cr. The cost of the Tehri Hydro Power Complex being shared in the ratio of 75:25(equity portion) by Govt. of India & Govt. of U.P. for power component, while theirrigation component(20% of cost of Tehri Dam & HPP) is being entirely funded by theGovt. of U.P. The current installed capacity of THDC is 1000 MW.

    Satluj Jal Vidyut Nigam (SJVN)

    The Satluj Jal Vidyut Nigam Limited SJVN (formerly Nathpa Jhakri PowerCorporation Limited NJPC) was incorporated on May 24, 1988 as a joint venture ofthe Government of India (GOI) and the Government of Himachal Pradesh (GOHP) toplan, investigate, organize, execute, operate and maintain Hydro-electric power projectsin the river Satluj basin in the state of Himachal Pradesh. The present authorized sharecapital of SJVN is Rs. 4500 crores and paid up share capital as on 31.03.2006 is Rs.4,108.81 crores. The debt equity ratio for the Nathpa Jhakri Hydro-Electric Project(NJHEP) is 1:1 and the equity-sharing ratio of GOI and GOHP is 3:1 respectively. Inaddition to the financial assistance from the World Bank, SJVN has also been financedloan by a Consortium of European Banks and the Power Finance Corporation (PFC). Nathpa Jhakri Hydro Electric Power Project, the largest underground hydroelectricproject was commissioned on 18.05.2004 and has generated already 15,795.255 MU upto January 11, 2007. Currently SJVNL is executing Rampur HEP (412 MW) in the Stateof Himachal Pradesh with World Bank assistance.

    e) AUTONOMOUS BODIES:

    National Power Traning Institute (NPTI)

    National Power Training Institute (NPTI), An ISO 9001 & ISO 14001organization, is a National Apex body for Training and Human Resources Development

  • 8/8/2019 Outcome Budget 2008-09

    13/239

    - 8 -Chapter I : INTRODUCTION

    Authority for the purpose of certification of competence to ensure availability ofproperly trained personnel to man the Indian Electricity Industry.

    Central Power Research Institute (CPRI)

    The Central Power Research Institute (CPRI) was established in Bangalore by theGovernment of India in 1960. It became an Autonomous Society in the year 1978 underthe aegis of the Ministry of Power, Government of India. The main objective of settingup of the Institute was to serve as a National Laboratory for undertaking applied researchin electric power engineering besides functioning as an independent National Testing andCertification Authority for electrical equipment and components to ensure reliability andimprove, innovate and develop new products. The Institute has several researchlaboratories and testing facilities and employs about 220 qualified Scientists andEngineers besides other supporting staff. The Head Office of the Institute is at Bangaloreand its other units are located at Bhopal, Hyderabad, Nagpur, Ghaziabad andThiruvananthapuram.

    Programmes and Schemes Implemented by the Ministry

    1. Secretariat : This scheme takes care of Establishment matters for the Secretariatof the Ministry of Power. Ministry of Power has 14 schemes under its administrativesupervision as explained hereafter.

    2. Central Electricity Authority : Provision under this scheme is made for theCentral Electricity Authority which coordinates the activities of the various agencies inrelation to control and utilization of national power resources. CEA is also responsible for

    carrying out the survey and studies, collection and recording of data concerninggeneration, distribution, utilization and development of power resources.

    3. Research & Development: Scheme of Research & Development isimplemented through Central Power Research Institute, Bangalore which serves as a National Laboratory for applied research in the field of electrical power and alsofunctions as an independent authority for testing, evaluation and certification of electricalequipment and components.

    4. Training: This scheme is implemented through National Power TrainingInstitute which is engaged in imparting training in various aspects of power sectorincluding operation and maintenance of power stations.

    5 C t l El t i it R l t C i i U d h i i f h ERC

  • 8/8/2019 Outcome Budget 2008-09

    14/239

    - 9 -Chapter I : INTRODUCTION

    6. Appellate Tribunal for Electricity: Under the provisions of ElectricityAct,2003,the Central Government has set up the Appellate Tribunal for Electricity. It

    hears appeals against the orders of the adjudicating officer or the AppropriateCommissions under the Electricity Act,2003. The provision under the scheme is formeeting the Tribunals running expenses.

    7. Joint Electricity Regulatory Commission (JERC) for UTs: One JointElectricity Regulatory Commission (JERC) is being set up for UTs except Delhi. 16 postsof various categories including one post each of Chairperson, Member & Secretary havebeen created for JERC for UTs with the approval of the Cabinet. The provision is for

    incurring expenditure on establishment and other activities of JERC.8. Rajiv Gandhi Grameen Vidyutikaran Yojana: This scheme of rural ElectricityInfrastructure and Household Electrification has been introduced in April, 2005 forachieving the National Common minimum programme objective of providing access toelectricity to all rural households over a period of four years. As per census 2001, 44%of the rural households have access to electricity. Improvement of rural electricityinfrastructure is essential to empower rural India and unleash its full growth potential.

    Rural Electrification Corporation (REC) is the nodal agency for the programme. Underthe scheme, projects can be financed with 90% capital subsidy for provision of RuralElectricity Distribution Backbone (REDB), creation of Village ElectrificationInfrastructure (VEI) and Decentralised Distributed Generation and Supply. REDB, VEIand DDG would also cater to the requirement of agriculture and other activities. Underthis scheme un-electrified Below Poverty Line (BPL) households will get electricityconnection free of charge.The continuation of the scheme in XI Plan was sanctioned on3rd January 2008 with the capital subsidy of Rs. 28,000 Crore in Phase-I. To increase the

    coverage of small habitations, Government sanctioned electrification of habitations upto100 population instead of 300.

    9. FutureGen Project: FutureGen Project has been initiated as a multi-national programme in a public-private partnership model for developing emission-free coal- based generation pilot project. Government of India is required to contribute US$ 10million to this project. India has become a full charter member in the FutureGenGovernment Steering Committee (GSC), which will be the mechanism to provideguidance, input and recommendations on the direction of the FutureGen Project.

    10. Energy Conservation: Provision under the scheme would be utilized forcarrying out the Energy Conservation related activities i.e National level awarenesscampaign, National Energy Conservation awards and National level painting competitionfor school children.

  • 8/8/2019 Outcome Budget 2008-09

    15/239

    - 10 -Chapter I : INTRODUCTION

    appliances in the country through consumer guidance. Further, the Energy ConservationBuilding Code has been launched to reduce energy consumption in commercial buildings.

    Government has also approved a scheme for the strengthening of SDAs (State DesignatedAgencies) for capacity building at the State level.

    12. Comprehensive Award Scheme: The scheme for awarding shields / certificateis being implemented by the Ministry of Power for outstanding performance of theThermal Power Stations and Utilities.

    13. Funds for Evaluation Studies and Consultancy: This provision is for

    conducting evaluation studies of various projects/programmes/ schemes.

    14. Assistance to Forum of Regulator for Capacity building: The provision is fororganizing full time training programmes every year to provide training to staff of theCentral/State Electricity Regulatory Commissions. The Forum of Regulator will alsoorganize orientation programmes for Chairperson/ Members of the Central/StateElectricity Regulatory Commissions.

    15. Investment in Public Enterprises: Provision under the scheme is towardscapital investment in the generation and transmission projects taken upon in the CentralSectors through CPSUs like NTPC, NHPC, NEEPCO, THDC, SJVNL and PGCIL.

  • 8/8/2019 Outcome Budget 2008-09

    16/239

    Chapter II

    Outcome Budget 2008-09

    Outcome focused budgeting has been introduced as a tool to improve the qualityand accountability of Governments expenditure programmes. This is to ensure that weget better value for money we spend.

    An amount of Rs.40460.10 crores is the approved outlay by the PlanningCommission for the year 2008-09. The details are given below: -

    Annual Plan 2008-09

    (Rs. in crores)

    INTERNAL & EXTRA BUDGETARY

    RESOURCES (IEBR)SL.

    NO.

