North Sea-Mediterranean TEN-T Core Network Corridor – Project list, 17/05/2017
Disclaimer: this list is indicative work in progress still evolving and does not represent a commitment by the MS or the project promoter.
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Modernization of marshalling yards located in the Walloon Region
RAIL Infrabel BE
Brussels-Antwerp axis including the by-pass of Mechelen (1) L25: by-pass of Mechelen (2) Complex of otterbeek (3) HSL Vilvoorde - Antwerpen Albertkanaal (4) L25: adaptation of the track alignment in Duffel
RAIL Infrabel BE 144.40 01/12/2024
LNG4Trucks INNOVATION Uniper LNG Kraftstoff GmbH
BE, DE, FR, PL 57.95
ETCS deployment: retrofitting of 106 electrical motor units
RAIL NMBS/SNCB BE,NL 26.50 01/12/2020
LNG motion INNOVATION Axegaz SAS BE, DE, ES, FR, HU, IT, NL, PL, RO
55.53 01/12/2020
C-ITS for Trucks (CITRUS) ROAD Be-Mobile NV BE 1.82 01/09/2019
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
InterCor ROAD ERTICO - ITS Europe BE, FR, NL, UK 30.00 01/05/2019
C-Roads Belgium/Flanders ROAD Flemish Department of Mobility and Public Works (MOW)
BE 3.18 01/12/2020
Upgrading Flemish RIS Infrastructure
IWW Waterwegen en Zeekanaal NV
BE 2.35 01/12/2019
Connecting Brussels airport AIRPORT De Lijn BE 88.86
BENEFIC INNOVATION Flemish Government BE - NL 32.10
OPTI CONNECT MARITIME NV ITC Rubis Terminal Antwerp
BE 15.00
More Liguid Bulk 4 Rail MARITIME Vopak Chemical Terminals Belgium NV
BE 8.01
ANTwerp Waterbus Exploration and Realisation Park&Ride building (ANTWERP)
IWW Stad Antwerpen BE 16.58
INtoLNG - Innovative LNG solutions to provide clean transport fuel
INNOVATION Engie LNG Solutions Antwerp bvba
BE 19.34
LNG as a fuel for road transport: a bridge between Southern and Northern Europe
INNOVATION Compagnie des Gaz de Petroie PRIMAGAZ
BE, FR 9.54
Upgrade of RoRo maritime link Hull-Antwerp-Kotka
MOS Finnlines Pic BE, FI, UK 24.85
Upgrade of the multi-port short-sea shipping service UK - mainland Europe
MOS Atlantic Container Line AB BE, DE, SE, UK 27.93
Upgrade of the short-sea shipping link Ghent-Gothenburg
MOS DFDS A/S BE, SE 7.63
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Arc Atlantic Corridor Phase III ROAD Service Public de Wallonie and Flemish Government
BE,ES,FR,IE,NL,UK 5.00 31/12/2020
Pilot deployment of a smart (bio-) LNG/CNG network in Flanders
INNOVATION DRIVE SYSTEMS BE 2.93 30/06/2019
New dock Noordlandbrug IWW NV De Scheepvaart BE 15.99
Internal port rail infrastructure and development of a multimodal terminal
MARITIME Private and port authority BE 5.50 01/12/2016
Upgrading shunting yards and junctions; freight transport services
MARITIME Port of Antwerp BE 100.00 01/12/2020
National study on the implementation of rail freight line systems connecting rail/road/water-terminals in the Rhine-Alpine Corridor
MULTIMODAL EGTC Rhine-Alpine NL, BE, DE, CH, IT 1.25 01/09/2018
Removal of level crossings RAIL Infrabel BE 329.40 01/12/2025
Preparatory studies for the implementation of additional measures on ERTMS Corridor Rotterdam-Genoa and ERTMS Corridor Antwerp-Basel-Lyon
RAIL Public-owned undertaking or body (IM)
NL, BE, DE, CH, IT 1.66 01/01/2014
Optimization of the Brussels Ring road
ROAD Agentschap Wegen en Verkeer
BE 2300.00 01/12/2023
Oosterweel connection Antwerp ROAD Beheersmaatschappij Antwerp Mobiel (BAM)
BE 3250.00 01/03/2023
ERTMS onboard deployment on NS and Arriva fleet
RAIL Ministry of Infrastructure and the Environment
BE, DE, NL 126.40 01/12/2020
Upgrading Inland Navigation Infrastructure in Port of Ghent
MARITIME Port of Gent BE 14.45 31/12/2015
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Connecting Citizen Ports 21 (CCP21)
IWW Port of Brussels BE 1.20 01/12/2017
Liège-Carex terminal project (feasability study)
AIRPORT Private promoter and Service Public de Wallonie
BE 2.20 31/12/2014
Increase in the capacity of access to the port of Antwerp
MARITIME Infrabel BE 224.40 01/12/2025
Study on packing-unpacking facilities in inland ports
MULTIMODAL
BE, FR, DE, UK, IR, IT, NL, SW, LU
Study to support PW45 implementation on the corridor
MULTIMODAL
BE, FR, DE, UK, IR, IT, NL, SW, LU
Fast-E ROAD Allego GmbH (coordinating applicant)
BE, DE, FR 17.52 01/09/2017
Accelerate LNG for inland waterway transport: from reality to materiality
INNOVATION Shell Trading Rotterdam B.V.
