Operational Improvementsat the
Grant Town Power Plant
Presented By:Steve Friend
Sr. Plant EngineerEdison Mission O&M
2005 ARIPPA Technical Symposium
![Page 2: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/2.jpg)
![Page 3: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/3.jpg)
Improvements at the Grant Town Power Plant
• Fuel Handling and ProcessingRo-Pro FacilitySilt System
• Ash HandlingBottom Ash Screw CoolersBottom Ash Piping
• Limestone ProcessingDFM
• BoilersGrid NozzlesTube ErosionCyclonesNOx Control
• DCSFoxboro Migration
![Page 4: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/4.jpg)
Fuel Processing and Handling
• Addition of the Ro-Pro facility has added flexibility to the fuel production process and additional means for final product cost
• Removal of the wet circuit equipment from the original preparation plant eliminated excessive reject and reduced costs of product – dewatering chemicals and equipment no longer used
• Silt system installation and modifications have allowed facility to maximize amount of lowest cost fuel to be added into final fuel blend – higher silt percentage = minimum fuel costs
![Page 5: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/5.jpg)
Ro-Pro Fuel Processing Facility
![Page 6: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/6.jpg)
Ro-Pro Screener
![Page 7: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/7.jpg)
Silt Feed System
![Page 8: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/8.jpg)
Bottom Ash Handling Improvements
• Screw Cooler capacity was approximately 20% lower than design with a 6” Pitch Auger – required running the screw cooler at higher RPM for adequate bed level control
• 7” Pitch Auger allowed screws to be slowed down – reduced erosion rates on the cooler components
• Addition of rifle bars has helped to control trough erosion but has increased wear rate on the auger
• Application of weld overlays, wear strips, and thicker materials has helped control auger wear
![Page 9: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/9.jpg)
Bottom Ash Screw Cooler Troughwith Rifle Bars
![Page 10: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/10.jpg)
Bottom Ash Screw CoolerInlet Section of Trough
![Page 11: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/11.jpg)
Bottom Ash Piping Modifications
• Initial design was sweep elbows on both the primary and redundant pressurized bottom ash conveying systems
• Sweep elbows had very low mean time between failures due to erosion – on the order of a few weeks
• Reconfiguration of the system using blinded tees for the direction transitions has reduced maintenance costs.
• Effective pipe rotation program has helped to further reduce ash conveying system maintenance costs
![Page 12: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/12.jpg)
Bottom Ash Blinded Tees
![Page 13: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/13.jpg)
Limestone Handling System
• Williams Direct Fired Mill for processing limestone for injection into the CFBs
• Velocity Cone did not have any impact on final product size
• Optimization of air flow though the mill has helped to produce more ideally sized product
• Installation of VFD on the product cyclone rotary valve has helped to minimize transport line pluggage and system processing delays
![Page 14: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/14.jpg)
DFM
![Page 15: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/15.jpg)
Boiler Modifications
• Erosion Control
– Sootblower lane shielding
– Economizer hanger tube tube monitoring/shielding/replacement
– Flame Spray
– Pad Welding
– Refractory Extensions
– Stainless Steel Overlay
![Page 16: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/16.jpg)
Combustor Tube Erosion
![Page 17: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/17.jpg)
Refractory Extensions
![Page 18: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/18.jpg)
Combustor Tube Weld Overlay
![Page 19: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/19.jpg)
Boiler Modifications
• Arrowhead Nozzles
– Provide nominal improvement in limestone utilization
– Backsifting is a BIG problem
– Internal stand pipe erosion now becoming a major concern
– Increased maintenance costs offsetting any benefit realized in reduced limestone consumption
– Considering repair/replacement options
![Page 20: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/20.jpg)
Arrowhead Nozzles
![Page 21: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/21.jpg)
New Nozzle being Considered as Arrowhead Replacement
![Page 22: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/22.jpg)
Boiler Modifications
• Cyclones
– Segmented Vortex Finders
– Narrowing of cyclone inlet opening
– Design of vertical bullnose on the cyclone inlet to narrow the opening about 10%
– Narrowing of the opening has increased inlet velocity to >75 ft/sec
– Both changes had major impacts on limestone consumption – improvement of about 20% in total when paired with the DFM optimizations.
![Page 23: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/23.jpg)
Vortex Finder Deformation
![Page 24: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/24.jpg)
Segmented Vortex Finder
![Page 25: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/25.jpg)
Bullnose Modification to Narrow Cyclone Opening
![Page 26: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/26.jpg)
Ammonia Unloading/Storage
![Page 27: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/27.jpg)
Ammonia Injection Skid
![Page 28: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/28.jpg)
DCS Modifications
• Foxboro Migration Package
– Poor availability of Bailey replacement parts and support
– Electrolytic capacitor failures
– No changes to I/O wiring
– Low cost alternative to wholesale DCS replacement
![Page 29: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/29.jpg)
I/O Rack
![Page 30: Operational Improvements at the Grant Town Power Plant](https://reader036.fdocuments.us/reader036/viewer/2022062410/56815de1550346895dcc072c/html5/thumbnails/30.jpg)
DCS Processor Rack