Orbit · 2017. 2. 10. · E.g. **20% to 40% of the steel in our steel tubing and sheet steel have...
Transcript of Orbit · 2017. 2. 10. · E.g. **20% to 40% of the steel in our steel tubing and sheet steel have...
Lewisburg, PA | 800.233.8404 | +1.570.522.9800 | PlayworldSystems.com
Orbit PE-1405
Front View
Lewisburg, PA | 800.233.8404 | +1.570.522.9800 | PlayworldSystems.com
Orbit PE-1405
Back View
Primary Color Scheme
Natural Color Scheme
Tropical Color Scheme
0 5' 10'
0 5' 10'
FOO
TIN
G L
EGEN
D
= C
OM
PO
NE
NT
FOO
TIN
G (
DET
AIL
3)
= C
AN
TILE
VE
R, "
T" P
OS
T, A
ND
CO
MP
ON
ENT
POST
FO
OTI
NG
(D
ETAI
L 2)
= S
PIR
AL
SLI
DE
CE
NTE
R P
OS
T FO
OTI
NG
(D
ETAI
L1)
= G
RO
UN
D Z
ER
O P
OS
T FO
OTI
NG
(D
ETAI
L 2)
= S
UP
PO
RT
PO
ST
FOO
TIN
G (
DET
AIL
1 or
4)
(144
" (36
58m
m) I
ND
ICA
TES
POST
LEN
GTH
)
(ZZC
H18
50 IN
DIC
ATES
PAR
T N
UM
BER
)
(112
" (28
45m
m) I
ND
ICA
TES
POST
LEN
GTH
)
GZ148"
GZ148"
GZ148"
GZ148"
GZ148"
GZ148"
GZ148"
GZ148"
GZ148"
GZ148"
FOO
TIN
G L
EGEN
D
= C
OM
PO
NE
NT
FOO
TIN
G (
DET
AIL
3)
FO
OTI
NG
(D
ETA
IL 2
)(ZZ
CH
1850
IND
ICAT
ES P
ART
NU
MB
ER)
= S
PIR
AL
SLI
DE
CE
NTE
R P
OS
T FO
OTI
NG
(D
ETAI
L1)
= C
AN
TILE
VE
R, "
T" P
OS
T, A
ND
CO
MPO
NEN
T PO
ST
= G
RO
UN
D Z
ER
O P
OS
T FO
OTI
NG
(D
ETAI
L 2)
= S
UP
PO
RT
PO
ST
FOO
TIN
G (
DET
AIL
1 or
4)
(144
" IN
DIC
ATE
S PO
ST L
ENG
TH)
(112
" IN
DIC
ATE
S PO
ST L
ENG
TH)
Posts
ZZCH0038GZ 101 3.5in OD x 148in GROUND ZERO POST
Ground Zer0 Climbers
ZZCH8390 12 THE STUMP JUMP
ZZCH8399 13 THE WAVE
ZZCH9070 14 OVAL CRATER JUNCTION
ZZCH9077 15 OVAL CRATER ARCH
ZZCH9080 16 QUAD JUNCTION
ZZCH9087 17 THE CROSSOVER
GroundZer0 Overhead Events
ZZCH8450 18 THE SKY LINK
Additional Tool & Maintenance Kits
ZZCHGUID 19 CHALLENGER GUIDELINES
ZZUN9910 110 SURFACING WARNING LABEL KIT
ZZUN9930 111 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZUN9990 112 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
Part No. Description
Design Number: PE-1405 - Bill Of Material
Orbit
Ref.No. Quantity
Friday, June 20, 2014 Page of1 1 www.PlayworldSystems.com
CertifiedZZCH0038GZ1 3.5in OD x 148in GROUND ZERO POST10 470.10 633 0 10.00 1.80 0
CertifiedZZCH83902 THE STUMP JUMP 1 197.32 708 3 2.75 0.09 1
CertifiedZZCH83993 THE WAVE 1 66.60 171 2 0.75 0.00 1
CertifiedZZCH90704 OVAL CRATER JUNCTION 1 237.98 1,092 3 3.00 0.06 1
CertifiedZZCH90775 OVAL CRATER ARCH 1 100.95 419 1 2.00 0.03 1
CertifiedZZCH90806 QUAD JUNCTION 1 125.48 335 4 0.50 0.00 1
CertifiedZZCH90877 THE CROSSOVER 1 186.58 386 4 1.50 0.06 1
CertifiedZZCH84508 THE SKY LINK 1 54.21 123 2 0.50 0.00 1
N/AZZCHGUID9 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0
CertifiedZZUN991010 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993011 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 13.07 90 0 0.00 0.00 0
N/AZZUN999012 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
1 3.46 75 0 0.00 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: PE-1405 - Compliance and Technical Data
Orbit
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
312 533 4,033 19 21.50 2.041,455.80 7Totals:
4 Metric Tons240 Kg140 Kg655.11 Kg 1.55 m3
Friday, June 20, 2014 Page of1 2 www.PlayworldSystems.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: PE-1405 - Compliance and Technical Data
Orbit
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number PE-1405, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Friday, June 20, 2014 Page of2 2 www.PlayworldSystems.com