BE, DE, NL 48.94
Improving the multimodal logistic platform of the Zeebrugge port
MARITIME Infrabel BE 7.99 01/01/2019
Sustaining the direct short-sea shipping link Rosyth-Zeebrugge
MOS AB DFDS Seaways BE, UK 8.14
ETCS on-board equipment on CFL rolling stock
RAIL Societe nationale des chemins de fer luxembourgeois
BE, FR, LU 23.89
Safe and secure parking areas for trucks in Kruishoutem and Kalken
ROAD Total BE 4.04 30/09/2017
Watertruck+ INNOVATION Waterwegen en Zeekanaal NV, NV De Scheepvaart, VIM
BE 23.01 31/12/2019
Feasibility study on the extension of the capacity of the Brussels North-South link
RAIL Infrabel and SNCB BE 1.00 31/12/2017
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Safe and secure infrastructure in Flanders
ROAD Agentschap Wegen en Verkeer
BE 2.62 31/12/2019
New Lock Terneuzen MARITIME Flemish Government - Mobiliteit en Openbare Werken
BE,NL 920.00 31/12/2022
Connect2LNG ROAD Unilever Poland Services Sp. Z.O.O. (coordinating applicant)
BE, DE, ES, FR, IT, LU, NL
9.09 01/12/2018
Upgrading of existing multimodal terminal with rail access
MULTIMODAL Ghent Port Company BE
01/12/2017
Increasing the capacity, robustness and safety of the Brussels North-South link
RAIL Infrabel BE 288.90
ETCS deployment on the Core Network
RAIL Infrabel BE 935.50 01/12/2025
EuroCap-Rail: modernization of the Brussels-Luxembourg axis
RAIL Infrabel BE 788.70 01/12/2025
Increase in capacity of the Ghent-Zeebrugge line
RAIL Infrabel BE 463.00 01/12/2025
Upgrade of the Rail Freight Corridor 2: Leuven-Luxemburg border
RAIL Infrabel BE 52.10 01/12/2025
Seine-Scheldt: Modernization River Lys
IWW Waterwegen en Zeekanaal BE 273.00
Seine-Scheldt: River Lys restauration
IWW Waterwegen en Zeekanaal BE 39.20
Lifting of bridges over the Canal Albert and upgrade of the section Wijnegem-Antwerp on the Albert Canal
IWW NV De Scheepvaart BE 227.08 31/12/2019
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Upgrade of the section Bocholt-Dessel (from CEMT class II to CEMT class IV)
IWW NV De Scheepvaart BE 80.00
Seine-Scheldt: works on the canal Bossuit-Kortrijk
IWW Waterwegen en Zeekanaal BE 69.90 31/12/2020
Seine-Scheldt: study of the modernization of the Canal Bossuit-Kortrijk
IWW Waterwegen en Zeekanaal BE 7.30
Seine-Scheldt: Modernization of the Brussels-Charleroi Canal
IWW Waterwegen en Zeekanaal BE 29.50
Seine-Scheldt: Modernization of the Brussels-Charleroi Canal between Lembeek and Halle
IWW Waterwegen en Zeekanaal BE 1.58
Seine-Scheldt: Canal Ghent-Oostende, section Ghent-Bruges
IWW Waterwegen en Zeekanaal BE 75.40
Seine-Scheldt: studies for the modernization of the Canal Roeselare-Lys
IWW Waterwegen en Zeekanaal BE 4.55
Seine-Scheldt: works on the Canal Roeselare-Lys
IWW Waterwegen en Zeekanaal BE 37.30
Seine-Scheldt: works on the Canal Roeselare-Lys
IWW Waterwegen en Zeekanaal BE 19.10
Implementation of River Information Services (RIS) in Belgium
IWW NV De Scheepvaart and Waterwegen en Zeekanaal
BE 4.33 31/12/2016
Meuse basin-Wallonia (period 2016-2020)
IWW Service Public de Wallonie BE 129.46 01/12/2019
Renovation of the Royers lock in the Port of Antwerp
IWW Flemish Government - Mobiliteit en Openbare Werken
BE 142.80 31/12/2023
Seine-Scheldt: ‘Seine-Scheldt- IWW Waterwegen en Zeekanaal BE 4.00 31/12/2020
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
West’ project: Upgrade and socio-economic monitoring to detect the need for long term solutions
Seine-Scheldt: River Dender interoperability
IWW Waterwegen en Zeekanaal BE 0.50
Seine-Scheldt: Modernization of the Upper-Scheldt river
IWW Waterwegen en Zeekanaal BE 114.50
Upgrade of the Brussels-Scheldt Sea Canal
IWW Waterwegen en Zeekanaal BE 24.20
Seine-Scheldt: Upper-Sea Scheldt and Southern Ghent Ring Canal
IWW Waterwegen en Zeekanaal BE 64.90
Capacity extension of locks in Wijnegem
IWW NV De Scheepvaart BE 100.00
Seine-Scheldt: Beneden-Nete Canal upgrade
IWW Waterwegen en Zeekanaal BE 5.50
Upgrade of the vertical clearance under some bridges in Brussels
IWW Port of Brussels and Ministry of Brussels mobility
BE 50.60
Seine-Scheldt (period 2014-2020) IWW Service Public de Wallonie BE 124.33 01/12/2019
Seine-Scheldt (period 2021-2027) IWW Service Public de Wallonie BE 125.67 01/12/2027
Meuse basin-Wallonia (period 2021-2027)
IWW Service Public de Wallonie BE 94.80 01/12/2027
Overall investments in RIS 2016 IWW Service Public de Wallonie BE 4.00 01/12/2020
Overall investments in RIS 2017-2020
IWW Service Public de Wallonie BE 0.50 01/12/2020
Development of the port areas IWW Service Public de Wallonie and Ports authorities
BE
Elimination of a level crossing on the Lyon-Avignon section
RAIL Ministry of the Environment, Energy and
FR 2.00
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Marine Affairs
Towards an optimised rail supply chain (TOSCA)
RAIL ID Logistics France 4 FR 13.44
