Orient/East-Med Core Network Corridor Project List 20 June 2017 · 2017. 6. 30. · Orient/East-Med...

23
Orient/East-Med Core Network Corridor Project List 20 June 2017 Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter. Project name Project category Project promoter Member States involved Project end date Total costs [M €] S1 - Vienna Outer Ring Expressway - Schwechat - Süßenbrunn (2nd part: Schwechat - Großenzersdorf) Road ASFINAG (Austrian Road Infrastructure Manager) AT 09/2025 1612,10 Planning and construction of the A5 North motorway. Schrick- Poysbrunn section Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2017 283,02 S1 - Vienna Outer Ring Expressway - Schwechat - Süßenbrunn (1st part: Großenzersdorf - Süßenbrunn) Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2020 271,10 A4 - Fischamend – Bruck a. d. Leitha 6-lane expansion and rehabilitation Road ASFINAG (Austrian Road Infrastructure Manager) AT 11/2020 151,68 A4 - Bruck a. d. Leitha - Neusiedl, 6-lane expansion and rehabilitation Road ASFINAG (Austrian Road Infrastructure Manager) AT 11/2022 93,00 A5 Construction Poysbrunn - Border AT/CZ 2nd Part Road ASFINAG (Austrian Road Infrastructure Manager) AT 06/2027 91,06 A5 Construction Poysbrunn - Border AT/CZ 1st Part Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2018 49,60 A 4 - General motorway renewal - Neusiedl - Nickelsdorf (border crossing AT/HU) Road ASFINAG (Austrian Road Infrastructure Manager) AT 11/2017 48,76 Secure parking improvement Phase 2: 6 parking areas (Nickelsdorf, Sinnersdorf Nord, Kematen, Gleissenfeld, Fischering, St. Andrä) Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2023 19,70 Safe & Secure parking improvement Phase 1 Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2018 13,52 Planning of the A5 North motorway, section between Poysbrunn and the Austria-Czech border Road ASFINAG (Austrian Road Infrastructure Manager) AT 02/2018 5,00 Roadside network information system Road ASFINAG (Austrian Road Infrastructure Manager) AT 11/2018 4,10 C-Roads Austria Road Bundesministerium für Verkehr, Innovation und Technologie / MoT AT AT 12/2020 19,10 Upgrade Austrian locomotives to ERTMS Baseline 3 Rail ERTMS Bundesministerium für Verkehr, Innovation und Technologie / MoT AT AT 12/2019 8,97 eCall.at Road Bundesministerium für Verkehr, Innovation und Technologie / MoT AT AT 12/2017 8,00 Third runway for the Vienna International Airport Airport Flughafen Wien AG AT 12/2028 800,00 Upgrade Nordbahn Wien Süßenbrunn - Bernhardsthal Rail ÖBB-Infrastruktur AG AT 02/2025 592,00 Cargo Center Vienna South (Inzersdorf) Multimodal ÖBB-Infrastruktur AG AT 12/2017 245,50 Integration of interlockings into signalling & dispatching centres Rail ÖBB-Infrastruktur AG AT 12/2017 25,70

Transcript of Orient/East-Med Core Network Corridor Project List 20 June 2017 · 2017. 6. 30. · Orient/East-Med...

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    S1 - Vienna Outer Ring Expressway - Schwechat - Süßenbrunn (2nd part: Schwechat - Großenzersdorf)

    Road ASFINAG (Austrian Road Infrastructure Manager) AT 09/2025 1612,10

    Planning and construction of the A5 North motorway. Schrick-Poysbrunn section

    Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2017 283,02

    S1 - Vienna Outer Ring Expressway - Schwechat - Süßenbrunn (1st part: Großenzersdorf - Süßenbrunn)

    Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2020 271,10

    A4 - Fischamend – Bruck a. d. Leitha 6-lane expansion and rehabilitation

    Road ASFINAG (Austrian Road Infrastructure Manager) AT 11/2020 151,68

    A4 - Bruck a. d. Leitha - Neusiedl, 6-lane expansion and rehabilitation

    Road ASFINAG (Austrian Road Infrastructure Manager) AT 11/2022 93,00

    A5 Construction Poysbrunn - Border AT/CZ 2nd Part Road ASFINAG (Austrian Road Infrastructure Manager) AT 06/2027 91,06

    A5 Construction Poysbrunn - Border AT/CZ 1st Part Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2018 49,60

    A 4 - General motorway renewal - Neusiedl - Nickelsdorf (border crossing AT/HU)

    Road ASFINAG (Austrian Road Infrastructure Manager) AT 11/2017 48,76

    Secure parking improvement Phase 2: 6 parking areas (Nickelsdorf, Sinnersdorf Nord, Kematen,

    Gleissenfeld, Fischering, St. Andrä) Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2023 19,70

    Safe & Secure parking improvement Phase 1 Road ASFINAG (Austrian Road Infrastructure Manager) AT 12/2018 13,52

    Planning of the A5 North motorway, section between Poysbrunn and the Austria-Czech border

    Road ASFINAG (Austrian Road Infrastructure Manager) AT 02/2018 5,00

    Roadside network information system Road ASFINAG (Austrian Road Infrastructure Manager) AT 11/2018 4,10

    C-Roads Austria Road Bundesministerium für Verkehr, Innovation und

    Technologie / MoT AT AT 12/2020 19,10

    Upgrade Austrian locomotives to ERTMS Baseline 3 Rail ERTMS Bundesministerium für Verkehr, Innovation und

    Technologie / MoT AT AT 12/2019 8,97

    eCall.at Road Bundesministerium für Verkehr, Innovation und

    Technologie / MoT AT AT 12/2017 8,00

    Third runway for the Vienna International Airport Airport Flughafen Wien AG AT 12/2028 800,00

    Upgrade Nordbahn Wien Süßenbrunn - Bernhardsthal Rail ÖBB-Infrastruktur AG AT 02/2025 592,00

    Cargo Center Vienna South (Inzersdorf) Multimodal ÖBB-Infrastruktur AG AT 12/2017 245,50

    Integration of interlockings into signalling & dispatching centres Rail ÖBB-Infrastruktur AG AT 12/2017 25,70

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    (Vienna)

    ETCS deployment Wien - Süßenbrunn Rail ERTMS ÖBB-Infrastruktur AG AT 02/2017 16,41

    Noise protection (Vienna) Rail ÖBB-Infrastruktur AG AT 12/2020 13,45

    Integration of interlockings into signalling & dispatching centres Wien - Bernhardsthal

    Rail ÖBB-Infrastruktur AG AT 02/2018 10,52

    Reconfigurationof the accessibility of Himberg Station Rail ÖBB-Infrastruktur AG AT 12/2020 10,48

    Noise protection Wien - Bernhardsthal Rail ÖBB-Infrastruktur AG AT 02/2020 3,56

    Noise protection Wien - Nickelsdorf Rail ÖBB-Infrastruktur AG AT 12/2017 1,72

    Train condition checkpoints Wien - Nickelsdorf Rail ÖBB-Infrastruktur AG AT 12/2017 0,84

    Train condition checkpoints Wien - Bernhardsthal Rail ÖBB-Infrastruktur AG AT 02/2018 0,74

    Extension Wien Erdberger Lände Rail Bridge (section Wien Simmering - Wien Praterkai)

    Rail ÖBB-Infrastruktur AG AT 02/2034 unknown

    Wien Zvbf Rail Freight Station - Alignment optimization of exit lines

    Rail ÖBB-Infrastruktur AG AT 12/2037 unknown

    Link between Vienna Airport - Bruck/Leitha (- border AT/HU) Rail ÖBB-Infrastruktur AG AT 12/2017 unknown

    ERTMS deployment Wien – Parndorf Rail ERTMS ÖBB-Infrastruktur AG AT 12/2022 unknown

    ERTMS deployment Parndorf – Nickelsdorf (border AT/HU) Rail ERTMS ÖBB-Infrastruktur AG AT 12/2022 unknown