    ORGANISATION

    / SCHEMES

    INTERNAL

    RESOURCES

    BONDS/DEB

    ENTURES

    ECB/ SUPPLIER

    CREDIT

    OTHERS TOTAL (IEBR) GBS TOTAL

    PLAN

    OUTLAY

    1 2 3 4 5 6 7 8 9

    A. CENTRAL PLAN1. N.T.P.C. 4628.00 7117.90 1842.10 0.00 13588.00 0. 00 13588.00

    2. N.H.P.C. 1119.60 1616.87 15.92 1598.80 4351.19 34.00 4385.19

    3. POWERGRID 2411.00 4235.00 1394.00 0.00 8040.00 0. 00 8040.00

    4. D.V.C. 2112.65 0.00 500.00 4000.00 6612.65 0. 00 6612.65

    5. T.H.D.C. 113.38 580.54 0.00 0.00 693.92 111. 00 804.92

    6. S.J.V.N. 246.81 310.03 0.00 0.00 556.84 0. 00 556.84

    7 NEEPCO 218.93 398.57 0.00 0.00 617.50 155. 00 772.50

    8. MOP(OTHER) 0.00 0.00 0.00 0.00 0.00 5700. 00 5700.00

  • 8/8/2019 Outcome Budget 2008-09

    17/239

    B. MOP SCHEMES

    Rajiv Gandhi Gramin

    Vidyutikaran Yojana 0.00 0.00 0.00 0.00 0.00 5500.00 5500.00

    N.P.T.I. (Training & HR) 0.00 0.00 0.00 0.00 0.00 20. 00 20. 00

    C.P.R.I. (Research &

    Testing) 0.00 0.00 0.00 0.00 0.00 50. 00 50. 00

    Programme & Infrastr-ctureimprovement of CEA 0.00 0.00 0.00 0.00 0.00 15. 00 15. 00

    Bureau of EnergyEfficiency 0.00 0.00 0.00 0.00 0.00 90.0 0 90.00

    Other MOP Schemes

    0.00 0.00 0.00 0.00 0.00 25. 00 25. 00

    Total -B 0.00 0.00 0.00 0.00 0.00 5700.00 5700.00

    GRAND TOTAL

    10850.37 14258.91 3752.02 5598.80 34460.10 6000.00 40460.10

    NON PLAN 2008-09

    (Rs. in crores)

    Sr.No. ORGANISATION/ SCHEMES Non Plan Budget

    1. B.T.P.S. 320. 76

    2. MOP Secretariat 13.09

    3. CERC 6.50

    4. NPTI 2.00

    5. Appellate Tribunal for Electricity 5.50

    6. Central Electricity Authority 45.24

    7. Setting Up for JERC for UTs except Delhi 2.67

    Grand Total 395.76

    For the above Plan Outlay, the outcome have been divided broadly into the following

    categories on which allocation of resources are made by the Ministry to its various

    CPSUs and other units either from the Budget or from the internal resources andborrowings of each of the concerned entity :-

    (a) Rural Electrification / Rajiv Gandhi Grameen Viduytikaran Yojana

    (b) Accelerated Power Development Reform Programme

    (c) Generation Scheme & Programmes

  • 8/8/2019 Outcome Budget 2008-09

    18/239

    (d) Creation of Transmission Network by Powergrid.

    (e) Energy Efficiency(i)Bureau of Energy Efficiency

    (ii)Energy Conservation Schemes of MOP

    (f) Research & Testing by CPRI(g) Training and skill improvement by NPTI

    (h) Capacity Building and Programme Assessment

    (i)Ministry of Power Secretariat

    (ii)Central Electricity Authority

    While the outcomes for each of the above categories in detail have been tabulated

    ahead, some of the major highlights are: -

    Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) - Rajiv Gandhi GraminVidyutikaran Yojana is major Village Electrification Scheme of the Government

    of India for attainment of the National Common Minimum Programme ofproviding access to electricity to all Rural Households in four years. The target for

    the year 2008-09 is for electrification of 25,000 un-electrified villages andproviding electricity connections to around 60 lakhs BPL households.

    Accelerated Power Development & Reform Programme (APDRP) - The

    scheme is being restructured with focus on actual demonstrable performance in

    terms of loss reduction and to achieve and sustain reduction in AT &C losses.

    GenerationCentral Sector Electricity Generation is planned and implemented through the

    various organizations. The details ahead along with their highlights are as under: -

    (i) NTPC

    The outlay of Rs.13588 crores during 2008-09 would result in commissioning of

    1320 MW (Sipat-I 2x660 MW). The outlay will also result in substantial physical

    progress of the projects scheduled to be commissioned during the XI Plan period.

    (ii) NHPC

    The capacity addition targeted by NHPC during the XI Five year plan is 5322

    MW. No capacity addition target is planned during the year 2008-09. The

    activities planned during the year 2008-09 include completion of residual works

  • 8/8/2019 Outcome Budget 2008-09

    19/239

    (iii) NEEPCO

    During the year 2008-09, all the major works of ongoing Kameng Hydro Electric

    Project (600 MW) are expected to be in full swing. The work in regard to the 110MW Pare Hydro Electric Project is likely to commence during 2008-09. For

    Tuirial HEP (60 MW), Mizoram, all out effort shall be made for early revival of

    the project during 2008-09. The gas allocation required for the Tripura Gas Basedthermal power Project (104.74 MW) has been received on 19-12-07 from ONGC.

    In addition, Survey & Investigation Works along with activities on new projects

    like Tipaimukh H. E. Project (1500 MW), Garo Hills Coal Based Thermal Power

    Project (500 MW) and other thermal projects are also likely to be taken up.

    (iv) THDC

    Although no capacity addition will be achieved in 2008-09, substantial progress

    will be made for Koteshwar HEP (400 MW). For Tehri PSP (1000 MW) and

    Vishnugad Pipalkoti HEP (444 MW) award of contracts of major civil works is inprocess and construction of major works shall be taken up after the award of the

    contracts in the year 2008-09.

    (v) SJVNL

    During the year 2008-09 the construction activities of Rampur HEP (412 MW)

    and Luhri HEP (775 MW) will achieve considerable progress. Works beingcarried out at Nathpa Jhakri HEP shall lead to greater availability of NJHPS for

    operation during high flood season.

    (vi) DVC

    The outlay of Rs. 6612.65 crs. during 2008-09 would result in commercial

    operation of Mejia Unit (VI) ( 1 x 250 MW ). In addition, units VII and VIII (2 x250 MW ) of Chandrapura Thermal Power Station(Extension) will also get

    synchronized. The work in respect of new projects like Koderma Stage-I ( 2x500

    MW ), Durgapur Steel TPS ( 2 x 500 MW), Raghunathpur TPS Phase-I ( 2x600

    MW) and Bokaro A TPS (500 MW) will gather momentum in 2008-09. Inaddition, works on replacement/extension projects of Mejia Phase-II are likely to

    progress substantially Substantial progress will also be made in joint venturethrough Maithon Power Limited (MPL) at Maithon at Right Bank Thermal Power

    Station.

  • 8/8/2019 Outcome Budget 2008-09

    20/239

    Rajiv Gandhi Grameen Vidyutikaran YojanaOUTCOME BUDGET 2008-09

    (Rs. in crore)

    Outlay 2008-09Sr.

    No.

    Name of

    Scheme/Programme

    Objective

    /Outcome Non-

    Plan

    Budget

    Plan

    Budget

    Comple-

    mentary

    Extra-Budgetary

    Resources

    Quantifiable

    Deliverables/Physical

    Outputs

    (2008-09)

    Processes/

    Timelines

    Projected

    Outcomes

    Remarks/Risk

    Factors

    1 2 3 4(i) 4(ii) 4 (iii) 5 6 7 8

    1. RajivGandhiGrameen

    Vidhyutikar

    anYojana

    (RGGVY)

    Electrifyingall villagesand

    providing

    access toelectricity

    all rural

    households

    in four years

    Rs.5,500crore

    Electrificationof25,000 un-

    electrified

    Villages andoffering

    electricity

    connections to

    around 60lakhs BPL

    households

    Schemeenvisages toelectrify 1.15

    lakh un-

    electrifiedvillages and

    provide

    connections to

    2.34 crore ruralhouseholds by

    2009*.

    Will facilitateoverall ruraldevelopment,

    employment

    generationand poverty

    alleviation

    The Cabinet hasapproved thecontinuation of

    RGGVY during

    XI plan with a provision of

    Rs.28,000 crore

    on 3.1.08. The

    projectexecution

    period is

    normally 18months. Efforts

    would be made

    by the Ministryof Power to

    compress this

    period to 12months in some

    of the projects.

    *This is subject to availability of RGGVY subsidy of Rs.24,000 crore during 2008-09

  • 8/8/2019 Outcome Budget 2008-09

    21/239

    Accelerated Power Development and Reforms Programme (APDRP)

    OUTCOME BUDGET 2008-09S.

