Swaken Port
Receiving bitumen From Vessel
Receiving Pipeline At Allied Africa's Terminal
Receiving Pipeline
Storage Tanks (Total Capacity 2,500 M Tons)
T1= 2,,000 M TONT2= 500 M TON
Loading Rack
Weight Bridge
2No.Loading Arms
)2 (No. Boilers
Inlet Heating Valves Outlet Heating Valves
100 No. Of Bitu – trainers each of 20 M TON Capacity
+249 155 18 18 25 20 M TON
Bitumen Pumps + Mobile Crane
2 No. Pumps
Loading The Bitumen Into The Bitu-tainers
2 No. 200 KVA Generators + (SGM) Software
The Added Value Of Using Bulk
Packed Bitumen
Asphalt Plant
The use of Bulk Bitumen ensures a homogenous Source Of Bitumen
How Much Does It Cost ?What Is The Solution???
The Solution Is the Use Of Bulk bitumen …
Think Green When The Situation Is Black
The use of Bulk Bitumen Reduces the operation cost by eliminating the Waste in Barrels (5 – 10 %) .
The use of Bulk Bitumen Reduces the operation cost by eliminating the need of the loader
The use of Bulk Bitumen Reduces the operation cost by eliminating the casual labors
The use of Bulk Bitumen Eliminates the Fire Hazard In TheBoiler, Bitumen Tank, Gas oil Tank & The Asphalt Plant
The use of Bulk Bitumen Reduces the Operation Cost & Storage Area
The use of Bulk Bitumen Is more Saver To The Staff & Friendly To The Environment
Pollution