Lyon Node, Lyon <-> Avignon, Lyon <-> Modane : Centralised network command
RAIL SNCF RESEAU FR 370.00 01/12/2032
Lyon node: Nœud Ferroviaire Lyonnais - NFL
RAIL SNCF RESEAU FR 4700.00 01/12/2035
Marseille rail node RAIL SNCF RESEAU FR 2500.00 01/12/2030
Lyon node (Salaise - Sablons) MULTIMODAL CNR, VNF, SNCF RESEAU, local authorities
FR
Avignon node (RRT and IWW) MULTIMODAL CNR, VNF, RFF, State, Provence Alpes Cote d'Azur Region
FR 120.00 01/12/2016
Calais / Paris - North Italy Rail motorway
MULTIMODAL VIIA FR/IT
01/12/2017
Sustainable LNG Operations for Ports and Shipping - Innovative Pilot Actions (GAINN4MOS)
MARITIME Fundacion Valencia port ES, FR, HR, IT, PT, SI
10.27 30/09/2019
Rail access improvement of the Port of Strasbourg
IWW Port Autonome de Strasbourg
FR 6.00 01/12/2018
North road access to the port of Strasbourg
IWW Port Autonome de Strasbourg
FR 15.00 01/01/2020
Increasing the size of entry locks to the port
IWW Port Autonome de Strasbourg
FR 4.00 01/01/2020
New multimodal terminal of the Port of Strasbourg / Lauterbourg site
IWW Port Autonome de Strasbourg
FR 10.12 01/06/2018
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Study and work on a new container terminal and a logistics zone in Ottmarsheim (Port of Mulhouse)
IWW Port of Mulhouse FR 25.00
Development of a new port area in Mulhouse agglomeration (Île Napoléon)
IWW Port of Mulhouse FR 6.50
Pilot implementation of an Upper Rhine traffic management platform
IWW Rhein Ports Basel-Mulhouse-Weil
FR, DE
Study to invigorate and develop the multimodal platform traffic on the large-gauge Moselle
IWW VNF/ Port of Metz/ Port of Frouard/ Port of Thionville-Illange
FR 1.42 05/07/2019
The multimodal and multisite platform development in Lorraine, on the Moselle river - 2nd part
IWW VNF/ Port of Metz/ Port of Frouard/ Port of Thionville-Illange
FR 75.00 01/01/2025
Rehabilitation of broadband network along the Moselle river
IWW VNF FR 0.35 01/06/2016
Modernised large-capacity Moselle IWW VNF FR 6.25 31/12/2021
Regeneration of civil engineering structures on the large-capacity Moselle
IWW VNF FR 80.00 01/01/2030
Reconstruction of the Liégeot dam on the Moselle river
IWW VNF FR 17.00 31/12/2019
Extension of Clévant lock on the Moselle river
IWW VNF FR 11.30 01/12/2022
Widening (extension) of the "Porte de garde" of Metz-La Maxe's port - Moselle river
IWW VNF FR 9.30 01/01/2022
Upper Rhine Ports: road IWW Port Autonome de CH, DE, FR 93.00 01/01/2022
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
accessibility upgrade for inland port platforms
Strasbourg, Upper Rhine Ports
Upper Rhine Ports: rail accessibility upgrade for inland port platforms
IWW Port Autonome de Strasbourg, Upper Rhine Ports
CH, DE, FR 42.00 01/01/2022
Upper Rhine Ports: rail capacity upgrade for inland port platforms
IWW Port Autonome de Strasbourg, Upper Rhine Ports
CH, DE, FR 33.00 01/01/2022
Upper Rhine Ports: IWW accessibility upgrade for inland port platforms
IWW Port Autonome de Strasbourg, Upper Rhine Ports
CH, DE, FR 46.00 01/01/2022
ERTMS deployment on the Longuyon- Basel line
RAIL SNCF RESEAU FR 181.00
Metz node upgrade RAIL SNCF RESEAU FR 40.00
Reinforcement of electric supply in Metz
RAIL SNCF RESEAU FR 20.00
Loading gauge enhancement between Metz and Strasbourg
RAIL SNCF RESEAU FR
Strasbourg node upgrade (4th track between Strasbourg and Vendenheim)
RAIL SNCF RESEAU FR 120.00
Strasbourg node upgrade (Strasbourg station upgrade)
RAIL SNCF RESEAU FR 118.00
Reinforcement of electric supply in Strasbourg
RAIL SNCF RESEAU FR 30.00
Atlantic rail motorway MULTIMODAL FR/ES FR ES
01/12/2025
Upgrade of the upper Seine between Bray-sur-Seine and Nogent-sur-Seine (Seine-Scheld
IWW VNF FR 240.00 31/12/2025
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
inland waterway)
IWW access to the Nogent-sur-Seine nuclear power plant (Seine-Scheld inland waterway)
IWW VNF FR 27.80 31/12/2022
Renovation and/or deepening of the small locks on the high Seine (Seine-Scheld inland waterway)
IWW VNF FR 16.90 31/12/2023
Creating a second lock at Varennes-sur-Seine (Seine-Scheld inland waterway)
IWW VNF FR 33.30
Restoring the environmental continuity on the upstream Seine (Seine-Scheld inland waterway)
IWW VNF FR 10.40 31/12/2024
Improving reliability of other locks and dams on the upstream Seine (Seine-Scheld inland waterway)
IWW VNF FR 5.60 01/06/2020
Services to users: turning basin and waiting areas on the upstream Seine (Seine-Scheld inland waterway)
IWW VNF FR 7.60 31/12/2024
Implementing remote control of locks on the upstream Seine (Seine-Scheld inland waterway)
IWW VNF FR 12.00 31/12/2025
Extension of the siding to improve rail access to the port area at the port of Metz
MULTIMODAL Port of Metz FR 3.00
Paris Seine Métropole phase 1 (western part). Development of aggregate products platform.