    No

    Name of the

    Scheme/Programme

    Objective/

    outcome

    Outlay 2008-09 Quantifiable

    deliverables/physicaloutputs

    Projected outcomes Processes/

    timelines

    Remarks/ risk

    factors

    1 2 3 4 5 6 7 8

    Non-PlanBudget

    Plan Budget ComplementaryExtra-Budgetaryresources

    4(i) 4(ii) 4(iii)

    2 AcceleratedPowerDevelopmentand ReformsProgramme(APDRP)

    To bringaboutefficiencyandcommercialviability intopowersector byway ofAggregateTechnical

    andCommercial(AT&C) lossreduction

    -

    1.00 Cr. The scheme isbeingrestructured forimplementationduring the 11

    th

    Five Year Planand is yet to befinalised. Thefunding patternof the schemewill be known

    only after theapproval of thescheme.

    Reduction ofAggregateTechnical andCommercial(AT&C) lossesthroughstrengthening &up gradation ofSub-Transmissionand Distribution

    network andadoption ofInformationTechnology inthe areas ofenergyaccounting &auditing.

    The scheme is beingrestructured forimplementationduring the 11

    thFive

    Year Plan and is yet tobe finalised. Theprojected outcomes arereduction of AggregateTechnical andCommercial (AT&C)losses in the APDRP

    project areas throughstrengthening & upgradation of Sub-Transmission andDistribution networkand adoption ofInformation Technologyin the areas of energyaccounting & auditing.

    Initially, establishmentof reliable andautomated systems forsustained collection ofaccurate base linedata, and the adoptionof InformationTechnology in theareas of energyaccounting & auditingresulting in fixing

    The scheme isbeingrestructured forimplementationduring the 11

    th

    Five Year Planand is yet to befinalised.

    The scheme isbeingrestructured forimplementationduring the 11

    th

    Five Year Planand is yet to befinalised.

  • 8/8/2019 Outcome Budget 2008-09

    22/239

    accountability at thelowest level in theelectricity distributionutility, which isexpected to bring down

    AT&C losses of theutilities. IT will alsoallow real timemonitoring of quality ofpower and service levelto consumers.

  • 8/8/2019 Outcome Budget 2008-09

    23/239

    CONSULTANCY CHARGES AND ENABLING ACTIVITIES FOR APDRP PROJECTS

    OUTCOME BUDGET 2008-09

    S.No

    Name of theScheme/Programme

    Objective/outcome

    Outlay 2008-09 Quantifiabledeliverables/physicaloutputs

    Projectedoutcomes

    Processes/timelines

    Remarks/ riskfactors

    1 2 3 4 5 6 7 8

    4(i) 4(ii) 4(iii)

    Non-PlanBudget

    Plan Budget ComplementaryExtra-Budgetaryresources

    3 Consultancy

    Charges andenablingactivities forAPDRPprojects.

    For

    validation ofbase linedata andotherenablingactivitiesrelating torevisedAPDRP

    scheme

    -

    0.01 Cr. - To validate the

    base line dataand toundertake otherenablingactivities forimplementationof the revisedAcceleratedPower

    Developmentand ReformsProgramme(APDRP)scheme duringthe 11

    thFive

    Year Plan.

    The APDRP

    scheme is beingrestructured forimplementationduring the 11

    th

    Five Year Planand is yet to befinalised. Theprojectedoutcomes will

    be known afterthe approval ofthe scheme.

    The APDRP

    scheme is beingrestructuredduring the 11

    th

    Five Year Planand is yet to befinalised.

    The APDRP scheme

    is being restructuredduring the 11

    thFive

    Year Plan and is yetto be finalised.

  • 8/8/2019 Outcome Budget 2008-09

    24/239

    FUNDS FOR EVALUATION STUDIES AND CONSULTANCY

    OUTCOME BUDGET 2008-09

    S.No

    Name of theScheme/Programme

    Objective/outcome

    Outlay 2007-08 Quantifiabledeliverables/physicaloutputs

    Projectedoutcomes

    Processes/timelines

    Remarks/ riskfactors

    1 2 3 4 5 6 7 8

    4(i) 4(ii) 4(iii)

    Non-PlanBudget

    Plan Budget ComplementaryExtra-Budgetaryresources

    4 Funds forevaluationstudies andconsultancy

    Evaluationof theprojectssanctionedunderrevisedAPDRPscheme andother

    schemes/programmesof Ministryof Power

    -

    Rs. 2.90cr.

    - The evaluationof APDRP/otherschemes andprogrammes willbring outwhether theprogramme isbeingimplemented

    properly,desired resultsbeing achievedor not andsuggestingchanges in theprogramme forachieving thedesired results

    The APDRPscheme is beingrestructured forimplementationduring the 11

    th

    Five Year Planand is yet to befinalised.Evaluation of

    other schemes/programmes willbe completedon need basis.

    - -

  • 8/8/2019 Outcome Budget 2008-09

    25/239

    OUTCOME BUDGET 2007-08

    FutureGen ProjectS.No. Name of

    scheme/

    programme/

    project

    Objective / Outcome Outlay 2006-07 Quantifiable

    Deliverables/Ph

    ysical Outputs

    Processes/

    Timelines

    Projected

    Outcomes

    (date of

    completion

    of the

    project)

    Remarks/

    Risk Factors

    1 2 3 4 5 6 7 8

    4(i) 4(ii) 4(iii)

    Non-Plan

    Budget

    PlanBudget

    ComplementaryExtra-Budgetary

    Resources

    5 FutureGen

    Project

    initiative by

    the USA

    To design, build

    and operate the first

    coal-fired emission-

    free power plant.This basically is a

    research projectwhich will benefitthe Indian power

    sector experts/

    scientists

    Nil Rs. 6

    crores

    Nil Participating

    in the

    Government

    SteeringCommittee

    meetings oftheProject/Site

    visits.

    March

    2009

    2015 It is a

    research

    project in

    which Indiais

    contributingabout 1% of

    the cost.

  • 8/8/2019 Outcome Budget 2008-09

    26/239

    Accelerated Generation and Supply Scheme(AG&SP)

    Outcome Budget 2008-09(Rs. in crore)

    Sl Name of

    Scheme

    Objective/ Outcome Outlay 2008-09 Quantifi

    ablePhysical

    Outputs

    Proces

    ses/Timeli

    nes

    Projected

    Outcomes/ Fateof completion of

    the project

    Remarks/

    Risk Factors

    1 2 3 4 5 6 7 84(i) 4(ii) 4(iii)

    6

    AG&SP

    The objective of the

    AG&SP program is to

    provide interest subsidyto R&M schemes,

    R&U schemes, selected

    Hydel and Thermalgeneration projects.

    Rs.01

    cr

    - The schemeis yet to be

    approved

    forcontinuation

    in the 11th

    Plan

  • 8/8/2019 Outcome Budget 2008-09

    27/239

    Joint Electricity Regulatory Commission (JERC) for Union Territories except Delhi

    Outcome Budget 2008-09Sl.

    No.

    Name of

    Scheme/

    Programme

    /

    Projects

    Sanctioned

    cost/

    Cumulative

    expenditure

    from

    beginning

    till 31.12.2007

    Objective/

    Outcome:

    Outlay 2008-2009 Quantifiable

    Deliverables/

    Physical

    Outputs

    Processes/

    Timelines

    Projected

    outcomes

    Remarks/ Risk Factor

    1. 2. 3. 4. 5. 6. 7. 8.

    4(i) 4(ii) 4(iii)3(i) 3 (ii)

    Non-

    Plan

    Budget(Amount

    Rs/lacs)

    Plan

    Budg

    et(Amou

    nt

    Rs/lacs)

    Complemen

    tary

    Extra-Budgetary

    Resources

    7 Joint

    Electricity

    Regulatory

    Commission

    (JERC) for

    UnionTerritories

    except Delhi

    Sanctioned

    Cost : Not

    Applicable

    Cumulative

    expenditure

    : Nil

    To meet the

    statutory

    requirement

    for setting

    up

    ElectricityRegulatory

    Commission

    267 Nil Nil The Commission

    would regulate

    tariff for supply

    of electricity in

    UTs resulting in

    efficiencyimprovements.

    This will be a

    permanent

    institution.

    The Joint

    Commission

    would be fully

    operationalised.

