OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office...

104
OUTLINE Office Practice 1

Transcript of OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office...

Page 1: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

OUTLINE

• Office Practice

1

Page 2: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

OFFICE PRACTICE

2

Page 3: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Deposited Plan

Section 410 of the National Land Code 1965 provides thedeposited plan that is a plan of the land shall be deposited if itis certified by the Director of Survey and Mapping as a validand properly plan for the land, with reference numberprovided by the State Director of Surveying and Mappingdated and kept in the State office.

According to Section 14 of the Land Surveyors Act 1958 (Act458), after survey fee deposited to the Board and the lotnumber applied by a licensed land surveyor from Departmentof Survey and Mapping, shall issue a lot after confirming thatpayment has been deposited with the Board.

3

Page 4: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Deposited Plan

After final survey, survey plan (e.g. certified plan) to besubmitted to the Department of Survey and Mapping,licensed land surveyor signed the certified plan shalldeposit the certified plan that together with field book,calculations sheet and survey data (in digital form) to theDepartment of Survey and Mapping within the time periodprescribed in the regulations. All documents shall, if theplan is approved by the Director General of Survey andMapping or other officer appointed by him, become theproperty of the Government and shall be filed as apermanent surveyed record.

4

Page 5: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Deposited Plan

If the work is not completed within the time period allottedin the regulation, the Board may instruct that the workundertaken by the Department of Survey and MappingMalaysia or other licensed land surveyors and survey feespaid in accordance with Section 28 of the Licensed LandSurveyor Regulations 2011.

5

Page 6: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Deposited Plan

Section 411 of the National Land Code 1965: Description of theland with reference to a deposited plan:

1) If:a) any land to be known in any written law or in any instrument,

notice or other documents published or made under,pursuant to or for the purposes of a written law; and

b) the exists of a deposited plan for land, it shall be sufficient ifthe land is known in the law, instruments, notices ordocuments with reference to the plan.

6

Page 7: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Deposited Plan

2) Subsection (1) of land known by reference to a depositedplan, the Minister (or an officer authorized by theMinister to act on his behalf for the purposes of thissubsection) may be ordered so many copies of the planas it deems appropriate shall be distributed to:

a) District Land office where the land is situated;b) Central registry of title to land in the State; andc) any officer and authorities as specified in the direction.

7

Page 8: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Deposited Plan

Section 412 of the National Land Code 1965: Copies ofdeposited plans.

For the purposes of this Chapter, every copy of the depositedplan shall:

a) issued in photography, photo-lithography or any mechanicalor other processes which in itself ensure the accuracy of thecopy;

b) made by or on behalf of the Director of Survey and Mapping,which was deposited in his office; and

c) certified by or on its behalf as a valid and original copy.

8

Page 9: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Deposited Plan

In the proceedings, any document purporting to be acopy of the deposited plan:

a) shall be presumed until the contrary is proved; and

b) while it considered the case, shall be received inevidence without further proof as a legitimate andcorrect plan for the land to which it refers.

9

Page 10: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Requisition Survey Plan

Requisition Survey Plan is a basic plan that came along withthe application to survey to State DSMM to begin withpreparing the field survey for surveyor. It should show theparticulars lot to be surveyed as well as other relevantinformation. The details contained in the Requisition SurveyPlan is district/county/town, scales, Standard SheetNumber, Location Plan, Figure of lot to be surveyed, areserve either rivers, roads and so on, the position of theold boundary mark, lot number for adjacent lot, area,bearing and distance.

10

Page 11: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Requisition Survey Plan

Requisition Survey Plan is an application form issued by theDistrict Land Office to DSMM to perform final survey asrequired under Section 79 (1) and 83 of the National LandCode 1965.

Section 79 (1) of the National Land Code 1965:“Where any approval of the State Authority to the alienation ofland under this Act relates to land which (under sub-section (2) ofsection 77) is required to be surveyed before it can be held underfinal title, it shall be given by reference to a plan and descriptionsufficient to enable the land and its boundaries to beprovisionally identified and ascertained pending the survey.”

11

Page 12: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Requisition Survey Plan

There are six types of requisition survey that is alienation ofGovernment Land, partition of Lot/Buildings, Amalgamationof Lot/Part and subdivision, and Surrender of Partial lot,acquisition of part of lot, and re-survey of lot.

12

Page 13: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Requisition Survey Plan

Requisition survey plan for approved land shall be providedsimultaneously with the issuance of qualified title. Draftsmanshall provide enough number of plans for the purpose ofapplication of Survey and Qualified Title. The following detailsmust be met:

i. The purpose of requisition survey and type of ownership,ii. Land area, bearing, distances and connection to boundaries

mark of the land to be surveyed,iii. Name, address and identification number landowner,iv. The State Executive Council approval, if required,v. Verification payment of survey fee, andvi. Reserved rivers, roads, buildings and other physical

characteristics . 13

Page 14: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Requisition Survey Plan

All query of requisition survey from DSMM shall beconveyed to the Chief Clerk through so that immediateaction can be taken. Solutions should be resolved and therequisition survey shall be sent back to the DSMM within aperiod of one month.