MULTIMODAL Port Autonome de Paris FR 110.00 01/01/2028
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Paris Seine Métropole phase 2 (eastern part). Development of multimodal platform
MULTIMODAL Port Autonome de Paris FR
01/01/2040
City port of Triel-sur-Seine MULTIMODAL Port Autonome de Paris FR 32.00 01/01/2022
Extension of the Limay multimodal terminal
MULTIMODAL Port Autonome de Paris FR 29.00 01/01/2022
Multimodal access to platforms of the ports of Paris (including new road link N406)
MULTIMODAL Port Autonome de Paris / DRIEA
FR 85.00 01/01/2019
Development of multimodal urban logistics Centers inside Paris an in Paris area
MULTIMODAL Port Autonome de Paris FR
01/01/2025
Studies to establish two ports on the Seine - Port Seine Metropole Ouest
MULTIMODAL Port Autonome de Paris FR
Recalibration of Condé – pommeroeul canal (Seine-Scheldt inland waterway)
IWW VNF FR 66.67 31/12/2023
ARMIS : Air Rail rapid Metro Interconnection System
MULTIMODAL Societe du Grand Paris FR 62.56 01/03/2017
Line 14 South connecting Orly Airport to Paris
MULTIMODAL Societe du Grand Paris FR 2100.00 01/01/2027
Calais Port 2015 MARITIME Région Nord-Pas de Calais-Picardie
FR 492.28 31/12/2020
Lengthening of the Rochetaillée-sur-Saône lock and building of a guiding wall
IWW VNF FR 11.80 01/01/2017
Eurotunnel Terminal 2015 ROAD Groupe Eurotunnel FR,UK 30.08 01/01/2016
Development of a multimodal MARITIME Dunkerque Port authority FR
31/12/2016
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
platform in the port of Dunkerque and its interconnection to the North Sea-Mediterranean Corridor
(GPMD)
Improvement of navigation conditions and capacity increase of the Rhone-Sete canal – 2nd phase
IWW VNF FR 25.00 31/12/2022
"Anneau des Sciences" Studies prior to public enquiry
ROAD Metropole de Lyon (Greater Lyon Urban Area Authority)
FR 27.00 31/12/2019
Direct rail connection between Dunkirk west port terminals and Calais/Tunnel main line
RAIL Dunkerque Port authority (GPMD)
FR 8.00 01/01/2019
Reinforcement of electric supply on Longuyon-Thionville
RAIL SNCF RESEAU FR
Mulhouse node upgrade RAIL SNCF RESEAU FR 130.00
Connection of the Mulhouse-Basel EuroAirport
RAIL EuroAirport and SNCF RESEAU
FR
Multimodal platform extension at the Port of Dunkerque
MULTIMODAL Dunkerque Port authority (GPMD)
FR 36.00 01/01/2018
Improvement of the interoperability between the port of Dunkerque and the national railway network
RAIL Dunkerque Port authority (GPMD)
FR 18.60 01/12/2018
Restoration of the Condé-Pommeroeul canal (Seine-Scheldt inland waterway)
IWW VNF BE, FR
Development of the multimodal platform near Dijon (Pagny trimodal platform)
MULTIMODAL Aproport, VNF FR
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Recalibration of Deûle river (Lille Deûlémont) (Seine-Scheldt inland waterway)
IWW VNF FR 37.50 31/12/2020
Seine Nord Canal (Seine-Scheldt inland waterway)
IWW VNF FR 5730.00 01/01/2025
Recalibration of Lys river (Deûlémont-Halluin) (Seine-Scheldt inland waterway)
IWW VNF BE, FR 59.00 31/12/2023
Implementing remote management of the locks on the Nord-Pas-de-Calais network and upgrading the locks involved (Seine-Scheldt inland waterway)
IWW VNF FR 27.27 31/12/2020
Increasing reliability of the Nord-Pas-de-Calais network (Seine-Scheldt inland waterway)
IWW VNF FR 37.50 31/12/2025
Services to users: turning basin and waiting areas (Seine-Scheldt inland waterway)
IWW VNF FR
Dredging dowtream of Creil access to locks (Seine-Scheldt inland waterway)
IWW VNF FR 2.60
Implementing remote control of locks on the Oise (Seine-Scheldt inland waterway)
IWW VNF FR 4.63 31/12/2024
Reconstruction of the Mours bridge to du pont de Mours to a height of 7 metres (Seine-Scheldt inland waterway)
IWW VNF FR 46.64 31/12/2024
Services to users: turning basin (Seine-Scheldt inland waterway)
IWW VNF FR -
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Upgrade to European gauge of the Oise between Creil and Compiègne (MAGEO project) (Seine-Scheldt inland waterway)
IWW VNF FR 241.00 31/12/2024
Port of Chalon-sur-Saone: Enlargement of the container platform, development of the container terminal and extension of the port's rail network
IWW CCI de Saône et Loire, port of Chalon-sur-Saone
FR
Port of Chalon-sur-Saone: Extension of the quay, development of a stocking platform on the quay