    With the approval of the

    Cabinet/ Ministry of

    Finance, 16 posts,

    including one post each of

    Chairperson, Member and

    Secretary, have beencreated for the JERC for

    UTs.

    The Selection Committee

    has recommended a panel

    each of two persons for

    the post of Chairperson

    and Member. Necessary

    approval for appointment

    is being obtained.

  • 8/8/2019 Outcome Budget 2008-09

    28/239

    Joint Electricity Regulatory Commission (JERC) for Manipur and Mizoram

    Outcome Budget 2008-09

    Sl.

    No.

    Name of

    Scheme/Program

    me/

    Projects

    Sanctioned

    cost/Cumulative

    expenditure

    from

    beginning

    till

    31.12.2007

    Objective/

    Outcome:

    Outlay 2008-2009 Quantifiable

    Deliverables/Physical

    Outputs

    Processes/

    Timelines

    Projected

    outcomes

    Remarks/ Risk

    Factor

    1. 2. 3. 4. 5. 6. 7. 8.

    4(i) 4(ii) 4(iii)3(i) 3 (ii)

    Non-PlanBudget

    (AmountRs/la

    cs)

    PlanBudget(Amo

    untRs/lacs)

    ComplementaryExtra-BudgetaryResources

    8 Joint

    Electricity

    RegulatoryCommiss

    ion(JERC)forManipurand

    Mizoram

    Sanctio

    nedCost :

    Rs.6.60crore

    Cumulativeexpenditure :

    Nil

    To fulfill the

    commitment of theGovernment of

    India for assistingthe States of North-Eastern region in

    the initial 5 years insetting ofCommission. Itwould help inregulating tariff for

    supply of electricityin the States ofManipur &Mizoram

    Nil 150 Nil The Commission

    would regulatetariff for supply

    of electricity inthese Statesresulting in efficiency

    improvements.

    Governmen

    t of Indiawill meettheexpenditureduring the

    initial 5years fromthe date ofconstitutionand

    thereaftertheGovernments of thetwo States

    will share

    The Joint

    Commissionwould befullyoperationalised.

    Chairperson and

    Member of theJERC have beenappointed. Theyhave assumed theirrespective offices

    on 24.1.2008.

  • 8/8/2019 Outcome Budget 2008-09

    29/239

    the cost.

  • 8/8/2019 Outcome Budget 2008-09

    30/239

    Appellate Tribunal for Electricity

    Outcome Budget 2008-09

    Sl.

    No.

    Name of

    Scheme/Program

    me/

    Projects

    Sanctioned

    cost/Cumulative

    expenditure

    from

    beginning

    till

    31.12.2007

    Objective/

    Outcome:

    Outlay 2008-2009 Quantifiable

    Deliverables/Physical

    Outputs

    Processes/

    Timelines

    Projected

    outcomes

    Remarks/ Risk Factor

    1. 2. 3. 4. 5. 6. 7. 8.

    4(i) 4(ii) 4(iii)3(i) 3 (ii)Non-

    PlanBudget(AmountRs/lacs)

    Plan

    Budget(AmountRs/lacs

    )

    Complem

    entaryExtra-BudgetaryResource

    s

    9 AppellateTribunalfor

    Electricity(APTEL)

    SanctionedCost: Notapplicable

    Expenditure from

    1.4.2007 to31.12.2007

    : Rs.137.84

    lakhs.

    To facilitateexpeditiousresolution of

    disputes inthe powersector at the

    appellatelevel.

    The Tribunalwill also

    function asappellate

    authorityunderPetroleum

    and Natural

    Gas

    550 Nil Nil Total appealsfiled and

    pending final

    disposal as on1st January,2008 are 164

    Judgements in

    respect of 10

    cases have beenreserved. 154

    appeals are pending at

    hearing level.

    Apart from

    this, 70 IAs/

    Petitions are

    The are likelyto bedisposed off

    along withfresh appeals

    being filed

    during 2008-09.

    Spreadthroughoutthe year

    APTEL had been set upwith appellate

    jurisdiction of power

    sector. With theenactment of Petroleumand Natural Gas

    Regulatory Board Act2006, petroleum sector

    has also come under its

    jurisdiction.

  • 8/8/2019 Outcome Budget 2008-09

    31/239

    RegulatoryBoard Act.

    also pendingfor disposal/

    admission.

    The abovedetails areinclusive of

    cases under thePetroleum and

    Natural GasRegulatoryBoard Act.

  • 8/8/2019 Outcome Budget 2008-09

    32/239

    Central Electricity Regulatory Commission

    Outcome Budget 2008-09Sl.

    No.

    Name of

    Scheme/

    Programme/

    Projects

    Sanctioned

    cost/

    Cumulative

    expenditur

    e from

    beginnin

    g till

    31.12.2007

    Objective/

    Outcome:

    Outlay 2008-2009 Quantifiable

    Deliverables/

    PhysicalOutputs

    Processes/

    Timelines

    Projected

    outcomes

    Remarks/ Risk Factor

    1. 2. 3. 4. 5. 6. 7. 8.

    4(i) 4(ii) 4(iii)3(i) 3 (ii)Non-

    PlanBudget(AmountRs/lacs)

    Plan

    Budget(AmountRs/lacs

    )

    Complem

    entaryExtra-BudgetaryResource

    s

    10 CentralElectricity

    RegulatoryCommission

    (CERC)

    Sanctioned Cost:

    Not

    applicable

    Expenditure from

    1.4.2007

    to31.12.20

    07:Rs.798.7

    1 lakhs

    Following arethe objectivesof CERC:-

    To

    improve theoperations andmanagement of

    the regionaltransmission

    systems.

    To

    formulate anefficient

    tariff settingmechanism

    To

    facilitate

    open access

    650 Nil Nil 60 petitions arelikely to bedisposed during

    the year 2008-09. The

    petitions

    include thetariff petitions

    for the Tariff

    Period 2004-09,

    miscellaneousapplications

    etc.

    Preparation for

    Theprocedures offraming

    Regulation asalso of

    passing

    orders byCERC are

    already laid

    down indetail in the

    Conduct ofBusiness

    Regulations.These

    procedureswould be

    followed

    Passing oftariff orderswill result in

    firm tariff forthe 5 yearTariff Period

    for which theTerms &

    conditions of

    Tariff havebeen

    specified byCERC.

    This wouldpromoteeffective

    utilization of

    assets across

    As per the past trend, itis expected that thetargets set will be

    achieved. However,the possible constrainswhich have the

    potential of slippageson time line include the

    complexities involved

    in some cases, forinstance in the framing

    of national tariffframework, multi year

    tariff principle for2009-14, wherein wide

    consultation with thestake holders is

    required.

  • 8/8/2019 Outcome Budget 2008-09

    33/239

    in inter-Statetransmission

    To

    facilitateinter-State

    trading

    Topromotedevelopment

    of powermarket

    To

    improve

    access toinformation for

    allstakeholders

    To

    facilitatetechnological and

    institutionalchanges for

    thedevelopment ofcompetitivemarkets.

    implementationof National

    TransmissionTariff

    framework.

    Review ofOpen AccessRegulations in

    the light of newdevelopmentincluding

    setting up ofPowerExchangeTransactions.

    Framing of

    Tariff

    Regulation forthe next Tariff

    period i.e.2009-14

    whiledisposing of

    the petitionsand other

    issueshighlightedin column-5.

    The targets asindicated in

    column-5 areexpected to

    be achieved

    during the

    year 2007-08

    the countryand

    accelerateddevelopment

    of the newtransmissioncapacities.

    This wouldfurther

    streamlinethe openaccess(OA)

    transactions

    and addressthe OA issuesrelating toPowerExchangeTransmission

    . This wouldset in placetheframeworkfor tariff

    determinationfor the period2009-14.

  • 8/8/2019 Outcome Budget 2008-09

    34/239

    Assistance to Forum of Regulators for Capacity Building

    Outcome Budget 2008-09

    Sl.

    No.

    Name of

    Scheme/Program

    me/

    Projects

    Sanctioned

    cost/Cumulativ

    e

    expenditur

    e from

    beginnin

    g till

    31.12.2007

    Objectiv

    e/Outcome

    :

    Outlay 2008-2009 Quantifiable

    Deliverables/Physical

    Outputs

    Processes/

    Timelines

    Projected

    outcomes

    Remarks/ Risk Factor

    1. 2. 3. 4. 5. 6. 7. 8.