14

Page 15: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Requisition Survey Plan

District Land Office shall request DSMM separately forRequisition Survey involved with the difference in surveyunder section 83(3) of the National Land Code 1965.Reference from the State Director of Survey and Mapping toState Authority shall also be submitted simultaneously. Forpartial land affected by land acquisition, a separateRequisition Survey for the lots must be availablesimultaneously. For cases in which the Requisition Surveyapplication was made, then the original Requisition Surveyapplication shall be referred to DSMM.

15

Page 16: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Requisition Survey Plan

Besides the Requisition Survey application received fromthe District Land Office and the Land and Mines Office,DSMM also accept applications for conductingmeasurements from FELDA and JKPTG.

16

Page 17: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration and Management Survey files

Each Requisition Survey received should be registered intothe system according to categories such as survey for LandTitle, Strata Titles, Gazette and multi purpose. These dataare stored in the Registration Survey Database. This willallow the files supervised and monitored.

17

Page 18: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration File For Land Title Survey, Gazette and Multi Purpose

i. Registration begins when requisition survey for LandTitle Survey, Application for Gazette Survey andApplication for Multi Purpose Survey is received fromthe District Land Office or Land Related Agencies. Theregistration system is also capable of displaying spatialdata and file movement.

ii. Registration system can receive hardcopy application orDigital application for requisition survey.

18

Page 19: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration File For Land Title Survey, Gazette and Multi Purpose

iii. Hardcopy application for requisition survey:

a) Requisition Survey received must be checked and scannedbefore the job file is opened.

b) Deputy Director of Survey verify and register the job file.c) The system will generate the file number automatically.

Information to be included in the Survey Database File.d) Based on the information obtained from the Requisition

Survey, the system will generate lot numbers based on thetotal number of or Parcel.

e) All documents should be scanned according to requisitionsurvey and stored in Document Management Databaserefers to the registered job file number.

19

Page 20: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration File For Land Title Survey, Gazette and Multi Purpose

iv. Digital Requisition Survey:

a) Digital Requisition Survey received from District LandOffice in a digital format which consists of three ASCIIfiles:

• * .pul - related information such as parcel area.• * .pub - information related to the boundary line.• * .pud - supporting information such as type of landuse, name and address of the applicant etc.

20

Page 21: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration File For Land Title Survey, Gazette and Multi Purpose

b) Besides ASCII Requisition Survey is received, theappendices related to land application shall be attachedwith application digitized requisition survey files. Amongthe attachment are:

• Letter of Approval * .TIF• Letter of District Land Office * .TIF• Fee Exemption Certificate * .TIF• Various documents related to land application.

21

Page 22: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration File For Land Title Survey, Gazette and Multi Purpose

c) All documents and Digital Requisition Survey shall bedigital signed by PTG/PTD.

d) Information from *.pul, *.pub and *.pud will be includedin the Registered Survey File Database.

v. Addition or subtraction of lot numbers is not allowedafter the file is registered. Deputy Director of StateSurvey and Mapping will approve the lot number foreach file only. If necessary subtraction and addition of lotnumbers, new files need to be registered.

22

Page 23: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Pre-Computation Plan

Pre-computation plan defined under Section 5 of theNational Land Code 1965, as a pre-calculation plan means alayout plan with lots that shows the boundaries of theproposed new lots that are based on calculations fromexisting survey and other relevant data, in which the linearmisclosure is not less than a part in four thousand;

23

Page 24: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Pre-Computation Plan

Linear dispute mentioned earlier should be interpreted as arequirement minimum linear dispute for the preparation ofthe layout lot or proposed lots through pre-computationplan. Accordingly, in the original linear dispute of existinglot does not meet the requirements, re-survey need toincrease the level of lot linear dispute shall not be carriedout.

24

Page 25: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Pre-Computation Plan

Legal Requirements

Amendment of provisions on pre-computation plan includedin Section 137(1)(b) and 204D(1)(c) of the National Land Code1965, which came into force on 1 January 1993. Allapplications for subdivision of land and application ofsurrender and re-alienation in Form 9A and Form 12DNational Land Code 1965 should be accompanied by pre-computing plan.

Although not provided for in the National Land Code 1965,the preparation and submission of pre-computation plan asapplication plan for subdivision of land shall also be made.

