ORGANISATION CHART OF RSRDC UNIT-1, AJMER RE Rakesh Kr. Jain AAO Sh. Shiv Kr. Sharma ARE Sh. Brijesh...
-
Upload
ramiro-plunkett -
Category
Documents
-
view
224 -
download
0
Transcript of ORGANISATION CHART OF RSRDC UNIT-1, AJMER RE Rakesh Kr. Jain AAO Sh. Shiv Kr. Sharma ARE Sh. Brijesh...
ORGANISATION CHART OF RSRDC UNIT-1, AJMER
RERakesh Kr. Jain
AAOSh. Shiv Kr. Sharma
ARESh. Brijesh Kr.
Mathur
ARESh. N.K. Tak
ARE.Sh. Avinash Kumar
ARESh. J.P. Kansal
ARESh. Harsh Rai
J.En. (Elect.)Sh. O.P. Sharma
Financial Work Load in Unit S. No. Name of Work Client Deptt. A& F Sanction Expenditure till date Balance Work
ARE – I Sh. Brijesh Mathur1 Parking space at
G/F & F/F, Office chamber on S/F and Auditorium on 3rd floor at BSER, Ajmer
B.S.E.R., Ajmer
1400.00 288.76 1111.24
2 1st floor & 2nd floor over old answer book at BSER, Ajmer
B.S.E.R., Ajmer
Total
106.00
1506.00
49.34
338.10
56.66
1167.90
Rs. in Lacs.
Financial Work Load in UnitS.
No.Name of Work Client Deptt. A& F Sanction Expenditure till
dateBalance Work
ARE – II Sh. N.K. Tak
1 Urban Hatt Bazar, Ajmer Industries Deptt.
190.00 113.68 76.32
2 LSQ at GRP Campus, Nareli, Ajmer (Part-IV)
Police Deptt. 434.72 334.18 100.54
3 USQ+LSQ at 11th RAC Battalion, Nareli, Ajmer (Part-I & II)
Police Deptt. 555.25 378.25 177.00
4 Company Store & Office for 11th RAC Battalion Nareli, Ajmer
Police Deptt. 21.00 7.90 13.10
5 1st floor on computer centre (Arya Bhatt Bhawan) at MDSU Ajmer
M.D.S.U., Ajmer
79.40 53.01 26.39
6 Women Hostel at MDSU Ajmer
M.D.S.U., Ajmer
180.91 7.62 173.29
7 Academic Staff College (Guest House) at MDSU Ajmer
M.D.S.U., Ajmer
Total
75.00
1536.28
11.05
905.69
63.95
630.59
Rs. in Lacs.
Financial Work Load in Unit Rs. in Lacs.
S. No.
Name of Work Client Deptt. A& F Sanction Expenditure till date
Balance Work
ARE – III Sh. Avinash Kumar
1 Part of Academic Building and Workshop at Govt. Mahila Engg. College, Ajmer
Principal Women Engg., Ajmer
257.00 253.02 3.98
2 Compound wall at Mahila Engg. College, Ajmer
Principal Women Engg., Ajmer
12.00 7.00 5.00
3 Internal Road at Mahila Engg. College, Ajmer
Principal Women Engg., Ajmer
35.89 6.55 29.34
4 Canteen Cum Guest House at Engg. College, Ajmer
Engg. College Society, Ajmer
42.00 25.90 16.10
5 USQ + LSQ at GRP Campus, Nareli, Ajmer (Part-I, II, III & V)
Police Deptt. 1138.56 875.16 263.40
6 2ndfloor on Management block at MDSU, Ajmer
MDSU, Ajmer 81.83 53.19 28.64
S. No. Name of Work Client Deptt.
A& F Sanction
Expenditure till date
Balance Work
ARE – III Sh. Avinash Kumar
7. Social Science Block at M.D.S.U., Ajmer (Development Work)
MDSU Ajmer
305.52 223.86 81.66
8 (A) App. Road and Parking Shed at Management Block at MDSU, Ajmer
MDSU Ajmer
48.22 31.36 16.86
(B) C.C. Interlocking paver block at Bharti niwas at MDSU, Ajmer
(C) Laying & Jointing Pipeline UG Tank to Girls Hostel at M.D.S.U., Ajmer
(D) Tube Well submersible pump set laying & jointing GI Pipe.
