Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems...
-
Upload
susan-wythe -
Category
Documents
-
view
213 -
download
0
Transcript of Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems...
![Page 1: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/1.jpg)
Optimizing High-Mix Low-Volume Operations
Shahrukh A. IraniDepartment of Integrated Systems Engineering
The Ohio State UniversityColumbus, OH 43210
PHONE: (614) 688-4685EMAIL: [email protected]
WEBSITE: http://ise.osu.edu/biosketch_SIrani.cfm
![Page 2: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/2.jpg)
Agenda Types of Manufacturing Systems
What type of manufacturing system do you manage?
What makes jobshops (high-mix, low-volume, MTO) different from any “Toyota-type” plant?
Limitations of the (Toyota)Lean tools
Examples of high-mix low-volume (HMLV) manufacturing systems
CASE STUDY: Optimization of the layout of an entire plant
CASE STUDY: Optimization of the setup on a press
A Toolbox for High-Mix Low-Volume Manufacturers
![Page 3: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/3.jpg)
Spectrum of Manufacturing SystemsQ
UA
NT
ITY
(Vol
um
e)
MIX(Variety)
High
Low
Low High
Assembly Lines or Transfer Lines
Flexible Flowshops
Manual Cells
Flexible Mfg.Cells
Jobshops
![Page 4: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/4.jpg)
$ALES ($)
MIX
(R
)
QUANTITY (Q,T)
Ou
tlie
rsIn
a P
art
Fam
ily
LOW
HIGHPROTOTYPES
STRANGERS
RUNNERS
REPEATERS
P
What is Your Manufacturing System?
![Page 5: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/5.jpg)
• Jobshops Assembly Facilities– High mix of products i.e. many different routings– Part families may not be known– Product mix segmentation must be done– Setup times, cycle times, lot sizes, etc. vary significantly– Wide variety of product designs and equipment types– Typical facility has a Process Layout (= batch-and-queue)
• Different (and Difficult) Business Environment– Demand is unstable– Lot sizes change– Customer loyalty and sanity are non-existent– Production schedules are driven by due dates (not Takt Time)– Shifting capacity constraints – Due dates are different and subject to frequent changes
Lean for Toyota Lean for Jobshops
![Page 6: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/6.jpg)
Strategic Planning Top-Down Leadership Motivated Workforce 5S Total Productive Maintenance Setup Reduction Error-Proofing Quality at Source Visual Workplace Right-sized Equipment Standardization of Work
X Right-sized (= Inflexible) Machines
X Kaizen Events (Mainly by Operators)
X 20th (not 21st) Century Managers
X Pencil-and-Paper Problem Solving
X Value Stream Mapping
X One-Piece Flow Cells
X Product-specific Kanbans
X FIFO Sequencing of Orders
X Pacemaker Scheduling
X Inventory Supermarkets
X Scheduling using Takt Time
X Heijunka/Load Leveling
X Assembly Line Balancing
Many Lean Tools are NOT Universal
![Page 7: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/7.jpg)
How to Recognize a High-Mix Low-Volume Manufacturing System?
![Page 8: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/8.jpg)
Forge Shop (≈500 Routings)
![Page 9: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/9.jpg)
MTO Industrial Scale Fabrication Facility
763IRONW
STORAGE LOCATIONSX Y Z
Shipping811ASM
770WHLBR
771HCFIN/771TEXTR
771VIKIN
763FSROB 764/763 WELDM
761POLSH
761SPWLD
761ASY
761DBURR
761TWELD
761HSTUD/761PEM
761FORM
761PUNCH
771FSWHL
LASER761AMADA
770MODBO
812ASM
770PANG764BURNM
764SHR20
763BDSAW
763ACRO
763SHR16 763PRBRK
763DRLPR
764PSMA
X
Z
Y
764CDROB
764SUBMR764UNPUN
764BRAKE
764BEVLR
763MONRC 763
MON45
771SNDBL
![Page 10: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/10.jpg)
Flexible Machining Cell
7
6
5
1
4
23
9 8
10
12
11
7
6
5
1
4
23
9 8
10
12
11
![Page 11: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/11.jpg)
Finish Grinding Department
![Page 12: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/12.jpg)
Factory Layout Optimization at Ulven Forging
![Page 13: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/13.jpg)
Current State
![Page 14: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/14.jpg)
Future State
![Page 15: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/15.jpg)
Actions Taken
An additional processing area was created in the Drop Hammer building where cleaning,finishing,packaging and shipping were consolidated.