25

Page 26: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Pre-Computation Plan

Purpose of Pre-computation Plan

Pre-computation Plan should be provided to facilitate and speedup the implementation of survey work where the boundaries tobe measured can be identified more accurately. Therefore anyproblems that may arise when a Land Surveyor carry out surveybased on survey that have not been completed will be reduced.Especially for subdivision applications and submissions andsurrender and re-alienation land in qualified title can be carriedout properly. Differences in position and area of the landbetween the approved and surveyed can be avoided.

26

Page 27: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Pre-Computation Plan

Preparation of Pre-Computation Plan

To meet the objectives mentioned above as well as therequirements of current legislation, all applications forsubdivision and surrender and re-alienation of land shall beaccompanied by a pre-computation plan as a plan.

With this amendment, all applications for subdivision of landand surrender and re-alienation to District Land Office forapproval must be accompanied by a pre-computation planshowing details of land lots. Pre-computation Plan should alsobe used to apply lot numbers from DSMM.

27

Page 28: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Pre-Computation Plan

Pre-computation Plan Should contain:

a. Appropriate Title.

b. Location plan drawn to scale showing, scale and northpointer also information that can help identify thelocation and boundaries of lots, abuttal and nearby lotnumbers, road name and others.

28

Page 29: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Pre-Computation Plan

c) Lot plans or existing lots involved with the originalproposed plan drawn accordance with the appropriatescale and based on survey that will be carried out:

i. Dimensions and bearing as well as area for lot or lotsand proposed lots.

ii. Width of roads/paths, river and other.iii. North pointer and scale.iv. Other information as may be necessary.

29

Page 30: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Pre-Computation Plan

v. Additional information:

• Guide and reminder.• Numbers Cadastral Map.• Validation from Local Authorities.• Confirmation technical department from Planning Authority.• Confirmation from Planning Authority.• Verification from District Land Office or State Land and Mines

Office and the State Authority.• Confirmation from land owner.• Confirmation from technical site of DSMM Licensed Land

Surveyors.• Confirmation of the Participant/Licensed Land Surveyors.

30

Page 31: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Pre-Computation Plan

Pre-computation plan should be provided by the Licensed LandSurveyor to ensure that the plan is accurate as required insection 5 of the National Land Code 1965. Perhaps there areothers can provide pre-computation plan but they do not subjectto any written law as a Licensed Land Surveyor subject to theLicensed Land Surveyors Act 1958 (Act 458) and regulations.Furthermore, Section 13 Licensed Land Surveyors Act andSection 400A of the National Land Code 1965 say only LicensedLand Surveyors and Survey Officer appointed under the NationalLand Code 1965 can perform title surveys. Preparation of pre-computation plan is part of title surveys based on the definitionin section 2 of Licensed Land Surveyors Act.

31

Page 32: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Pre-Computation Plan

In line with the requirement for subdivision, surrender andre-alienation of land under the National Land Code 1965,the approval of such applications must follow the pre-computation plan. The objective is to avoid problems whereoverlapping land under qualified title.

32

Page 33: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Pre-Computation Plan

Land Administrator shall ensure that the pre-computationplan accompanying with form 9A and 12D National LandCode 1965, a plan prepared by a Licensed Land Surveyorsand approval of subdivision of land and surrender and re-alienation should also be guided by the pre-computationplan provided by Licensed Land Surveyors.

33

Page 34: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Pre-Computation Plan

According to Section 137 the National Land Code 1965, everyapplication for subdivision of land to be distributed to Landand Mines Office for approval must meet severalrequirements:

i. Adequate fee.ii. Pre-computation plan that shows the subdivision. This

subdivision does not conflict with any planning plan and wasaccompanied by a letter of consent from related parties.

iii. Form for subdivision of land (Form 9A).

With the pre-computation plan, the difference in area,bearing, distance and position of the lot will not arise again.

34

Page 35: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Pre-Computation Plan

In pre-computation plan, there are several features thatcontrol inconsistencies in each country. For example, eachpre-computation plan bearing, distance, area, road reserve,open spaces and etc. Each lot is calculated as accuracy tothe accuracy of the class according to a specific title. Eachsubdivided lot area is clearly indicated. There are also keyindicators and scale used in pre-computation plan andlocation plan of lot.

35

Page 36: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Pre-Computation Plan

According to the old method of using only the layout planbefore the amendment in 1992, the subdivision plan onlyavailable in scaled values and area not shown in nearestdecimal place. No precision bearings and distances value. Thishas led to differences on the measured lot area and resultedshifted in lot and reserves .

With the use of pre-computation plan in Section 137 of theNational Land Code 1965 (Amendment) 1992 (A832), nolonger have different ways of implementation. Everythingaccording to pre-computation plan provided by the LicensedLand Surveyor in advance.