IWW CCI de Saône et Loire, port of Chalon-sur-Saone
FR
Bulk terminal revamp (Port of Dunkerque)
MARITIME Dunkerque Port authority (GPMD)
FR 17.00 01/01/2019
Container berth upgrade in the Port of Dunkerque
MARITIME Dunkerque Port authority (GPMD)
FR 65.00 01/06/2018
LNG bunkering infrastructure (Port of Dunkerque)
MARITIME Dunkerque Port authority (GPMD)
FR 29.60
Maritime access adaptation of the Port of Dunkerque
MARITIME Dunkerque Port authority (GPMD)
FR 20.20 01/04/2016
Development of stops for passenger ships (Rhône)
IWW VNF FR 3.30 01/12/2019
Standardisation of Slipway in Arles IWW VNF FR 8.00 01/12/2019
Development of quays and waiting areas for alternate traffic direction
IWW VNF FR 5.10 01/12/2018
Creil rail node RAIL SNCF RESEAU FR
Rhine-Rhône high speed rail line (LGV Rhin-Rhône) 2d phase of the East branch
RAIL SNCF RESEAU FR 1160.00
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Capacity increase on Lille - Valenciennes
RAIL SNCF RESEAU FR
Rail link Roissy-Picardie RAIL SNCF RESEAU FR 588.00
Doubling of the Quesnoy-sur-Deûle lock (Seine-Scheldt inland waterway)
IWW VNF FR 72.00 31/12/2015
Lengthening of the Quesnoy-sur-Deûle lock (Seine-Scheldt inland waterway)
IWW VNF FR 34.00 01/12/2023
Doubling of locks between Dunkerque and Cuinchy (Seine-Scheldt inland waterway)
IWW VNF FR 3.75 01/12/2040
Doubling of the Fontinettes lock (Seine-Scheldt inland waterway)
IWW VNF FR 1.25 01/12/2030
Lengthing of the Douaisis locks, doubling of locks on the wide-gauge network (Seine-Scheldt inland waterway)
IWW VNF FR 3.00 01/12/2040
Raising of bridges on the Nord-Pas-de-Calais network (Seine-Scheldt inland waterway)
IWW VNF FR 22.08 01/12/2020
Restoration of locks and dams in Nord-Pas-de-Calais (Seine-Scheldt inland waterway)
IWW VNF FR 21.82 01/12/2021
Saone-Moselle/Saone-Rhine Canal IWW VNF FR
CAP2020: Maritime infrastructure development in the Port of Dunkerque
MARITIME Dunkerque Port authority (GPMD)
FR 790.00 01/01/2021
Recalibration of Escaut river (Valenciennes-Mortagne-Trith) (Seine-Scheldt inland waterway)
IWW VNF BE, FR 7.50 31/12/2015
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Upgrading of the anchorage in the Bourbourg canal - from confluence with Mardyck derivation until Dunkerque
IWW VNF FR 34.70 31/12/2025
The Longueil-Sainte-Marie turnaround area
IWW VNF FR 2.90 31/12/2019
Venette landing stage IWW VNF FR 1.40 31/12/2018
Water line management entralisation and traffic management optimisation
IWW VNF FR 4.63 31/12/2024
Charleville-Mézières- Longuyon loading gauge enhencement
RAIL SNCF RESEAU FR
Longuyon-Thionville loading gauge enhancement
RAIL SNCF RESEAU FR
ERTMS deployment on the corridor (Excluding Longuyon-Bâle already in the list) by 2030
RAIL SNCF RESEAU FR
Marseille / Fos <--> Avignon Centre (existing line) and Marseille node (Miramas terminal)
RAIL SNCF RESEAU FR
01/12/2025
Lyon node (Grenay) MULTIMODAL SNCF RESEAU FR 65.00 01/12/2020
Lyon area bypass (CFAL) RAIL SNCF RESEAU FR 3500.00
Fos-sur-Mer node (rail last mile) RAIL SNCF RESEAU FR
Fos-sur-Mer node (rail last mile) RAIL SNCF RESEAU FR
Marseille node (rail last mile) RAIL SNCF RESEAU FR 2500.00
Avignon centre (node) MULTIMODAL SNCF RESEAU FR 50.00 01/01/2025
Pantograph interoperability (study)
RAIL SNCF RESEAU DE, FR 0.30
Marseille node (port): Widening of the North Pass
MARITIME Marseille-Fos Port authority (GPMM)
FR 32.70 01/07/2017
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Marseille node (Fos-sur-Mer port) : European Southern Multimodal Gateway
MARITIME Marseille-Fos Port authority (GPMM)
FR 40.00 01/12/2023
Marseille node (RRT and port): Mourepiane combined transport terminal
MARITIME Marseille-Fos Port authority (GPMM)
FR 29.00 01/12/2023
Marseille node (port): Upgrade of Short Sea Shipping terminals
MARITIME Marseille-Fos Port authority (GPMM)
FR 41.00 01/12/2020
Marseille node (RRT and Fos-sur-Mer port): Fos combined transport terminal
MARITIME Marseille-Fos Port authority (GPMM)
FR 25.00 01/01/2020
Marseille node (RRT and port): Rolling motorway terminal
MARITIME Marseille-Fos Port authority (GPMM)
FR 5.00 01/12/2021
Marseille node (Fos-sur-Mer port): Waterway link
MARITIME Marseille-Fos Port authority (GPMM)
FR 34.00 01/12/2023
Marseille node (Fos-sur-Mer port): Fos 4XL container terminal
MARITIME Marseille-Fos Port authority (GPMM)
FR 2.50 01/12/2020