    CEE goes ETCS Rail ERTMS Salzburg AG fur Energie, Verkehr und

    Telekommunikation AT unknown 0,51

    RIS COMEX IWW Bundesministerium für Verkehr, Innovation und

    Technologie / MoT AT

    AT, BE, BG, CZ, DE, FR, HR, HU, LU, NL, RO, RS,

    SK

    12/2020 19,77

    RIS COMEX IWW Bundesministerium für Verkehr, Innovation und

    Technologie / MoT AT

    AT, BE, BG, CZ, DE, FR, HR, HU, LU, NL, RO, RS,

    SK

    12/2020 6,73

    ERTMS series retrofitment and upgrade on electric locomotives Rail ERTMS Alpha Trains Luxembourg S.a r.l. AT, BE, DE, HU,

    NL, SE unknown 15,90

    Regional and Transport Development in the Danube-Black Sea Region towards a Transnational Multiport Gateway Region - DBS

    Gateway Region IWW Regional Government of Lower Austria

    AT, BG, DE, HR, HU, MD, RO, RS,

    SK, UA 06/2019 2,18

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Retrofitment and upgrade of locomotives Rail ERTMS Lokomotion Gesellschaft fur Schienentraktion

    mbH AT, CZ, DE, HU,

    IT, SI 12/2020 5,41

    Deployment of ERTMS/ETCS onboard components Rail ERTMS CD Cargo, a.s. AT, CZ, DE, HU,

    PL, SK 12/2020 137,50

    Deployment of ERTMS/ETCS onboard components Rail ERTMS Ceske drahy, a.s. AT, CZ, DE, HU,

    PL, SK 04/2020 246,89

    Retrofitment of 35 locomotives with ERTMS Rail ERTMS MAV-START Vastui Szemelyszallito Zartkoruen

    Mukodo Reszventytarsasag AT, HR, HU, RO,

    SI, SK 09/2019 12,72

    LNG motion Innovation Axegaz SAS BE, DE, ES, FR, HU, IT, NL, PL,

    RO 12/2020 60,32

    LNG4Trucks Innovation Uniper LNG Kraftstoff GmbH BE, DE, FR, PL unknown 57,90

    Upgrade of the multi-port short-sea shipping service UK - mainland Europe

    MoS Atlantic Container Line AB BE, DE, SE, UK unknown 27,90

    LNG 2.0 - The C02llaborative S0- 2lution MoS Furetank Rederi AB BE, EE, NL, LT,

    LV, PL, DE 11/2019 28,40

    Rehabilitation of Safety in the Black Sea Port of Burgas Maritime BPI Co. BG 02/2019 12,78

    Implementation of Black Sea - Burgas Port Safety, VTMIS Phase IV Maritime BPI Co. BG 02/2019 4,50

    Black Sea - Burgas Port Safety - development of monitoring system

    Maritime BPI Co. BG 02/2019 3,00

    Feasibility study Port Community Systems (Burgas Seaport, Vidin IWW port)

    Maritime BPI Co. BG 02/2017 0,50

    Development and approval of Port Burgas Master Plan Maritime BPI Co. BG 02/2018 0,48

    Development of high-speed communication system of Bulgarian Road Network

    Road MTITC BG 02/2018 6,00

    Modernisation of Medkovets - Ruska Byala sections Rail NRIC BG unknown 1140,00

    Modernisation of Radomir - Kulata line Rail NRIC BG unknown 1140,00

    Modernisation of Ruska Byala - Sofia section Rail NRIC BG unknown 817,20

    Modernization of Railway line Sofia-Plovdiv: Section Elin Pelin-Kostenets

    Rail NRIC BG 12/2023 603,69

    Modernisation of Vidin - Medkovets railway section Rail NRIC BG unknown 451,33

    Rehabilitation of Plovdiv - Burgas railway line; Phase 2 Rail NRIC BG 07/2021 412,30

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Modernisation Sofia railway node Rail NRIC BG unknown 214,55

    Modernisation of Sofia - Pernik railway line Rail NRIC BG unknown 204,52

    Modernisation of Sofia - Plovdiv railway line, Kostenets - Septemvri section

    Rail NRIC BG 12/2020 178,26

    Modernisation of Septemvri - Plovdiv section Rail NRIC BG 03/2017 159,35

    Modernisation of Pernik - Radomir railway line Rail NRIC BG unknown 155,06

    Development of Plovdiv railway node Rail NRIC BG 12/2020 137,96

    Development of Sofia Railway Junction: Sofia -Voluyak Railway Section

    Rail NRIC BG 12/2020 104,21

    Modernization of the railway section Sofia - Elin Pelin (Design and construction)

    Rail NRIC BG 12/2020 67,98

    Deployment of ERTMS along the Sofia-Pernik-Radomir-Kulata railway line

    Rail ERTMS NRIC BG unknown 62,05

    Deployment of ETCS along the Sofia-Septemvri railway line Rail NRIC BG 12/2020 34,36

    Technical assistance for preparation of project "Modernization of the Sofia - Pernik - Radomir - Gyueshevo - border with Republic of

    Macedonia railway line Rail NRIC BG 02/2020 16,00

    Construction of four overpasses along the Septemvri - Plovdiv railway section

    Rail NRIC BG 06/2017 12,23

    Rehabilitation of Railway Infrastructure along sections of the Plovdiv - Burgas Railway Line - reconstruction, repair and

    modernization of traction sub-stations Burgas, Karnobat and Yambol

    Rail NRIC BG 08/2017 10,91

    Reconstruction of Stara Zagora and Nova Zagora railway stations Rail NRIC BG 12/2020 9,20

    Reconstruction of Poduyane, Iskar, Kazichene railway stations Rail NRIC BG 12/2020 3,67

    Reconstruction of Karnobat railway station Rail NRIC BG 12/2020 3,07

    Safe and competitive multimodal port - Bulgaria West Port Maritime Port Bulgaria West JSC. BG unknown 16,14

    Construction of A3 Struma Motorway Lot 3 (Blagoevgrad - Sandanski)

    Road RIA BG 02/2023 850,00

    Modernization of Vidin - Montana express road Road RIA BG 12/2019 506,00

    Modernization of Mezdra - Botevgrad express road Road RIA BG 02/2019 180,00

    Modernization of Montana - Vratsa express road Road RIA BG 12/2019 150,00

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Reconstruction of Vratsa - Mezdra express road Road RIA BG 02/2019 10,00

    Development of the Sofia - West rail-road terminal

    Multimodal Translog Cargo Ltd. BG unknown 3,20

    SESAR Deployment Programme implementation 2015 - Cluster 3 Innovation SESAR Deployment Manager (NATS (En-Route)

    Plc on behalf)

    BG, HR, CZ, EE, HU, PL, PT, RO,

    SK, GR 12/2020 63,78

    Port of Lemesos : Expanding cargo storage capacity Maritime CPA CY 12/2040 160,00

    Port of Lemesos : Expansion of Terminal 2 Vasiliko Maritime CPA CY 12/2030 123,00

    Port of Lemesos - Port Community System Maritime CPA CY 12/2020 5,00

    Synchronised PBN Implementation Cohesion Europe (SPICE) Innovation EUROCONTROL CY 12/2020 39,03

    Port of Lemesos : 2 Super Post-Panamax Gantry Cranes Maritime Eurogate Container Terminal Limassol Ltd CY 01/2019 40,00

    Larnaka Airport Multimodal Logistic (freight) Platform Multimodal Hermes Airport LTD CY 05/2019 10,28

    Lefkosia South Orbital Motorway Road MoT CY 12/2030 235,00

    Link road connecting Lemesos-Paphos Motorway with the Lemesos Port

    Maritime MoT CY 02/2020 115,00

    Link road connecting Lemesos-Lefkosia Motorway with the Vasiliko Terminal (Lemesos Port)