36

Page 37: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration Of Survey File For Pre-Computation Plan By Licensed

Land Surveyori. The registration file of file began when Pre-

computation Plan is accepted for application of lotnumber. This registration system capable of displayingspatial registry data and file movement.

ii. Pre-Computation Plan shall take into account thefollowing:

a) For areas with full NDCDB, Licensed Land Surveyor needto send the following files:* .pul - information such as area.* .pub - information such as boundary lines.* .pud - supporting information such as land use

37

Page 38: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration Of Survey File For Pre-Computation Plan By Licensed

Land Surveyorb) For Pre-computation Plan prepared without using NDCDB,

Pre-computation Plan shall be prepared based on thecoordinates GDM2000 along with Cadastral Reference Mark.Information in Pre-Computation Plan shall contain files Pre-Computation Plan in ASCII as follows:

*.pul - information such as area.*.pub - information such as boundary lines.*.pud - supporting information such as land use, name and

address of the applicant etc.*.crm - file information and location*.pot – GNSS coordinate information

38

Page 39: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Registration Of Survey File For Pre-Computation Plan By Licensed

Land Surveyori. Licensed Land Surveyor can send Pre-Computation Plan

online or through counters in DSMM.

ii. Pre-computation plan in State Cassini shall be reprocessed tomeet NDCDB accuracy. Referred to the Circular DirectorGeneral 3/2009.

iii. For the purposes of this conversion, Section Geodesy DSMMprovides services of direct conversion of States Cassinicoordinates to coordinate GDM2000 and provide thenecessary parameters for conversion purpose.

39

Page 40: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Quality Checking Process

Adjustment on observation data by traverse Method (16 ASCII)

Adjustment process on observed data is only allowed toregistered users with DSMM online.

Mandatory digital files needed by the system for adjusting theobserved data as follows:

- Field book (*.fbk)- Geographical information (*.coo)- Traverses (*.tps)- Solar observation (*.sob) (Optional)

40

Page 41: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Quality Checking Process

However, other digital files should be forwarded togetherfor the purpose of data lodgement though the file contentno info (NULL), namely:

41

- corrections (*.cor)- bearing close statement (*.bcs)- area comparison (*.acs)- deduced field data (*.ncp)- fahrasat (*.fah)- EDM test (*.edm)

- topography (*.tpo)- job details (*.job)- lot details (*.lot)- bearing, distance & coordinates (*.bdy)- old value (*.po)- base line (*.bln)

Page 42: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Quality Checking Process

Adjustment on observation data by Full GNSS Methods

Mandatory digital files needed by the system for adjustingthe observed data as follows:

- Cadastral Reference Mark (*.crm)- CRM Point (*.pot)- Checkroll (*.crd)- Dairy (*.dry)- Fahrasat (*.Fah)- Traverses (*.tps)

42

Page 43: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Quality Checking Process

However, other digital files should be forwarded togetherfor the purpose of data lodgement though the file contentno info (NULL), namely:

43

- field book (*.fbk)- coordinates information (*.coo)- solar observation (*.sob) (Jika ada)- corrections (*.cor)- bearing close statement (*.bcs)- area comparison (*.acs)- deduced field data (*.ncp)

- EDM test (*.edm)- topography (*.tpo)- job details (*.job)- lot details (*.lot)- bearing, distance & coordinates (*.bdy)- old value (*.po)- base line (*.bln)

Page 44: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Quality Checking Process

Adjustment on observation data by Combined Data GNSS andTraverses Method

Mandatory digital files needed by the system for adjusting theobserved data as follows:- Cadastral Reference Mark (* .crm)- CRM Point (* .pot)- Checkroll (* .crd)- Dairy (* .dry)- Fahrasat (* P.Fah)- Field book (* .fbk)- Geographical information (* .coo)- Traverses (* .tps)- Solar observation (* .sob) (Optional) 44

Page 45: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Quality Checking Process

However, other digital files should be forwarded togetherfor the purpose of data lodgement though the file contentno info (NULL), namely:

45

- corrections (*.cor)- bearing close statement (*.bcs)- area comparison (*.acs)- deduced field data (*.ncp)- fahrasat (*.fah)- EDM test (*.edm)

- topography (*.tpo)- job details (*.job)- lot details (*.lot)- bearing, distance & coordinates (*.bdy)- old value (*.po)- base line (*.bln)

Page 46: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Certified Plan (CP)

Certified Plan is the end product of cadastral survey reflectthe actual boundary on the ground (in relative terms)according to the format, media and scale set by DSMM forthe purpose of preparing final title and others. CertifiedPlan will be generated by DSMM or Licensed LandSurveyors.

