Grant Offer Grant 50% up to a maximum of €2300 Or € 757/kWp Or kWp x €3,800 – €System cost whichever is the lowest.
Transcript of General Information EU Funded PV Grant Scheme Operational Programme I.
![Page 1: General Information EU Funded PV Grant Scheme Operational Programme I.](https://reader036.fdocuments.us/reader036/viewer/2022081517/5a4d1b037f8b9ab05998788e/html5/thumbnails/1.jpg)
General Information
EU Funded PV Grant Scheme
Operational Programme I
![Page 2: General Information EU Funded PV Grant Scheme Operational Programme I.](https://reader036.fdocuments.us/reader036/viewer/2022081517/5a4d1b037f8b9ab05998788e/html5/thumbnails/2.jpg)
Applications will be received from
13th July 2015@ MRA Office
0800hrs to 1530hrs, Monday to Fridayor
@ Ministry for Gozo 0800hrs to 1200hrs, Monday to Friday
Or by Post
![Page 3: General Information EU Funded PV Grant Scheme Operational Programme I.](https://reader036.fdocuments.us/reader036/viewer/2022081517/5a4d1b037f8b9ab05998788e/html5/thumbnails/3.jpg)
Grant Offer
Grant 50% up to a maximum of €2300Or
€ 757/kWpOr
kWp x €3,800 – €System costwhichever is the lowest.
![Page 4: General Information EU Funded PV Grant Scheme Operational Programme I.](https://reader036.fdocuments.us/reader036/viewer/2022081517/5a4d1b037f8b9ab05998788e/html5/thumbnails/4.jpg)
Feed-in-Tariff
FIT – 16c5/kWhr guaranteed for 6 years and marginal cost
thereafter (exported electricity)
Current cap of 1600kWhr/Kwp
![Page 5: General Information EU Funded PV Grant Scheme Operational Programme I.](https://reader036.fdocuments.us/reader036/viewer/2022081517/5a4d1b037f8b9ab05998788e/html5/thumbnails/5.jpg)
Number of Applications
This call will be capped at €5 million
First come first servedApplicant will receive grant if PV systems is
installed by not later thanend of October 2015