    4(i) 4(ii) 4(iii)3(i) 3 (ii)

    Non-Plan

    Budget(AmountRs/lacs)

    Plan

    Budget(AmountRs/lacs)

    Complem

    entaryExtra-Budgetar

    yResource

    s

    11 Assistanc

    e toForum ofRegulato

    rs forCapacity

    Building

    Sanction

    ed Cost:Rs.10.00crore (to

    beapproved

    )

    Expendit

    ure from1.4.2007to31.12.2007: Nil

    Capacity

    building by wayof

    training/re-

    orientation of

    personnel

    ofRegulatoryCommissions

    200 50 regulators

    and 100 staffwill be trainedin a year.

    These funds

    will be spentduring the11th Plan

    period.

    Regulatory

    Commissionswill havetrained

    personnel.

  • 8/8/2019 Outcome Budget 2008-09

    35/239

    MINISTRY OF POWER SCHEMES

    OUTCOME BUDGET 2008-09.

    (Rs. in crore)

    Sr.No

    .

    Name of Scheme/Programme/Projects

    Objective/Outcome:

    Sanctioned cost/

    Cumulative

    expenditure from

    beginning till

    31.12.2007.

    Outlay 2008-2009 QuantifiableDeliverables/

    Physical

    Outputs

    Processes/

    Timelin

    es

    Projected Outcomes:Date of completion of

    the project

    Remarks/RiskFactor

    1. 2. 3. 4. 5. 6.7.

    8.

    4(i) 4(ii) 4(iii)

    !

    Non-Plan

    Budget

    Plan

    Budget

    Complement

    ary Extra-

    Budgetary

    Resources

    18.

    (a) MOP Secretariat

    (Main):- Salary, wages

    and other establishment

    expenditure includingover-time allowance,

    medical treatment,

    domestic travel expenses,

    foreign travel expenses,

    publications, other

    administrative

    expenditure, advertising

    and publicity profession

    services and subsidies.

    (a) To meet the

    salary wages and

    other incidental

    expenses for supportservices.

    Cumulative

    Expenditure

    incurred upto

    31.12.2007: Rs.4.88

    crores.

    10.13 NA (a) The

    expenditure is

    incurred on

    salary andother support

    services and

    hence outputs

    are not

    measurable in

    quantitative/

    qualitative

    terms.

    (a) Under these

    provisions, salary,

    wages and other

    establishment expensesare met for all the

    officials of M/o Power.

    These are basically

    support services to

    facilitate personnel

    involved in framing

    overall policies and

    their implementation.

    Through variouspublications and

    publicity campaigns,

    the programmes, policy

    initiatives of the

    Ministry are

    disseminated to the

    general public in an

    effective manner.

    ______

  • 8/8/2019 Outcome Budget 2008-09

    36/239

    (b) Departmentalized

    Accounting Set up of

    Ministry of Power

    To maintain all

    Financial

    /Accounting matters

    of Ministry of

    Power

    1.21 NA NA All the

    requisite

    documents e.g.

    Finance

    Accounts ,S.C.T.,

    Appropriation

    of Financial

    transactions of

    Ministry of

    Power to be

    laid before

    Parliament

    through O/o

    the Controller

    General of

    Accounts.

    - The requisitedocuments will befurnished by due date.

    -

    ( ) Offi E (b) A Pl h 1 75 1 00 d F ll i th j

  • 8/8/2019 Outcome Budget 2008-09

    37/239

    (c) Office Expenses (b) A Plan scheme

    with duration of 5

    years (2002-03 to

    2006-07) was

    initiated to upgrade

    data, collection,sharing and

    dissemination of

    information through

    computerization,

    renovation &

    modernization of

    offices in the

    Secretariat of the

    Ministry. This is

    basically intended to

    enable quick and

    prompt decision

    making. The Plan

    scheme is proposed

    to be continued

    during the XI Plan.

    1.75 1.00 _______ ---do--- _____ Following are the major

    benefits when the

    scheme is fully

    implemented

    (i) Availability of

    versatile and developedcentralized on-line

    technical data base

    system.

    (ii) Development of a

    well inter-connected

    local area network and

    remote connection with

    various power utilities.

    (iii) Enhanced skill of

    manpower in the M/o

    Power in the field of

    Information

    Technology.

    (iv) Conducive

    environment &

    aesthetic ambience

    created through

    renovation/office

    automation isfacilitating smooth and

    effective discharge of

    official work.

    The project will be

    completed on 31.3.2012

    (v) Replacement of old

    IT related system with

    latest system.

    ____

  • 8/8/2019 Outcome Budget 2008-09

    38/239

    CENTRAL POWER RESEARCH INSTITUTE

    Outcome budget 2008-09

    (Rs. Crore)

    SlNo.

    Name ofScheme/Programme

    Objective/ Outcome Annual Plan2008-09(Proposed)

    QuantifiableDeliverables

    Process/Timelines

    Date ofcompletion oftheproject

    Remarks

    1 2 3 4(i) 4(ii) 4(iii) 5 6 7 8

    On-going Schemes(spill over from X plan)

    1. National &Internationalaccreditation ofCPRI laboratories

    Accreditation forlaboratories of CPRIfrom National

    Accreditation Board

    of laboratories,IEECEECB, STL &

    ASTA. Improvementof client relatedservices

    Total Project outlayRs. 1.60 Cr

    0.10 Continuation ofASTA, IECCB,IECEE schemes,NABL and

    internationalmarketing

    August2008

    August2008

    Project isas per

    schedule

    2 Augmentation & Augmentation & 4 85 Procurement of Jan Mar Sept Project is

  • 8/8/2019 Outcome Budget 2008-09

    39/239

    2. Augmentation &Modernisation ofCPRI Laboratories

    Augmentation &Modernisationthrough facilityaddition for the

    laboratoriesIn order to creategood workenvironment in thelaboratories, it isproposed to give aface lift to thelaboratories forinteriors,modernization ofelectrical works,installation of firesafety devices,providing airconditioning facility.

    4.85 Procurement ofidentifiedequipments

    Anticipated

    Expenditure:Rs.500 lakhs

    Modernization oflaboratories byinterior design &associated works

    AnticipatedExpenditure:Rs.485 lakhs

    Jan-Mar2008

    Sept.2008

    Project isas per

    schedule

    3. Relocation ofRegional Testing

    Laboratory fromMuradnagar toNoida

    The presentlaboratory being in a

    remote place was notaccessible to servicethe customers.Hence, it wasdecided for relocatingto a place near Delhi

    Total Project outlay

    Rs. 8.69 Cr

    Award of civil worksand

    commencement ofconstructionactivities

    Execution of civilworks for buildingof laboratories,

    shifting of

    Jan-March

    2008

    Apr-Dec2008

    March2009

    Project isas per

    schedule

    equipments & 11kV

  • 8/8/2019 Outcome Budget 2008-09

    40/239

    equipments & 11kVsub-station fromMuradnagar toNoida

    AnticipatedExpenditure:Rs.200.00

    lakhs

    Commissioning ofequipments andinauguration oflaboratory

    AnticipatedExpenditure:Rs.140.00

    lakhs

    Jan-Mar2009

  • 8/8/2019 Outcome Budget 2008-09

    41/239

    Placing order for Jan-Mar2. Refurbishment It is proposed to 0.55 Mar 2009 Project

  • 8/8/2019 Outcome Budget 2008-09

    42/239

    Placing order forrewinding rotor andrepair of rotor

    Anticipatedexpenditure:Rs.125 lakhs

    Jan Mar2008

    1. Replacement ofstator wedges forOerlikon make 1500MVA s/c generator2. Fabrication,installation andcommissioning ofair ducts forresistance cooling

    Anticipatedexpenditure:

    Rs.30.00 lakhs

    Apr-June2008

    Completion ofrepair work of rotor

    AnticipatedExpenditure:Rs.35.00 lakhs

    Jul-Sept.2008

    2. Refurbishmentof 1500 MVAs/c generatorat STDS,

    Bhopal

    It is proposed torefurbish the 1500MVA short circuitgenerator at STDS,

    CPRI, Bhopal whichhas out lived its life

    Total Project outlayRs. 3.30 Cr

    Repair of coolingwater tower

    AnticipatedExpenditure:Rs.65.00 lakhs

    Oct-Dec.2008

    Mar 2009 Project

    approvedon 22.1.08

  • 8/8/2019 Outcome Budget 2008-09

    43/239

    Commissioning ofSC Generator &other misc. works

    AnticipatedExpenditure:Rs.75.00 lakhs

    Jan-Mar.2009

    Preparation oftechnicalspecification andindents

    Jan-Mar2008

    Tender processing/Evaluation oftenders

    Apr-Jun2008

    Release of PO forthe equipment

    Sept- Dec2008

    3. State of artMobile fieldtestinglaboratory foronsite accuracytest andconditionassessment ofEHV classInstrumenttransformers

    facility forCT/PT

    To establish state-of the art mobilefield test laboratoryfor testing CT/PT ofEHV class

    Total Project outlayRs. 4.65 Cr

    2.65

    Arrival ofequipment

    AnticipatedExpenditure:Rs.265 lakhs

    Jan-Mar2009

    Dec 2009 Projectapproved

    on 19th Dec2007

    Procurement action Jan-Mar4. Centre for To establish center 0.98 Project

  • 8/8/2019 Outcome Budget 2008-09

    44/239

    for equipmentsidentified forenergy efficiency

    studies for coolingtowers, Thermalpower plants,electrical networks,Hydro powerstation, coal mills,Electrostaticprecipitation, Lowenergy devices

    2008

    Evaluation oftenders & placingorder forequipments

    Apr-Jun2008

    AdvancedEnergyResearch in

    the AreaEnergyEfficiency &Energy Audit

    for excellence forstudy on nergyefficiency & energy

    audit

    Total Project outlayRs. 1.98 Cr

    Receipt of

    equipments,inspection &performanceevaluation

    AnticipatedExpenditure: Rs.50

    lakhs

    July-Sept

    2008

    j

    approvedby MOP on11.1.08

    Receipt of Oct-Dec

  • 8/8/2019 Outcome Budget 2008-09

    45/239

    equipments,inspection &performance

    evaluation

    AnticipatedExpenditure: Rs.98lakhs

    2008

    Initiation of Civilworks forestablishing trainingcentre

    Jan-Mar2009

    Framing oftechnicalspecification ofcoal/ Fly ashmeasuring system,

    Flue gas analyser,Volume flowanalyser, NDT

    Jan-Mar2008

    Procurement actionof equipments

    Apr-Jun2008

    5. Establishmentof mobilediagnosticfacility forpower plant

    specificequipment forimprovingperformance

    To establishmobile diagnosticfacility forconductingperformance test

    on in thermalpower plants

    Total Project outlayRs. 410 Cr

    2.60

    Evaluation of

    tenders & placingof orders ofequipments &framing ofspecification of Vanto house theequipments

    July-Sept

    2009

    Jan 2010 project

    approvedon

    24.01.08

    Receipt, inspectionl f

    Oct-Dec

  • 8/8/2019 Outcome Budget 2008-09

    46/239

    & evaluation ofequipments,housing in van

    AnticipatedExpenditure:Rs.290 lakhs

    2008

    Receipt inspection& evaluation ofequipments

    Anticipated ,housing in vanExpenditure:Rs.120 lakhs

    Jan-Mar2009

    Preparation ofspecification

    Jan-Mar2008

    Manufacturing and

    supply of RotorCoils of thegeneratorExpenditure: Rs.80lakhs

    Apr-Jun

    2008

    6. Refurbishmentof 50 MVAshort circuittest station

    Refurbishment ofexisting aged SCgenerator in SC labto ensure continued

    service to clientsTotal Project outlayRs. 8 Cr

    4.00

    Design engineeringmanufacturing ofstatic excitationsystem and SCtransformer.

    Expenditure:Rs.400 lakhs

    Jul-Mar2008

    July 2009 projectapproved

    on07.02.08

  • 8/8/2019 Outcome Budget 2008-09

    47/239

    Projects submitted for approval under XI Five Year Plan Scheme

    7. Centre ofExcellence forLife CycleManagementand Condition

    Assessment ofHigh VoltageSubstation andPower PlantElectricalequipment

    To create adequateR&D infrastructurefor functionalevaluationsimulation, ageingstudies & diagnosticmonitoring ofspecimens/modelspower apparatusinsulation

    Total Project outlayRs. 12.38 Cr

    5.00

    - - - Approvalawaited fromMinistry of

    Power

    8. Centre ofExcellence for

    Di-electricStudies

    To set up centre ofexcellence for di-

    electric studieswherein severallaboratories will comeup under one roofwith additionaltesting & researchfacilities in the areasof di-electricmaterials andmaterial technologies

    Total Project outlayRs. 7.68 Cr

    2.43 - - - Approvalawaited from

    Ministry ofPower

    9. Modernisationand

    Establishment ofa Facility to conduct

    2.00 - - - Approvalawaited from

  • 8/8/2019 Outcome Budget 2008-09

    48/239

    andaugmentationof switchgear

    test facilitiesat CPRI,Bangalore

    a. Facility to conductinductive loadswitching tests on

    HV CBii) Facility to conduct

    capacitor currentswitching test on 245kV CBs

    Total Project outlayRs. 24.60 Cr

    awaited fromMinistry of

    Power

    10. Modernisationof short circuittest facilitiesand

    Augmentationof power

    transformertest facilities

    Establishment ofi)Facility for lossmeasurement oftransformers upto 50MVA ii) facility fortype test on OLTC

    iii) Instrumenttransformercalibration testfacility

    Total Project outlayRs. 23.60 Cr

    2.00 - - - Approvalawaited fromMinistry of

    Power

    11. Setting up oftest facilities

    To set up test facilityfor testing for pre

    3.00 - - - Approvalawaited from

  • 8/8/2019 Outcome Budget 2008-09

    49/239

    test facilitiesfor pre-qualification

    test on 400 kVXLPE cablesystem

    for testing for pre-qualification test on400kV XLPE cable

    system

    Total Project outlayRs. 14.80 Cr(Revised proposalsubmitted)

    awaited fromMinistry of

    Power

    12. MechanicalStrength TestFacility

    To automate towererection facility &also to augmentvibration test facilitywith higher capability

    Total Project outlayRs. 6.50 Cr

    5.00 - - - Approvalawaited fromMinistry of

    Power

    13. Augmentationof testfacilities foroptimization of800kV AC /DCtransmissionsystem

    To augment testfacilities forconductingoptimization studies& transmissionsystems of 800kV AC& 800kV DC ratings

    Total Project outlayRs. 30.60 Cr

    6.00 - - - Approvalawaited fromMinistry of

    Power

    14. Establishmentof Mobile

    To set up mobile testfacility for testing

    - - - - Approvalawaited from

  • 8/8/2019 Outcome Budget 2008-09

    50/239

    of MobileTransformertest facility.

    Conditionallyapproved in Xplan, expectedto be taken upin the currentyear after finalapproval

    facility for testingpower transformer &other sub-station

    components in thefield

    Total Project outlayRs. 14.70 Cr

    awaited fromMinistry of

    Power

    15. InternationalMarketing &CollaborativeBusinessDevelopmentfor CPRI

    To enhance themarket reach of CPRIin the globalperspective & torealize higherbusiness turnoverTotal Project outlay

    Rs. 1.50 Cr

    0.34 - - - Approvalawaited fromMinistry of

    Power

    16. On-line testfacility forlarge powertransformertest

    To establish on-linetest facility fortesting powertransformers in therange of 100-315MVA

    Total Project outlayRs. 200 Cr

    - - - - Approvalawaited fromMinistry of

    Power

    17. Augmentation ofhigh power testfacilities byinstallation ofadditional 2500

    Installation ofadditional 2500 MVA

    Alternator at HPL,CPRI, Bangalor etotest transformers to

    - - - - Approvalawaited fromMinistry of

    Power

    MVA alternatorwith associated

    125 MVA CBs upto400 kV Insulators

  • 8/8/2019 Outcome Budget 2008-09

    51/239

    with associatedequipment athigh power

    laboratory, cpri,Bangalore

    400 kV Insulatorsupto 400kV

    Total Project outlayRs. 314 Cr

    18. Plan R&D Inhouse R&D plan ofCPRI aimed atproduct/ processdevelopment,augmentation of testfacilities,

    improvement ofstandards etc.