    Maritime MoT CY 12/2023 28,00

    Construction of Stavrou Grade Separated Junction on Lefkosia-Lemesos Motorway

    Road MoT CY 12/2023 25,00

    Interurban Multimodal Terminals in Cyprus Multimodal MoT CY 12/2020 6,00

    Cyprus Core Network Energy Efficiency Lighting Innovation MoT CY 12/2019 6,00

    ITS Development on Lefkosia-Lemesos Motorways and Lefkosia-Larnaca Motorways (Relevant EU CEF Co-funded projects)

    Innovation MoT CY 12/2030 5,00

    Alternative fuels infrastructure development on Cyprus core road network

    Road MoT CY 12/2020 4,00

    Upgrading Sia Grade Separated Junction on Lefkosia-Lemesos Motorway

    Road MoT CY 01/2018 1,50

    Advanced Safety Nets for Prague airport Airport Air Navigation Services of the Czech Republic

    (ANS CR) CZ unknown 4,35

    Deployment of ERTMS/ETCS on-board components Rail ERTMS CD Cargo, a.s. CZ 12/2020 137,52

    EV fast charging backbone network Central Europe Road CEZ, a. s. CZ 12/2018 2,84

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Port Melnik modernization Multimodal Czech Ports a.s. CZ 12/2020 10,58

    Improvement of navigation conditions on the Dolni Labe in the section Strekov - state border

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2024 160,00

    Extension of navigability from Melnik to Pardubice

    Construction of new lock Prelouc II in order to extend navigability on Elbe

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2024 113,44

    Extension of navigability on Vltava Waterway

    Securing clearance under bridges on the Vltava Waterway (study in progress)

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2019 34,27

    Extension of navigability from Melnik to Pardubice

    Modernization of the lock chamber Srnojedy in order to extend navigability on Elbe

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2020 15,44

    Increasing draught levels on the Vltava waterway in order to extend and improve navigability on Vltava

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 06/2020 11,11

    Adaptation of chambre gates in Horin (Extension of navigability on Vltava Waterway)

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2018 8,69

    Construction of a new road bridge over Elbe between Valy and Melice

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2018 8,26

    Construction of a new public port of Pardubice - Phase 1 Basic Infrastructure Works

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2024 8,20

    Adaptation of waterway Zbraslav & Stechovice (Vltava) IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 02/2022 7,40

    Modernization of the lock chamber Stvanice approaches (Extension of navigability on Vltava Waterway)

    IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2019 3,65

    Stabilization of fairway in the port of Chvaletice IWW Directorate of waterways of the Czech Republic

    (RVC) CZ 12/2022 3,20

    Study of projects for stabilisation of navigation depths IWW

    Directorate of waterways of the Czech Republic (RVC)

    CZ 02/2022 unknown

    Study of projects for extension of waterway to Pardubice, works IWW Directorate of waterways of the Czech Republic CZ 02/2019 unknown

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    on enhancements of parameters and performance conditions (locks)

    (RVC)

    Introduction and development of ITS for road transport on highways, limited access highways and 1st class roads (incl.

    Operation or toll system) Road Ministry of Transport CZ 12/2023 1272,00

    C-Roads Czech Republic Road Ministry of Transport CZ 12/2020 18,93

    Traffic control of waterways (RIS) IWW Ministry of Transport CZ 02/2023 11,00

    Motorway D1 - extension of the rest area Strechov Road Ministry of Transport CZ 07/2019 10,82

    Motorway D1 - extension of the rest area Humpolec Road Ministry of Transport CZ 07/2021 1,48

    D1 Mirosovice - Kyvalka Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 12/2019 542,86

    Ring road around Praha: A7 D0 520 Brezineves – Satalice 13,7 km Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 02/2030 420,13

    D52 Pohorelice - border CZ/AT Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 12/2030 380,00

    Ring road around Praha: A1 D0 511 Bechovice – D1 12,6 km Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 02/2025 346,27

    B22 D1 01191 Starý Lískovec – Brno-jih 6,7 km Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 12/2028 110,65

    B21 D1 01172 Bosonohy – Starý Lískovec 4,9 km B Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 12/2028 41,12

    D1 Kývalka – Bosonohy 4,8 km Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 12/2023 24,18

    Ring road around Praha: A5 D0 518 Ruzyne – Suchdol 9,4 km Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 02/2030 unknown

    Ring road around Praha: A6 D0 519 Suchdol – Brezineves 6,7 km Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 02/2030 unknown

    Modernization of D0 Prague ring road, section D0 510 Satalice - Běchovice

    Road Ministry of Transport, Road and Motorway

    Directorate (RSD) CZ 02/2025 unknown

    Improving data sharing on transported goods Innovation OLTIS Group CZ unknown 0,73

    Securing navigability of Dolni Vltava from Melnik beyond Praha

    IWW Povodí Vltavy, state enterprice CZ 12/2020 24,00

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Modernization of the lock chamber Praha-Stare Mesto in order to extend and improve navigability on Vltava (study in progress)

    Open multimodal rail road terminal Přerov Multimodal Private operator to be specified CZ 01/2030 unknown

    Rail road terminal Přerov Multimodal Rail Cargo Operator - CSKD s.r.o. CZ unknown unknown

    HSR Dresden - Praha (part border - Usti nad Labem) Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2030 2500,00

    HSR Dresden - Praha (part Lovosice / Litomerice - Praha) Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2030 2000,00

    Upgrade of Brno - Breclav line as a High Speed Rail line Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2030 980,00

    Railway junction Brno (Works) (also: Brno Rail Node) Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 02/2030 745,00

    Optimization of the line Praha Vysocany- Lysa nad Labem, 2nd construction phase (Praha Freight Bypass)

    Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2022 289,81

    Modernization and construction of the line Praha - Veleslavin- Vaclav Havel International Airport

    Airport Railway Infrastructure Administration, state

    organization (SZDC) CZ 03/2024 270,33

    Construction of the line Praha - Veleslavin- Praha Masaryk railway station

    Airport Railway Infrastructure Administration, state

    organization (SZDC) CZ 06/2024 260,00

    Modernization of the line Usti nad Orlici - Chocen Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2020 241,00

    Passage through the railway junction Ceska Trebova Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2020 219,00

    Passage through the railway junction Pardubice (works) Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2020 138,00

    Optimization of the line Praha Hostivar - Praha hl.n., 2nd part - Praha Hostivar - Praha hl.n.

    Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 10/2020 134,30

    Modernisation of the railway junction Přerov Phase 2 Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 10/2021 84,60

    Decin tunnels Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 02/2028 75,00

    Modernization of railway st. Nymburk hl. n. Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 01/2023 75,00

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Electric traction system change to 25 kV AC, 50 Hz in the section Nedakonice - Říkovice

    Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 06/2020 55,20

    Increasing capacity of the Freight line Praha-Libeň – Praha-Malešice – Praha-Hostivař / Praha-Vršovice (Praha Freight Bypass)

    Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2023 47,91

    Reconstruction of the Negrelli viaduct Airport Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2019 47,43

    Modenisation of the track Šakvice - Hustopeče Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2019 40,37

    Optimization of the line Decin - Vsetaty - Lysa nad Labem - Kolin Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2026 36,11

    Modernisation of the railway junction Přerov Phase 3 Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2021 26,05

    ETCS on 1st rail transit corridor: State Border (DE) - Dolní Zleb - Praha-Libeň – Kolín

    Rail ERTMS Railway Infrastructure Administration, state

    organization (SZDC) CZ 08/2020 25,00

    ETCS Petrovice u Karvine - Ostrava - Prerov - Breclav Rail ERTMS Railway Infrastructure Administration, state

    organization (SZDC) CZ 12/2018 24,14

    ETCS on railway line Ceska Trebova - Prerov Rail ERTMS Railway Infrastructure Administration, state

    organization (SZDC) CZ 11/2019 13,99

    Railway junction Brno (Study) (also: Brno Rail Node) Rail Railway Infrastructure Administration, state

    organization (SZDC) CZ 02/2024 11,00

    Motorway D8 - extension of the rest area Sirejovice Road Road and Motorway Directorate of the Czech