Lyon node: port improvements IWW CNR, SNCF Reseau (rail part)
FR 20.80 01/12/2023
RIS COMEX IWW Via Donau FR, BE, NL, DE, PL, IT, AT, RO, BG, HU, HR, RS, CZ, SK, SI
3.16
Bypass of Martigues and Port-de-Bouc
ROAD French Government FR 145.00 01/01/2023
Bypass of Miramas ROAD French Government FR 50.00 22/03/2017
Motorway link Fos <-> Salon-de-Provence. Resolution of physical bottlenecks
ROAD French Government FR
Bypass of Arles. Resolution of physical bottlenecks
ROAD French Government FR
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Fos-sur-Mer <-> Avignon (road last mile)
ROAD French Government FR
Reconfiguration Container terminal 2 in bulk terminal, quay wall, roro ramp
IWW Port of Mulhouse FR 3.00 01/01/2019
Port of Huningue : New Terminal in Village Neuf (bulk)
IWW Port of Mulhouse FR 4.00 01/01/2019
Port of Ottmarsheim : Heavy lift gantry crane
IWW Port of Mulhouse FR 10.00 01/01/2019
Extension of the multimodal platform at the Nouveau Port de Metz
MULTIMODAL Port of Metz FR 5.00 01/01/2020
Extension of railways on the Terminal 2 at the Nouveau Port de Metz
MULTIMODAL Port of Metz FR 1.50 01/07/2019
Upper Rhine Ports: pilot development of an extended Upper Rhine traffic management platform
IWW Port Autonome de Strasbourg, Upper Rhine Ports
FR / DE /CH 2.00 01/12/2022
Seine-Escaut Canal multimodal platforms
MULTIMODAL City of Marquion, City of Péronne, City of Nesle, City of Noyon
FR
01/01/2020
Lille Express Network RAIL Hauts-de-France Region FR 25.00 01/01/2020
Atlantic Rail Motorway - Network improvements
RAIL SNCF RESEAU FR
Reconfiguration Container terminal 2 in bulk terminal, quay wall, roro ramp
IWW Port of Mulhouse FR 3.00 01/01/2019
Port of Huningue : New Terminal in Village Neuf (bulk)
IWW Port of Mulhouse FR 4.00 01/01/2019
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Port of Ottmarsheim : Heavy lift gantry crane
IWW Port of Mulhouse FR 10.00 01/01/2019
Upper Rhine Ports: pilot development of an extended Upper Rhine traffic management platform
IWW Port Autonome de Strasbourg, Upper Rhine Ports
FR / DE /CH 2.00 01/12/2022
Port of Cork Ringaskiddy Project MARITIME Port of Cork Company IE 109.77 30/09/2020
City Centre Re-signaling Project RAIL Department of Transport, Tourism and Sport
IE 59.29 31/07/2018
Dublin Port Alexandra Basin Redevelopment Project
MARITIME Dublin Port Company IE 224.34 31/12/2020
The Causeway Study - Impact of CNG on the Irish Gas Network
INNOVATION Ervia IE, UK 29.90 31/12/2020
Innovation Fund Grant Scheme INNOVATION Ervia IE 10.00 31/12/2019
Dublin city centre re-signalling Phases 3 & 4 (sub-project of DU)
RAIL Irish Rail / National Transport Authority
IE 55.00 30/09/2017
Central Traffic Control Centre (sub-project of DU)
RAIL Irish Rail IE 40.00 01/01/2020
Electrification of the DART from Malahide to Balbriggan (sub-project of DU)
RAIL Irish Rail / National Transport Authority
IE 80.00
Allow some services on the Kildare line to bypass Heuston station and into the Central Business District
RAIL Irish Rail / National Transport Authority
IE 12.00 01/01/2016
Improvement of railway stations RAIL Irish Rail/ National Transport Authority
IE 20.00 01/01/2020
N/M28 Cork to Ringaskiddy Improvement Scheme
ROAD National Roads Authority (NRA)
IE 190.00 01/01/2024
N8/N25/N40 Dunkettle ROAD National Roads Authority IE 120.00 01/01/2021
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Interchange Upgrade (NRA)
M7 Naas - Newbridge Motorway Widening Scheme
ROAD National Roads Authority (NRA)
IE 64.00 01/01/2020
Ringaskiddy infrastructure improvements
MARITIME Port of Cork Company IE 100.00 01/01/2020
Alexandra Basin Redevelopment Project (part of the Port of Dublin Masterplan)
MARITIME Port of Dublin IE 200.00 01/01/2020
Package of measures to benefit the rail corridor between Cork and Belfast via Dublin
RAIL Irish Government (DTTAS), Irish Rail / National Transport Authority
IE
01/01/2020
Metro North RAIL National Transport Authority
IE
DART Underground (DU) Programme
RAIL Irish Government (DTTAS) Irish Rail/ National Transport Authority
IE 4000.00
Full electrification of the Dublin-Belfast line (Post 2020)
RAIL Irish Government (DTTAS), Irish Rail / National Transport Authority
IE
Electrification of the DART on the Kildare line (sub-project of DU)
RAIL Irish Rail / National Transport Authority
IE