    Total Project outlayRs. 3.00 Cr

    3.00 Contribution toimprovement ofstandards;Establishment of testfacilities;Development of

    products/processes

    April2008 March2009

    Approvalawaited fromMinistry ofPower

    19. RSoP Schemes Ministry of Powersponsored

    programmes onResearch for IndianPower SectorTotal Project outlayRs. 2.00 Cr

    2.00 Study of power sectorproblems by utilities &

    Industry

    April2008

    March2009

    Approvalawaited from

    Ministry ofPower

    20. NationalPerspective Plan

    projects

    Undertaking projectsidentified under

    National PerspectivePlan report asapproved byStanding Committeeon R&D and Ministryof PowerTotal Project outlayRs. 34.67 Cr

    3.50 Projected expenditurefor 3 ongoing projects

    is Rs. 73 lakhs. Anexpenditure of Rs.127lakhs is anticipated fornew proposals to beprocessed.

    April2008

    March2009

    As per theindividual

    projectschedules.

    26 newprojects

    have beenreceived andare beingevaluated bytherespectivetask forces.

    Total 50.0

    MINISTRY OF POWER SCHEMES

  • 8/8/2019 Outcome Budget 2008-09

    52/239

    Outcome Budget 2008-09

    Outlay 2008-09Sl.

    No.

    Name of

    Scheme/

    Programme/

    Project

    Objective/ Outcome

    Non-

    Plan

    Budget

    Plan

    Budget

    Complemen

    tary Extra-

    Budgetary

    Resources

    Quantifiable

    Deliverables/

    Physical

    Outputs

    Projected

    Outcomes

    Processe

    s/

    Timelin

    es

    Remarks/

    Risk

    Factors

    41 2 3

    4(i) 4(ii) 4(iii)

    5 6 7 8

    13.

    Compre-

    hensive

    Award

    Scheme

    for power

    sector

    To inculcate competitive spirit and to

    motivate higher level of efficient and

    economic operation in the field of

    construction operation and maintenance

    of thermal/hydro/transmission projects,

    implementation of distribution reforms,

    environment performance, community

    development and safety records.

    However, the expected returns can not bequantified.

    - Rs.57

    lakhs

    -

    Improvement

    in

    performance

    of generation,

    transmission

    and

    distribution

    segments.

    To

    contribute

    in achieving

    reliable,

    affordable

    and quality

    power

    supply to all

    by 2012

    _ _

  • 8/8/2019 Outcome Budget 2008-09

    53/239

    Bureau of Energy Efficiency

    Outcome Budget 2008-09

    (Rs. Crores)

    S.N

    o

    Name of

    Scheme/ Prog

    Objective/

    Outcome

    Outlay

    2008-09

    Quantifiable Deliverables/ Physical

    Outputs

    Projected

    Outcomes

    Remarks/ Risk

    Factors

    1 2 3 4 5 6 7

    1 Standards &

    Labeling

    Programme

    To reduce enduse consumption

    by applyingstandards/labeling for

    equipments/

    appliances

    11.22 o Notification for mandatory labeling

    o Launch of awareness campaign

    o

    Rating plan foe motors, ceiling fans,LPG burners, kerosene stoves

    o Commencement of check testing-

    Independent Agency (RITES)

    o Finalizing of rating plan for consumer

    electronics, transport sector, CFLs in all about 20 high energy using end-

    use equipments & appliances

    o Enhancement ofawareness about

    energy efficientproducts

    o Market

    transformation

    towards energy

    efficient products in the

    market

    -Notification formandatory

    standards &labeling (MEPS)-Building

    awareness amongst

    masses on the need

    to use energyefficient devices

    -First cost bias

    -Inclusive participation of

    industry

    -Balanced &effective

    implementation

    2 Energy

    Conservation

    Building Codes(ECBC)

    To reduce

    energy

    consumption incommercial

    buildings.

    2.80 Creating a pool of ECBC expertArchitects EOI

    Training material for variousstakeholders

    Simplified guidebooks

    Initiation of outreach activities

    Initiation of 5 pilots in states-provision of technical assistance

    Outreach/Conferences in major state

    capitals

    ECBCimplementation

    on voluntarybasis

    Enhancing

    capacity and

    awareness ofstakeholders

    -First cost bias &

    awareness

    -Availability oftrained personnel in

    ECBC

    -Compliance

    procedure &requirements

    -Availability of

    ESCOs & their

    Simplified compliance procedures forstate & local bodies

    financial credibility-Availability of

  • 8/8/2019 Outcome Budget 2008-09

    54/239

    Capacity building of state & localgovernment personnel

    Evaluation of code for revision Strengthening of testing labs

    Promotion of ESCOs

    Rating of ESCOs to improve investorconfidence

    Innovative financial products

    Setting up of partial risk guaranteefund for risk mitigation

    finance to ESCOs

    bases projects

    3 Bachat LampYojana -

    To promoteenergy efficient

    & high quality

    CFLs asreplacement for

    incandescent

    bulbs in

    households

    14.40 Coverage of entire country in a phased manner based on DISCOM

    areas 6 major CFL manufacturers & 3

    suppliers have agreed to participate

    Pilot projects CFL

    POA to be submitted for DNA

    approval to CDM Executive Boardafter validation & stakeholder

    consultation States of Assam, Punjab, Andhra

    Pradesh, Haryana, Maharashtra,

    Chattisgarh have commenced project

    preparation. Other states in the

    process No. of projects in 2008-09 will be

    around 100

    Estimatedreplacement of

    about 400

    millionincandescent

    light bulbs in

    household

    sector Market

    transformation

    in favour ofenergy efficient

    CFLs in the

    household

    sector by highscale volumes &

    lower retailprice.

    -Approval of CDMExecutive Board of

    individual projects

    -High transactioncost for individual

    projects

    -Monitoring cost &

    quality-Investment risk

    -Quality &

    reliability of CFLs-Additionality &

    baseline as per

    CDM EB

    guidelines

    4 SDA

    Strengthening

    Programme

    To empower the

    SDAs as partners

    of BEE at state

    23.71 To enhance institutional capacity of

    the SDAs so that they have a common

    understanding of the issues related to

    o To strengthen

    SDAs as partners of

    BEE at state level

    -Diverse nature of

    SDAs-60% being

    renewable energy

    level toimplement EC

    A t

    energy conservation activities & areable to implement the EC Act in their

    ti t t

    o Effective proliferation of the

    d

    organizations & thebalance

    i t t &

  • 8/8/2019 Outcome Budget 2008-09

    55/239

    Act. respective states No physical target is possible under

    this programme but the SDAs are

    expected to have a minimum

    understanding of nuances of energy

    conservation & efficiency likeimplementing performance

    contracting projects, ECBC, IT based

    monitoring & evaluation etc. Energy Conservation Action Teams

    (ECATs) are being encouraged in thestates

    awareness and

    promotional programmes in

    states.

    inspectorates &

    DISCOMs-Inspection powers

    under EC Act of

    SDAs

    5 Designated

    Consumers

    and SMEs

    Programme

    Targeted energy

    consumptionreduction of

    Designated

    Consumers andSMEs.

    Capacity building ofEnergy Auditors

    and Managers

    14.22 Investment grade energy audits

    (bankable DPRs) for about 10 units ineach of the 25 clusters

    Template for DPR preparation for the

    balance units in clusters, given theirsimilarities

    Adequate provision of expertise forthe local service providers to helpreach out to the units

    Availability of financing by capacity

    building of banking personnel in

    matters like project appraisal ofperformance contracting

    o Creation of

    trained manpowerto undertake this job

    o Data collection/

    collation andanalysis in respect

    of DesignatedConsumers asmandated by EC

    Act.

    o Developmentand marketing of

    energy efficient

    products andservices for SMEs

    -Lack of data on

    energyconsumption

    including

    measurement &verification

    available withSMEs.-Lack of project

    development

    capability & the

    ability to translateenergy efficiency

    benefits into

    savings-Lack of

    standardized

    contracts, audit &M&V protocols,

    annual performance

    reports & so on

    6 InstitutionalStrengthening

    f BEE

    To equip BEE toimplement its

    d t d

    2.50 Setting up of Energy ConservationInformation Centre (ECIC) christened

    BEE t b bl d li d t

    o Enhance humanand organisational

    it

    -Availability ofadequate number of

    ti t d

  • 8/8/2019 Outcome Budget 2008-09

    56/239

    of BEE mandate under

    EC Act.