The 158 ton Trim Press was replaced by a 440 ton press that was positioned next to the 5000# Hammer. This eliminated the transportation of large forgings to a distant 350 ton Trim press. Also, a 350 kW induction heater and conveyor were purchased and co-located with this press to form an Upset Forging cell.
A new 2.5” Upsetter was purchased and positioned next to the 3000# Hammer to form an Upset Forging cell.
![Page 16: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/16.jpg)
Actions Taken (contd.)The 1.5” Upsetter was replaced with a faster machine and
positioned next to the 700 ton Press to form an Upset Forging cell.
A crane was installed over the 5000# Hammer to reduce piston change-out time, reduce die key tightening time and to facilitate product movement in the area.
A portable Marvel Hacksaw and 1.5” Bar Shear were acquired.
A CNC Mill was acquired and positioned next to the EDM machine to reduce vendor costs and lead times for die sinking.
![Page 17: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/17.jpg)
BenefitsApproximately 5% cost savings on annual sales of $ 6 million
WIP reductions were significant
Lead times quoted to customers were reduced
Throughput ($ales) increased
Since this company is a defense supplier, they were reluctant to release financial and delivery performance data that could be seen by their customers (Defense Logistics Agency and Department Of Defense)
![Page 18: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/18.jpg)
Press Setup Optimization at Hirschvogel
![Page 19: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/19.jpg)
Observe and Document the Press Setup
![Page 20: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/20.jpg)
Work Locations around the Press
![Page 21: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/21.jpg)
Sequence of Tasks in Press Setup
![Page 22: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/22.jpg)
Operator Motion Traffic around the Press
![Page 23: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/23.jpg)
16
1
79
17
8
15
14
6
22
12
10
11
5
New Workstation Layout for the Press
![Page 24: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/24.jpg)
Operator Motion in Previous Layout
![Page 25: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/25.jpg)
Operator Motion in New Layout
![Page 26: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/26.jpg)
Press Setup Time: Before vs. After
ActivitiesCurrent Process Redesigned Process Difference
No. Time % No. Time % No. TimeOperations 247 1:32:07 71% 235 1:28:53 79% -12 -0:03:14Inspections 32 0:11:28 9% 31 0:11:23 10% -1 -0:00:05Transport. 135 0:17:54 14% 92 0:12:45 11% -43 -0:05:09
Storage 0 0:00:00 0% 0 0:00:00 0% 0 0:00:00Delays 12 0:09:01 7% 0 0:00:00 0% -12 -0:09:01Total 426 2:10:30 100% 358 1:53:01 100% -68 -0:17:29
57:07
00:00
02:52
05:45
08:38
11:31
14:24
17:16
20:09Initial Time Taken Revised Time Taken
Tim
e (i
n m
in.)