46

Page 47: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Certified Plan

i. Certified Plan shall be prepared for land title survey, strata stratumtitle survey. However, the Certified Plan need not be provided forre-survey unless:

a) Survey involves refixation or replacement of boundary marks;b) Survey involves upgrades. In this case, the re-survey in accordance

with the provisions of circular to the existing lot that formerlywere surveyed using second class and below is considered asupgrades;

c) space on the existing Certified Plan insufficient to includeinformation according to Paragraph 44, circular Director general6/2009; and

d) involves a existing lot why share natural boundaries in accordancewith Paragraph 28(4), circular Director general 6/2009.

47

Page 48: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Certified Plan

ii. Certified Plan shall be prepared based on the coordinatevalues generated from NDCDB.

iii. Certified Plans must be drawn from existing survey recordsin cases where certified plans can not be detected orbecause their physical condition can not be used asParagraph 42(5), circular Director general 6/2009.

iv. For any survey carried out in stages, Certified Plan shall beprepared in accordance with Paragraph 42(6), circularDirector general 6/2009 and other procedures prescribed bythe Department.

48

Page 49: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Certified Plan

v. Numbering of Certified Plan shall be managed in accordanceas in Paragraph 60, circular Director general 6/2009.

vi. For Certified Plan that composition of NDCDB, theDepartment will use the digital pre-computation plan ordigitized requisition survey received to generate theCertified Plan.

vii. Certified Plan used either A2 or A3 size.

viii. All offsets information should be shown in the Certified Planand generated from GLMS layer.

49

Page 50: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Data Shown In Certified Plan

i. All necessary information shown in Certified Plan shall begenerated from NDCDB as follows:

a. boundary marks; and boundary marks with number shouldbe shown in circle, while terms and symbols shall be inaccordance with the procedures prescribed by theDepartment.

b. lot number;c. lot area as prescribed by Paragraph 38(3), circular Director

general 6/2009;d. abuttal and lot numbers and numbers of Certified Plan

adjacent lots;

50

Page 51: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Data Shown In Certified Plan

e) administrative boundaries, if any;f) offsets related to roads, buildings and hydro if applicable

from GLMS layer;g) coordinate values for two extreme corner lot to the nearest

0,001 meters;h) bearing and distance to be generated in the form of

tabulation and shown to 10“ for bearing and the nearest0.001 meter for distance; and

i) for information that can not be shown due to insufficientspace, use diagram or diagrams without scale is allowed.

51

Page 52: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Data Shown In Certified Plan

ii. Column text for each certified plan shall indicate:

a) Indicators north;b) Title information, as follows:

• name of State;• name of district;• name of county or town or country;• section number (where applicable);• lot number;• scale;• numbers certified plan earlier for subdivision;• original lot number and Certified Plan number in

subdivision or partition or other;• history of lot and related notes, if any. 52

Page 53: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Data Shown In Certified Plan

c. Survey file number;

d. District Land Office file number;

e. Standard Sheet Number;

f. Text of " Diluluskan " and the name of the State Director ofSurvey and Mapping;

g. Number Certified Plan; and

h. 2D Barcode.

53

Page 54: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Certificate on Certified Plan

For Certified Plan that generated for licensed land surveyor job,certificate must be presented in certified plan as follows:

“Saya ………………………………………………. seorangJuruukur Tanah yang dilesenkan di bawah Akta JuruukurTanah Berlesen 1958 (Akta 458), memperakui bahawapengukuran telah dijalankan dan ditanda di atas tanah oleh sayaatau di bawah arahan saya sendiri secara langsung di lapanganpada ..…… haribulan ………………….., 20 …………. semata-mata mengikut Peraturan–peraturan Juruukur Tanah Berlesen.Bahawa saya bertanggungjawab sepenuhnya ke atas salahbetulnya ukuran ini.…………………………….....................................................Juruukur Tanah Yang Dilesenkan di bawah Akta 458”

54

Page 55: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

55

Page 56: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Amendment On Survey Plan

i. Accordance with the provisions of section 396a of theNational Land Code 1965, the Director of Survey andMapping Affairs is responsible for amending andcorrecting mistakes or add data left on the CertifiedPlan which was approved in the followingcircumstances:

a) errors or omissions in the Certified Plan; orb) the change of administrative boundaries; orc) alienated land stop to be part of the town or country or

district.

56

Page 57: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Amendment On Survey Plan

ii. Correction procedure:

a) State Director of Survey and Mapping shall investigateand ensure that the mistakes or missed data isauthentic;

b) If authentic, updates NDCDB shall be made prior to theattributes that need to be amended or madecorrections and should be verified digital signature bythe State Director of Survey and Mapping.

57

Page 58: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Amendment On Survey Plan

c) Any amendments or corrections to be recorded indigital and amendment or correction on certified plangenerated are shown in red as follows:

• erroneously data shall be deleted and corrected;• data left to be added; and• correction or addition shall be digital signed by the State

Director of Survey and Mapping.

