On receiving customer complaint or return component for repair process

16
On receiving customer complaint or return component for repair process, notification needs to be created by business wherein information below can be entered like- Cause Codes Defect Codes Different activities can be entered which needs to be preformed to repair the products Priority Incoming / Outgoing Calls etc. Warranty validation is carried out within notification if equipment master has got warranty dates & system correspondingly gives a message if the repair product is in warranty or not. Transaction Code – IW51 Notification- 300000104 Notification type needs to be entered (Z4) as indicated below- 3.2 Creation of Repair Sales Order Within notification, mandatory fields as indicated below can be entered and then repair order needs to be clicked within the action box on the right side-

Transcript of On receiving customer complaint or return component for repair process

Page 1: On receiving customer complaint or return component for repair process

On receiving customer complaint or return component for repair process, notification needs to be created by business wherein information below can be entered like-

Cause Codes Defect Codes Different activities can be entered which needs to be preformed to repair the products Priority Incoming / Outgoing Calls etc.

 Warranty validation is carried out within notification if equipment master has got warranty dates & system correspondingly gives a message if the repair product is in warranty or not. Transaction Code – IW51Notification- 300000104 Notification type needs to be entered (Z4) as indicated below-

3.2 Creation of Repair Sales Order Within notification, mandatory fields as indicated below can be entered and then repair order needs to be clicked within the action box on the right side- 

Page 2: On receiving customer complaint or return component for repair process

This will give the pop up wherein repair sales order type, service material needs to be entered, and save this as indicated below- 

 This generates the repair sales order & can be seen in the document flow of notification- 

Page 3: On receiving customer complaint or return component for repair process

 SO-109000054 We check this repair sales order in VA03 Transaction code, note the repair button at the bottom- 

 We can see in the repair tab there is one repair item we need to receive- 

Page 4: On receiving customer complaint or return component for repair process

 3.3 Return Delivery To receive the repair material, we create returns delivery using Transaction code VRRE, below details needs to be put- 

Page 5: On receiving customer complaint or return component for repair process

 Check the details in the returns delivery-

 Return Delivery - 7008500050  3.4 Goods Receipt against Return Delivery for Repaired Item Now, Goods receipt for the repair material needs to be done using VL02n transaction code as indicated- 

Page 6: On receiving customer complaint or return component for repair process

 Pl check the document flow for material document- 

 Check the movement type used for return material-

Page 7: On receiving customer complaint or return component for repair process

  Pl see above that this is non valuated material and there is no financial postings.  3.5 Service Order Creation from Repair Order Now we create the service order for this return material from sales order VA03 transaction, hit the proposal button below as indicated- 

Page 8: On receiving customer complaint or return component for repair process

 This calls for the task list (list of work centers maintained for the service material)-

 Confirm the availability control, save the Sales Order, which will create the service order in the background. To check the service order, hit on button below as indicated in VA03 Transaction code- 

Page 9: On receiving customer complaint or return component for repair process

 System would take you to IW33 transaction code where you get to see the service order created. Service Order – 4000084 is created. Service Order can be seen below in transaction IW33-

Page 10: On receiving customer complaint or return component for repair process

  3.6 Service Order Updation with Operations, Components & Settlement Rule of Cost Centre Now, based on the requirement to repair the returned product, put in the operations required- 

 Add on components can also be put in which would be required for the repairing of returned product- 

Page 11: On receiving customer complaint or return component for repair process

  We update the settlement rule-

 Cost Centre needs to be put for service / repair process; this is where cost of operations & components would be settlement- 

Page 12: On receiving customer complaint or return component for repair process

 3.7 Service Order Confirmation We come to IW42 transaction to confirm the operations and issue the components to service order as below 

 Save this. You can check in service order (IW33) to check the goods movement of components

Page 13: On receiving customer complaint or return component for repair process

 You get the material document. Pl check the movement type and accounting document- 

 Goods issue accounting entries are as below- 

Page 15: On receiving customer complaint or return component for repair process