ORM Project Management Presentation Pubcon 2009

23
Reputation Management Project Management Presented by: John Carcutt

description

My Presentation Deck for the Online Reputation Management session at PubCon 2009 in Vegas. The focus of the presentation is ORM Project Management.

Transcript of ORM Project Management Presentation Pubcon 2009

Page 1: ORM Project Management Presentation Pubcon 2009

Reputation Management

Project ManagementPresented by: John Carcutt

Page 2: ORM Project Management Presentation Pubcon 2009

Lets Talk About the Clients!

A Typical ORM Client Profile

• Upset, Angry, Frustrated• Stressed or Panicked• Loosing Money/Business• Needs Immediate Resolution

Page 3: ORM Project Management Presentation Pubcon 2009

Because Angry, Frustrated, Panicked and in a Hurry is

Everyone’s Dream Client

Page 4: ORM Project Management Presentation Pubcon 2009

Be Brave. Be Prepared.Have a Plan.

A Well Managed ORM Project will Make all the Difference

• Build Confidence• Create a Solid Foundation• Set Proper Expectations• Communication Structure

Page 5: ORM Project Management Presentation Pubcon 2009

Confidence Will Calm the Wild Beast.

The Client Already Trusts You

• Trust can be Faith Based• Confidence is Experience Based

More Confidence = Less

Page 6: ORM Project Management Presentation Pubcon 2009

Be Their Light at the End of the Tunnel.

Page 7: ORM Project Management Presentation Pubcon 2009

ORM Foundation: Target Term(s)

Where is the Problem?

• The Clients Observations• Variations on Terms• Capitalization?• ORM Longtail Issues?

Page 8: ORM Project Management Presentation Pubcon 2009

Capitalized Lowercase

Page 9: ORM Project Management Presentation Pubcon 2009

Capitalized Lowercase

Page 10: ORM Project Management Presentation Pubcon 2009

Capitalized Lowercase

Page 11: ORM Project Management Presentation Pubcon 2009

ORM Foundation: Target Term(s)

Where is the Problem?

• The Clients Observations• Variations on Terms• Capitalization?• ORM Longtail Issues?

Page 12: ORM Project Management Presentation Pubcon 2009

ORM Foundation: Get Focus

Personal vs. Brand ORM

• Different Strategies• Different Motivators• Client Involvement Changes

Page 13: ORM Project Management Presentation Pubcon 2009

ORM Foundation: Get Focus

Page 14: ORM Project Management Presentation Pubcon 2009

ORM Foundation: Get Focus

Personal vs. Brand ORM

• Different Strategies• Different Motivators• Client Involvement Changes

Page 15: ORM Project Management Presentation Pubcon 2009

ORM Foundation: Set Parameters

Incorporate Client Considerations

• Legal/Personal Restrictions• Client Participation Levels• Editorial/Branding Considerations• Content Creation & QC

Page 16: ORM Project Management Presentation Pubcon 2009

ORM Expectations: Agree on Scope

Which Properties are Involved

• Select Specific Engines• How Many Positions Deep• Plan for Modifications

Agree Prior to Initiation

Page 17: ORM Project Management Presentation Pubcon 2009

ORM Expectations: Listing Assessment

Which Listings are Involved?

• Define Listing Types• Positive• Neutral• Negative

• Classify Existing Baseline

Page 18: ORM Project Management Presentation Pubcon 2009

ORM Expectations: Timeframe

“When will it all be better?”

• Educate on Timeliness Factors• Position of Negative Listing(s)• Strength of Negative Listing(s)• Budget Considerations

• Give Your Best Estimate

Page 19: ORM Project Management Presentation Pubcon 2009

ORM Expectations: SERP Evaluation

 

 Positive

   Negative

   Positive

   Neutral

   Neutral

   Negative

   Positive

   Positive

   Neutral

   Neutral

 

 Positive

   Neutral

   Positive

   Negative

   Neutral

   Negative

   Negative

   Negative

   Negative

   Negative

Page 20: ORM Project Management Presentation Pubcon 2009

Communication: Ongoing

Staying in Touch

• Some clients want to know everything that’s going on

• Participation Channels• Adhoc Questions & “Emergencies”

Page 21: ORM Project Management Presentation Pubcon 2009

Communication: Reporting

Showing the Results

• Clients check SERPs more than you do

• Monthly Reports about showing activity and results.

• Base off of Benchmark SERPs

Page 22: ORM Project Management Presentation Pubcon 2009

In Closing: 3 Take-Aways

1. Your client needs to be confident your in control.

2. Agree upon & create the project foundation & clear expectations at the beginning.

3. Consistent ongoing communication and reporting is critical.

Page 23: ORM Project Management Presentation Pubcon 2009

Thank You John Carcutt, SEO Manager at MediaWhiz

@[email protected]

m

www.MediaWhiz.com866-477-5600