58

Page 59: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Amendment On Survey Plan

d) If many correction or amendment needs to be done,Certified Plan shall be regenerated by supplying newCertified Plan number, while the existing Certified Planis cancelled.

e) State Director of Survey and Mapping shall notify theRegistrar or the Land Administrator on any necessaryamendments to the plan title as a result of changes oradditional information to the certified plan.

59

Page 60: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Certified Plan For Re-Survey

If the certified plan need not be provided for the re-survey,the annotation shall be provided in the existing CertifiedPlan and signed by the State Director of Survey andMapping as below:

“Sempadan lot ……......... telah disahkan pada…………………..dalam fail…………………….

Pengarah Ukur dan Pemetaan”

60

Page 61: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Compilation Of Certified Plan

If the Certified Plan was drawn with all the lotboundaries values prepared according to existingcertified plans, the statement “Pelan disusun daripadaP.A. ...........” Shall be provided on a Certified Plan.

If the certified plan has been drawn in partial of theboundaries values prepared according to existingcertified plans, the statement “Diukur oleh….........dandisusun sebahagiannya daripada P.A. ….............” Shall beprovided on a Certified Plan.

61

Page 62: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Gazetted Plans

Requirements in gazetted plan under Section 62, 63 and 64of the National Land Code 1965. Section 433 National LandCode 1965 is the requirement of legal and specific notices.The plan has four categories: declarations on amendment,additions, production, and repeal. Application for gazettedplan requires an application letter, Form 126 Amendment1/86 (Requisition Survey) with Requisition Plan,Government Meeting Minutes (MMK) and the relatedapproval letter from MMK in respect of Survey Fee chargeunder Section 4 (2) of the National Land Code (Fee Survey),1965 (LN 486) for free.

62

Page 63: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Gazetted Plan

The gazetted plan contains gazette title, north point, scale,standard sheet number, departmental file number,administrative boundaries, abuttal, nearby lot numbers andCertified Plan number, area, number PT/HS(M)/lot, name ofchecker, name of the State Director of Survey and Mappingand gazetted plan number.

63

Page 64: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Gazetted Plan

The preparation of gazetted plan as follows:

a) Processing of the draft gazette plan and distribute forapproval

b) Processing gazette plan after receiving the approveddraft gazette plan for verification of State Director ofSurvey and Mapping.

c) distribute gazetted plans to gazette after the StateDirector of Survey and Mapping. (6 copies or 2 copies ofthe Gazette Plan and 2 copies of Certified Plan.

64

Page 65: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Gazetted Plan

Besides providing PA and PA(B), DSMM also provides GazettedPlan according to the existing laws, which include:

i. For public under Section 62 of the National Land Code 1965;ii. Forest reserve under Section 7 of the National Forestry Act

1984 (Act 313);iii. Malay Reserve under Malay Reservation Enactment;iv. Areas and Protected Places under Region and Protected

Places Act, 1959 (Act 298);v. Group settlement areas under Sections 4 and 5 of the Land

(Group Settlement Areas) Act 1960 (Act 530);vi. Election area under Section 7 of the Electoral Act 1958.

65

Page 66: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Gazetted Plan

Draft Gazette (DW) generated by the system based onthe requisition for gazette plan be certified in advance bythe applicant or land related agency before gazetted planprepared.

Each draft Gazette and the Gazetted Plan given a uniqueserial number, which is generated by the system.

66

Page 67: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Gazetted Plan

The information contained in draft gazette and gazettedplan is as information for the preparation of plans for landtitled, except:

i. Serial number of the Draft Gazette and the GazettedPlan;

ii. Plot numbers for the Draft Gazette and Gazetted Plan ;iii. Certificate of Gazetted plan;iv. The extract attributes from NDCDB if applicable; andv. Additional attributes that are not contained in NDCDB

but necessary in applications for gazette and others.

67

Page 68: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

68

Page 69: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

69

Page 70: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

70

Page 71: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

71

Page 72: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

72

Page 73: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

73

Page 74: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

74

Page 75: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

75

Page 76: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Certified Plan For Mining Lease

Before Certified Plan for Mining Leases can be prepared,Mining Certificate shall be prepared based NDCDB forapproval of the State Authority.

For work done by Licensed Land Surveyor, the pre-computation plan submitted to DSMM shall be based onNDCDB and generated for the purpose of Lot Plan for theMining Certificate.

76

Page 77: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Certified Plan For Mining Lease

Methods and survey process for preparing of MiningCertificate is same as the survey for the purpose of landtitle

Certified Plan for Mining Lease can only be provided afterMining Certificate approved by the State Authority.

Certified Plan for Mining Lease Format and preparationprocedure is as Certified Plan for land titles.