![Page 27: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/27.jpg)
0 5 10 15 20 25 30 35 40 45 500
2,500
5,000
7,500
10,000
12,500
15,000
17,500
20,000
22,500
Number of Setups
Num
ber
of P
arts
Pro
duce
d
Potential Increase in Production = [EPT – (# of Setups * Time/Setup)] / Cycle Time per Part
Estimation of Increased Production
![Page 28: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/28.jpg)
0 5 10 15 20 25 30 35 40 45 50 $-
$50,000.00
$100,000.00
$150,000.00
$200,000.00
$250,000.00
$300,000.00
$350,000.00
Lowest Revenue per Part
Average Revenue per Part
Highest Revenue per Part
Number of Setups
Rev
enue
s fr
om E
xtra
Pro
duct
ion
Potential Increase in Revenue = [EPT – (# of Setups * Time/Setup) / Cycle Time per Part] * $/Part
Estimation of Increased $ales
![Page 29: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/29.jpg)
Part # Demand Price/ Part RevenueA1234 6,000 $ 15.55 $ 93,300.00 B3456 3,300 $ 7.00 $ 23,100.00 D6755 7,500 $ 12.50 $ 93,750.00
Extra Parts 16800 Extra Revenue $ 210,150.00
Category Initial Proposed % DecreaseSetup Time (min) 130.5 60.86 53.3%
Number of Activity Steps 426 358 16.0%
Distance travelled by Operator (steps) 1167 797 31.70%
Potential Increase in Revenue
Savings in Setup Time
Benefits
![Page 30: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/30.jpg)
Parallel Task Scheduling for Press Setup
1 Operator 113.02 min (Current State) 2 Operators 60.86 min (Parallel
Execution of Activities) 3 Operators 60.86 min (Unnecessary, 2
operators are OK)
Gantt Chart for Optimized 2-Person Setup ProcessOp #1
Op #2
![Page 31: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/31.jpg)
Optimization could Enhance Every Lean Tool
![Page 32: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/32.jpg)
Value Stream Mapping
Work Order Release
Multi-Period Slotting of
Orders
Demand Forecasting
Cell Design
Scheduling Material Handlers
Scheduling Supplier
DeliveriesWIP
Inventory Control
Work Center Scheduling
Warehouse Design
Current Project at Pompano Beach
![Page 33: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/33.jpg)
CURRENT STATE“4H” LEADERSHIP
• Walks the Gemba• Knowledgeable• Beyond TLSS• Competitive• Respects Employees• Efficient Fire Fighters (Risk Managers)• Change Managers• Invested in Talent and Technology
ENGAGED WORKFORCE
• Lean Thinkers• “Factory of One” Problem Solvers• Empowered• Multi-skilled• Team-oriented• IT Savvy• Collaborative
INDUSTRIAL ENGINEERING
• Work Measurements• Facility Layout• Ergonomics• Scheduling• Variety Control• Value Analysis/Value Engineering• DFMA• Flexible Mfg. Cells• Product/Process Standardization• Product Mix Rationalization• etc.
LEARNING ENTERPRISE
• Cafeteria Chats• E-newsletter• Wikis• Kaizens• Online Chat Groups• Idea Boards• Annual Conference• Resource Center - E-books - Case Studies - Videos - Online Apps - etc.
COMPETING THROUGH
INNOVATION
• Value Network Mapping• M3 Facilities• Flexible Focus (GT)• Product Mix Segmentation• ERP+FCS+MES• IT-enabled JIT Communications• Virtual Cells and Distributed Teams• Water Striders• Real-time Order Tracking• PLM+CAPP• Agile Suppliers
UNIVERSITY PARTNERSHIPS
• Co-Curricular Projects• Co-ops• Internships• Faculty R&D • Executives on Loan• Factories as “Test Beds”
FUTURE STATE
MORE….
A Toolbox for HMLV Manufacturers
![Page 34: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/34.jpg)
Acknowledgements
The PRO-FAST Program is enabled by the dedicated team of professionals representing the Defense Logistics Agency, Department of Defense and industry. These team mates are determined to ensure the Nation’s forging industry is positioned for the challenges of the 21st Century. Key team members include: R&D Enterprise Team (DLA J339), Logistics Research and Development Branch (DLA – DSCP), and the Forging Industry Association (FIA).
![Page 35: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/35.jpg)
Acknowledgements
Project Champion: Craig KaminskiProject Engineer: Haydn Garrett
Project Champion: Andrew UlvenProject Engineer: Jim Huiras
Project Champion: Joe KracheckProject Engineer: John Lucas
Project Champion: John WilburProject Engineers: Thomas Slauta
WWWEBER METALS, INC.ALUMINUM AND TITANIUM FORGINGS
Project Champion: Thomas StysProject Engineer: Jorge Alvarez
Project Champion: Kevin ShawProject Engineer: Greg Muniak
Project Champion: Dick JohnstonProject Engineer: Todd Sheppard
PFAST Development TeamDr. Rajiv RamnathDr. Rajiv Shivpuri
Dan Gearing
Jon TirpakRussell BeardVicky McKenzie
![Page 36: Optimizing High-Mix Low-Volume Operations Shahrukh A. Irani Department of Integrated Systems Engineering The Ohio State University Columbus, OH 43210 PHONE:](https://reader035.fdocuments.us/reader035/viewer/2022062712/56649c905503460f9494a075/html5/thumbnails/36.jpg)
Questions?