    BEEnet as a web enabled online data

    collection & collation system Infrastructure & resource

    augmentation of BEE

    capacity

    o IT based platform for data

    collection/ collation

    and analysis.

    motivated

    programmemanagers for

    understanding the

    task

    7 Agriculture

    DSM & Mu

    DSM

    To reduce the

    overall powerconsumption,

    improving

    efficiencies of

    ground waterextraction &

    reducing the

    subsidy burdenof the states

    To reduceenergy cost &

    improve energyoverall incurred by the

    municipalities

    12.80 Business model linked to subsidy

    reduction being evolved Shelf of bankable DPRs to be

    prepared -10 in each states to

    stimulate the market

    Baseline development, conduciveregulatory regime & payment security

    mechanism being worked out Awareness & outreach to local &

    municipal bodies

    Manual for Mu DSM being

    developed with standard contractdocuments to enable easier

    implementation Risk mitigation measures for

    encouraging PPP being evolved

    CDM benefits for the scheme being

    put in

    o To demonstrate

    by setting examplethe benefits and

    business models for

    energy conservation

    projects to otherGovernment/ semi-

    Government and

    other organizations

    -Regulatory,

    financial, politicaland technological

    risk

    - Baseline

    formulation andmonitoring

    - Incentive to

    farmers- Awareness and

    capacity

    - Subsidy linkedapproach.

    8 Contribution

    to SECF

    SECF is a

    statutory

    requirement andis one of the key

    elements of theECAP.

    8.35 The scheme will provide contribution

    to SECF after it is notified by states

    and will be pari-passu with thecontribution made by the states.

    o The effort will

    be to create a pool

    of financiallysustainable

    activities for SDAswhich can augment

    the fund.

    -Notification of

    SECF by States

    -Matchingcontribution from

    states-Sustainable

    business model for

    SECF

    Total 90.00

    Outcome Budget 2008-09.

    Energy conservation(Rs Crores)

  • 8/8/2019 Outcome Budget 2008-09

    57/239

    (Rs. Crores)

    S.No Name of Scheme/

    Prog

    Objective/

    Outcome

    Outlay 2008-09 Quantifiable Deliverables/

    Physical Outputs

    Projected Outcome Processes/

    Timelines

    Remarks

    / Risk

    Factors1 2 3 4(i

    )

    4(ii) 4(iii) 5 6 7 8

    1 National Energy

    Conservation

    Awards

    To recognize

    the efforts of

    industrial

    consumers to

    adopt energy

    conservation

    measures

    which may

    become models

    for others to

    emulate

    - 1.00 - o National Awards to

    industry establishment

    for achieving energy

    savings by proactive

    measures

    Enhancement of

    awareness about

    energy efficient

    products.

    Greater proliferation

    of adoption of energy

    efficient technologies

    by industry.

    Progressively from

    April 2008 to

    March 2009. The

    Award function is

    scheduled for 14th

    December, 2008.

    2 National Level

    Painting

    Competition for

    school children

    To inculcate in

    children the

    relevance and

    importance of

    energy

    efficiency andconservation.

    1.00 o Organisation of

    painting competition

    for school children all

    over the country.

    Awareness amongst

    children about need

    of energy

    conservation

    Organisation of

    district, state and

    national level

    competition in

    October,

    November andDecember, 2008.

    3 Awareness and

    Publicity

    To spread the

    message of

    energy

    conservation

    and efficiency

    through the

    media.

    8.00 o Awareness campaign

    through print, visual

    and electronic media

    Enhancement of

    awareness about

    energy efficient

    products

    Greater proliferation

    of adoption of energy

    efficient practices by

    masses.Creating an

    atmosphere for

    practicing energy

    conservation to

    enhance the impact of

    all other schemes of

    BEE.

    Progressively from

    April 2008 to

    March 2009

    Total 10.00

  • 8/8/2019 Outcome Budget 2008-09

    58/239

    CENTRAL ELECTRICITY AUTHORITYOUTCOME BUDGET 2008-09

    (Rs. in lakhs)(Rs. in lakhs)

    Sl.No.

    Name of Scheme /Programme

    Objective / Outcome Outlay 2008-09 QuantifiableDeliverables /

    PhysicalOutputs

    ProjectedOutcomes

    Processes /Timelines

    Remarks/ RiskFactors

    1 2 3 4 5 6 7 8

    4(i) 4(ii) 4(iii)

    Non-Plan

    Budget

    PlanBudget

    CEBR

    1. All India Load SurveyScheme

    To assess demand ofPower over a period oftime

    150.31 - - Collection ofAnnual PowerSurvey Datafrom about 185power utilitiesand about 5000

    HV/EHVindustrieshavingelectricitydemand of oneMW and above.

    Data basecreated isanessentialinput forformulation

    of NationalElectricityPlan & itsReviews.

    Continuousprocess forbringing outAnnual ElectricPower SurveyReports /

    Reviews once in5 years.

    Continuousprocess forcollection of dataon captivegeneration andinstalled capacity

    from industries.

    Continuousprocess forbringing outAnnual GeneralReview.

    The report of17

    thElectric

    PowerSurvey ofIndia wasapproved by

    the 17th

    ElectricPowerSurveyCommitteeandpublished inMay 2007.

    Publication ofGeneralReview 2006-07 andcontinuousprocess fornext GR.

    (Rs. in lakhs)

    Sl.No.

    Name of Scheme /Programme

    Objective / Outcome Outlay 2008-09 QuantifiableDeliverables /

    Ph i l O t t

    ProjectedOutcomes

    Processes /Timelines

    Remarks/ Risk Factors

  • 8/8/2019 Outcome Budget 2008-09

    59/239

    Physical Outputs

    1 2 3 4 5 6 7 8

    4(i) 4(ii) 4(iii)Non-PlanBudget

    PlanBudget

    CEBR

    2. Renovation &Modernisation(R&M) of ThermalPower Stationsincluding Project

    Maintenance andPAGER Scheme(Plan)

    To arrest thedeterioration inperformance of thermalpower stations,technological

    upgradation,environmentalrequirement byrenovation &modernisation and lifeextension works.

    - 328.00 - Coordination andmonitoring work forimplementation ofR&M works on 52units of 13 thermal

    stations where workis under progress.Finalisation ofschemes in another25 units of NTPC.Monitoring of LifeExtension (LE) worksof on-going 28 unitsand finalisation of LE

    schemes in another53 units to be carriedon during 11

    thPlan.

    Increasedproductionofelectricitywith better

    efficiencywith lessinvestment.

    The LifeExtensionworks aretaken upbased on the

    result ofResidual LifeAssessment(RLA)studies. Thetime ofcompletiondepends onthe quantum

    of works tobe carried outbased onRLA studies.As such, theLE works onsome of theunits startedduring 2007-08 may be

    completed inthe year2008-09.

    The works arebeing implementedby state powerutilities. Thecompletion of work

    depends uponavailability of fundsfrom concernedfinancing agenciesand shut down ofthe units forcarrying out R&M /LE works.

    (Rs. in lakhs)

    Sl.No.

    Name of Scheme /Programme

    Objective / Outcome Outlay 2008-09 QuantifiableDeliverables /

    Physical

    ProjectedOutcomes

    Processes /Timelines

    Remarks/ RiskFactors

  • 8/8/2019 Outcome Budget 2008-09

    60/239

    PhysicalOutputs

    Factors

    1 2 3 4 5 6 7 8

    4(i) 4(ii) 4(iii)

    Non-Plan

    Budget

    PlanBudget

    CEBR

    3. Standing Committee forselection of sites forThermal Power Stations

    To create a shelf of feasiblesites for thermal power stationsto meet the power requirementof the country upto the year

    2011-12 and beyond.

    Shelf of potential sites for pithead and coastal thermalprojects including Ultra MegaProjects would be available forinvestment by prospectiveinvestors for expeditiousthermal capacity addition in thecountry.

    - 30.00 - Identificationand selection ofsites forlocation of

    coastal andpithead thermalpower projectsin differentstates.

    Shelf ofpotential sitesfor pit head andcoastal thermal

    projects wouldbe available forinvestment byprospectiveinvestors forexpeditiousthermalcapacityaddition in thecountry.

    Originallyapprovedterm was 5years

    beginningfrom the 1styear of the10th Plan.

    The planscheme for isbeingcontinued foranother 5years.

    -

    (Rs. in lakhs)

    Sl.No.

    Name of Scheme /Programme

    Objective / Outcome Outlay 2008-09 QuantifiableDeliverables /

    Physical