    Republic (RSD) CZ 01/2019 1,31

    EAST-E Innovation Zapadoslovenska energetika, a.s. CZ, SK, HR 12/2018 7,44

    ETCS retrofit Rail ERTMS LEO Express a.s. CZ, SK, PL 07/2019 3,79

    Implementation of TAF TSI by private railway operators Rail OLTIS Group CZ, SK, PL 12/2019 1,10

    Expansion of the Elbe-Lübeck Canal IWW [MoT DE] BMVI DE 12/2030 838,10

    Deepening the fairway of Lower and Outer Elbe IWW [MoT DE] BMVI DE 12/2030 389,10

    Early replacement construction of a new lock in Lüneburg Scharnebeck

    IWW [MoT DE] BMVI DE 12/2030 270,40

    Upgrade Middle Weser IWW [MoT DE] BMVI DE 12/2017 206,00

    National Policy Framework on electric energy supply on road infrastructure of corridor(s)

    Road [MoT DE] BMVI DE 12/2020 100,00

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Improving navigability on the Mittel- and Oberelbe by re-establishing pre-flood conditions

    IWW [MoT DE] BMVI DE unknown 69,00

    Deepening the fairway of Outer Weser Maritime [MoT DE] BMVI DE 12/2030 62,30

    Design and eguipment of ERTMS for six cross-border sections and three gap closings

    Rail ERTMS [MoT DE] BMVI DE 12/2020 55,20

    National Policy Framework on hydrogen energy supply on road infrastructure of corridor(s)

    Road [MoT DE] BMVI DE 12/2025 50,00

    Deepening the fairway of Lower Weser (Northern part) Maritime [MoT DE] BMVI DE 12/2030 35,40

    Deepening the fairway of Lower Weser (Southern part) Maritime [MoT DE] BMVI DE 12/2030 5,30

    A 10 AD Pankow - AD Havelland [part of DE CPR 3] Road [MoT DE] BMVI (BB) DE 02/2022 791,90

    A 10 AD Potsdam - AD Nuthetal, extension of lanes Road [MoT DE] BMVI (BB) DE 10/2020 149,00

    A 10 AD Barnim - Federal state border Brandenburg/Berlin Road [MoT DE] BMVI (BB) DE 12/2018 17,60

    NBS/ABS Hamburg/Bremen-Hannover (Optimised Alpha E) Rail [MoT DE] BMVI (DB Netz) DE 12/2030 3891,00

    Node extension Frankfurt, Hamburg, Köln, Mannheim, München + Hannover, Bremen

    Rail [MoT DE] BMVI (DB Netz) DE 12/2030 2500,00

    ABS/NBS Hannover - Bielefeld Rail [MoT DE] BMVI (DB Netz) DE 12/2030 1885,00

    Upgrading railway line Leipzig - Dresden (ABS Berlin - Dresden) Rail [MoT DE] BMVI (DB Netz) DE 12/2023 1451,00

    Upgrading railway line Berlin - Dresden (first and second phase) Rail [MoT DE] BMVI (DB Netz) DE 12/2018 802,00

    ABS Oldenburg - Wilhelmshaven/Langwedel - Uelzen Rail [MoT DE] BMVI (DB Netz) DE 12/2022 729,00

    Reconstruction of railway line Südkreuz - Blankenfelde Rail [MoT DE] BMVI (DB Netz) DE unknown 561,00

    Hamburg node (DE) Rail [MoT DE] BMVI (DB Netz) DE unknown 545,00

    Upgrading of railway lines in Leipzig node Rail [MoT DE] BMVI (DB Netz) DE 12/2019 478,60

    Magdeburg node (DE), upgrade of railway infrastructure Rail [MoT DE] BMVI (DB Netz) DE 12/2022 347,00

    Reconstruction of "Nordbahn" between Nordkreuz and Birkenwerder

    Rail [MoT DE] BMVI (DB Netz) DE unknown 268,00

    Reconstruction of Ostkreuz railway junction Rail [MoT DE] BMVI (DB Netz) DE 12/2018 162,00

    Track doubling of railway line Nordkreuz - Karow Rail [MoT DE] BMVI (DB Netz) DE 12/2019 154,00

    Megahub Lehrte (DE) Multimodal [MoT DE] BMVI (DB Netz) DE 12/2019 136,00

    Upgrade Berlin node [Global project of 4035, 4036, 4037, 4038, ...]

    Rail [MoT DE] BMVI (DB Netz) DE unknown unknown

    ABS Karlsruhe-Stuttgart-Nürnberg-Leipzig/Dresden Rail [MoT DE] BMVI (DB Netz) DE 12/2030 unknown

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Rail Corridor Wilhelmsburg / Reallocation Wilhelmsburger Reichsstrasse

    Rail [MoT DE] BMVI (DB Netz) / Land Hamburg DE 12/2019 136,00

    CPR 3: A 281 Weser fixed link Road [MoT DE] BMVI (HB) DE 12/2030 260,40

    Motorway A 281 Bremen Strom - Bremen Gröpelingen incl. Weser Tunnel [CPR3] BA 4, new construction

    Road [MoT DE] BMVI (HB) DE unknown 260,00

    A 281 Bremen Kattenturm – Bremen Airport-Stadt BA 2.2, new construction

    Road [MoT DE] BMVI (HB) DE unknown 143,00

    A 27 AK Bremen - AS HB-Überseestadt Road [MoT DE] BMVI (HB) DE 12/2030 124,10

    A26-East motorway (construction) Road [MoT DE] BMVI (HH) DE 12/2025 942,00

    A26-East motorway (planning) Road [MoT DE] BMVI (HH) DE 12/2020 8,27

    A 19 near Malchow [part of DE CPR 4] Road [MoT DE] BMVI (MV) DE 12/2018 43,00

    A 14 AS Leipzig Ost - AD Parthenaue (A 14/A 38) Road [MoT DE] BMVI (SN) DE 12/2030 26,20

    Optimisation of the apron Airport Airport Bremen GmbH DE 12/2018 10,00

    Reconfiguaration of the passenger terminal departure area Airport Airport Bremen GmbH DE 12/2017 9,00

    Study on new approaches of Environmental Airport Management Airport Airport Bremen GmbH DE unknown 0,20

    Construction of offshore-terminal Maritime Bremenports GmbH & Co. KG DE 12/2019 180,00

    Port of Bremerhaven - Quality and capacity upgrade of the railway system (Speckenbüttel)

    Maritime Bremenports GmbH & Co. KG DE 12/2022 30,00

    LNG Klappschute: construction of a hopper barge with an LNG unit Maritime Bremenports GmbH & Co. KG DE 06/2017 4,90

    Upgrade of terminal Großbeeren - Construction of 2nd module Multimodal DB Netz DE 12/2028 40,00

    Upgrade of terminal Hamburg-Billwerder - Construction of 4th module

    Multimodal DB Netz DE 12/2026 40,00

    Upgrade of the Berlin-Halle/Leipzig (VDE 8.3) track from ETCS Level 2, Baseline 2 to Baseline 3

    Rail ERTMS DB Netz DE 12/2019 39,00

    Upgrade of terminal Hannover-Lehrte - Upgrade Megahub Lehrte (2 cranes + 6 dollys)

    Multimodal DB Netz DE 12/2022 20,00

    Upgrade of terminal Hannover-Lehrte - Upgrade storage area; extension of tracks

    Multimodal DB Netz DE 12/2025 10,00

    Upgrade of terminal Leipzig-Wahren - 3rd crane Multimodal DB Netz DE 12/2025 10,00

    Upgrade of terminal Großbeeren - Construction of 2 new tracks for 700 m

    Multimodal DB Netz DE 12/2020 5,00

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Upgrade of terminal Hamburg-Billwerder Multimodal DB Netz DE 12/2020 5,00