Removal of level crossings, resignalling & electrification (sub-project of DU)
RAIL Irish Rail / National Transport Authority
IE
M7 M50 - Naas Motorway Upgrade
ROAD National Roads Authority (NRA)
IE 200.00 01/01/2020
ITS and SESAR ROAD NRA, IAA, DAA., Airlines IE
Further development of Port of Cork Masterplan
MARITIME Port of Cork Company IE 60.00
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Poolbeg Peninsula Development Project
MARITIME Dublin Port Company IE 75.00
Unitised Terminals Redevelopment Project
MARITIME Dublin Port Company IE 200.00
N221/N69 Limerick-Adare-Foynes road link
ROAD National Roads Authority (NRA)
IE
31/12/2024
Bettembourg railway station upgrade
RAIL CFL LU 507.40 01/12/2022
Construction of a new bimodal terminal (rail/road) in Bettembourg/Dudelange
RAIL CFL LU 220.00 01/12/2017
Construction of a new peripheral railway station in Luxembourg-Howald
RAIL CFL LU 294.40 01/12/2025
Luxembourg railway station upgrade
RAIL CFL LU 554.30 01/12/2020
EuroCap-Rail: Phase 2: Modernization of the Luxembourg-Kleinbettingen railway line
RAIL CFL LU 602.10 01/12/2017
Railway line Rodange-Esch/Alzette-Bettembourg/border upgrade
RAIL CFL LU
Modernization of a bridge on motorway A1 from Luxembourg to Germany
ROAD n.a. LU
Construction of 2 more lanes on the motorway section between Luxembourg (LU) and Metz (F)
ROAD n.a. LU
Construction of a new parking for trucks with an Intelligent Parking System at the highway station of Berchem (A3/E25)
ROAD n.a. LU
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Implementation ERTMS: infrastructure and rolling stock; section3
RAIL Prorail NL 26.00 31/12/2030
Implementation ERTMS: infrastructure and rolling stock; section 4
RAIL Prorail NL 12.00 31/12/2027
PHS Amsterdam CS RAIL Ministry of Infrastructure and the Environment
NL 433.00 01/12/2026
A13/A16 Rotterdam ROAD Rijkswaterstaat NL 979.00 01/12/2023
Princess Beatrix Lock and Lek Canal IWW Rijkswaterstaat NL 234.00 01/12/2020
Capacity Volkeraklock IWW Rijkswaterstaat NL 155.00 01/12/2026
New Sealock Ijmuiden IWW Rijkswaterstaat NL 815.00 01/12/2019
New location for transhipment of bulk goods, IJmuiden, Averijhavendepot
MARITIME Rijkswaterstaat NL 65.00 01/12/2018
A4 Vlietland-N14 ROAD Dutch Ministry of Infrastructure and the Environment
NL 15.60 01/12/2022
A24 Blankenburg connection ROAD Dutch Ministry of Infrastructure and the Environment
NL 1173.00 01/12/2024
Increased capacity of mooring places Beneden-Lek
IWW Dutch Ministry of Infrastructure and the Environment
NL 12.00 01/12/2017
Traffic management system Hollandsch Diep-Dordtsche Kil
IWW Dutch Ministry of Infrastructure and the Environment
NL 10.00 01/12/2027
Road upgrade A1/A6/A9 Schiphol - Amsterdam - Almere
ROAD Dutch Ministry of Infrastructure and the
NL 5066.00 01/12/2026
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Environment
Zuidasdok Rail. Increase capacity of railway station Amsterdam-South.
RAIL Ministry of Infrastructure and the Environment
NL 1569.00 01/12/2028
Public transport Schiphol-Amsterdam-Almere-Lelystad. (OV SAAL)
RAIL Ministry of Infrastructure and the Environment
NL 1182.00 01/12/2022
Theemsweg railway section upgrade
RAIL Havenbedrijf Rotterdam N.V.
NL 299.65 01/12/2020
Safe & Secure Truck Parking Areas on the Core Network in the Netherlands
ROAD P.V.L. B.V. NL 6.47 01/12/2018
High efficient container terminal boosting multi modal freight between Rotterdam and the European hinterland
MULTIMODAL APM Terminals Maasvlakte II
NL 27.30
LNG Masterplan for Rhine-Main-Danube
IWW Pro Danube Management GmbH
NL 80.00 01/12/2020
Capacity expansion of mooring locations Gorinchem - Dordrecht
IWW Rijkswaterstaat NL 20.00 01/12/2017
Rail connections Maasvlakte 2. Upgrade along port railway line.
RAIL Prorail NL 217.00 01/12/2015
Identified missing element in 2014 work plans: Upgrade line to allow freight speed of >100 km/h
RAIL
NL
01/12/2030
Identified missing element in 2014 work plans: Upgrade line for axle load of 22.5t
RAIL
NL
01/12/2030
Redesign Waalhaven Zuid freight RAIL Public+EU NL
01/12/2019
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
yard for containers
Models for economic hydrogen refuelling infrastructure
INNOVATION Element Energy Ltd DE, IT, NL, UK 33.24 01/06/2020
Multifunctional secure truck parking solution in Rotterdam
MARITIME Havenbedrijf Rotterdam N.V.