77

Page 78: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Plan Others

Plan others are drawn from title plan which includinggazette plan. Examples of such survey at the crime scene,racing sports, contour, offshore. All sample survey requiresPlans Others when requested by departments orgovernment agencies.

78

Page 79: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Plan Others

Title on the Plan Others should be clearly stated thepurpose of the plan is drawn. Other information that needsto be shown is scale, county, district and reference files.Due to plan others are not deposited plans as providedunder Section 410 of the National Land Code 1965, thenthis plan does not need to be certified or approved by theState Director of Survey and Mapping.

79

Page 80: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

80

Page 81: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Multi Purpose Plan

Multi Purpose Plan is provided to illustrate the positionof a plot of various survey work made or received by theDepartment from time to time.

Multi Purpose plan shall be prepared accordingly exceptthat involve survey in the field.

81

Page 82: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Multi Purpose Plan

Any amendment to Multi Purpose Plan as amendmentprocedure in certified plan.

Information contained in the Multi Purpose Plan is as inCertified Plan with additional information as follows:

i. Purpose of surveyii. Multi Purpose Plan Serial Number

82

Page 83: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Land Ownership Plan

Land ownership plan is issued in compliance with theprovisions of section 86 (c) and 87 (c) of the National LandCode 1965, strata titles plan issued in accordance withsection 16(2) (b) of the Strata Titles Act 1985 and alsomining leases issued in accordance section 27 of the Mining(Mining Enactment) (Cap147).

83

Page 84: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Land Ownership Plan

Confirmation of land ownership plans, strata title andmining lease are made based on section 3 of the Plan andLand Document and Mining (Photographic Copies) Act 1950(Revised 1980). The plan is taken either partially or entiretyfrom the existing certified plan. Authentication of the planphotograph taken for part and whole of the existing planshould be created using a separate certification statementand ensure that is legally. Confirmation is made using acertificate that such statements are stated in paragraph 3 ofDirector General Circular 1/1985.

84

Page 85: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Amendment Of Land Ownership Plan

Director of Survey and Mapping shall notify the Registrar orthe Land Administrator on any amendments to the plantitle as a result of changes in or additional information tothe Certified plan .

85

Page 86: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Duplicate Title

Documents of title to the replacement shall be provided inaccordance with the provisions of section 166 of the NationalLand Code 1965.

Before the replacement of title documents provided, Directorof Survey and Mapping shall ensure that the Registrar or theLand Administrator has provided sufficient evidence that theoriginal title documents:

i. cancelled;ii. disappear;iii. destroyed in whole or in part; oriv. Fully use

86

Page 87: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Verification Copies Of Partial Photographic Plan

If it involves a small lot, partial copy of the photograph topartly certified plan shall be made. Appropriate methodsfor providing certificate shall be determined for example byproviding frames that contain separate certificatestatements to use when taking a copy of the plan. This willavoid short cuts and signature made on each copy of theplan. A certificate shall be made and contain the followingstatement:

87

Page 88: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Verification Copies Of Partial Photographic Plan

"Adalah diakui mengikut seksyen 3 dalam Akta Pelan danDokumen Tanah dan Lombong (Salinan Fotograf) 1950(Semakan 1980), bahawa ini ialah salinan pelan yang betullagi benar yang telah dibuat pada ......... bagi lot ..… didalam .......... (contoh: Mukim/Bandar/Pekan dsbnya)………… (contoh: Daerah/Jajahan) seperti ditunjuk di ataspelan……………"

Signature of the State Director of Survey and Mapping orrepresentative

88

Page 89: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Verification Copies Of Whole Photographic Plan

If it involves a large lot that can not fit into the frame, acopy of the photograph of the overall certified plan and thecertified strata plan should be made. Information such aslot number, district, town and etc does not need to bespecified in the certificate because the information isshown on the copy of the plan when a copy of the entireplan is taken. A certificate shall be made and contain thefollowing statement:

89

Page 90: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Verification Copies Of Whole Photographic Plan

"Adalah diakui mengikut seksyen 3 dalam Akta Pelan danDokumen Tanah dan Lombong (Salinan Fotograf) 1950(Semakan 1980), bahawa ini ialah salinan pelan .................yang betul lagi benar yang telah dibuat pada........................ "

Signature of the State Director of Survey and Mapping orrepresentative

90

Page 91: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Digital Land Title Plan (B1 TIFF)

Digital land title plan by DSMM is based on the provisionsof paragraph 5(1), Table 14 (Section 5A), the National LandCode 1965. According to the existing practice, DSMMprovide two copies of final title plan based on Certified Planfor the related lot. Copy of the land title pan will becertified by the State Director of Survey and Mapping or hisrepresentative to meet the requirements of Section 3 of theAct, Planning, Lands and Mines Documents (PhotographicCopies-Revised 1980) and the Director General Circular1/1998.