    Modification of track layout Leipzig-Mockau Rail DB Netz DE unknown unknown

    Prolongation of sidings for 740m trains Rail DB Netz DE unknown unknown

    Upgrade and modernisation as well as capacity enhancement of bridges

    Rail DB Netz DE unknown unknown

    Upgrade and modernisation as well as stabilisation and insuring of capacity for electronical interlockings

    Rail DB Netz DE unknown unknown

    Rail facilities for Rail Undertakings Rail DB Netz DE unknown unknown

    ABS Berlin - Rostock

    Finalisation of the extension of the railway line Rostock - Berlin up to an axial load of 25 tons (here: section Kavelstorf - Seaport of

    Rostock)

    Rail DB Netz / Port of Rostock DE unknown 855,00

    Medium-term expansion program (with six subprojects) Airport FBB GmbH [Flughafen Berlin Brandenburg] DE unknown 600,00

    Master-Planning: long-term infrastructure expansion planning Airport FBB GmbH [Flughafen Berlin Brandenburg] DE 11/2017 1,50

    Study on improvement and extension of public transport access Airport FBB GmbH [Flughafen Berlin Brandenburg] DE unknown 1,00

    Medium-term expansion program: subproject extension SXF North

    Airport FBB GmbH [Flughafen Berlin Brandenburg] DE 06/2019 unknown

    Medium-term expansion program: subproject Media infrastructure

    Airport FBB GmbH [Flughafen Berlin Brandenburg] DE 12/2023 unknown

    Medium-term expansion program: subproject Extension aprons, taxiways.

    Airport FBB GmbH [Flughafen Berlin Brandenburg] DE 12/2023 unknown

    Medium-term expansion program: subproject construction additional terminal

    Airport FBB GmbH [Flughafen Berlin Brandenburg] DE 12/2023 unknown

    Medium-term expansion program: subproject construction additional buildings for airport operations

    Airport FBB GmbH [Flughafen Berlin Brandenburg] DE 12/2023 unknown

    Medium-term expansion program: subproject optimisation terminal BER

    Airport FBB GmbH [Flughafen Berlin Brandenburg] DE 12/2023 unknown

    Study on additional railway links to Hamburg Airport Airport Flughafen Hamburg GmbH DE unknown unknown

    Capacity improvement for airport terminals B and C Airport Flughafen Hannover-Langenhagen GmbH DE 06/2020 25,51

    Improvement of road access to air cargo terminals and extension of the apron for air cargo aircraft

    Airport Flughafen Hannover-Langenhagen GmbH DE 12/2023 9,97

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Study on capacity improvement for airport terminals B and C Airport Flughafen Hannover-Langenhagen GmbH DE 03/2018 3,20

    Planning and construction of Köhlbrand Bridge Maritime Hamburg Port Authority DE 12/2035 500,00

    Western extension of terminal Walterhof Maritime Hamburg Port Authority DE unknown 299,00

    Connection Georgswerder Tunnel Südanbindung A252 Maritime Hamburg Port Authority DE 12/2030 227,00

    New Bridge Kattwyk Maritime Hamburg Port Authority DE 12/2021 219,00

    retrofitting of several berths for the handling of ULCV with more than 20.000 TEU capacity

    Maritime Hamburg Port Authority DE unknown 180,00

    Pre-routing group Alte Süderelbe Maritime Hamburg Port Authority DE 12/2035 110,00

    Neuhofer Knoten Maritime Hamburg Port Authority DE unknown 110,00

    Connection Container Terminal Tollerort Maritime Hamburg Port Authority DE unknown 100,00

    SmartPort Energy (Stage 2) Maritime Hamburg Port Authority DE 12/2030 100,00

    Restoration of Freihafen Elbe Bridge Maritime Hamburg Port Authority DE 12/2021 65,80

    SmartPort Logistics (Stage 2) Maritime Hamburg Port Authority DE 12/2030 33,30

    Western bypass to the freight station Alte Süderelbe Maritime Hamburg Port Authority DE 12/2020 19,00

    Construction of addidtional waiting and emergency betrhs Maritime Hamburg Port Authority DE 06/2019 15,00

    Connection Altenwerder Süd – Anbindung Ri. Moorburg Maritime Hamburg Port Authority DE 12/2022 13,00

    Digital Infrastructure Hamburg Port Maritime Hamburg Port Authority DE 12/2030 10,00

    RailDataGate Maritime Hamburg Port Authority DE 12/2018 3,70

    Establishment of a testwise, alternative container transportation technology

    Maritime Hamburg Port Authority DE unknown 2,00

    2. PrePort-Parking Lot Maritime Hamburg Port Authority DE unknown 1,00

    WiFi equipment / coverage of the entire port area Maritime Hamburg Port Authority DE unknown unknown

    Transport connection of Burchardkai Maritime Hamburg Port Authority DE 12/2019 109,70

    Southern rail connection Altenwerder / Alte Süderelbe Maritime Hamburg Port Authority DE unknown 100,00

    Adjustment of gateway of several deepsea terminals (extending the turning radius, filling an inactive bassin of the former

    Kohlenschiffhafen) Maritime Hamburg Port Authority DE 03/2017 94,20

    Reconstruction of freight station Waltershof (all phases) Maritime Hamburg Port Authority DE 06/2019 91,50

    SmartPort Energy (Stage 1) Maritime Hamburg Port Authority DE 12/2018 75,00

    New tracks in Hohe Schaar station including connection to new Kattwyk rail bridge

    Maritime Hamburg Port Authority DE 12/2030 52,30

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Engine service facility Maritime Hamburg Port Authority DE 06/2018 34,60

    Optimization of track infrastructure in the freight station Hohe Schaar

    Maritime Hamburg Port Authority DE 12/2020 30,00

    SmartPort Logistics (Stage 1) Maritime Hamburg Port Authority DE 12/2020 25,00

    New construction of Reihersteig lock Maritime Hamburg Port Authority DE 12/2022 22,30

    Double track upgrade Nordkurve Kornweide according to 2-axes concept

    Maritime Hamburg Port Authority DE 12/2021 5,50

    IBIS - Intelligent Barge Information Service Maritime Hamburg Port Authority DE 09/2018 1,20

    Small-scale liquefaction and supply facility for Liquefied Biogas as alternative fuel for the transport sector

    Innovation HGM Energy GmbH DE unknown unknown

    C-Roads Germany Road ITS automotive nord GmbH DE 12/2020 9,90

    ABS Berlin - Görlitz, upgrade of railway line Rail Ministry for Infrastructure and Spatial Planning

    of Land Brandenburg DE 12/2017 255,00

    Durchbindung "Kremmener Bahn": new construction of regional railway link

    Rail Ministry for Infrastructure and Spatial Planning

    of Land Brandenburg DE unknown 20,00

    Improvement of public transport and its connections to long-distance traffic inside urban node area of Berlin-Brandenburg

    Rail Ministry for Infrastructure and Spatial Planning

    of Land Brandenburg DE 12/2017 unknown

    Extension of the apron for cargo aircraft Airport Mitteldeutsche Flughafen AG DE 12/2022 60,00

    Extension of aircraft maintenance facilities (hangar) Airport Mitteldeutsche Flughafen AG DE 12/2019 25,00

    Extension of the power supply facility (fuel cell technology) Airport Mitteldeutsche Flughafen AG DE unknown 6,00

    Renewal rain storage reservoir Airport Mitteldeutsche Flughafen AG DE 12/2018 2,90

    Renewal of taxiway „November“ Airport Mitteldeutsche Flughafen AG DE 12/2018 2,30

    Renewal of waste water channel apron 1 – Kabelske Airport Mitteldeutsche Flughafen AG DE 12/2017 1,50

    Introduction of an Airport Colaborate Decision Making System Airport Mitteldeutsche Flughafen AG DE unknown 1,30

