NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study...

20
NYVT BiState Intercity Passenger Rail Study House Transportation Rail Study House Transportation Committee Costa Pappis, AICP February 19, 2014

Transcript of NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study...

Page 1: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

NY‐VT Bi‐State Intercity Passenger 

Rail Study

House Transportation

Rail Study

House Transportation 

Committee

Costa Pappis, AICPFebruary 19, 2014

Page 2: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

• FRA‐funded study for project to feed intoFRA funded study for project to feed into pipeline of future High‐Speed and Intercity Passenger Rail Program (HSIPR) projectsPassenger Rail Program (HSIPR) projects.

• Undertaken jointly with the New York State Department of Transportation.

• Purpose is to provide intercity passenger railPurpose is to provide intercity passenger rail service to unserved and underserved areas in western Vermont and east‐central NYwestern Vermont and east central NY.

2

Page 3: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

• Project Administrator – VTransProject Administrator  VTrans

• Project Management Team (PMT)VT R t ti– VTrans Representatives  

– NYSDOT Representatives 

– Rutland Regional Planning Commission 

– Bennington County Regional Commission 

3

Page 4: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

• ConsultantsConsultants – VHB: Planning, Design

HNTB: Railroad Infrastructure Engineering– HNTB: Railroad Infrastructure Engineering

– STV: Maintenance Facilities; Safety & Security, Environmental JusticeEnvironmental Justice

– HMMH: Noise and Vibration

FHI: Public Outreach– FHI: Public Outreach

– Gallop: Ridership & Revenue Estimates

4

Page 5: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Multiple Railroads in New York

5

Page 6: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning StudyRange of Alternatives

Evaluation MethodologyEvaluation Methodology

Tier One Screening• Tier One Screening Qualitative Criteria

P iti /N ti /N t l i

Tier TwoScreening

Positive/Negative/Neutral scoring

Two best alternatives progress

g

• Tier Two Screening Qualitative and quantitative criteria

Preferred Alternative

Scoring range: ‐2, ‐1, 0, +1, +2

Weighting of criteria

6

Preferred Alternative

Page 7: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Alternative 2, Loop ServiceAlternative 1, No-Build

No Project

7

Page 8: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Alternative 3, New Service to SW Vermont –Terminus in Manchester

Alternative 4, New Service to SW Vermont –Terminus in Rutland

8

Page 9: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Alternative 5, Reroute Ethan Allen Service Alternative 6, Split Shuttle Service

9

Page 10: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Phase II Alternatives Analysis

• Four categories were identified for use in evaluating the alternatives: 1. Rail Access and Mobility ‐ access to key destinations, 

travel time savings, adequate/appropriate frequency and routingrouting

2. Transportation Efficiencies ‐ intermodal connections, costs, impacts to existing rail operationscosts, impacts to existing rail operations

3. Economic/Sustainable Development – public benefits, capital and operating costs

4. Environmental Quality ‐ environmental benefits vs. impacts 10

Page 11: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

New Service Along the Western Corridor Reroute Existing Ethan Allen

11

Page 12: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

12

Page 13: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

13

Page 14: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

14

Page 15: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Cost estimates developed for discrete segments to 

allow for phased l f d dimplementation if needed

15

Page 16: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Proposed Implementation Schedule

16

Page 17: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Alternative 1: Cost-sharing NY-VT split operating subsidy for both trains based on the cost-g p p g ysharing methodology currently in use for the Ethan Allen Express.

Alternative 2: VT pays the operating subsidy for the re-routed service.

17

Page 18: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Implementation ChallengesImplementation Challenges

S f di l il bl l1. No HSIPR funding currently available – only realistic funding source for a project of this isize.

2. PRIIA s.209 – Significant increases state funding needed for operations.  

3. Railroad and political interest in NY – unclear pon the priority of this project. 

18

Page 19: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Next StepsNext Steps

d f i l i l i k1. Need for Legislative Delegations to work NY counterparts to secure commitments (joint 

li i hi f d )grant application, matching funds).

2. Need for rail advocacy organizations to work with railroads (not all railroads excited about passenger rail). 

19

Page 20: NY VT Bi State Intercity Passenger RailStudy · 19/2/2014  · Track 3 Planning Study Implementation Challenges 1. No HSIPR fdifunding currently avail blilable – only realistic

Track 3 Planning Study

Questions / Comments?Questions / Comments?

C P iCosta PappisVermont Agency of [email protected]

http://www.ny-vt-passengerrail.org/documents.html

20