9
10
Environmental Sc. Building at MDSU, Ajmer
Dormetory on 1st Floor at Food Craft Institute at Ajmer
M.D.S.U., Ajmer
Principal Foof Craft Institute
Total
238.62
38.00
2197.64
0.00
0.00
1476.04
238.62
38.00
721.6
Financial Work Load in Unit Rs. in Lacs.
S. No.
Name of Work Client Deptt. A& F Sanction Expenditure till date
Balance Work
ARE – IV Sh. J.P. Kansal
1 Ad.Trainee at PTS Kishangarh. Police Deptt. 150.00 130.06 19.14
2 Hostel Building for Trainee at PTS., Kishangarh
Police Deptt. 100.00 54.79 45.21
3 Adm. Block at RPL Hadirani Battalion, Ajmer
Police Deptt. 125.00 31.30 93.70
4 Adm. Buidling for Police Outpost at Shastri Nagar, Ajmer
Police Deptt. 11.00 9.17 1.83
5 Adm. Building for Police out post at Gandhi Nagar, Kishangarh
Police Deptt. 11.00 6.00 5.00
6 Adm. Building for police out post at Saket Nagar, Beawar
Police Deptt. 11.00 5.55 5.45
7 Adm. Building for Police Police Deptt. out post at Kasai Mohalla, Beawar
11.00 2.27 8.73
8 Adm. Building for Zone officer for CID office, Ajmer
Police Deptt. 31.50 1.40 30.10
9 30 Mens Barracks at PTS, Kishangarh
Police Deptt.
Total
17.00
467.50
5.76
246.30
11.24
221.20
Financial Work Load in Unit Rs. in Lacs.
S. No.
Name of Work Client Deptt.
A& F Sanction
Expenditure till date
Balance Work
ARE – V Sh. Harsh Rai
1 100 men barrack at RPLHadirani Battalion (Part-I )
Police Deptt.
100.00 2.91 97.09
2 100 Men Barrack at RPL Hadirani Battalion, Ajmer (Part-II)
Police Deptt.
Total
100.00
200.00
0.58
3.49
99.42
196.51
Bharat Vidhya Adhayan Sankul at M.D.S.U., Ajmer
Completion Cost – Rs. 1.10 Crs.
Foundation Stone laid by Hon’ble Minister for Higher Education Rajasthan State Sh. Ghanshyam Tiwari in March, 07
Inaugurated by Prof. Sukhdev Thorat Chairman UGC on 12.10.09
Important Works Completed during last 5 years
Important Works Completed during last 5 years
Boy’s Hostel at M.D.S.U., Ajmer
Completion Cost – Rs. 1.65 Crs.
Foundation Stone laid by Hon’ble Minister for Higher Education Rajasthan State Sh. Ghanshyam Tiwari in March, 07
Important Works Completed during last 5 years
Girls Hostel at M.D.S.U., Ajmer
Completion Cost – Rs. 1.65 Crs.Completion Cost – Rs. 1.40 Crs.
Inaugurated by Honble Mininster for Higher Education Rajasthan State Govt. Sh. Ghanshyam Tiwari on 21.08.2006
Foundation Stone laid by Hon’ble Minister for Higher Education & PWD Rajasthan State Sh. Lalit Kishor Chaturvedi on 24.09.1998
Important Works Completed during last 5 years
Social Science Block at M.D.S.U., Ajmer
Completion Cost – Rs. 3.05 Crs.
Inaugurated by Honble Mininster for Higher Education Rajasthan State Govt. Sh. Ghanshyam Tiwari on 10.08.2006.
Foundation Stone laid by Hon’ble Minister for Mahilla Bal Vikas & JanJati Kashetrya Vikas, Rajasthan State Sh. Kankmal Katara on 01.06.2005.
Important Works Completed during last 5 years
Yoga Centre at M.D.S.U., Ajmer
Completion Cost – Rs. 0.63 Crs.
Inaugurated by Honble Mininster for Higher Education Rajasthan State Govt. Sh. Ghanshyam Tiwari on 29.06.2007.
Foundation Stone laid by Hon’ble Minister for Higher Education & PWD Rajasthan State Sh. Lalit Kishor Chaturvedi on 24.09.1998
Important Works Completed during last 5 years
Women Engineering College at Ajmer
Completion Cost – Rs. 2.57 Crs.