    Extension of the space for passenger and baggage security checks incl. creation of a single area for checks for Terminal A + B

    Airport Mitteldeutsche Flughafen AG DE 06/2017 0,85

    Safety control center Airport Mitteldeutsche Flughafen AG DE unknown unknown

    Expansion of berthing capacities for bulk and project cargo Maritime Port of Rostock DE 12/2025 50,00

    Infrastructure provision for additional areas for ferry-, Ro-Ro- and containertransport

    Maritime Port of Rostock DE 12/2030 45,00

    Upgrade of terminal infrastructures within the field of ferry and Maritime Port of Rostock DE 12/2030 25,00

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    ro-ro-transport for the improvement of existing traffic respectively for the extension of the lines serving the seaport of

    Rostock

    Further improvement of the IT of the seaport or Rostock by the expansion of the existing terminal information and control system

    (intermodal cross-linkage) Maritime Port of Rostock DE 12/2017 2,25

    Eastern / southern expansion of the port for the infrastructure provision for logistics, industry and cargo handling

    Maritime Port of Rostock DE 12/2035 unknown

    Construction of a an access road from the Seaport of Rostock to the planned greater business district Mönchhagen

    Maritime Port of Rostock DE 12/2035 unknown

    Conversion of port areas into logistics areas and construction of logistics facilities.

    Maritime Port of Rostock DE 12/2030 unknown

    Expansion and deepening of the Sea Canal Rostock Maritime Port of Rostock / BMVI (WSV Stralsund) DE 12/2023 unknown

    Regional strategy and action plan towards traffic safety Road Region Hannover DE 12/2018 0,22

    E-mobility plan Innovation Region Hannover DE 06/2018 unknown

    Planning of S 21 regional railway line Rail Senate Departement for Environment, Transport

    and Climate Protection DE 12/2020 8,10

    Upgrade of the railway system in the Bremerhaven seaport (Imsumer Deich Plus)

    Maritime Stadtgemeinde Bremen DE 12/2018 16,50

    Construction of facilities for LNG-bunkering Maritime Third Party Investor with support by Port of

    Rostock DE 12/2020 unknown

    NEXTCHARGE - The next level of European charging Corridors Innovation CLEVER A/S DE, DK, SE unknown 13,10

    Deployment of ETCS prototype eguipment on crossborder shunting locomotives

    Rail ERTMS Vossloh Locomotives GmbH DE, FR unknown 10,10

    TRAXX AC2 Baseline 3 standardised ETCS on-board unit prototyping

    Rail ERTMS Deutsche Bahn AG DE, LU, SE, UK unknown 26,70

    Construction of the Skotina - Evagelismos section Road Aegean Motorway S.A. EL 03/2017 1665,10

    Completion of the Strymoniko- Petritsi section Road Egnatia Odos S.A. EL 05/2017 228,62

    Construction of road connection between Port of Thessaloniki and Egnatia Odos Motorway

    Maritime Egnatia Odos S.A. EL 02/2019 40,40

    Designs for the connection of Egnatia/PATHE axis with Macedonia Airport of Thessaloniki (Phase B)

    Airport Egnatia Odos S.A. EL 12/2017 11,84

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Egnatia Odos Real Time Travel Information System

    Innovation Egnatia Odos S.A. EL 06/2019 4,00

    Core network Egnatia Odos GreenWay Innovation Egnatia Odos S.A. EL 06/2019 3,50

    Construction of new line Kiato-Diakopto Rail ERGA OSE S.A. EL 12/2017 734,21

    Completion of railway line Tithorea - Lianokladi - Domokos Rail ERGA OSE S.A. EL 12/2018 385,83

    Construction of railway infrastructure in section Rododafni -Psathopirgos

    Rail ERGA OSE S.A. EL 09/2018 316,70

    Construction of new line Diakopto-Rododafni Rail ERGA OSE S.A. EL 12/2017 227,93

    Upgrading of the existing single line Thessaloniki -Promahonas Rail ERGA OSE S.A. EL 02/2025 225,00

    Construction of railway infrastructure in the section Psathopirgos - Patras section (Bozaitika)

    Rail ERGA OSE S.A. EL 12/2020 112,00

    Infrastructure and superstructure upgrading on sections of Thessaloniki -Promahonas railway line and line electrification.

    Rail ERGA OSE S.A. EL 08/2022 110,00

    Completion of electrification of Pireas -Athina RS section ,construction of 4 grade separated crossings along Pireas-Tris

    Gefyres and installation of signalling system and ΕΤCS in section Pireas - Tris Gefyres

    Rail ERGA OSE S.A. EL 02/2025 105,00

    Upgrading of infrastructure and superstructure along SKA -Inoi section

    Rail ERGA OSE S.A. EL 04/2022 100,00

    Construction of superstructure, Railway Stations and Stops, signalling, electrification, planting works in Rododafni-Patra

    (Bozaitika area) Rail ERGA OSE S.A. EL 02/2022 97,00

    Construction of the quadruple railway in the section Athens RS exit – Tris Gefires

    Rail ERGA OSE S.A. EL 09/2022 94,91

    Deployment of ETCS Level 1 on the Athina-Thessaloniki-Promahonas railway axis

    Rail ERTMS ERGA OSE S.A. EL 12/2017 77,35

    Completion of second phase of railway marshalling yard complex at Thriasio Pedio

    Rail ERGA OSE S.A. EL 04/2017 69,46

    Electrification of the line Kiato-Rododafni Rail ERGA OSE S.A. EL 06/2020 67,70

    Local interventions along Inoi-Thessaloniki corridor Rail ERGA OSE S.A. EL 02/2025 49,00

    Installation of electrification and ETCS in Paleofarsalos-Kalambaka section

    Rail ERGA OSE S.A. EL 07/2020 44,11

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Installation of GSM-R along Kiato-Athina-Thessaloniki-Promahonas rail corridor (except for Tithorea - Domokos), including SKA - Athens Int. Airport - 3 Gefyres - Pireas, and Thriasio – Ikonio

    Rail ERTMS ERGA OSE S.A. EL 05/2017 31,53

    Installation of GSM-R system in the sections Tithorea-Domokos and Kiato-Patra

    Rail ERTMS ERGA OSE S.A. EL 02/2022 27,00

    Rail connection to the freight Port of Thessaloniki (6th pier) Maritime ERGA OSE S.A. EL 09/2022 26,25

    Construction of grade separated crossings in Thessaloniki area Rail ERGA OSE S.A. EL 02/2023 12,00

    Studies for the upgrading of SKA -Inoi section Rail ERGA OSE S.A. EL 12/2018 1,70

    Studies for infrastructure upgrading on sections of Thessaloniki -Promahonas railway line

    Rail ERGA OSE S.A. EL 04/2019 1,00

    Port of Igoumenitsa: Port Development Phases B and C Maritime General Secretariat of Public Works EL 02/2020 67,54

    ADRI-UP - Adriatic MoS Upgraded Services (Construction of Igoumenitsa Freight Village)

    Multimodal Igoumenitsa Port Authority S.A EL 12/2020 10,82

    New Port of Patra: 3A-Section, Phase A. Maritime MoT EL 02/2020 42,48

    ITS Observatory of Greece Innovation MoT EL 02/2020 4,00

    Construction of Ionia Odos Motorway concession: Antirio - Ioannina

    Road Nea Odos S.A EL 03/2017 1446,60

    Construction of Olympia Odos Motorway concession: Korinthos- Patra section

    Road Olympia Odos S.A. EL 03/2017 2486,70

    Studies, infrastructure upgrading, electrification, telecommanting signalling on section Patra (Bozaitika area)-Patra (New Port)

