PowerPoint-presentation€¦ · År 0 År 1 År 2 År 3 År 4 År 5 0 kr. 500.000 kr. 1.000.000...
Transcript of PowerPoint-presentation€¦ · År 0 År 1 År 2 År 3 År 4 År 5 0 kr. 500.000 kr. 1.000.000...
2016
•
•
•
•
•
•
Illustration:
•
•
•
•
Illustration:
Illustration: IEA ECBCS Annex 47
10
Owner
Commissioning steering group
Ownersrepresentative
Design teamand/or contractor
CxACommissioning Authority
Operating personnel, users,suppliers of owner’s supplies
Construction managers, consultants,contractors, suppliers
Auto-mation
Venti-lation
Heating&
cooling
Data com-muni-cations
Elec-
trical
Auto-mation
Venti-lation
Heating&
Cooling
Data com-muni-cations
Elec-trical
Cx SpecialistsCx technical ressources
•
•
2009
50.000
5.000.000 kr.
10.000.000 kr.
15.000.000 kr.
År 0 År 1 År 2 År 3 År 4 År 5
20.000.000 kr.Indoor
climate
Operation
Investment
Construc-
tion
< In
vest
| S
avin
gs>
0 kr.
50.000
År 0 År 1 År 2 År 3 År 4 År 5
0 kr.
500.000 kr.
1.000.000 kr.
-500.000 kr.
1.500.000 kr.
Indoor
climate
Operation
Investment
Construc-
tion
< In
vest
| S
avin
gs>