91

Page 92: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Digital Land Title Plan (B1 TIFF)

This module allows the land title Plan prepared in Tiffformat and is designed according to the requirements inForm B1 as in the Computerised Land Registration System(CLRS). Land title plan is then sent to the State landoffice/land and mines office online. Module B1 Tiff usingdata from image system and digital cadastre database forpreparation of digitized land title.

92

Page 93: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Digital Land Title Plan (B1 TIFF)

In line with the ICT, DSMM developed an applications inpreparing digital land titles (B1 Tiff). This module allows theland title Plan in Tiff format and is designed according toForm B1 in the Computerised Land Registration System(CLRS). Land title plan then sent to the District Land Officeor State Land And Mines Office in softcopy format online.

93

Page 94: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Digital Land Title Plan (B1 TIFF)

Module B1 Tiff using data from Document ImageManagement System (SPID) and the National DigitalCadastral Database (NDCDB). To facilitate the provision ofdigital land title plan (B1 Tiff) is implemented, a guidelinehas been prepared to explain the procedures.

94

Page 95: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Digital Land Title Plan (B1 TIFF)

Module B1 Tiff should be implemented by all State DSMMfor the preparation of all types of titles either normal orredraft. To ensure this module runs smoothly, certified planof related lots together with NDCDB and SPID should beupdated first..

95

Page 96: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Of Digital Land Title Plan (B1 TIFF)

If the frame for B1 Tiff format can not cope with graphicdisplay for the entire lot or lots which have many certifiedplans, follow the requirement from Director GeneralCircular No. 1/1985 and 1/1998.

96

Page 97: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Work Flow of B1 TIFF

Preparation work flow of B1 Tiff as follows:

a) Action by Head of Registration and Records Uniti. Received instruction to prepare land title plan.ii. Enter the number of Certified Plan.iii. Provide basic information of NDCDB and SPID Generate

basic data using B1 Data Creator Module.iv. Identify Processor to process B1 tiff Plan.v. Minutes to the processor for generating B1 Tiff Plan.

97

Page 98: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Work Flow of B1 TIFF

b) Action by processor

i. Received instruction from unit head and ensure basic dataexists in the folder certified plan (NetB1 PreparationModule).

ii. Create register process and transparent Certified Plans in tiffusing NDCDB.

iii. Use NetB1 Preparation Module to generate B1 tiff Plan foreach lot.

iv. Prepare *.tiff format plan for related lots according to scale.v. Minutes and distribute files through eSRS to Registration

and Records Unit.

98

Page 99: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Work Flow of B1 TIFF

c) Action by Head of Registration and Records Unit

i. Collect Certified Plans folder in B1 tiff.ii. Prepare PA_ List.iii. Use district sorter to receive survey file and make sure all

the information was generated.iv. Isolate B1 tiff according to district.v. Prepare Land Registry file.vi. Sent online to District Land Office or State Land and Mines

Office.vii. Check the storage media to ensure that the information in

the back-up is complete.

99

Page 100: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Preparation Work Flow of B1 TIFF

viii. Prepare the following items to be forwarded to State Landand Mines Office/District Land Office:

•B1 tiff online•Statement of Wages of Survey fee (if)•Covering letter to the State Land and Mines Office/District LandOffice.•Acknowledgement.ix. Minutes and distribute files to unit head for further action.

d) Deputy Director of Survey minutes and distribute files toRegistration and Records Survey unit to measure thetransmission of documents to District Land and Mines/ StateLand and Mines Office.

100

Page 101: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Digital Signatures

In eKadaster, all data and plans are generated in digitalform. Sending, receiving, processing and generation ofsurvey results is online.

To ensure credibility and accountability as well as thesurvey data and plans that are generated, the data and planmust be digital signed using Public Key Infrastructure (PKI).

101

Page 102: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Digital Signatures

Only Trusted Certification Authority authorized underMalaysian Communications and Multimedia Commission Act562, Digital Signature Act 1997 can be used for digital signatures.

It is the responsibility of all and be sure that all the documentsand plans are in place before making the digital signature.

All information such as user ID or password associated withPKI shall be maintained and kept by the parties involved with thesecret and be careful that PKI is not misused by unscrupulouspeople.

102

Page 103: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

Digital signatures

Two (2) methods for digital signature as follows:i. Onlineii. Offline

For digital signature online, the Director of Survey andMapping and Licensed Land Surveyor will implement it using aportal which has been developed by the Department. Whereasfor offline digital signature will be done locally on each computerthrough software developed by the Department.

103

Page 104: OfficePractice - Universiti Teknologi Malaysia · Requisition Survey Plan District Land Office shall request DSMM separately for Requisition Survey involved with the difference in

T H A N K YO U

104