Foundation Stone laid by Hon’ble Chief Minister Govt. of Rajasthan Smt. Vasundhra Raje on 30.04.07
Handed Over in November, 2009
Important Works Completed during last 5 yearsWomen Engineering College at Ajmer
Completion Cost – Rs. 2.57 Crs.
Foundation Stone laid by Hon’ble Chief Minister Govt. of Rajasthan Smt. Vasundhra Raje on 30.04.07
Handed Over in November, 2009
Important Works Completed during last 5 years
Management Block at M.D.S.U., Ajmer
Completion Cost – Rs. 1.97 Crs.
Inaugurated by Honble Mininster for Industries Rajasthan State Govt. Sh. Rajendra Pareek on 17.09.09.
Important Works Completed during last 5 years
New Answer Book Halls at 1st Floor & 2nd Floor in B.S.E.R., Ajmer
Completion Cost – Rs. 2.15 Crs.
Handed Over in November, 2009
Important Works Completed during last 5 years
Engineering College, Ajmer
Completion Cost – Rs. 5.40 Crs.
Inaugurated by Honble Chief Mininster Govt. of Rajasthan Smt.Vasundhra Raje on 25.01.08.
POLICE HOUSING SCHEME (ONGOING WORK AT GRP CAMPUS)
No. of Quarters : 304 Nos. (L.S.Q.-292 + U.S.Q.-12)
Total Cost : 15.73 Crores
Location : G.R.P. Campus, Nareli, Ajmer
Date of Start : February, 2008 / October, 2008
Stipulated Date of Completion : January, 2009 / September, 2009
Expenditure till Date : 12.09 Crores
Likely Completion date : March, 2010
Bottlenecks if any : (i) Sanction for Development works not given.
(ii) Water supply connection in campus is to be carried out by PHED. For which Six Months period required.
(iii) 60 Nos Qtrs. (L.S.Q.) taken in Phase-II
POLICE HOUSING SCHEME (ONGOING WORK AT GRP CAMPUS)
POLICE HOUSING SCHEME (ONGOING WORK AT RAC,NARELI CAMPUS)
No. of Quarters : 108 Nos. (L.S.Q.-104 + U.S.Q.-4)
Total Cost : 5.55 Crores
Location : R.A.C. Campus, Nareli, Ajmer
Date of Start : February, 2008 / October, 2008
Stipulated Date of Completion : January, 2009 / September, 2009
Expenditure till Date : 3.78 Crores
Likely Completion date : March, 2010
Bottlenecks if any : (i) 56 L.S.Q. taken in Phase-II work in month of October, 2008 therefore, campus may be ready for handing over by March, 2010.
Name of Work:- Various Works in M.D.S. University, Ajmer
Construction of First Floor at Computer Centre
Total Cost : 0.54/0.79 CroreLocation : M.D.S. University, CampusDate of Start : September, 2008Stipulated Date of Completion : April, 2009Expenditure till Date : 0.53 CroreLikely Completion date : March, 2010Bottlenecks if any : Revised Sanction for additional work
received in June, 2009 and delay in payment from client.
Name of Work:- Various Works in M.D.S. University, Ajmer
Construction of Women Hostel
Total Cost : 1.81 CroresLocation : M.D.S. University, CampusDate of Start : September, 2009Stipulated Date of Completion : June, 2010Expenditure till Date : 0.08 CroreLikely Completion date : June, 2010Bottlenecks if any : Work started in October, 2009 due to
foundation stone ceremony in September, 2009.
Foundation Stone Lead by Hon’ble State Minister for Information Technology & Communication Govt. of India Sh. Sachin Piolet on 15th September, 2009
Name of Work:- Various Works in M.D.S. University, Ajmer
Construction of Academic Staff College (Guest House)
Total Cost : 0.75 CroreLocation : M.D.S. University, CampusDate of Start : August, 2009Stipulated Date of Completion : December, 2009Expenditure till Date : 0.11 CroreLikely Completion date : March, 2010Bottlenecks if any : Funds not released by client timely.
Name of Work:- Various Works in M.D.S. University, AjmerConstruction of Environmental Science Building
Total Cost : 2.39 Crores
Location : M.D.S. University, Campus
Date of Start : December, 2009
Stipulated Date of Completion : November, 2010
Expenditure till Date : 0.00 Crore
Likely Completion date : November, 2010
Bottlenecks if any : -
Foundation Stone Lead by Hon’ble State Minister for Information Technology & Communication Govt. of India Sh. Sachin Piolet on 15th September, 2009
Name of Work:- Various Works in Board of Sec. Edu., Rajasthan, Ajmer
Construction of Parking, Office, Chamber & Auditorium
Total Cost : 14.00 CroresLocation : B.S.E.R. CampusDate of Start : September, 2008Stipulated Date of Completion : August, 2011Expenditure till Date : 2.89 CroresLikely Completion date : August, 2011Bottlenecks if any : Work stopped on account of decision
not given by client for Construction of Auditorium hence, Construction of 2rd Floor held up for Two Months.
