OM CIMA
-
Upload
nibraas-khan -
Category
Documents
-
view
12 -
download
0
description
Transcript of OM CIMA
![Page 1: OM CIMA](https://reader035.fdocuments.us/reader035/viewer/2022072008/55cf900c550346703ba2b515/html5/thumbnails/1.jpg)
P1
• Linear programming for situations involving multiple constraints.
7
7
8
E2
7
7
Operations
Management
• Solution by graphical methods and simultaneous equations of two variable problems, and the meaning of ‘optimal’ solutions. Operation
s Managem
ent
• Expected value tables and the value of perfect and imperfect information. • Decision trees for multi-stage decision problems.
Operations
Management
• Maximin, maximax and minimax regret criteria • Payoff tables.
• Definition of project attributes.
Operations
Management
• Time, cost and quality project objectives. • The purpose and activities associated with the key stages in the project lifecycle.• Examples of the role of project management methodologies in project control (e.g. PRINCE2, PMI).
• Key tools for project management, including work breakdown schedule (WBS), Gantt Charts, and Network analysis.
Operations
Management
• Scenario planning and buffering.
• The contribution of project management software.