NL 12.91
Improvement and promotion of Rail Freight Corridor North Sea - Mediterranean
RAIL Groupement Europeen d'interet Economique Rail Freight Corridor 2
BE, FR, LU, NL, UK 4.80 31/12/2018
Environmental compliance and upgrade of the North Sea MoS Felixstowe-Vlaardingen
MARITIME DFDS A/S NL, UK 6.10 31/12/2016
Scrubbers: Closing the loop MARITIME Stena UK Ltd NL, SE, UK 40.67 31/12/2017
Maasroute upgrading phase 2b 2015-2018
IWW Dutch Ministry of Infrastructure and the Environment
NL 64.90 31/12/2018
Preparatory Study for deployment of ERTMS on the railway line section Kijfhoek (Port of Rotterdam) - Roosendaal - Belgian border - Core Network Corridor / Rail Freight Corridor North Sea - Mediterranean
RAIL Dutch Ministry of Infrastructure and the Environment
NL 4.70 31/12/2017
Study of Innovative Natural Gas Solutions for Road Transport in North West Europe with Pilot Deployment in UK and Netherlands
ROAD ENN Clean Energy UK Limited
NL, UK 10.80 31/12/2018
SCRUBBER SAMSKIP - New scrubber solution for lolo vessel operating in North and Irish sea
MARITIME Samskip Multimodal B.V IE, NL, UK
31/05/2017
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Reconstruction of the Theodorus Port, Bergen op Zoom, phases 2,3 and 4A
IWW Gemeente Bergen op Zoom
NL 14.65 31/12/2019
Rail freight terminal at core Port of Moerdijk.
RAIL Havenschap Moerdijk NL 2.56 31/08/2018
ERTMS deployment plan NSMED corridor.
RAIL Prorail NL 50.00 31/12/2030
A10 junctions De Nieuwe Meer and Amstel (part Zuidasdok road) A10 Separate local from long-distance traffic.
ROAD Rijkswaterstaat NL 297.00 01/12/2028
A9 Badhoevedorp. Traffic congestion at junction.
ROAD Rijkswaterstaat NL 340.00 31/12/2018
Future vision Waal. Fairway depth and cross-border mooring places.
IWW Rijkswaterstaat NL 131.00 01/12/2023
Wilhelmina Canal IWW Municipality Tilburg and Province of Noord-Brabant
NL 104.20 01/12/2016
A58 St Annabosch-Galder and A58 Eindhoven-Tilburg
ROAD MinIenM NL 390.00 01/12/2024
EU ITS Platform ROAD Ministero delle Infrastrutture e dei Trasporti
NL, IT, 15 member states in total
12.90 01/12/2020
Multimodal Logistics Hub for the Venlo Region (Rail and Barge Terminal Venlo)
MULTIMODAL Trade Port Noord CV NL 80.40
Schiphol Plaza. Passenger terminal capacity.
AIRPORT Dutch Ministry of Infrastructure and the Environment
NL
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
D00R2LNG MOS Containerships Ltd Oy FI, NL, UK 73.86 01/12/2018
Harbourline - Oude Maas river crossing
RAIL RFC RALP
01/12/2028
Amsterdam Dijksgracht - free level crossing
RAIL RFC RALP
01/12/2025
BRIDGE (Building the Resilience of International and Dependent Gateways in Europe) - Motorways of the Sea II and Funding Objective 1
MARITIME DOVER HARBOUR BOARD UK 134.00 31/12/2020
EURO-HUB - Open access finished vehicle handling facility
MULTIMODAL DB SCHENKER RAIL (UK) LIMITED
UK 5.09 01/12/2016
Improving London's Interconnections with the Core Network: Old Oak Common Study
RAIL Transport for London UK 8.08 01/10/2017
Bottleneck Alleviation and Cross Border Connectivity Works on Knockmore to Lurgan Rail Line
RAIL Dept. for Regional Transport Northern Ireland
UK 32.28 01/04/2018
Cannock Multimodal Rail Freight Terminal (CMRFT)
MULTIMODAL Pentalver Cannock Limited UK 19.72 01/01/2017
Belfast: Road and rail traffic improvements
MULTIMODAL Dept. for Regional Transport Northern Ireland
UK 110.00
Edinburgh-Glasgow Improvement Programme (EGIP)
RAIL Network Rail UK 346.00 01/01/2019
Felixstowe-Nuneaton Improvements
RAIL Network Rail UK 850.00 01/01/2019
Northern Hub RAIL Network Rail UK 1580.00 01/01/2019
Project name Project category Project promoter Member States / countries involved
Total costs (estimate) Project end date
Stafford area improvements on WCML
RAIL Network Rail UK 265.00 01/03/2016
WCML: North Wembley to Great Strickland
RAIL Network Rail UK 276.00 01/01/2017
WCML: Southampton via Reading and Oxford
RAIL Network Rail UK 54.00 01/01/2016
Improve accessibility between the Westlink and the M2 and M3 in central Belfast
ROAD Dept. for Regional Transport Northern Ireland
UK 165.00 01/01/2017
M6 Junctions 10a - 13 smart motorway
ROAD Highways England UK 128.00 01/01/2016
Central Scotland: M8 M73 M74 Motorway Improvements project
ROAD Transport Scotland UK 631.00 01/01/2017
M3 "smart motorway" junctions 2 and 4a
ROAD Highways England UK 218.00 01/06/2017
Widening the A14 J7-9 Kettering bypass
ROAD Highways England UK 53.00 01/04/2015
Warrenpoint Harbour to the A1 TEN-T Core Corridor
ROAD Dept. for Regional Transport Northern Ireland
UK 265.00
M25 Junction 30/A13/A126 ROAD Highways England UK 129.00 01/10/2016
Birmingham International Station Integrated TEN-T Transport Hub
RAIL Solihull Metropolitan Borough Council
UK 1.75 01/09/2017
NT3: Railway network improvement project
RAIL Dept. for Regional Transport Northern Ireland
UK 130.00
A5 Cross-border road improvement project
ROAD Dept. for Regional Transport Northern Ireland
UK 200.00
A6 Key transport connectivity to NSMed corridor
ROAD Dept. for Regional Transport Northern Ireland
UK 327.00