Name of Work:- Various Works in Board of Sec. Edu., Rajasthan, Ajmer
Construction of 1st & 2nd Floor on Old Answer Book Hall
Total Cost : 1.06 CroresLocation : B.S.E.R. CampusDate of Start : September, 2008Stipulated Date of Completion : February, 2010Expenditure till Date : 0.49 CroreLikely Completion date : March, 2010Bottlenecks if any : (i) Funds not released by client timely.
(ii)Work stopped by client on account of thorough passes for access of examination stationary through trucks.
Name of Work:- Various Works under Police Modernization
Construction of Adm. Training Block at PTS Kishangarh
Total Cost : 1.5 Crores
Location : Kishangarh
Date of Start : September, 2008
Stipulated Date of Completion : May, 2009
Expenditure till Date : 1.30 Crores
Likely Completion date : January, 2010
Bottlenecks if any : Part sanction of Rs. 0.5 crores received in phase-II.
Name of Work:- Various Works under Police Modernization
Construction of Hostel Building of Trainee at PTS Kishangarh
Total Cost : 1.00 Crore
Location : Kishangarh
Date of Start : September, 2008
Stipulated Date of Completion : May, 2009
Expenditure till Date : 0.55 Crore
Likely Completion date : January, 2010
Bottlenecks if any : Part sanction of Rs. 0.2 crores received in phase-II.
Name of Work:- Various Works under Police Modernization
Construction of Adm. Building for RPL, Hadi Rani Battalion, Ajmer
Total Cost : 1.25 CroresLocation : Nareli, AjmerDate of Start : January, 2009Stipulated Date of Completion : December, 2009Expenditure till Date : 0.31 CroreLikely Completion date : January, 2010Bottlenecks if any : Work Started in July, 2009 due to non
availability of land.
Name of Work:- Various Works under Police Modernization
Construction of 100 mens barracks at RPL, Hadi Rani Battalion, Ajmer (Part-I)
Total Cost : 1.00 CroreLocation : Nareli, AjmerDate of Start : January, 2009Stipulated Date of Completion : December, 2009Expenditure till Date : 0.03 CroreLikely Completion date : January, 2010Bottlenecks if any : Work Started in July, 2009 due to non
availability of land.
Name of Work:- Various Works under Police Modernization Construction of 100 mens barracks at RPL, Hadi Rani Battalion, Ajmer (Part-II)
Total Cost : 1.00 CroreLocation : Nareli, AjmerDate of Start : January, 2009Stipulated Date of Completion : December, 2009Expenditure till Date : 0.006 CroreLikely Completion date : January, 2010Bottlenecks if any : Work Started in July, 2009 due to
non availability of land.
Name of Work:- Various other works in Unit-I, Ajmer
Construction of Canteen cum Guest House at Engineering College, Ajmer
Total Cost : 0.42 Crore
Location : Ajmer
Date of Start : December, 2007
Stipulated Date of Completion : July, 2008
Expenditure till Date : 0.26 Crore
Likely Completion date : March, 2010
Bottlenecks if any : -
Name of Work:- Various other works in Unit-I, Ajmer
Construction of Urban Hatt at Ajmer
Total Cost : 1.60 / 1.90 Crores
Location : Ajmer
Date of Start : June, 2007
Stipulated Date of Completion : May, 2008
Expenditure till Date : 1.14 Crores
Likely Completion date : March, 2010
Bottlenecks if any : Work Stopped since October, 2008 due to funds not released by client
Proposed New WorksS. No. Name of Work Client Deptt. Mode Estimated Cost
Actual plus / Tendered
1. Const. of Women Engineering college (Ph.-II)
Principle Mahilla Engineering College, Ajmer
Actual Plus 393.00 Lacs.
2. Additional Works in ITI Building and Campus at Beawar.
Institute Management Committee of ITI, Beawar
Actual Plus 60.00 Lacs.
With Regards
Thanks