    Rail OSE S.A & ERGA OSE S.A. EL 02/2023 150,00

    Construction of new single railway line Kalambaka- Ioannina – Igoumenitsa

    Rail OSE S.A. EL 12/2030 1729,00

    Works on Pireas-Athina RS section Rail OSE S.A. EL 02/2025 69,10

    Completion of remaining studies and elaboration of tender documents for the construction of the line Kalambaka- Ioannina –

    Igoumenitsa –Phase C Rail OSE S.A. EL 12/2022 16,00

    Studies and works for the electrification of the single railway line of Thriasio-Ikonio

    Rail OSE S.A. EL 02/2025 10,00

    Port of Heraklion: Expansion / Construction of new port facilities Maritime Port Authority of Heraklion S.A EL unknown 35,40

    Port of Heraklion: Maintenance works 2 Maritime Port Authority of Heraklion S.A EL unknown 2,58

    Port of Heraklion: Deployment of VTMIS system Maritime Port Authority of Heraklion S.A EL unknown 1,50

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Port of Heraklion: Maintenance works 1 Maritime Port Authority of Heraklion S.A EL unknown 0,44

    Port of Thessaloniki: Container Terminal Expansion Maritime Thessaloniki Port Authority S.A EL 02/2023 195,00

    Port of Thessaloniki: Construction of Dry Bulk Terminal Maritime Thessaloniki Port Authority S.A EL 02/2029 152,30

    Port of Thessaloniki: Cruise Terminal Construction Maritime Thessaloniki Port Authority S.A EL 02/2024 27,10

    Port of Thessaloniki: Bulk Terminal Specialized Warehouses Maritime Thessaloniki Port Authority S.A EL 02/2030 23,00

    Port of Thessaloniki: Rail and Road Connections inside port Maritime Thessaloniki Port Authority S.A EL 02/2021 14,40

    Port of Thessaloniki : Ro-Pax Terminal Works Maritime Thessaloniki Port Authority S.A EL 02/2020 9,80

    Port of Thessaloniki: Cruise and Container Terminal Cold ironing Maritime Thessaloniki Port Authority S.A EL unknown 7,00

    ELEMED - ELectrification of the Eastern MEDiterranean area MoS Hellenic Lloyd's SA EL, CY 03/2018 1,48

    POSEIDON MED II MoS DEPA S.A. EL, CY, IT 12/2020 53,28

    CarEsmatic MoS Luka Koper, d.d. EL, ES, SI 12/2018 17,14

    Design and eguipment of ERTMS required by Regulation EU 2017/6 (EDP)

    Rail ERTMS EU Commission EU unknown unknown

    Design and construction of a new passenger Pier B starting from Terminal 2B at Liszt Ferenc Int'l Airport (BUD)

    Airport Budapest Airport Co HU 07/2018 16,90

    Free Route Airspace From the Black Forest to the Black Sea Airport HungaroControl Air Navigation Service

    Pte.Ltd.Co. HU 07/2017 2,21

    Implementation of Airport Collaborative Decision Making at Hungaro-Control

    Airport HungaroControl Air Navigation Service

    Pte.Ltd.Co. HU 06/2016 1,04

    PAN LNG Project in Hungary Road Magyar Gázüzemű Közlekedés Klaszter Egyesület

    (Project coordinator) HU 09/2019 16,98

    New Railway Hub Terminal in the Hungarian capital Multimodal Metrans HU 02/2017 unknown

    CNG Clean Fuel Box Project Road MGKKE - Magyar Gazuzemu Kozlekedes Klaszter

    Egyesulet HU 12/2018 12,74

    Connecting the Budapest international airport to the railway network

    Airport Ministry of National Development HU unknown 360,47

    Traffic management of bypass sections Road Ministry of National Development HU unknown 7,91

    CROCODILE 2.0 Hungary Road Ministry of National Development HU 12/2018 5,94

    Improvement of traffic management on public road network Innovation Ministry of National Development HU unknown 2,47

    Upgrade of the Hegyeshalom - Rajka (Hungarian/Slovak border) railway section

    Rail Ministry of National Development HU 02/2018 2,23

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    C-Roads Hungary Innovation Ministry of National Development HU unknown 0,17

    Deployment of ETCS L2 onboard units on 59 FLIRT (EMUs) electric multiple units

    Rail ERTMS Ministry of National Development HU 09/2019 29,50

    Upgrading the railway link to Budapest inland free port IWW Ministry of National Development ( National

    Infrastructure Development Co (NIF), Hungarian National Railways (MÁV))

    HU 02/2018 0,99

    Stage 2 of deployment of the GSM-R system on the TEN-T Railway Core Network in Hungary

    Rail ERTMS Ministry of National Development, Hungarian

    National Railways Co (MÁV) HU 12/2020 58,23

    Gyoma - Békéscsaba interlocking upgrade and ETCS2 implementation on Békéscsaba station, Ferencváros - Lőkösháza

    line (III/I.b. phase) //under coonstruction

    Rail ERTMS Ministry of National Development, Hungarian

    National Railways Co (MÁV) HU 06/2017 51,27

    M0 Ring Motorway around Budapest: Southern section's upgrade (replacement of deteriorated asphalt with high bearing capacity concrete pavement on first carriageway between interchanges

    M0/M1 and M0/M51)

    Road Ministry of National Development, National

    Infrastructure Development Co (NIF) HU unknown 70,34

    M15: section between M1 – Rajka HU-SK border (2x1 lanes --> 2x2 lanes).

    Road Ministry of National Development, National

    Infrastructure Development Co (NIF) HU 10/2019 64,66

    Study of M0 Ring Motorway Western Section between interchanges M0/RN10 and M0/M1

    Road Ministry of National Development, National

    Infrastructure Development Co (NIF) HU 12/2019 48,40

    Study of M0 Ring Motorway North-Western Section between interchanges M0/RN10 and M0/RN11.

    Road Ministry of National Development, National

    Infrastructure Development Co (NIF) HU 12/2018 17,74

    Preparing studies, preliminary design and issuing permits needed to increase the capacity (by building 3rd traffic lanes) of M1

    Motorway between interchanges M1/M0 and M1/M19 Road

    Ministry of National Development, National Infrastructure Development Co (NIF)

    HU 03/2023 unknown

    Upgrade of Biatorbágy - Tata line and ETCS2 implementation on Budapest Ferencváros - Hegyeshalom line

    //Authorization and implementation plan in progress Rail ERTMS

    Ministry of National Development, National Infrastructure Development Co (NIF), Hungarian

    National Railways (MÁV) HU 12/2020 403,10

    Szolnok railway station complex upgrade. Rail Ministry of National Development, National

    Infrastructure Development Co (NIF), Hungarian National Railways (MÁV)

    HU 12/2020 131,25

    Removing bottleneck on the common section of three core Rail Ministry of National Development, National HU 12/2020 114,24

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    network corridors with upgrade of Budapest South Railway Bridge Infrastructure Development Co (NIF), Hungarian National Railways (MÁV)

    Study and design for the modernization as well as construction of 2nd track on Békéscsaba-Lökösháza railway line

    Rail Ministry of National Development, National

    Infrastructure Development Co (NIF), Hungarian National Railways (MÁV)

    HU 12/2018 4,68

    Connection of the railway line Budapest-Arad to the multi-modal hub at Budapest Airport

    Airport Ministry of National Development, National

    Infrastructure Development Co (NIF), Hungarian National Railways (MÁV), Budapest Airport Co.

    HU 12/2020 17,74

    EU ITS Platform (EU EIP) Innovation

    Ministero delle Infrastrutture e dei Trasporti (IT) will implement the project, through the following implementing bodies. An MoU

    between italian partners identifies SINA S.p.A as technical coordination. Implementing bodies

    – SINA S.p.A, designated by IT; – Autovie Venete S.p.A., designated by IT;

    – Autostrade per l’Italia S.p.A., designated by IT; – Autostrade TECH S.p.A, designated by IT;

    – ANAS S.p.A, designated by IT; – Finnish Transport Agency, designated by FI;

    – Finnish Transport Safety Agency, designated by FI;

    – National Roads Authority - Ireland, designated by IE;

    – National University of Ireland, Maynooth, designated by IE;

    – Highways Agency, designated by UK; – Transport Scotland, designated by UK;

    – Department for Regional Development, Roads Service, designated by UK;

    – Department for Economy, Science and Transport, designated by UK;

    IT, SE, FI, DK, DE (RO);(ES);(FR);

    (IE);(UK);(NL);(PT);(LT);(BE);(PL)

    12/2020 12,95

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    – DIRECCIÓN GENERAL DE TRÁFICO, designated by DGT;

    – Bundesanstalt für Straßenwesen, designated by DE;

    – Oberste Baubehörde im Bayerischen Staatsministerium des Innern, für Bau und

    Verkehr, designated by DE; – Hessen Mobil, designated by DE; – Ministerium für Bauen, Wohnen,

    Stadtentwicklung und Verkehr des Landes Nordrhein-Westfalen, designated by DE; – Ministerium des Inneren, für Sport und Infrastruktur des Landes Rheinland-Pfalz,

    designated by DE; – Rijkswaterstaat, designated by NL;

    – Instituto da Mobilidade e dos Transportes, I.P. - IMT, designated by PT;

    – Armis, Sistemas de Informação, Lda., designated by PT;

    – EP-ESTRADAS DE PORTUGAL, S.A., designated by PT;

    – Afdeling Verkeerscentrum, designated by Vlaanderen;

    Setup and ITS connectivity of safe and secure truck parking areas in Romania

    Road A&O (Ausnit, Olariu si Asociatii SRL) RO 02/2018 5,00

    Lugoj - Dr. Tr. Severin Express Road construction/upgrade Phase C1 (142 km)

    Express Road Lugoj - Caransebes Express Road Caransebes - Orsova

    Express Road Orsova - Dr. Tr. Severin

    Road CNAIR (Former CNADNR) RO 12/2026 1345,46

    Drobeta-Turnu-Severin – Maglavit/Calafat Road upgrade (Works) ET Tracia Upgrade of Drobeta Turnu Severin - Calafat road

    Road CNAIR (Former CNADNR) RO 12/2023 49,28

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Timisoara NODE ringroad (16.8 km) RVO013 Road CNAIR (Former CNADNR) RO 12/2019 48,00

    Craiova (RO)- Maglavit - Calafat/Vidin brigde (BG): Upgrade - EuroTrans on TEN-T Core corridor

    Road CNAIR (Former CNADNR) RO 12/2023 41,50

    Feasibility Study Lugoj - Dr.Tr. Severin - Craiova (OEM up to Dr. Tr Severin) Expressway

    Road CNAIR (Former CNADNR) RO 12/2027 26,92

    Feasibility Study Drobeta-Turnu-Severin – Maglavit/Calafat Road upgrade (Study)

    Road CNAIR (Former CNADNR) RO 12/2021 1,52

    CNG ROMANIA: initial market deployment of refuelling stations Innovation Denisson Energy S.R.L. RO 12/2019 5,21

    Rail/Road terminal Craiova Multimodal Local authorities RO unknown 34,25

    Rehabilitation + new line of Railway line Craiova - Caransebes (226 km)

    Rail National Railway Company CFR S.A. RO 02/2025 1231,70

    Modernisation/ Rehabilitation rail line Caransebeș - Timișoara (98 km) double/simple electrified line (F015)

    Rail National Railway Company CFR S.A. RO 01/2024 534,10

    Modernisation/ Rehabilitation rail line Timișoara - Arad (57 km) double/simple electrified line (F016)

    Rail National Railway Company CFR S.A. RO 01/2024 310,65

    Modernizing and reabilitation of TEN-T corridor network on RO territory, section Border rail Curtici-Arad - km 614

    Rail National Railway Company CFR S.A. RO 12/2017 257,26

    Modernisation/ Rehabilitation and Electrification of Craiova-Calafat railway section (107 km)

    Rail National Railway Company CFR S.A. RO 01/2023 218,00

    Feasibility study for the rehabilitation of the Craiova - Drobeta Turnu Severin - Caransebes railway line

    Rail National Railway Company CFR S.A. RO 12/2018 9,92

    Caransebeș - Timișoara - Arad : Feasibility Study for Rail rehabilitation

    Rail National Railway Company CFR S.A. RO 12/2017 1,76

    The revision of the Feasibility Study for the rehabilitation of Craiova-Calafat railway line

    Rail National Railway Company CFR S.A. RO 06/2018 1,74

    Timisoara International Airport development Airport Romanian Ministry of Transport RO unknown 136,05

    Early warning intelligent system for road transportation risks Innovation Romanian Ministry of Transport RO 08/2019 1,40

    Construction of new intermodal terminal in the area of Timisoara, Remetea Mare

    Multimodal Timisoara Local Council RO unknown 34,25

    Motorway ITS Bratislava Node Road National motorway company (NDS) SK 12/2019 24,50

    Parking facilities on Motorway D2 Road National motorway company (NDS) SK 12/2019 17,60

    Study on Motorway Junction D2 Cunovo Road National motorway company (NDS) SK unknown 1,50

  • Orient/East-Med Core Network Corridor Project List 20 June 2017

    Disclaimer: This list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.

    Project name Project

    category Project promoter

    Member States involved

    Project end date

    Total costs [M

    €]

    Study on Increasing Capacity of Motorway D2 section Bratislava-Lamač

    Road National motorway company (NDS) SK unknown 0,30

    Rail Node Bratislava - Works Rail Slovak railways (ZSR) SK 12/2030 900,00

    Modernisation of the railway : Devínska Nová Ves - border CZ/SK Rail Slovak railways (ZSR) SK 12/2020 273,08

    Implementation of ERTMS on corridor IV: Devínska Nová Ves - border CZ/SK

    Rail ERTMS Slovak railways (ZSR) SK 02/2020 87,00

    ZSR Intermodal Terminal Bratislava - 1st construction phase Multimodal Slovak railways (ZSR) SK 02/2020 50,00

    Rail Node Bratislava - Project Documentation Rail Slovak railways (ZSR) SK 02/2019 25,00

    Construction of terminals integrated passenger transport in Bratislava - Devínska Nová Ves, implementation

    Rail Slovak railways (ZSR) SK 09/2020 19,66

    Construction of terminals integrated passenger transport in Bratislava - Lamačská brána, implementation

    Rail Slovak railways (ZSR) SK 06/2021 16,35

    Construction of terminals integrated passenger transport in Bratislava - Patrónka, implementation

    Rail Slovak railways (ZSR) SK 04/2021 9,94

    Construction of terminals integrated passenger transport in Bratislava - Trnávka, implementation

    Rail Slovak railways (ZSR) SK 01/2021 8,93

    The information system of the integrated transport system of Bratislava region

    Rail Slovak railways (ZSR) SK 08/2017 6,54

    Construction of terminals integrated passenger transport in Bratislava - Ružinov, implementation

    Rail Slovak railways (ZSR) SK 07/2020 4,46

    Construction of terminals integrated passenger transport in Bratislava - Mladá garda, implementation

    Rail Slovak railways (ZSR) SK 11/2023 3,00

    Rail Node Bratislava - Feasibility Study Rail Slovak railways (ZSR) SK 08/2017 1,30

    Terminals integrated passenger transport in Bratislava - project documentation

    Rail Slovak railways (ZSR) SK 03/2017 1,00

    Implementation of the technical interoperability for TAP TSI sub system

    Rail Zeleznicna spolocnost Cargo Slovensko, a.s. SK 12/2019 8,66

    Implementation of the technical interoperability for TAF TSI sub system

    Rail Zeleznicna spolocnost Cargo Slovensko, a.s. SK 12/2019 3,14

    NCE - FastEvNet Innovation GreenWay Infrastructure, s.r.o. SK, PL 03/2019 4,80